05000272/LER-2077-091-03, Inoperability of Channel III Pressurizer Level

From kanterella
Jump to navigation Jump to search
Inoperability of Channel III Pressurizer Level
ML19031B045
Person / Time
Site: Salem  
Issue date: 01/25/1978
From: Librizzi F
Public Service Electric & Gas Co
To: Grier B
NRC/IE, NRC Region 1
References
LER 1977-091-03
Download: ML19031B045 (3)


LER-2077-091, Inoperability of Channel III Pressurizer Level
Event date:
Report date:
2722077091R03 - NRC Website

text

....,,;,.,*-~* --'l" Janua~y 25, 1978 Mr. Boyce H. Grier Director of USNRC Offi~e of Inspections arid Enforcements Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Mr. Grier:

LICENSE NO. DPR-70 DOCKET NO. 50-272 REPORTABLE OCCURRENCE 77-91/03L Pursuant to the requira~ents of Salem Generating Station Unit No. 1 Technical Specifications, Section 6.9.1, we are submitting Licensee Event Report for Reportable Occurrence 77-91/03L.

  • This report.is required within thirty (30) days of the occurr.ence.

Sincerely yours, i

I

,-1

/.12 J/~

/"'

//


....--:y.

.r,,

/

/

F. P. Librizzi General Manager Electric Production CC:

Director, Office of Inspection and Enforcement (30 copies)

Director, Office of Management Information and Program Control (3 copies)

  • I 95 2£10 ~ JOO.'.:

Report Number:

  • .* r
  • ~ _* ~ ~ep..ort Date:

Occurrence Date:

Facility:

  • 7-91/0JL
i./4/78 12/27/77 Salem Generating Station Public Service Electric & Gas Company Hancocks ~ridge, New Jersey 08038 IDENTIFICATION OF OCCURRENCE:

Pressurizer Level Channel III Inoperable CONDITIONS PRIOR TO OCCURRENCE:

Operational Mode 1 - Reactor Power:

100%

DESCRIPTION OF OCCURRENCE:

At 1025 hours0.0119 days <br />0.285 hours <br />0.00169 weeks <br />3.900125e-4 months <br />, pressurizer level Channel III was declared inoperable due to it reading 4% higher than other operable channels.

Pressurizer level Channel III was placed in the tri~ped condition and Action Statements for LCO's 3.3.1.1 and 3.3.2.l(b) were implemented.

Instru...:.

mentation personnel investigated and the channel was returned to operanle status at 1550.hours.

DESIGNATION OF APPARENT CAUSE OF OCCURRENCE:

Non-condensable gas trapped in the sensing line between the condensate pot and.the differential pressure transmitter caused a false high level signal.

ANALYSIS OF OCCURRENCE:

Applicable Action Statements for LCO's 3.3.1.1 and 3.3.2.1 allow power operation to continue until the next required functional test provided the inoperable charinel is placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

Channel III pressurizer level was placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and remained in that condition until

.it was returned to operable status.

CORRECTIVE ACTION

The condensate pot on pressurizer level channel III was vented to remove the non-condensate gas.

Level indication decreased to match other operable channels.

FAILURE DATA:

N/A Prepared by T. L. Spencer

~~~~~-=~~~~~~~-

SORC Meeting No.

1-78

~~~~~~~~~~-

,,,.# ;, ""7:.r 1,'..

REPORT DATE: l/ 4 /7 8 LJCENSEEEVENT REPOR.

CONTROL SLOC K

,_I __.._.__....___..__...__.I 1.

6 L.ICENSES:

NAME L.ICENSE NU... 8ER

@Ji] IN I J 1* S I G I S I 11 9

14 I o I O I -1 o I O I 0 I O I O I -'! O I O j 15 2~

REPORT l'IE?ORT CATEGORY TYi'£ SOURCE OOCXET NUMSER.

1.,ICENSE TVPE 14111 11 11,~

EVENT TVPE EVENT OATE REPORT CATE.

~

coN'Tk-1-J I ;g 1 I lJI

~p I 51 0 I -I 0 I 2 I 71 2J 1112121717171 !011101417!8J

~

u n

  • EVENT OESCRIPTION

@:ill I Durina Mode 1 operation, Channel TII pressurizer level was *declared in-7 8 9 so

@BJ operable due to it indicating 4% greater than other operable channels.

7 8 9

@El Channel III was placed in the tripped condition and Action St.aternents

  • 1
  • a

@ID I for LCO' s 3. 3.1.1 & 3. 3. 2.1 were implemented.

Condensate. pot vented..

7 9 9

~I This is. the third, occurrence of this type.

(77-91/03L) 7 8 9 Pl'llME SYSTEM

CAUSE

COMPONENT COCE COCE COMPONENT CCOE SUPPL.I ER

@mtIIBI LCJ

!Z!ZIZ!ZllliJ 11,J

. 7 8 9 10 11 12 17 43 COMPONENT.

MANUFACTURER I Z! 91 91 9!

44 47 VIOl.ATION l.!::!.J 48 CAUSE DESCRIPTION

~1 9

Non-condensable gas trapped in the condensate pot caused a false high

@lif I level signal.

7 8 9 I

ea I

eo I

00 I

8)

II@]

7 9~9:--:-----------------------------------------------------.......100 FACll..ITV*

STATUS Gm l.EJ.

. *-7 ll -9*

FORM OF

'!!.POWER 111 01 0 I 10 1'2 METHOOOF QTHEfl STATUS OISCOVE.RV I.. N1A I W

  • 1~3~-----------44~

45 ACTI VITV CONTENT REl..~EC OF REL.EASE AMOUNT OF ACTIVITV OISCOVEAV qESCRIPTION N;A

  • I so L.OCATION OF RELEASE Efil w

~ I N/A.

  • 1 a*
  • g 10 11 I

80 I

I*

N/A 444

~5;-----..,--------..;_---. ___________

._.,~

PERSONNEl. EXPOSURES r;T.;l NUMBER

. TYPE:..

OESCRIPTION L!.l:.il 0 I 0 I 0 I lZ..J N.....,._;;;A.._. --:---------:-------------.,.,!

7 8 9 11.

12 13.

SQ PERSONNEL INJURIES r.r.l NUM8£R OESCRIPTION l.!.J.:J I 0 I 0 I 0 1-

,__I :------__;N_,./..;;A.;;_ __________ --------~

1

  • a 9 *
  • 11 12 ao J

. OFFSITe CONSeQUENCl:S

~19..

    • N/A LOSS OR DAMAGa TO FACILITY J

TYP£ OESCRIPTldN V la! t;J

"'~o--------------N:.;./._A;;,;;:. "'-. ------------------------...1 PUBLICITY

  • Gm 7 8~9:---..,----------..J.:1..;..t.=--------------......,.---..,---------------~SQ AOOITION.AL FACTORS ITI!I.,._ __ * ---------------------=-N'"'-""A::..------------------------------------------__.,,

7 8 9 GE 1

a~g:--__,.--------------------------------------------~so NAMe: __.._ _____

~T::....:..."-=L~*:-~S~o~e:::.=<n~c~e=-=r------

PHONE: (609) 365-7000 Ext. Salem 521: