Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19031B157 + (10:31:39, 5 January 2025)
- ML19031B159 + (10:31:39, 5 January 2025)
- ML19031B149 + (10:31:40, 5 January 2025)
- ML19031B155 + (10:31:40, 5 January 2025)
- ML19031B147 + (10:31:41, 5 January 2025)
- IR 05000528/2018004 + (10:32:03, 5 January 2025)
- ML19031B138 + (10:32:03, 5 January 2025)
- ML19031B137 + (10:32:04, 5 January 2025)
- ML19031B124 + (10:32:05, 5 January 2025)
- ML19031B134 + (10:32:05, 5 January 2025)
- ML19031B095 + (10:32:06, 5 January 2025)
- ML19031B101 + (10:32:06, 5 January 2025)
- SECY-19-0012, Weekly Information Report - Week Ending January 25, 2019 + (10:32:07, 5 January 2025)
- ML19031B083 + (10:32:08, 5 January 2025)
- ML19031B081 + (10:32:08, 5 January 2025)
- 05000272/LER-2078-056-03, Submit Licensee Event Report for Reportable Occurrence 78-56/03L + (10:32:10, 5 January 2025)
- ML19031B067 + (10:32:11, 5 January 2025)
- ML19031B068 + (10:32:11, 5 January 2025)
- ML19031B066 + (10:32:12, 5 January 2025)
- ML19031B065 + (10:32:13, 5 January 2025)
- ML19031B064 + (10:32:13, 5 January 2025)
- ML19031B063 + (10:32:14, 5 January 2025)
- 05000272/LER-2077-017-01, Missed Technical Specification Surveillance + (10:32:16, 5 January 2025)
- 05000272/LER-2077-028-01, Loss of Transmission Line Due to Protective Relay Operation + (10:32:18, 5 January 2025)
- 05000272/LER-2077-031-01, Inoperability of Valves Due to Excessive Closure Time + (10:32:21, 5 January 2025)
- 05000272/LER-2077-037-01, Transmission Line Trip Due to Protective Relay Actuation + (10:32:22, 5 January 2025)
- 05000272/LER-2077-036-01, Pressurizer Pressure Decreased to Below DNB Limit of LCO 3.2.5 + (10:32:27, 5 January 2025)
- 05000272/LER-2077-038-03, RCS Leakage + (10:32:29, 5 January 2025)
- 05000272/LER-2077-035-03, Inoperability of Pressurizer Level + (10:32:31, 5 January 2025)
- 05000272/LER-2077-044-03, Inoperability of Auto Stop Oil Pressure Switch + (10:32:33, 5 January 2025)
- 05000272/LER-2077-048-03, Inoperabilit of No. 12 S/G Level Channel I + (10:32:34, 5 January 2025)
- 05000272/LER-2077-089-03, Inoperability of Boron Injection Tank Due to Low Boron Concentration + (10:32:37, 5 January 2025)
- 05000272/LER-2077-091-03, Inoperability of Channel III Pressurizer Level + (10:32:38, 5 January 2025)
- 05000272/LER-2078-001-03, Inoperability of No. 14 Steam Flow Channel II Due to Excessive Trip Setpoint + (10:32:40, 5 January 2025)
- 05000272/LER-2078-012-03, Inoperability of Apd Unit + (10:32:42, 5 January 2025)
- 05000272/LER-2078-021-03, Missed Surveillance of Fluoride Sample + (10:32:44, 5 January 2025)
- 05000272/LER-2078-027-03, Malfunctioning Exterior Door of Containment Entry Air Lock + (10:32:46, 5 January 2025)
- 05000272/LER-2078-033-03, No. 11 Steam Generator Steam Flow Channel II + (10:32:48, 5 January 2025)
- 05000272/LER-2078-040-03, Inoperability of Makeup Valve from Demineralized Water Plant + (10:32:49, 5 January 2025)
- 05000272/LER-2078-042-03, Excessive Trip Setpoint During Functional Test on No. 13 S/G Steam Flow Channel 1 + (10:32:51, 5 January 2025)
- ML19031B037 + (10:32:52, 5 January 2025)
- 05000272/LER-2078-044-03, Inoperability of No. 11 S/G Feedwater Flow Channel 2 + (10:32:54, 5 January 2025)
- ML19031B016 + (10:32:55, 5 January 2025)
- ML19031B004 + (10:32:55, 5 January 2025)
- ND-19-0061, Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.2.03.11a.i (Index Number 207) + (10:32:56, 5 January 2025)
- ML19031B000 + (10:32:56, 5 January 2025)
- ML19031A956 + (10:32:57, 5 January 2025)
- ML19031A952 + (10:33:01, 5 January 2025)
- ML19031A954 + (10:33:01, 5 January 2025)
- ML19031A947 + (10:33:02, 5 January 2025)
- ML19031A920 + (10:33:03, 5 January 2025)