Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138K318 + (ML20138K318)
- ML20138K323 + (ML20138K323)
- ML20138K336 + (ML20138K336)
- ML20138K340 + (ML20138K340)
- ML20138K351 + (ML20138K351)
- 05000261/LER-1985-022-01, :on 850928,Exxon Nuclear Corp Informed Util of Error in Large Break LOCA Analysis Which Resulted in Peak Clad Temp Being Underpredicted.Reactor Power & High Flux Trip Setpoint Increased within New Limits + (ML20138K353)
- ML20138K357 + (ML20138K357)
- IA-85-731, Responds to FOIA Request for Doe/Nrc 741 Forms Re Shipments of Nuclear Fuel Entering Us at Ports,Airports or Via Highways in States of or & Wa from 1970-Oct 1985 & Import Licenses + (ML20138K357)
- ML20138K358 + (ML20138K358)
- ML20138K359 + (ML20138K359)
- ML20138K362 + (ML20138K362)
- ML20138K367 + (ML20138K367)
- ML20138K369 + (ML20138K369)
- ML20138K376 + (ML20138K376)
- ML20138K381 + (ML20138K381)
- 05000362/LER-1985-027-01, :on 850920,during Main Purge,Containment Airborne Radiation Monitor 3RE-7804 Reached Alarm Setpoint & Initiated Train a Containment Purge Isolation Sys.Caused by Movement of Stagnant Air Into Purge Exhaust + (ML20138K383)
- 05000354/LER-1997-001, :on 970103,EDG & Fire Suppression Sys Interaction Results in Plant Being in Condition Outside of Design Basis Occurred.Caused by Inadequate Analysis During Plant Construction.Training Will Be Completed + (ML20138K385)
- ML20138K387 + (ML20138K387)
- ML20138K391 + (ML20138K391)
- ML20138K393 + (ML20138K393)
- 05000309/LER-1997-002, :on 970110,PCC/SCC Vacuum Relief Valve Testing Occurred.Cause Not Determined.Valves Are Currently in Process of Being Replaced by New Vacuum Breaker Valves.New Valves Will Be Included in IST Program + (ML20138K396)
- ML20138K397 + (ML20138K397)
- ML20138K400 + (ML20138K400)
- ML20138K405 + (ML20138K405)
- ML20138K410 + (ML20138K410)
- ML20138K414 + (ML20138K414)
- ML20138K418 + (ML20138K418)
- ML20138K421 + (ML20138K421)
- ML20138K424 + (ML20138K424)
- ML20138K426 + (ML20138K426)
- ML20138K429 + (ML20138K429)
- ML20138K430 + (ML20138K430)
- ML20138K432 + (ML20138K432)
- ML20138K435 + (ML20138K435)
- ML20138K442 + (ML20138K442)
- ML20138K447 + (ML20138K447)
- ML20138K448 + (ML20138K448)
- 05000155/LER-1997-002, :on 970115,penetration Insp Was Not Performed IAW Ts.Process for Facility Change 462J,App R Penetration Nozzle Installation,Did Not Provide Adequate Review. Penetrations Were Inspected + (ML20138K453)
- ML20138K455 + (ML20138K455)
- ML20138K456 + (ML20138K456)
- ML20138K458 + (ML20138K458)
- ML20138K461 + (ML20138K461)
- ML20138K465 + (ML20138K465)
- ML20138K470 + (ML20138K470)
- ML20138K475 + (ML20138K475)
- ML20138K479 + (ML20138K479)
- ML20138K485 + (ML20138K485)
- ML20138K486 + (ML20138K486)
- 05000206/LER-1985-014-02, :on 850919,reactor Tripped in Response to Turbine Trip.Turbine Trip Caused by Too Rapid Rate of Pressure Increase in Auxiliary Transformer B.Nitrogen Addition Operations Revised + (ML20138K489)
- ML20138K491 + (ML20138K491)
- ML20138K496 + (ML20138K496)