Interim Report of Potential 10 CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors
ML19120A106
Person / Time
Site: Hatch, Calvert Cliffs, Peach Bottom, Harris, Saint Lucie, Grand Gulf, Pilgrim, Braidwood, Susquehanna, Limerick, Robinson  Constellation icon.png
Issue date: 04/17/2019
From: Bolt T
AZZ / NLI Nuclear Logistics, AZZ Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
P21-02082019IR-l, Rev. 1
Download: ML19120A106 (2)


Text

l Date: April 17, 2019 e~z NUCLEAR Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 Fax Number (301) 816-5151 Part 21 Report No: P21-02082019IR-1, Rev. 1

Subject:

Interim Report of potential 10CFR Part 21, EATON Size 1 and 2 A200 Series Starters/Contactors Pursuant to 10CFR21.21 (d) (3) (ii), AZZ Nuclear is providing written notification of the identification of a deviation.

PDMS material has been identified in the Eaton A200 series starters/contactors with. date ,code T4115 (41 st week of 2015) which is outside the range of May 2008 to De.ceml:,er 20.12 tb,ai wen: originally identified in NRC Event 51611 from 2015. * * ** * * '

Tl;l.e deyiation reported to AZZ by Susquehanna is currently under review. The failed units have been supplied;,, to AZZ: for evaluation. The evaluation is still in process to determine if there are other yariables* which may have contributed to the condition that was reported at the plant. The units being evaluated are only the size 1 style. The size 2 units are the same basic configuration as.the size 1. There hav~.been no reported issues with size 3 and*greater. ,, .. ;*,. * * ,..,  :. * ' * ., ...

to The: .Size' f3,

  • 4; :. 5: A200, *Starters !and C'c:iii~tors' are inofl~Ubjeet* *'thiih1l'otification and are not being

~vatuate4. :since, there have. been: n6 reported; failures:

  • The: co'ii'strbction o:fih~*: *strtrt~rs/96htad&s 1is* 'i differ.enU:lesign:*. ::*.:, * ,,.,. '.,;;::* .. ** , ,::. :e: .* .*r*  ; ,i* * *** *:*, .. :;u: ::, ,.,,,*:.. ,. *..* ,

',. * i 'r ; ; ;  !  :.it*:*:  ; ,.. : tr: ( ; '; '.;'* .'.

AZZ Nuclear is expecting to have the evaluation completed by 5/15/2019.

The application in which the unit was discovered to not operate as expected:

At Susquehanna Station, Drywell Cooling Fan application, Continuous Duty Operation, Size 1 R~yersing: st~rter installed in a 2-speed configuration utilizing an additional non-reversing starter ~ire~ ,

in.~* configmation- to allow Jor:jF,ast :speed'~and'. Slow Spbed**bp~fration.' fhe1i2ohditi<lfi.' 1~~s' 1ftlen!i~~4 ;

QUfinga,SUrVe,illanC¢,aOtivit)'Oll'the:teV.efSillg ;Sfartef,pdrfidrifdf the 'llSSetnbly;; :_;', 'lf;(-* :; :_;,: " 1 . I' :: : ,, .. : ' ..*

Additional facilities where the A200 Ser*fos Statfer/Contactors have been supplied by AZZ Nuclear /

  • NuclearLogistics: * * *. . ,, ... , . . . ,.. * *j *' ;"** 1:

~* ' ' ' I ', .. ,* * \ ' ' ' 1 ,'\ '. ' '

BRAIDWOOD*::

CALVERT CLlFFS * ,,.,

' .*~ ' .  ! ..' ! ': ~.

,-,-/~_cl

. _._-- l- I q

ORAND GULF *,. *' ' *, "

HATCH (l/';(fi._

'.' . l '

,P2 .l-02,082019IR,.,l, RfV. 1 ~ *:r*

  • *** *
  • fag_e,l of2 :
  • HBROBINSON KRSKO eAZz NUCLEAR LIMERICK PEACH BOTTOM PILGRIM PSEG SHEARON HARRIS ST. LUCIE The following information is required per 10CFR 21.21 (d) (4).

(i) Name and address of the individual or individuals informing the Commission.

Tracy Bolt, Director of Quality Assurance AZZ Nuclear 7410 Pebble Drive Ft. Worth, TX 76118 Please contact me with any questions or comments.

Sincerely, tracybolt@azz.com 817-284-0077 P21-02082019IR-l, Rev. 1 Page 2 of2