Issue date | Title | Topic | |
---|---|---|---|
ML20058G892 | 7 November 1990 | Forwards Insp Repts 50-155/90-20 & 50-255/90-20 on 900925-28 & 1015-19.Violations Noted | |
IR 05000309/1990018 | 1 November 1990 | Discusses Enforcement Conference Rept 50-309/90-18 on 901018 Re fitness-for-duty Related Event.Viewgraphs Encl | |
ML20058D341 | 30 October 1990 | Forwards Safety Insp Rept 50-309/90-20 on 900924-27.No Violations Noted | |
ML20062C073 | 22 October 1990 | Forwards Safety Insp Rept 50-309/90-21 on 901010-11.No Violations Noted | |
ML20058B494 | 18 October 1990 | Forwards Exam Rept 50-309/90-16OL on 900827-31.All Individuals Passed All Portions of Exams | |
ML20062A228 | 15 October 1990 | Advises That Util 900925 Response to Generic Ltr 90-03, Relaxation of Staff Position in Generic Ltr 83-08,Item 2.2 Part 2, 'Vendor Interface for Safety-Related Components,' Acceptable | |
ML20062B709 | 12 October 1990 | Extends Invitation to Participate in 910220 Symposium & Workshop in King of Prussia,Pa Re Engineering Role in Plant Support | |
ML20062A367 | 9 October 1990 | Forwards Insp Rept 50-309/90-17 on 900731-0918.Violations of Regulatory Requirements Identified But Not Issued | |
IR 05000309/1990001 | 5 October 1990 | Discusses Requalification Program Evaluation Rept 50-309/90-01 (OL-RO) on 900312-15 & Forwards Notice of Violation | |
ML20059N463 | 2 October 1990 | Ack Receipt of Informing NRC of Corrective & Preventive Actions Taken in Response to Violations Noted in Insp Rept 50-309/90-11 | |
ML20059N097 | 26 September 1990 | Forwards Audit Trip Rept Re NRC Bulletin 88-011, Pressurizer Surge Line Thermal Stratification for Plant | |
ML20059K991 | 20 September 1990 | Forwards Safety Evaluation Accepting Methodology Re Statistical Combination of Uncertainties for RPS Setpoints | |
ML20059L408 | 14 September 1990 | Informs That 900827 Response to Generic Ltr 89-10, Safety-Related Motor-Operated Valve Testing & Surveillance, Acceptable.Nrc Considers TAC 75679 Closed | |
ML20059H578 | 12 September 1990 | Forwards Safety Evaluation Re Facility Response to Station Blackout Rule.Requests Revised Response to Listed Items That Require Resolution,Within 60 Days of Ltr Date | |
ML20059H060 | 7 September 1990 | Discusses Unescorted Access to Licensee Facilities & fitness-for-duty Program,Per .Nrc Regulations Do Not Prohibit Licensee from Accepting Access Authorization Program of Another Licensee,Contractor or Vendor | |
ML20059G546 | 4 September 1990 | Discusses 900816 Site Visit Re Const Activities Requiring Security Force Compensatory Measures & Security Plan | |
ML20059C983 | 30 August 1990 | Forwards Amend 117 to License DPR-36 & Safety Evaluation. Amend Modifies Tech Spec 3.14, Primary Sys Leakage, by Deleting Current Limit of 1.0 Gpm from All Steam Generator Tubes | |
ML20059B718 | 23 August 1990 | Discusses NRC Understanding of Licensee Informing of Completion of Component Cooling Water Heat Balance to Support Operation at 2,700 Mwt.Updated Heat Load Analysis Expected to Be Retained Onsite W/Design Basis Documents | |
ML20059E250 | 23 August 1990 | Forwards Insp Rept 50-309/90-13 on 900620-0731.Weaknesses Noted in Procedure Quality & Adherence | |
ML20059B983 | 13 August 1990 | Forwards Evaluation of Topical Rept Cen 387-P Re Pressurizer Surge Line Flow Stratification,Per NRC Bulletin 88-011,Item 1.b.Adequate Basis Not Provided to Conclude That Pressurizer Surge Line Meets All Appropriate ASME Code Limits | |
ML20058M614 | 7 August 1990 | Forwards Sample Registration Ltr for 901010 Generic Fundamentals Section of Written Operator Licensing Exam. Registration Ltr Listing Names of Candidates Taking Exam Should Be Submitted to Region 30 Days Prior to Exam Date | |
ML20058N050 | 6 August 1990 | Discusses Licensee Engineering Initiatives.Encourages Initiation of Initiative Similar to Region V Establishment of Engineering Managers Forum to Share Experiences | |
ML20056A940 | 3 August 1990 | Forwards Insp Rept 50-309/90-08 on 900507-11.No Violations Noted | |
ML20056A498 | 1 August 1990 | Forwards Master Bwr/Pwr Generic Fundamentals Exam Section W/Answer Key.W/O Encls | |
IR 05000309/1989082 | 30 July 1990 | Advises That Util Actions to Address NRC Bulletin 88-010 Re Nonconforming molded-case Circuit Breakers Complete,Per Insp Rept 50-309/89-82 | |
ML20055J435 | 23 July 1990 | Ack Receipt of 900702 Transmittal of Rev 26 to Physical Security Plan.Estimated Start & Completion Dates for Each Mod Project & Compensatory Measures Requested within 30 Days After Receipt of Ltr | |
ML20055G597 | 19 July 1990 | Forwards Insp Rept 50-309/90-10 on 900516-0619 & Notice of Violation.Util Actions to Prevent Recurrence of Similar Personnel & Procedural Errors Be Formally Submitted in Response to Encl Notice of Violation | |
ML20055G321 | 16 July 1990 | Accepts Util 900702 Response to NRC Bulletin 89-002, Stress Corrosion Cracking of High Hardeness Type 410 Stainless Steel Internal Preloaded Bolting in Anchor/Darling Model S350W Swing Check Valves or Valves of Similar Design | |
ML20055G738 | 13 July 1990 | Forwards Enforcement Conference Rept 50-309/90-11 on 900627 & Notice of Violation.Disagrees W/View Re Licensee Identified Violations.Weaknesses in Planning,Oversight & Controls of Radiological Work Resulted in Violations | |
ML20055E650 | 9 July 1990 | Discusses Generic Implications & Resolutions of Control Element Assembly (CEA) Failures at Maine Yankee.Waterford Unit 3 Does Not Have Old Style CEAs Installed in Reactor Core & Does Not Plan to Use Any in Future | |
ML20055F227 | 6 July 1990 | Forwards Physical Security Insp Rept 50-255/90-16 on 900618- 22 & 25.No Violations Identified | |
ML20055F147 | 6 July 1990 | Discusses Generic Implications & Resolution of Control Element Assemblies Failure at Plant.Requests Description of Analyses Planned & Schedule for Completion of Analysis within 60 Days of Ltr Receipt | |
ML20055G158 | 5 July 1990 | Advises That Changes to Plant Physical Security Plan, Acceptable,Per 890817,900116 & 0612 Ltrs | |
ML20055C880 | 14 June 1990 | Forwards Radiological Controls Insp Rept 50-309/90-09 on 900507-11.No Violations Noted.Observations by Inspector Indicated Improvement in Radiological Planning & Control of Outage Work Activities | |
ML20059M918 | 13 June 1990 | Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl | |
ML20059M920 | 13 June 1990 | Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl | |
ML20055C392 | 26 February 1990 | Approves Util 900214 Request for Use of B&W Steam Generator Plugs W/Alloy 690 as Alternative to Alloy 600.Alternate Matl Is nickel-base Alloy (ASME Designation SB-166) | |
ML20055C289 | 20 February 1990 | Forwards Safety Evaluation Accepting Util Assessment of Asymmetric LOCA Load Problems.Reviews Included Evaluation of plant-specific Cavity Pressure,Subcooled Blowdown & Structural Analyses | |
ML20248D377 | 27 September 1989 | Forwards Amend 10 to Indemnity Agreement B-51,reflecting Changes to 10CFR140,effective 890701 | |
IR 05000255/1989021 | 27 September 1989 | Forwards Safety Insp Rept 50-255/89-21 on 890718-0831.No Violations Noted | |
ML20248C932 | 26 September 1989 | Advises That 890823 Rev 23 to Security Plan Meets Provisions of 10CFR50.54(p) & Acceptable.Encl Withheld (Ref 10CFR73.21) | |
ML20248G973 | 20 September 1989 | Forwards Unexecuted Amend 13 to Indemnity Agreement B-69, Reflecting Increase in Primary Layer of Nuclear Energy Liability Insurance Provided by ANI & Maelu | |
IR 05000309/1989011 | 19 September 1989 | Forwards Insp Rept 50-309/89-11 on 890801-31.Instances That Need Mgt or Supervisory Attention Noted | |
ML20247M460 | 18 September 1989 | Forwards Radiological Controls Insp Rept 50-309/89-15 on 890821-24.No Violations Noted.Continuing Problems Noted Re Radiation Protection Deficiency Corrective Action Program | |
ML20247H641 | 12 September 1989 | Advises That 890816 Revisions to ATWS Mitigation Sys Acceptable W/Requirements of 10CFR50.62(c)(1) | |
ML20247K223 | 11 September 1989 | Forwards Amends 123 & 41 to Licenses DPR-61 & NPF-49, Respectively & Safety Evaluation.Amends Change Tech Specs 4.10.1.D.1.h & 4.4.5.4.a.8 to Allow Insp of Steam Generator Tubes by Insertion of Ultrasonic Test Probe | |
ML20247G112 | 9 September 1989 | Requests Detailed Design Analysis Supporting Util 890331 Proposed Design Enhancements Involving Offsite Automatic Bus Transfer Sys & Replacement of Existing X-14 Transformer W/Larger,More Capable Transformer | |
ML20247L147 | 8 September 1989 | Advises That Licensee Prepare Request for Disposal of Slightly Contaminated Chemical Cleaning Solution as Licensee Prepared 881102 Request Re Technical Content, Justification & Format & Modify or Resubmit Application | |
ML20247J756 | 7 September 1989 | Requests Addl Info for Closeout of IE Bulletin 79-15, Including Type & Application of Listed Pumps,Drawings, Sectional Assemblies & Parts List of Subj Pumps,Applicable P&Ids of Subj Pumps & Testing Requirements & Procedures |