Issue date | Title | Topic | |
---|---|---|---|
ML20059H939 | 13 September 1990 | Forwards Amended Response to Notice of Violations Noted in Insp Repts 50-266/89-27 & 50-301/89-26.Corrective Action: Revised Procedures Will Not Be Issued Until After Unit 2 Refueling Outage.Other Changes Anticipated by 901231 | |
ML20059G721 | 5 September 1990 | Responds to Generic Ltr 90-03, Vender Interface for Safety- Related Components. Implementing Formal Vendor Interface Program for Every safety-related Component Impractical | |
ML18026A394 | 1 September 1990 | Requests Waiver of Compliance from Tech Spec 3.8.1.1 to Evaluate Increase in Action from 72 H to 15 Days Re Ac Sources Based on 900829 Borescopic Insp of Emergency Diesel Generator | Power change |
ML20059G874 | 31 August 1990 | Forwards Revised Security Plan,Per NRC .Summary of Revs Listed.Rev Withheld (Ref 10CFR3,50,70 & 73) | |
ML20028G907 | 31 August 1990 | Advises That long-term erosion/corrosion-induced Program for Pipe Wall Thinning in Place,Per Generic Ltr 89-08.Program Assures Erosion/Corrosion Will Not Lead to Degradation of Single & two-phase High Energy Carbon Steel Sys | |
ML20064A471 | 29 August 1990 | Forwards Semiannual Monitoring Rept,Jan-June 1990, Rev 1 to Process Control Program, Rev 7 to Environ Manual & Rev 5 to Odcm | Process Control Program |
ML20059C107 | 24 August 1990 | Forwards Addenda 10-1A,10-1B & 10-1C to Physical Security Plan.Encls Withheld (Ref 10CFR73.21) | |
ML20059E695 | 24 August 1990 | Forwards Rev 30 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) | |
ML20059B886 | 22 August 1990 | Advises That Dl Hill Employment W/Util Terminated,Effective 900817.Operator License OP-50333 Expired | |
ML13302B341 | 21 August 1990 | Responds to NRC Bulletin 88-010 Re Nonconforming molded-case Circuit Breakers (Mccbs).Affected MCCBs Purchased for Use in safety-related Applications,Including MCCBs Used W/Motor Controllers.Outage Rept Encl,Per 890330 Ltr | |
ML20064A216 | 16 August 1990 | Responds to NRC Re Violations Noted in Insp Repts 50-361/90-16 & 50-362/90-16.Reply to Notice of Violation Not Required Due to Sufficient Info Provided in ,Per 900807 Discussion W/R Huey | |
ML13309A921 | 14 August 1990 | Forwards Monthly Operating Repts for Jul 1990 for San Onofre Units 2 & 3,revised Unit 2 Monthly Operating Rept for June 1990 & Rev 22 to ODCM | Offsite Dose Calculation Manual |
ML20058Q296 | 14 August 1990 | Forwards Util & June 1990 NPDES Monitoring Rept. W/O Rept | |
ML20058N037 | 9 August 1990 | Advises That on 900713,new Land Use Located W/Calculated Dose Greater than Value Currently Calculated.New Location Results in Annual Dose Increase of 27% for Units 2 & 3 & 39% Increase for Unit 1 | |
ML17157A274 | 8 August 1990 | Forwards Topical Rept PL-NF-90-001, Application of Reactor Analysis Methods for BWR Design & Analysis. | |
ML20058L147 | 3 August 1990 | Responds to NRC Re Weaknesses Noted in Insp Repts 50-266/90-201 & 50-301/90-201 Re Electrical Distribution. Corrective Actions:Design Basis Documentation Will Be Developed to Alleviate Weaknessess in Diesel Generators | |
ML20058N677 | 3 August 1990 | Forwards Public Version of Revised Procedures to Emergency Plan manual.W/900813 Release Memo | |
IR 05000387/1990080 | 3 August 1990 | Responds to Violations Noted in Insp Repts 50-387/90-80 & 50-388/90-80.Corrective Actions:Util Conducted Operator Training on How to Implement Eops If Suppression Chamber Pressure Not Available | |
ML18030A074 | 3 August 1990 | Responds to Violations Noted in Insp Repts 50-387/90-80 & 50-388/90-80.Corrective Actions:Util Conducted Operator Training on How to Implement EOPs If Suppression Chamber Pressure Not Available | |
ML20056A178 | 2 August 1990 | Discusses Review of Possibility of Accelerating Schedule for Performing & Submitting Results of Individual Plant Exams for Units 1,2 & 3.Util Believes That Submittal Schedule for Unit 1 Can Be Accelerated to 920102 | |
ML18041A222 | 31 July 1990 | Responds to NRC 900518 Ltr Re Violations Noted in Insp Repts 50-206/90-10,50-361/90-10 & 50-362/90-10.Corrective Action: computer-based Mgt Sys Will Be Developed to Permit Incoming Revised Info to Be Matched W/Documents Requiring Review | |
ML20058L504 | 30 July 1990 | Discusses & Forwards Results of fitness-for-duty Program Performance Data for 6-month Period Ending 900630 | Fitness for Duty |
ML20055H964 | 27 July 1990 | Responds to NRC Re Violations Noted During Special Safety Sys Functional Insp on 891030-1130.Corrective Action:Util Will Review & Revise Operating & Calibr Procedures by 901031 | |
ML20055J203 | 25 July 1990 | Responds to NRC Bulletin 89-002 Re Insp of safety-related Anchor/Darling Model S350W Check Valves Supplied w/A193 Grade B6 Type 410 SS Retaining Block Studs.Studs Visually Inspected & No Cracks Found | |
ML20055H573 | 24 July 1990 | Provides Notification of Completion of Installation of Backup Nitrogen Sys Isolation Check Valves & Test Connections at Facility | |
ML20055H778 | 24 July 1990 | Forwards Corrected Monthly Operating Rept for June 1990 for Point Beach Unit 2.Correction on Line 18 Regards Net Electrical Energy Generated | |
ML20058K894 | 23 July 1990 | Forwards June 1990 Updated FSAR for Point Beach Nuclear Plant Units 1 & 2.Steam Generator Upper Ph Guideline in Table 10.2-1 Changed from 9.3 to 9.4 | |
ML20055H662 | 23 July 1990 | Forwards Central Files & Public Versions of Revised Epips, Including Rev 2 to EPIP 1.1.1,Rev 16 to EPIP 4.1,Rev 6 to EPIP 6.5,Rev 20 to EPIP 1.2,Rev 8 to EPIP 6.3,Rev 0 to EPIP 7.3.2,Rev 10 EPIP 10.2 & Rev 11 to EPIP 11.3 | |
ML20055H263 | 23 July 1990 | Discusses Model 3RE-7870 Not Being Declared Operable Due to Lack of Process Flow.Monitor Failed on 900708.Caused by Moisture Intrusion Into Housing.All Affected Components Repaired or Replaced | |
ML20055F190 | 9 July 1990 | Informs That Ej Schoonover Employment W/Util Terminated, Effective 900629 | |
ML20044A909 | 6 July 1990 | Responds to NRC Bulletin 90-001 Re Loss of Fill Oil in Transmitters Mfg by Rosemount.None of Listed Transmitters Installed at Plant in Aug 1988 Identified as Having High Failure Fraction Due to Loss of Fill Oil | |
ML20055D442 | 3 July 1990 | Forwards Reactor Containment Bldg Integrated Leak Rate Test Point Beach Nuclear Plant Unit 1,1990, Summary Rept | |
ML18026A235 | 2 July 1990 | Forwards Application for Proposed Amend 132 to License NPF-14,revising Tech Spec to Support Cycle 6 Reload | Shutdown Margin Anticipated operational occurrence Feedwater Controller Failure Fuel cladding |
ML20055D347 | 29 June 1990 | Provides Addl Response to Bulletin 88-008, Thermal Stresses in Piping Connected to Rcss. Engineering Evaluations Performed to Assure Code Compliance Due to Unanalyzed Condition of Thermal Stratification Addressed | Unanalyzed Condition |
ML20055D622 | 29 June 1990 | Provides Suppl to Re Loss of All Ac Power.Test Demonstrated That Ventilation Mod & Recalibration of High Temp Trip for Auxiliary Power Diesel Improved Performance of Gas Turbine Generator as Alternate Ac Source | |
ML20044A412 | 27 June 1990 | Requests Approval of Use of Plugs Fabricated of nickel-chromiun-iron Uns N-06690 Matl to Plug Tubes in Plant Steam Generators.Change to Use Alloy 690 Tube Plugs Results from Matl Corrosion Consideration | |
ML20056A884 | 25 June 1990 | Responds to NRC Forwarding Insp Repts 50-206/90-10,50-361/90-10 & 50-362/90-10.Results of Review of Awareness & Response to Industry Check Valve Concerns & Evaluation of Need to Establish Dedicated Program Provided | |
ML20055D229 | 22 June 1990 | Informs NRC That Gj Maxfield Promoted to Plant Manager effective,900701 | |
ML20055D623 | 22 June 1990 | Advises of Decision to Proceed W/Leak Testing of Sys During Plant Refueling Outage Due to Delay in Delivery of Gamma-Metrics Hardware Fix Kits.Test Revealed That Both in-containment Cable & Detector Assembly Cable Had Leaks | |
ML18030A072 | 19 June 1990 | Forwards Rev 1 to SEA-EE-183, Evaluation of Unit 1 Computer Class 1E - Non-Class 1E Interfaces & Rev 1 to SEA-EE-184, Evaluation of Unit 1 Annunciator Class 1E - Non-Class 1E Interfaces. | |
ML20043H785 | 19 June 1990 | Informs That Jl Mullins Employment W/Util Terminated Effective 900608.Operator License OP-50089-2 Expired | |
ML20043H510 | 19 June 1990 | Informs That Wk Giffrow Employment W/Util Terminated. Operator License OP-50050-2 Expired | |
ML20044A001 | 18 June 1990 | Provides Current Implementation Status of Generic Safety Issues at Plant,In Response to Generic Ltr 90-04 | Scram Discharge Volume |
ML18026A393 | 7 June 1990 | Requests NRC Approval to Install Mod at Plant Determined to Constitute Unreviewed Safety Question When Evaluated.Util Will Implement Administrative Controls to Ensure Larger Min Vol Met for Diesel E Prior to Tech Spec Change | |
ML13304A486 | 4 June 1990 | Forwards Evaluation of Unisolable Piping from RCS W/Potential for Leakage Induced Thermal Stresses in Response to NRC Bulletin 88-008 SONGS 2 & 3, in Response to Request | |
ML20043D651 | 25 May 1990 | Discusses Cycle 18 Reload on 900519,following 7-wk Refueling & Maint Outage.Reload SER for Cycle 18 Demonstrates That No Unreviewed Safety Questions,As Defined in 10CFR50.59, Involved in Operation of Unit During Cycle | |
ML20043B491 | 22 May 1990 | Submits Rept:On 900507,eddy Current Insp of Steam Generator Tubing Completed.Of 2,106 Tubes Inspected in Steam Generator E-088 No Tubes Found Defective.One Tube in Steam Generator E-089 Found Defective & Plugged | |
ML20043B148 | 18 May 1990 | Advises That Necessary Info Received from Westinghouse Re Revised Administrative Controls for NRC Bulletin 88-002, Rapidly Propagating Fatique Cracks in Steam Generator Tubes. | |
ML20043B110 | 17 May 1990 | Documents Status of Evaluations Committed to Be Performed Re IE Bulletin 79-14 Program.Support CH-151-4-H50 Modified During Unit 1 Refueling Outage & Now in Code Compliance. Meeting Proposed During Wks of 900618 or 900716 | |
ML20043B141 | 17 May 1990 | Informs That Senior Reactor Operator License No Longer Needed for JW Ryder,Effective 900425.License SOP-50288 Expired on 900425 |