ML20138K369

From kanterella
Jump to navigation Jump to search
Forwards Conformance to Reg Guide 1.97,Pilgrim Nuclear Power Station, Interim Rept Based on Review of 841101 Submittal.Response to Identified Open Items Re Plant Variables & Sys Parameters Requested
ML20138K369
Person / Time
Site: Pilgrim
Issue date: 12/12/1985
From: Zwolinski J
Office of Nuclear Reactor Regulation
To: Harrington W
BOSTON EDISON CO.
Shared Package
ML20138B596 List:
References
RTR-REGGD-01.097, RTR-REGGD-1.097 NUDOCS 8512180412
Download: ML20138K369 (3)


Text

r

, S DEC 121985 Docket No. 50-293 Mr. William D. Harrington Senior Vice President, Nuclear Boston Edison Company 800 Boylston Street Boston, Massachusetts 02199

Dear Mr. Harrington:

Re: Pilgrim Nuclear Power Station By letter dated November 1, 1984, Boston Edison provided a report which addresses the concerns in Regulatory Guide (R.G.) 1.97 with respect to

-instrumentation at Pilgrim Station to monitor plant variables and system parameters during and following an accident. With the assistance of EG&G Idaho, Inc., we have reviewed your submittal and conclude that you have provided an explicit commitment on conformance to R.G.1.97, with the exception of certain items which were identified in your report. We also concluded that the justifications for exception of some items are acceptable and others are not.

The enclosed interim report provides the specific results of our review.

We request that you respond to the open items identified therein on a schedule negotiated with your project manager. Please comment also if you find that the enclosed report includes any incorrect assumptions or reflects a comitment beyond your intent.

Sincerely, odgenet signed by John A. Zwolinski, Director BWR Project Directorate #1 Division of BWR Licensing

Enclosure:

As stated cc w/ enclosure:

See next page

,)lSTRIBUTION Almenet-we;Q NRC PDR Local PDR BWD#1 Rdg RBernero OELD EJordan 8512180412 851212 BGrimes PDR ADocK 05000293 JPartlow F PDR PLeech CJamerson ACRS (10)

DBL:PD#1 I)

DOL. D#1

-DBL:PD#1 CJamerson PLeech:tm JZwolinski 9./@/85 l'L/Io/85 gg A/85 e.

  1. $,, UNITED STATES 8 o NUCLEAR REGULATORY COMMISSION r, .g WASHINGTON, D. C. 20555

% ,,,,, # December 12, 1985 Docket No. 50-293 Mr. William D. Harrington Senior Vice President, Nuclear Boston Edison Company 800 Boylston Street Boston, Massachusetts 02199

Dear Mr. Harrington:

SUBJECT:

GENERIC LETTER 82-33; REGULATORY GUIDE 1.97 REQUEST FOR ADDITIONAL INFORMATION Re: Pilgrim Nuclear Power Station By letter dated November 1, 1984, Boston Edison provided a report which addresses the concerns in Regulatory Guide (R.G.) 1.97 with respect to instrumentation at Pilgrim Station to monitor plant variables and system parameters during and following an accident. With the assistance of EG&G Idaho, Inc., we have reviewed your submittal and conclude that you have provided an explicit commitment on conformance to R.G. 1.97, with the exception of certain items which were identified in your report. We also concluded that the justifications for exception of some items are acceptable and others are not.

The enclosed interim report provides the specific results of our review.

We request that you respond to the open items identified therein on a schedule negotiated with your project manager. Please comment also if you find that the enclosed report includes any incorrect assumptions or reflects a commitment beyond your intent.

Sincerely, i

~ '

John . Zwolinski, Director BWR Project Directorate #1 Division of BWR Licensing

Enclosure:

As stated cc w/ enclosure:

See next page

3 .

Mr. William D. Harrington Boston Edison Company Pilgrim Nuclear Power Station cc:

Mr. Charles J. .Mathis, Station Mgr.

Boston Edison Company RFD #1, Rocky Hill Road Plymouth, Massachusetts 02360 Resident Inspector's Office U. S. Nuclear Regulatory Commission Post Office Box 867 Plymouth, Massachusetts 02360 Mr. David F. Tarantino Chairman, Board of Selectman 11 Lincoln Street Plymouth, Massachusetts 02360 , ,

Office of the Comissioner Massachusetts Department of Environmental Quality Engineering One Winter Street Boston, Massachusetts 02108 Office of the Attorney General 1 Ashburton Place "

19th Floor Boston, Massachusetts 02108 Mr. Robert M.-Hallisey, Director Radiation Control Program Massachusetts Department of Public Health 150 Tremont Street Boston, Massachusetts 02111 Regional Administrator, Region I U. S. Nuclear Regulatory Comission 631 Park Avenue King of Prussia, Pennsylvania 19406 Mr. A. Victor Morisi Boston Edison Company 25 Braintree Hill Park Rockdale Street Braintree, Massachusetts 02184 L