Issue date | Title | Topic | |
---|---|---|---|
ML23348A394 | 14 December 2023 | Interim Part 21 Report of a Potential Deviation or Failure to Comply Associated with Starter Contactors for the High Pressure Coolant Injection Suppression Pool Inboard Suction Valve | |
ML24004A209 | 12 December 2023 | Flowline, Inc. - Interim Part 21 Report Notification Regarding Supply of 1 Sch. 80 (0.179 Wall) SB466 Uns C71500 Buttweld Long Radius 90 Degree Elbow; Manufacturer: Flowline; Heat No: 27668; 27 Pieces - Heat Code | |
ML23352A238 | 8 December 2023 | 56882-EN 56882 - Tioga Pipe, Inc Interim Part 21 Report Re Supply of 1 Inch Sch. 80 SB466 Uns C71500 Buttweld Long Radius 90 Degree Elbow | |
ML23335A072 | 1 December 2023 | Interim Report of a Deviation or Failure to Comply Associated with a Relay in the Unit 2 Reactor Core Isolation Cooling Condensate Pump | |
ML23320A254 | 16 November 2023 | Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump | |
ML23282A002 | 6 October 2023 | Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump | |
NLS2023049, 10 CFR Part 21 Report Regarding HGA Relays | 6 September 2023 | 10 CFR Part 21 Report Regarding HGA Relays | |
ML23212A950 | 24 May 2023 | Engine Systems, Inc., Part 21 Report Re Woodward EGB-35P Governor/Actuator with Foreign Material | |
ML22208A004 | 17 June 2022 | Nutherm International, Inc., USNRC 10CFR Part 21 Notification Reference: Arnold Magnetics Power Supply Part Number PBM-24-106 | |
ML22153A079 | 7 April 2022 | 10CFR Part 21 Notification for Curtiss-Wright Supplied RCS-Dresser Actuator P/N: SURE-24-10-4 | |
ML21322A051 | 27 October 2021 | Paragon Energy Solutions, LLC, P21-09282021, Rev. 0, Final Notification of a Deviation with Inverter Assembly (Model NLI-072034-CSI-K-5-A) | |
ML21295A247 | 18 October 2021 | Engine Systems, Inc., Part 21 Reportable Notification on a Pressure Regulator Valve | Dedication package |
ML21294A029 | 4 October 2021 | Flowserve Part 21 Notification for Limitorque Supplied DC Motor | |
ML21260A007 | 9 September 2021 | Ametek Solidstate Controls, Notification of Potential Defect - 10CFR Part 21 Report Re Omron Timer Relay | |
ML20049A075 | 11 February 2020 | C&D Technologies, Inc. -10 CFR Part 21 Evaluation Regarding Container Failure in KCR-07 Batteries | |
ML19347A426 | 10 December 2019 | General Atomics - Reportable Occurrence Under 10CFR21: Reported Failure in Analog High Range Radiation Monitor (RP-2C) | Post Accident Monitoring |
ML19317D093 | 25 October 2019 | Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0127, Rev. 0, Emd Fuel Injectors - Seized Plunger and Bushing | |
ML19295D732 | 11 October 2019 | Engine Systems, Inc. Report No. 10CFR21-0125, Rev. 1 - Signal Converter Transmitter | Safe Shutdown Commercial Grade Dedication |
ML19253A053 | 29 August 2019 | Azz Nuclear - Report of Potential 1O CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors | |
ML19219A152 | 22 July 2019 | Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance Report No. 10CFR21-0125, Rev. 0, Signal Converter Transmitter P/N SCT/4-20MA/4-20MA/24DC/-LIM-TA(DCM) | Safe Shutdown |
ML19207A056 | 19 July 2019 | Engine Systems, Inc. - Part 21 Report 10CFR21-0125, Rev. 0, for a 10CFR21 Reportable Notification on a Signal Converter Transmitter | Safe Shutdown Commercial Grade Dedication |
ML19190A044 | 7 June 2019 | 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 | |
ML19165A027 | 5 June 2019 | 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0125-INT, Rev. 0 | Safe Shutdown |
ML19168A012 | 31 May 2019 | Paragon Energy Solution LLC-10 CFR Part 21 Report of Defect GS2 Terry Turbine Introl Positioners | |
ML19120A106 | 17 April 2019 | Interim Report of Potential 10 CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors | |
ML19080A059 | 8 March 2019 | Interim Report of Potential 10CFR Part 21, Eaton A200 Series Starters/Contactors | |
ML19024A164 | 7 January 2019 | Ametek - Notification of Potential Defect - 10CFR Part 21 Re Solidstate Controls Safety-Related Operational Spare Parts Kits | Commercial Grade Dedication Commercial Grade |
ML19002A204 | 21 December 2018 | to Engine Systems, Inc., Part 21 Report Re Emd Fuel and Soakback Pumps - Potentially Undertorqued Cover Bolts | |
ML18341A247 | 6 December 2018 | Mirion Technologies - 10 CFR Part 21.21 Report Re Relays Defect | |
ML18354A742 | 4 December 2018 | Engine Systems, Inc., Submittal of 1OCFR21 Reporting of Defects and Non-Compliance - Report No. 1OCFR21-0123, Rev. 0 - Emo Fuel and Soakback Pumps - Potentially Undertorqued Cover Bolts | |
ML18302A228 | 19 October 2018 | Itt Enidine - USNRC 10CFR Part 21 Notification | |
ML18102A529 | 3 April 2018 | 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0121, Rev. 0, Refurbished Pressure Regulator Assembly, P/N 1776 506. | Safe Shutdown |
ML18087A003 | 21 March 2018 | Crane Nuclear, Inc. - Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl 10x8x10 and 6x4x6 Bolted Bonnet Gate Valve (Updated) | |
ML18079A014 | 6 March 2018 | Crane Nuclear, Inc., 10 CFR Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl I0x8x10 and 6x4x6 Bolted Bonnet Gate Valve | |
ML18075A355 | 6 March 2018 | 10 CFR Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl 10x8x10 and 6x4x6 Bolted Bonnet Gate Valve | |
ML18003A260 | 19 December 2017 | Crane Nuclear, Inc. - 10 CFR Part 21 Notification of Defect on Weak Link Analysis for Chapman Gate Valve Figure L900, Item #18, Drawing CC05307, Revision B | Weak link |
ML17212A628 | 24 July 2017 | Lake Engineering Co. - Potentially Degraded Snubber SF1154 Hydraulic Fluid Second - Interim Notification Per 10 CFR Part 21 | |
ML17194A825 | 11 July 2017 | Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections | Anchor Darling |
ML17179A378 | 7 June 2017 | TE Connectivity - Part 21 Transfer of Information TE-023 | |
ML17142A323 | 11 May 2017 | Interim Report Concerning Supply of Stainless Steel Tubing | |
ML17114A069 | 19 April 2017 | Part 21 Report - Control Rod Drive Mechanisms Contaminated with Chlorides | Safe Shutdown Pressure boundary leak |
ML17114A070 | 13 April 2017 | Part 21 Notification - Identified Fisher 546S Electro-Pneumatic Transducers Standard Mounting Brackets Failed Seismic Testing Standards | |
ML17090A397 | 28 March 2017 | Part-21 Notification - Willful Misconduct and Falsification of Records | VT-2 |
ML17081A453 | 20 March 2017 | Part 21 - Plastic Jar Dedication Sampling | |
ML17039A569 | 3 February 2017 | Final Part 21 Report on Defect, Potential for Test Induced Damage 0867F Series Main Steam Safety Relief Valves | |
ML17026A414 | 20 January 2017 | C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling | |
ML16321A451 | 21 October 2016 | Part 21 Reporting of Defects and Noncompliance | |
ML16294A264 | 18 October 2016 | Part 21 Report - Defective Current to Pressure Transducers | |
ML16281A271 | 30 September 2016 | Part 21 - Safety Related Component Welding by an Unqualified Welder | |
ML16281A270 | 22 September 2016 | Part 21 - Initial Notification of Masterpact Breaker Fail to Close |