ML17090A397

From kanterella
Jump to navigation Jump to search
Part-21 Notification - Willful Misconduct and Falsification of Records
ML17090A397
Person / Time
Site: Cooper, Cook  Entergy icon.png
Issue date: 03/28/2017
From: Stuckey W
System One Solutions
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
52383
Download: ML17090A397 (2)


Text

0312812017 U.S. J'fuc/ear Regulatory Commission Operations Center Event Report Pagel Part 21 (PAR) Event# 52383 Rep Org: SYSTEM ONE SOLUTIONS LLC Notification Date I Time: 11/21/2016 11 :43 (EST)

Supplier: SYSTEM ONE SOLUTIONS LLC Event Date I Time: 10/28/2016 (EST)

Last Modification: 03/28/2017 Region: 1 (

Docket#:

City: CHESWICK Agreement State: Yes County: License#:

State: PA NRC Notified by: WILLIAM STUCKEY Notifications:,: AARON McGRAW R3DO HQ Ops Officer: MARK ABRAMOVITZ \

\.

Emergency Class: NON EMERGENCY PART 21/50.55 REACTORS EMAIL 10 CFR Section: JAMES DWYER R1DO 21.21 (d)(3)(i) DEFECTS AND NONCOMPLIANCE '

/

PART-21 NOTIFICATION - WILLFUL MISCONDUCT AND FALSIFICATION OF RECORDS The following report was excerpted from an e-mail:

"On September 28th, System One received an email from Curtis Wright that a 'forged' VT-1, 2, 3 Level II training record was being circulated by [an individual], who was seeking employment with Applied Technical Services.

"On September 28th 2016, System One voided the certification of [the individual] and proceeded to address the condition under the nonconformance reporting process.

"On October 11th, 2016, System One determined that [the individual], who was certified in VT-1, 2, 3 by the System One Quality Assurance Manager, did not fully meet the certification requirements of the System One Written Practice under CP-199 (in effect at the time) due to lack of acceptable VT [visual testing] Training (40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> of required class room training) to support the VT-1, VT-2 and VT-3 certification issued by System One. A review of the original certification record found/confirmed there was indication of alteration on a training record used for the original certification.

"On October 28th, 2016, System One notified stakeholders (AREVA NP). [The individual was deployed to Areva on two occasions] based upon holding VT-1, 2, 3 certification.

AREVA NP - deployed in 10/7/2012 to Cooper with VT-1, 2, 3 Certification AREVA NP - deployed in 3/31/2013 to DC Cook with VT-1, 2, 3 Certification Carolina Energy Services - deployed in 8/23/2013 - certification conducted by CES not System One LLC.

AREVA NP - deployed in 10/27/2013 to Palo Verde with PT Level II and QC Mechanical (not deployed for VT-1, 2, 3)

0312812017 U.S. Nuclear Regulatory Commission Operations Center Event Report Page 2 "AREVA NP has informed System One that they have conducted/completed their extent of condition review regarding work performed by [the individual], and confirmed to System One, that [the individual] did not perform any safety related VT-1, 2, 3 work at either the D. C. Cook or Cooper facilities.

"Our internal investigation has determined this matter does not represent a breakdown in the mechanics of the System One Quality Assurance Program or procedures in effect at the time. We have established the event

  • rE!presents willful misconduct and the falsification of a record by an individual, and use of such forged record, under 10 CFR references contained in US NRC Information Notice 2013-15."
      • UPDATE ON 3/28/~7 BY BETHANY CECERE***

System One determined that the individual who had been deployed to the various sites referenced, did not falsify the certification documents in question.

Notified R1 DO (Cook), R3DO (Cameron), R4DO (Hipschman), and Part 21/50.55 Reactors Group by email.