Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20062G679 | 21 November 1990 | Forwards SE Determining That Load Profile Used During Surveillance Test Procedures Meets Requirement of Tech Spec 4.8.2.3.2.e,per Unresolved Item Noted in Insp Repts 50-317/90-80 & 50-318/90-80 | |
ML20062F048 | 19 November 1990 | Advises That SR Peterson Replacing C Poslusny as Project Manager for Facility,Effective 901105 | |
IR 05000317/1990028 | 14 November 1990 | Discusses 901102 Enforcement Conference Re Insp Repts 50-317/90-28 & 50-318/90-28 Covering Security Event | Contraband |
ML20062E682 | 14 November 1990 | Forwards Insp Rept 50-302/90-30 on 900924-28.No Violations or Deviations Noted | |
ML20216K154 | 13 November 1990 | Forwards Safety Insp Repts 50-317/90-31 & 50-318/90-31 on 901029-1102.No Violations Noted | |
ML20216K000 | 13 November 1990 | Forwards Insp Repts 50-313/90-30 & 50-368/90-30 on 900905- 1016 & Notice of Violation | |
IR 05000302/1990026 | 13 November 1990 | Ack Receipt of Responding to Violations Noted in Insp Rept 50-302/90-26.Response Meets Requirements of 10CFR2.201 | |
ML20217A013 | 9 November 1990 | Forwards Insp Repts 50-317/90-25 & 50-318/90-25 on 900916-1020.One Noncited Violation Noted | |
ML20058H641 | 9 November 1990 | Forwards Final SALP Rept 50-346/90-01 Covering Mar 1989 to June 1990 | |
IR 05000313/1990032 | 8 November 1990 | Ack Receipt of Outlining Steps to Provide Addl Technical Support for Radiation Protection Manager.Planned Actions Acceptable as Documented in Insp Repts 50-313/90-32 & 50-368/90-32 | |
ML20058G847 | 8 November 1990 | Forwards Insp Repts 50-313/90-32 & 50-368/90-32 on 900924-29.No Violations or Deviations Noted | |
ML20058G163 | 7 November 1990 | Forwards Summary of Current Status of Unimplemented Generic Safety Issues at Plant | |
IR 05000302/1990032 | 7 November 1990 | Discusses Insp Rept 50-302/90-32 on 900918-1005 & Forwards Notice of Violation | |
ML20062E078 | 2 November 1990 | Forwards Requalification Exam Rept 50-302/OL-90-01 Administered During Wk of 900917.Attention Should Be Given to Concern Over Exam Matl Development | |
ML20058E288 | 1 November 1990 | Rejects 900302 Request for Amend to Tech Specs to Revise Power Calibr Requirements for Linear Power Level & Core Protection Calculator delta-T Power & Nuclear Power Signals | |
ML20058E982 | 1 November 1990 | Forwards List of Unimplemented Generic Safety Issues at Plant,Per Util 900627 Response to Generic Ltr 90-04 | |
ML20058F637 | 31 October 1990 | Forwards Insp Rept 50-302/90-29 on 900908-1005.No Violations or Deviations Noted | |
ML20062D551 | 31 October 1990 | Forwards Insp Repts 50-313/90-31 & 50-368/90-31 on 901001-04.No Violations Noted | |
ML20062D576 | 31 October 1990 | Forwards Insp Repts 50-313/90-40 & 50-368/90-40 on 901015-19.No Violations Noted | |
ML20062D563 | 31 October 1990 | Forwards Insp Repts 50-313/90-37 & 50-368/90-37 on 901015-19.No Violations Noted | |
ML20058D662 | 30 October 1990 | Informs That Util Response to Bulletin 90-003, Relaxation of Staff Position in Generic Ltr 83-28, Acceptable | |
ML20058E714 | 30 October 1990 | Forwards Exam Forms & Answer Keys,Grading Results & Individual Answer Sheets for Each Applicant | |
ML20058D677 | 25 October 1990 | Forwards Exemption Request for Reactor Operators Selected for NRC Requalification Exam | Exemption Request |
ML20058F481 | 24 October 1990 | Forwards Safety Insp Rept 50-346/90-16 on 900814-1009.No Violations Noted | |
ML20062C189 | 24 October 1990 | Forwards Evaluation Rept Re Implementation of B&W Owners Group Safety & Performance Improvement Program at Plant | |
ML20058F149 | 23 October 1990 | Confirms Arrangements for Enforcement Conference to Be Conducted on 901031 at Region II Re Containment Integrity & Design Requirements for Maintaining Containment Integrity | |
ML20058A700 | 19 October 1990 | Forwards Safeguards Insp Repts 50-317/90-28 & 50-318/90-28 on 901010 & 11.Violation Noted | |
ML20058B081 | 19 October 1990 | Forwards Insp Rept 50-302/90-32 on 900918-1005.Violations Noted | |
ML20062C681 | 18 October 1990 | Forwards Safeguards Insp Rept 50-346/90-19 on 900924-28.No Violations Noted | |
ML20058A684 | 17 October 1990 | Forwards Insp Repts 50-317/90-23 & 50-318/90-23 on 900812- 0915.No Violations Noted | |
ML20058A521 | 16 October 1990 | Forwards Insp Repts 50-313/90-38 & 50-368/90-38 on 901001- 05.Violation Considered for Escalated Enforcement Action | |
ML20059P044 | 16 October 1990 | Authorizes Use of Inconel 690 (I-690) as Alternate to I-600 in Steam Generator Tube Sleeves/Plugs Per 10CFR50.55a(a)(3) | |
ML20058A081 | 15 October 1990 | Forwards Questions Re 900808 License Amend Request to Increase Reactor Power to 100% for Response | |
ML20062B570 | 15 October 1990 | Advises of Suspension of Action on Tech Spec Change Request 170 Re Pressure/Temp Limits Rept Until Suitable Solution Can Be Worked Out within Framework of Tech Spec Improvement Program,Per 890726 & 1031 Ltrs | |
ML20062B204 | 12 October 1990 | Advises of Acceptance of 900924 Response to Generic Ltr 90-03, Relaxation of Staff Position in Generic Ltr 83-28, Item 2.2,Part 2 Vendor Interface for Safety-Related Components | |
ML20059N942 | 12 October 1990 | Advises of Resolution of Auxiliary Feedwater Issue,Per .Issue Concerns Ability of AFW Sys to Provide Flow to Steam Generators Following Pipe Break | |
ML20058B156 | 12 October 1990 | Ack Receipt of 900928 Response Re Violations Noted in Insp Rept 50-302/90-24 | |
ML20062B669 | 12 October 1990 | Requests Analyses of Liquid Samples Spiked W/Radionuclides Be Completed within 60 Days of Sample Receipt | |
IR 05000317/1990008 | 11 October 1990 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-317/90-08 & 50-318/90-08 | |
ML20058A962 | 11 October 1990 | Forwards Insp Rept 50-302/90-31.No Violations or Deviations Noted | |
ML20062A551 | 10 October 1990 | Forwards SER Re Util 890403,13 & 0717 Responses to Station Blackout Rule.Issue of Conformance Still Open | |
ML20062B836 | 9 October 1990 | Forwards Special Team Insp Rept 50-317/90-24 on 900904-07 Re 900830 Reactor Vessel Water Level Anomaly | Reactor Vessel Water Level Temporary Modification |
ML20059N666 | 9 October 1990 | Forwards Correction to SER Re Request for Relief from ASME Boiler & Pressure Vessel Code,Section XI Requirements.W/O Encl | |
ML20059N578 | 9 October 1990 | Advises That Util 900510 Submittal of Revised Section of Inservice Insp Program Plan Addressed Provisions of Safety Evaluation | |
ML20059N411 | 4 October 1990 | Forwards Insp Rept 50-302/90-27 on 900917-21.No Violations or Deviations Noted.Rept Withheld (Ref 10CFR2.790 & 73.21) | |
IR 05000313/1990001 | 4 October 1990 | Ack Receipt of 900420 & 0914 Ltrs Re Validation of Nonlicensed Operator Staffing Per Insp Repts 50-313/90-01 & 50-368/90-01 | |
ML20059N223 | 1 October 1990 | Forwards Safety Evaluation Accepting Proposed Actions Re Potential Design Deficiency,Per LER 89-023 | |
ML20059N118 | 28 September 1990 | Forwards Safety Insp Repts 50-317/90-22 & 50-318/90-21 on 900827-31.No Violations Noted.Post Maint Testing Program Assessed to Be Comprehensive,Well Implemented & Met Objectives of Performance Improvement Program | |
ML20059M775 | 27 September 1990 | Advises That NRC Approved Request for Relief from ASME Code Section XI Re Reactor Coolant Charging Pumps in | |
ML20059M044 | 26 September 1990 | Approves 900809 Request to Withhold 86-1179795-01, ANO-1 HPI Flow Rate Requirements (Ref 10CFR2.790(b)(5)) |