NPDES Noncompliance Notification:On 911121,water Discharged from Oil/Water Separator Discharge Piping.Caused by Excavation Activity.Adjacent Potential Joint Leak on Piping Unearthed & Hot Patch Applied
ML18096A405
Person / Time
Site: Salem  PSEG icon.png
Issue date: 12/20/1991
From: Swanson R
Public Service Enterprise Group
To:
NEW JERSEY, STATE OF
References
NLR-E91307, NUDOCS 9201030143
Download: ML18096A405 (10)


Text

..

e PS~G

'1*

(~ -

--o"'*,

Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038 Nuclear Department CERTIFIED MAIL DEC 2 o 1991 RETURN RECEIPT REQUESTED NLR-E91307 Bureau of Discharge Prevention New Jersey Department of Environmental Protection and Energy 401 East state street CN027 Trenton, New Jersey 08625-0027 Attention: Discharge Confirmation Report

Dear Sirs:

DISCHARGE OF WATER - UNDERGROUND PIPE LEAK PUBLIC SERVICE ELECTRIC AND GAS (PSE&G)

SALEM GENERATING STATION -

(CASE #91-11-21-0918-06) - 30 DAY CONFIRMATION REPORT As per the requirements of NJAC 7:1E-5.8, PSE&G has prepared the attached report confirming the discharge of water originally reported as a broken line on #2 Oil/Water Separator (skim tank) .

The discharge, which occurred at the above facility on November 21, 1991, occurred entirely within PSE&G property and no injuries resulted.

As 'the leak and discharge was not from a known polluted or radiologically contaminated system, no notification of the release was reported to any agency other than the New Jersey Department of Environmental Protection and Energy (NJDEPE) and the Nuclear Regulatory Commission (NRC), as required under 10CFRS0.72, Significant Events.

The leak was in fact determined to be the result of tidal water in the reinforced concrete underground discharge piping leading from a permitted treatment works which was out of service at the time and. not discharging. At the time of the incident, the river was at high tide accounting for the presence of the water in the discharge piping. Excavation activity disturbed the discharge piping, dislodging approximately 6 inches of pipe sealant/packing and allowing the river water leakage into the excavation.

I I The Energy People

(----*::i2()T(i:::nn-4:3y"'.CfZ'.ZO.-----~

i PDR ADOCK 05000272 *c *di SMl 12-90 S PDR

_I

JEL ;:; v ~*

,1.,_.; __*

NJ DE PE 2 NLR-E91307 PSE&G believes it acted in accordance with the intent of NJAC 7:1E, Subchapter 5, which requires all major facilities to notify the NJDEPE of discharges of petroleum and other potentially hazardous substances in any concentration. However, based on a review of system operations and the discharge event, the discharge of water was not from the facility but in fact to the facility from the river. Therefore, PSE&G was not obligated to notify the NJDEPE since the event was not a hazardous substance discharge.

As a result of this discharge, PSE&G has conducted a follow-up investigation of the incident, has repaired the piping leak and ta~en further action to initiate an engineering review of the system piping to determine the best means of lining the piping to minimize the potenti_al for future recurrence.

Should you have any questions concerning the information contained herein, or require additional information, please contact Mr. Paul Behrens of Licensing and Regulation at (609) 339-1577.

Sincerely, R. Swanson General Manager -

Engineering & Plant Betterment Attachment

NJ DE PE 3 NLR-E91307 C New Jersey Department of Environmental Protection and Energy Division of Environmental Quality Bureau of Communications and Support Services CN 411 Trenton, New Jersey 08625-0411 New Jersey Department of Environmental Protection

.and Energy Off ice of Enforcement Policy Southern Bureau of Water and Hazardous Waste 20 E. Clementon Road Gibbsboro, New Jersey 08026 Attention: Mr. William Dunphee United States Nuclear ~egulatory Commission

. Document controf*- Desk -

Washington, D.C., 20555 Salem County Department of Health 98 Market Street Salem, New Jersey 08079 Attention: Mr. James Warner

ATTACHMENT 1 DISCHARGE CONFIRMATION REPORT - SUPPLEMENTAL INFORMATION RELATED TO REPORTED DISCHARGE OF WATER FROM OIL/WATER SEPARATOR DISCHARGE PIPING FROM SALEM GENERATING STATION -

CASE #91-11-21-0918-06 INDIVIDUAL REPORTING DISCHARGE:

Senior Nuclear Shift Supervisor Public Service Electric and Gas Salem Generating Station P. O. Box 236, M/C SOl Hancocks Bridge, New Jersey 08038 (609) 339-5200 INDIVIDUAL SUBMITTING CONFIRMATION REPORT:

General Manager ~ Nuclear Engineering Public Service Electric and Gas Nuclear Department P. o. Box 236, M/C N19 Hancocks Bridge, New Jersey 08038 (609) 339-1700 FACILITY OWNER/OPERATOR:

Public Service Electric and Gas Co.

P. o. Box 570-17G Newark, New Jersey 07101-0570 IND~VIDUAL(S) RESPONSIBLE FOR THE DISCHARGE:

General Manager - Nuclear Engineering Public Service Electric and Gas Nuclear Department P. o. Box 236, M/C N19 Hancocks Bridge, New Jersey 08038 (609) 339-1700 DISCHARGE SOURCE:

  1. 2 Oil/Water Separator discharge piping The leak was the result of a disturbance to the oil/water separator underground piping caused by excavation activity. The activity dislodged approximately 6 inches of pipe sealant/packing allowing the river water leakage into the excavation.

This treatment works was out of service at the time and not discharging.

ATTACHMENT 1 (continued)

DISCHARGE CONFIRMATION REPORT - SUPPLEMENTAL INFORMATION RELATED TO REPORTED DISCHARGE OF WATER FROM OIL/WATER SEPARATOR DISCHARGE PIPING FROM SALEM GENERATING STATION -

CASE #91-11-21-0918-06 This discharge occurred after a disturbance to a section of underground piping. As a sump was dewatering the excavation at the time of the discovery, quantification of the amount of water from the pipe is .not practical. Approximately 5 cubic feet of soil from the immediate area of the piping leak which was removed after the discovery of the leak, was treated as a potentially oil contaminated soil and drummed for disposal.

DISCHARGE LOCATION:

Salem Generating Station End of Buttonwood Road Block#: 26 Lot#: 4 Municipality: Hancocks Bridge County: Salem County Zip Code: 08038 Tax #: 22-1212-800 EPA ID#: NJD077070811 (Map. enclosed - See Figure 1)

CHEMICAL 'DISCHARGED:

Water from tidal river in discharge piping.

CAS Number: 7732-18-5 (Per New Jersey Worker and Community Right To Know)

QUANTITY DISCHARGED: Unquantified DATE/TIME DISCHARGE BEGAN: Unknown DATE/TIME DISCHARGE ENDED: November 21, 1991 Approximately 1400 hours0.0162 days <br />0.389 hours <br />0.00231 weeks <br />5.327e-4 months <br /> DATE/TIME DISCHARGE DISCOVERED: November 21, 1991 0855 Hours DATE/TIME DISCHARGE REPORTED: November 21, 1991 *0918 Hours To NJDEPE Hotline JUSTIFICATION FOR DELAY IN 15 MINUTE NOTIFICATION:

Personnel discovering discharge were unable to determine probable cause for reportability. Licensing and Regulation personnel responded to remote location to make on-site determination of reportability. Immediate reporting was then made.

_j

\,(

MEASURES TAKEN TO CONTAIN, CLEANUP AND REMOVE THE DISCHARGE:

The sump already in place to dewater the excavation continued to operate and discharge to a permitted treatment facility (#1 Oil/Water Separator) and subsequently to outfall DSN 489. No water left the immediate vicinity of the excavation. The discharge was terminated by the installation of a temporary packing.

CORRECTIVE MEASURES:

After the discharge was discovered, the Shift supervisor verified the inoperable status of #2 oil/water separator. The construction manager responsible for the site directed craft personnel to apply the temporary packing to the leak allowing subsequent repair by encasement of the joint in a concrete sleeve poured over the joint in the reinforced concrete pipe.

  • An adjacent potential joint leak on the piping was unearthed and a "hot patch" was applied to ensure that i1: would not leak after closure of the excavation.

To further prevent future recurrence of a similar problem, Licensing and Regulation sponsored a Nuclear Department Resource Allocation Program request to investigate engineering solutions to prevent future discharges of this nature on this system.

"1 INDIVIDUAL INVOLVED IN CONTAINMENT/CLEANUP:

No significant cleanup activities were conducted associated with this discharge. on-site personnel with contaminated soil disposal responsibilities were consulted for this discharge cleanup. Approximately 5 cubic feet of soil, removed from the immediate area surrounding the pipe joint was handled as hazardous as a precautionary measure. These individual(s) are:

Yard Supervisor Site Services Maintenance Public Service Electric and Gas Nuclear.Department P. O. Box 236, M/C N34 Hancocks Bridge, New Jersey 08038 (609) 339-5338 Senior Staff Engineer Licensing and Regulation Public Service Electric and Gas Nuclear Department P. o. Box 236, M/C N21 Hancocks Bridge, New Jersey 08038 (609) 330-1459 TYPE, QUANTITY, LOCATION AND DATE OF SAMPLES:

No laboratory data was collected for this discharge.

Information relevant to the chemical characteristics of the Delaware River water in the vicinity of Salem Generating station, and analytical data associated with the normal operation of the oil/water separator systems is available from the following individual(s):

Chemistry Supervisor Radiation Protection/Chemistry Department Public Service Electric and Gas -

Salem Generating Station P. o. Box 236, M/C S07 Hancocks Bridge, New Jersey 08038 (609) 339-2653 Engineer Licensing and Regulation Public Service Electric and Gas Nuclear Department -

P. 0. Box 236, M/C N21 Hancocks Bridge, New Jersey 08038 (609) 339-1577

INDIVIDUAL CONDUCTING ANALYSIS: Not applicable.

QUALITY ASSURANCE PROCEDURES: Not applicable.

SAMPLE METHODOLOGY: Not applicable.

RATIONALE FOR SAMPLING LOCATION: Not applicable.

FINANCIAL RESPONSIBILITY:

Financial responsibility is provided through Excess Liability Insurance. This insurance is through the following carrier:

Associated Electric and Gas Services, Inc.

Harborside Financial Center 700 Plaza Two Jersey City, New Jersey 07311-3944 Policy #: X0015A1A91 Effective Date: 8/1/91

e 1 HAZARDOUS WASTE TRANSFER AREA 2 COOLING TOWER 3 500 KY SWITCHYARD 4 GUARD HOUSE 5 TURBINE BUILDING DSN 489 - STORMWATER DISCHARGE 6 REACTOR BUILDING DSN 489AIB - OILJWATER SKIM TANKS 7 AUXILIARY BUILDING 8 ADMIN FACILITY AND STOREROOM 9 SEWAGE TREATMENT PLANT 10 LOW VOLUME & OILY WASTE SYSTEM SALEM STATION 11 MAIN FUEL OIL TANK 12 BARGE SUP 13 SERVICE WATER INTAKE 14 #1 OILJWATER SKIM TANK 15 #2 OILJWATER SKIM TANK HOPE CREEK STATION 16 #3 OILJWATER SKIM TANK 17 NONflAD LIQUID WASTE DISPOSAL SYSTEM 3

."- DSN 489 16 8 5

=

7 DELAWARE RIVER PSE&G ARTIFICIAL ISLAND GENERAL SITE MAP DISCHARGE CONFIRMATION REPORT SECURITY CASE NUMBER 91 21 -091 8-06 FENCE NOVEMBER 1 991 -

FIGURE i

.J *

  • _f.l CERTIFICATION State of New Jersey: .

SS County of Salem I certify under penalty of law that the information provided in th+/-.s document is true, accurate and complete. I am aware that there are significant civil and criminal penalties, including fine$ or imprisonment or both, for submitting false,*inaccurate or incomplete information.

sworn and subscribed b~;o~me.

on :this ch day of '~~ , 1991.