B17848, Startup Test Rept Cycle 7. with30 September 1999Startup Test Rept Cycle 7. with
ML20211Q3367 September 1999Proposed Tech Specs Removing Current Special Exception Which Precludes Applying Eighteen Month Functional Testing Surveillance to SG Hydraulic SnubbersHigh Radiation Area
ML20211H64725 August 1999Proposed Defueled Tech Specs,Revising Sections 5.6.1,5.7.2 & 5.7.3 & Adding Proposed Section 5.6.4 to Reflect ACs Contained in NUREG-1433High Radiation Area
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Fire Protection Program
ML20211G13424 August 1999Proposed Tech Specs Replacement Pages,Incorporating Addl Info for Pending TS ChangeHigh Radiation Area
Offsite Dose Calculation Manual
ML20210Q5215 August 1999Proposed Tech Specs Sections 3.8.3.2,4.6.2.1,4.6.2.2, 4.8.1.1,4.9.12 & Bases Section B 3/4.3.2,B 3/4.6.1.2 & B 3/4.8.4,incorporating Editorial Revs
ML20210D43331 July 1999Material Recovery Plan, for Haddam Neck Plant
ML20210F51228 July 1999Rev 0 to CY-HP-0031,Haddam Neck Plant Health Physics Dept Technical Support Document, Bounding Dose Assessment for Offsite Radioactive MatlsDeep Dose Equivalent
Scaffolding
ML20210C60916 July 1999Proposed Tech Specs Relocating Selected TS Related to Refueling Operations & Associated Bases to Plant TRMShutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
ML20195C8593 June 1999Proposed Tech Specs Incorporating Changes Which Reflect Limitations & Requirements Appropriate to Present Configuration of PlantHigh Radiation Area
Grab sample
Offsite Dose Calculation Manual
Time to boil
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Annual Radiological Effluent Release Report
Fire Protection Program
ML20206U10417 May 1999Proposed Tech Specs Section 4.4.6.2.2.e,deleting Reference to ASME Code Paragraph IWV-3472(b) Re Frequency of Leakage Rate Testing for Valves Six Inches Nominal Pipe Size & LargerFuel cladding
ML20206M82210 May 1999Restart Assessment Plan Millstone Station
ML20206D17627 April 1999Rev 1 to Millstone Unit 3 ISI Program Manual,Second Ten-Yr IntervalNon-Destructive Examination
Hydrostatic
Nondestructive Examination
Temporary Modification
VT-2
Liquid penetrant
Through-Wall Leak
Dissimilar Metal Weld
Scaffolding
ML20205R24119 April 1999Rev 3 to CP2804L, Unit 2 Rx Coolant & Liquid Waste PassGrab sample
ML20205R25019 April 1999Rev 0 to CP2804M, Unit 2 Vent & Containment Air Pass
ML20205R27519 April 1999Proposed Tech Specs,Reflecting Permanently Defueled Condition of UnitTime of Discovery
High Radiation Area
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Fire Protection Program
ML20205S56116 April 1999Rev 5 to Epop 4426, On-Site Emergency Radiological Surveys
ML20205M0897 April 1999Proposed Tech Specs Modifying Value for Monthly Surveillance Testing of Tdafwp
ML20205E44129 March 1999Rev 2 to CP 2804L, Unit 2 Rx Coolant & Liquid Waste PassGrab sample
ML20196K57724 March 1999Rev 1 to Chemistry Procedure CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass
ML20205D53222 March 1999Rev 3 to RPM 2.3.5, Insp & Inventory of Respiratory Protection EquipmentHydrostatic
ML20204K09719 March 1999Proposed Tech Specs Supporting Spent Fuel Pool Rerack to Maintain Full Core Reserve Capability Approaching End of OLSafe Shutdown
Shutdown Margin
Safe Shutdown Earthquake
Operating Basis Earthquake
Code Reconciliation
Earthquake
ML20204J15819 March 1999Proposed Tech Specs Section 6, Administrative Controls, Reflecting Certified Fuel Handler License Amend Changes, Approved on 990305Offsite Dose Calculation Manual
ML20204J41019 March 1999Proposed Tech Specs Relocating Instrumentation TSs 3.3.3.2, 3.3.3.3 & 3.3.3.4 to Mnps,Unit 2 TRM
ML20204F90317 March 1999Proposed Tech Specs,Revising 3.5.2,3.7.1.7 & 3.7.6.1 Re ECCS Valves,Atmospheric Steam Dump Valves & CR Ventilation Sys. Associated Bases Will Be Modified as Necessary to Address Proposed ChangesBoric Acid
Ultimate heat sink
ML20206K1125 March 1999Proposed Tech Specs Bases Sections 3/4.7.7, CR Emergency Ventilation Sys & 3/4.7.8 CR Envelope Pressurization Sys. Changes Are Editorial in Nature
ML20207H9555 March 1999Proposed Tech Specs Section 6.0 Re Administrative ControlsShutdown Margin
High Radiation Area
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Process Control Program
Fire Protection Program
ML20207F6213 March 1999Rev 2,change 1 to Communications - Radiopaging & Callback Monthly Operability Test
ML20207E0322 March 1999Proposed Tech Specs 3/4.7.4, SW Sys, Proposing Change by Adding AOT for One SW Pump Using Duration More Line with Significance Associated with Function of Pump
ML20207D48226 February 1999Proposed Tech Specs Re Addl Mods Concerning Compliance Issues Number 4
ML20207J00022 February 1999Rev 7 to Millstone Unit 2,IST Program for Pumps & ValvesSafe Shutdown
Unanalyzed Condition
Boric Acid
Stroke time
Downpower
ML20203E40511 February 1999Proposed Tech Specs Re DG Surveillance RequirementsOffsite Circuit
ML20206D19911 February 1999Change 7 to Rev 5 to ISI-3.0, Inservice Testing Program. Pages 2 of 3 & 3 of 3 in Valve Relief Request Section 6.1 of Incoming Submittal Not IncludedBoric Acid
Stroke time
Incorporated by reference
Power-Operated Valves
ML20210D21221 January 1999Proposed Tech Specs Sections 3/4.5.2 & 3/4.5.3, ECCS Subsystems for Info Only
ML20199L28420 January 1999Proposed Tech Specs & Final SAR Proposed Rev to Ms Line Break Analysis & Revised Radiological Consequences of Various Design Basis Accidents
ML20199L45618 January 1999Proposed Tech Specs Revising TS Table 3.7-6, Air Temp Monitoring. Proposed FSAR Pages Describing Full Core off- Load Condition as Normal Evolution Under Unit 3 Licensing Basis,IncludedBoric Acid
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Earthquake
ML20199L32718 January 1999Proposed Tech Specs 3.6.1.2, Containment Sys - Containment LeakageOperating Basis Earthquake
Design basis earthquake
Earthquake
ML20199L08018 January 1999Proposed Tech Specs Change to TS 3/4.2.2 Modifies TS to Be IAW NRC Approved W Methodologies for Heat Flux Hot Channel factor-FQ(Z).Changes to TS Section 6.9.1.6 Are Adminstrative in NatureShutdown Margin
ML20199L04318 January 1999Proposed Tech Specs Removing TS 3/4.6.4.3, Containment Systems,Hydrogen Purge Sys
ML20199K48618 January 1999Proposed Tech Specs to Relocate Requirements for Seismic Monitoring Instrumentation from Section 3/4.3.3.3 of TSs to TRMOperating Basis Earthquake
Incorporated by reference
ML20199E09313 January 1999Rev 2 to Health Physics Support Procedure RPM 2.3.4, Insp & Maint Process for Respiratory Protection EquipmentHydrostatic
ML20206P5124 January 1999Proposed Tech Specs 3.5.2,3.6.2.1,3.7.1.2,3.7.3.1 & 3.7.4.1, Incorporating Changes to ESF Pump TestingBoric Acid
Power Operated Valves
ML20199A75331 December 1998Restart Backlog Mgt Plan CommitmentsTemporary Modification
B17501, 1998 - 2000 Performance Plan - Work Environ Focus Area Update31 December 19981998 - 2000 Performance Plan - Work Environ Focus Area Update
ML20198K63631 December 1998Proposed Tech Specs Section 6.0, Administrative ControlsOffsite Dose Calculation Manual
Process Control Program
Fire Protection Program
ML20198P97528 December 1998Proposed Tech Specs Pages Revising Loss of Normal Feedwater (Lonf) Analyses to TS 2.2.1,TS Bases Change to Floor Value for Thermal Margin Low Pressure Reactor Trip & Proposed FSAR Changes
ML20197G9834 December 1998Proposed Tech Specs 4.7.10.e,eliminating Need to Cycle Plant & Components Through SD-startup Cycle by Allowing Next Snubber Surveillance Interval to Be Deferred Until End of RFO6 of 990910,whichever Date Is Earlier
ML20196H6304 December 1998Proposed Tech Specs Re Section 6.0, Administrative ControlsOffsite Dose Calculation Manual
ML20196A21820 November 1998Restart Assessment Plan Millstone StationFitness for Duty
Ultimate heat sink
Temporary Modification
Exemption Request
ML20195D40410 November 1998Proposed Tech Specs,Modifying Sections 3.3.1.1 & 3.3.2.1 by Restricting Time That Reactor Protection or ESF Actuation Channel Can Be in Bypass Position to 48 H,From Indefinite Period of TimeShutdown Margin
ML20195D81010 November 1998Revised marked-up Page of Current TS 3.8.1.1 & Revised Retyped Page Re 980717 Request to Change TS