MONTHYEARNLS2023049, 10 CFR Part 21 Report Regarding HGA Relays2023-09-0606 September 2023 10 CFR Part 21 Report Regarding HGA Relays ML21260A0072021-09-0909 September 2021 Ametek Solidstate Controls, Notification of Potential Defect - 10CFR Part 21 Report Re Omron Timer Relay ML19295D7322019-10-11011 October 2019 Engine Systems, Inc. Report No. 10CFR21-0125, Rev. 1 - Signal Converter Transmitter ML19219A1522019-07-22022 July 2019 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance Report No. 10CFR21-0125, Rev. 0, Signal Converter Transmitter P/N SCT/4-20MA/4-20MA/24DC/-LIM-TA(DCM) ML19207A0562019-07-19019 July 2019 Engine Systems, Inc. - Part 21 Report 10CFR21-0125, Rev. 0, for a 10CFR21 Reportable Notification on a Signal Converter Transmitter ML19190A0442019-06-0707 June 2019 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19165A0272019-06-0505 June 2019 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0125-INT, Rev. 0 ML19168A0122019-05-31031 May 2019 Paragon Energy Solution LLC-10 CFR Part 21 Report of Defect GS2 Terry Turbine Introl Positioners ML18302A2282018-10-19019 October 2018 Itt Enidine - USNRC 10CFR Part 21 Notification ML18191B1712018-07-0505 July 2018 Emerson - Submittal of Information Notice, (FIN) 2018-02, Licensees or Purchaser of Deviations or Failures to Comply ML18087A0032018-03-21021 March 2018 Crane Nuclear, Inc. - Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl 10x8x10 and 6x4x6 Bolted Bonnet Gate Valve (Updated) ML18079A0142018-03-0606 March 2018 Crane Nuclear, Inc., 10 CFR Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl I0x8x10 and 6x4x6 Bolted Bonnet Gate Valve ML18075A3552018-03-0606 March 2018 10 CFR Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl 10x8x10 and 6x4x6 Bolted Bonnet Gate Valve ML18022A2822018-01-0505 January 2018 Engine Systems, Inc., Submittal of Defects and Non-Compliance Thermostatic Valve Assembly, P/N 6BOCF14001 ML17194A8252017-07-11011 July 2017 Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections ML17114A0702017-04-13013 April 2017 Part 21 Notification - Identified Fisher 546S Electro-Pneumatic Transducers Standard Mounting Brackets Failed Seismic Testing Standards ML17090A3972017-03-28028 March 2017 Part-21 Notification - Willful Misconduct and Falsification of Records ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML16321A4512016-10-21021 October 2016 Part 21 Reporting of Defects and Noncompliance ML16294A2642016-10-18018 October 2016 Part 21 Report - Defective Current to Pressure Transducers ML16243A4722016-08-25025 August 2016 Part 21 Reporting of Defects and Noncompliance ML16209A0502016-07-13013 July 2016 Part 21 - Furmanite Nuclear Grade Leak Seal Material FSC-N-1B ML16139A8342016-05-10010 May 2016 Electroswitch - Transmittal of 10CFR Part 21 Reporting of Defects and Noncompliance Regarding Vendor Inspection of Electroswitch Corporation Docket No. 99900833 ML16039A2692016-02-0303 February 2016 Nutherm International, Inc. - Potential Issue Regarding Incorrect Industrial Irradiation Dose, Per Cooper, Oconee, Fitzpatrick, Point Beach, Brunswick, and Susquehanna ML15103A4852015-04-0707 April 2015 Itt Engineered Valves - 2nd Interim Report to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M I Diaphragms, Customer Testing ML15022A6502015-01-20020 January 2015 Letter from Steven R. Eisenberg USNRC 10CFR Part 21 Notification ML14274A0522014-09-22022 September 2014 Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities ML14261A1502014-09-17017 September 2014 Interim Report to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M1 Diaphragms, Customer Testing ML14210A0102014-07-23023 July 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML14204A7082014-07-23023 July 2014 Enclosure 2, Description of Closure Evaluation, Non-Proprietary Information - Class I (Public) ML14204A7072014-07-23023 July 2014 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV ML14134A1212014-05-0909 May 2014 Notification of Potential Part 21 - Potential Defect in General Electric Type CR120AD Control Relays ML14113A3982014-04-17017 April 2014 Part 21 - Bearing Defect W3F1-2014-0026, Notification of Potential Part 21 Report of Time-Delay Relays Spurious Actuation2014-04-11011 April 2014 Notification of Potential Part 21 Report of Time-Delay Relays Spurious Actuation ML14101A3432014-04-10010 April 2014 Notification of Part 21 - Potential Defect in General Electric Type CR120 AD Control Relays ML14094A4452014-04-0101 April 2014 Notification of Part 21 Report on Defective Raw Material Used to Manufacture Valve Stems ML14079A3532014-03-17017 March 2014 Notification of Part 21 Re Bearing Defect ML14069A4682014-03-0202 March 2014 Part 21 Report - Defective Raw Material Used to Manufacture Valve Stems ML14042A2022014-02-0505 February 2014 Part 21 Report Regarding Unqualified Material Used in Electrical Penetration Assemblies ML13277A0102013-09-23023 September 2013 Interim Report Update for Component ASME Material Supplied by Mirion Technologies (Conax Nuclear), Inc. (Mtcn), as Part of Containment Electric Penetration Assemblies (EPA) ML13246A0842013-08-23023 August 2013 Notification of Potential Defect & Interim Report Regarding a Potential Defect of Materials Supplied to Operating Us Nuclear Power Plants by Mirion Technologies (Conax Nuclear) Inc. (Mtcn) with Containment Electric Penetration Assemblies ML13211A1682013-07-26026 July 2013 Westinghouse, Notification of Potential Existence of Defects Pursuant to 10 CFR Part 21 Inconsistency Between the Intended Design Functionality of the Shield Passive Thermal Shutdown Seal (SDS) and That Observed During Post-Service Testing ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13092A1182013-03-29029 March 2013 Notification of Potential Part 21 Interim Report on the Failure of an Emergency Diesel Generator Excitation System ML13073A1072013-03-12012 March 2013 Notification of Potential Part 21 Report - Defective Raw Material Used to Manufacture Valve Stems ML13064A0122013-02-25025 February 2013 Notification of Potential Part 21 Report Re Wedge Pin Failure of an Anchor/Darling Double-Disc Gate Valve ML13042A0962013-02-0808 February 2013 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Error in Main Steam Line High Flow Calculational Methodology ML13044A0752013-02-0808 February 2013 Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology ML13024A0302013-01-0909 January 2013 MPR Associates Inc., Interim Report in Accordance with 10 CFR Part 21 2023-09-06
[Table view] |
Text
0312812017 U.S. J'fuc/ear Regulatory Commission Operations Center Event Report Pagel Part 21 (PAR) Event# 52383 Rep Org: SYSTEM ONE SOLUTIONS LLC Notification Date I Time: 11/21/2016 11 :43 (EST)
Supplier: SYSTEM ONE SOLUTIONS LLC Event Date I Time: 10/28/2016 (EST)
Last Modification: 03/28/2017 Region: 1 (
Docket#:
City: CHESWICK Agreement State: Yes County: License#:
State: PA NRC Notified by: WILLIAM STUCKEY Notifications:,: AARON McGRAW R3DO HQ Ops Officer: MARK ABRAMOVITZ \
\.
Emergency Class: NON EMERGENCY PART 21/50.55 REACTORS EMAIL 10 CFR Section: JAMES DWYER R1DO 21.21 (d)(3)(i) DEFECTS AND NONCOMPLIANCE '
/
PART-21 NOTIFICATION - WILLFUL MISCONDUCT AND FALSIFICATION OF RECORDS The following report was excerpted from an e-mail:
"On September 28th, System One received an email from Curtis Wright that a 'forged' VT-1, 2, 3 Level II training record was being circulated by [an individual], who was seeking employment with Applied Technical Services.
"On September 28th 2016, System One voided the certification of [the individual] and proceeded to address the condition under the nonconformance reporting process.
"On October 11th, 2016, System One determined that [the individual], who was certified in VT-1, 2, 3 by the System One Quality Assurance Manager, did not fully meet the certification requirements of the System One Written Practice under CP-199 (in effect at the time) due to lack of acceptable VT [visual testing] Training (40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> of required class room training) to support the VT-1, VT-2 and VT-3 certification issued by System One. A review of the original certification record found/confirmed there was indication of alteration on a training record used for the original certification.
"On October 28th, 2016, System One notified stakeholders (AREVA NP). [The individual was deployed to Areva on two occasions] based upon holding VT-1, 2, 3 certification.
AREVA NP - deployed in 10/7/2012 to Cooper with VT-1, 2, 3 Certification AREVA NP - deployed in 3/31/2013 to DC Cook with VT-1, 2, 3 Certification Carolina Energy Services - deployed in 8/23/2013 - certification conducted by CES not System One LLC.
AREVA NP - deployed in 10/27/2013 to Palo Verde with PT Level II and QC Mechanical (not deployed for VT-1, 2, 3)
0312812017 U.S. Nuclear Regulatory Commission Operations Center Event Report Page 2 "AREVA NP has informed System One that they have conducted/completed their extent of condition review regarding work performed by [the individual], and confirmed to System One, that [the individual] did not perform any safety related VT-1, 2, 3 work at either the D. C. Cook or Cooper facilities.
"Our internal investigation has determined this matter does not represent a breakdown in the mechanics of the System One Quality Assurance Program or procedures in effect at the time. We have established the event
- rE!presents willful misconduct and the falsification of a record by an individual, and use of such forged record, under 10 CFR references contained in US NRC Information Notice 2013-15."
- UPDATE ON 3/28/~7 BY BETHANY CECERE***
System One determined that the individual who had been deployed to the various sites referenced, did not falsify the certification documents in question.
Notified R1 DO (Cook), R3DO (Cameron), R4DO (Hipschman), and Part 21/50.55 Reactors Group by email.