RBG-41094, Provides Rept on Plant Training Simulator Testing Program. Testing Program for 1991-94 Completed on Schedule.No Uncorrected Performance Test Failures.Schedule for 1995-98 Simulator Performance Testing Encl

From kanterella
Jump to navigation Jump to search
Provides Rept on Plant Training Simulator Testing Program. Testing Program for 1991-94 Completed on Schedule.No Uncorrected Performance Test Failures.Schedule for 1995-98 Simulator Performance Testing Encl
ML20078Q776
Person / Time
Site: River Bend Entergy icon.png
Issue date: 12/13/1994
From: James Fisicaro
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
RBF1-94-0126, RBF1-94-126, RBG-41094, NUDOCS 9412230069
Download: ML20078Q776 (4)


Text

.. ..-.. . . - -. . _

. . ~ . - ,. .

Entergy Operations, Inc.

4 1

River Bend Stat.on 5485 US. H,ghway 61

" ENTERGY T J % % a 70775 (504) 336 6225 FAX (504) 635 5068 JAMES J. FISICARO D rector Nuclear Safety December 13,1994 Director, Office of Nuclear Reactor Regulation

. Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

IUver bend Station - Unit 1 Docket No. 50-458 License No. NPF-47 Simulator Performance Testing Schedule File No. G9.5, G9.25.1 J

RBG-41094 RBF 1-94-0126 Gentlemen:

Pursuant 10CFR55.45(b) (4) (iii), Entergy Operations, Incorporated is providing the following report on the River Bend Station training simulator testing program.

The testing program for 1991 through 1994, described in the December 17,1990 submittal, was completed as scheduled. There were no uncorrected performance test failures. The schedule for 1995 through 1998 simulator performance testing is attached. Testing results and supporting documentarian are on file at the River Bend Station Training Center.

If further information is required, please contact Mr. L.G. Lewis at (504) 381-4752.

Sincerely,

.4>>a f Lcw JHM/kym Attachments 9412230069 DR 94121v '

ADOCK 05000459 .

I PDR g w, . _ _ - -

  • l Simulator Performance Testing Schedule December 13,1994 RBG-41094 RBF1-94-0126 Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington. TX 76011 NRC Sr. Resident Inspector P.O. Box 105i St. Francisville LA 70775 i

j l

)

ATTACilMENT

/

i SIMULATOR PERFORMANCE TESTING SCHEDULE 1995 - 1998 1 - Tests to be performed each year 1 - Computer Real Time Test 2 - Steady State and Normal Operations Tests 3 - Transient Tests 2 - Tests to be performed during calendar year 1995 1 - Steam Leak Inside the Drywell 2 - Steam Leak Outside the Containment 3 - Relief Valve B21-F041A Fails Open 4 - Instrument Air Line Rupture 5 - Loss of 1NPS-SWG1A 6 - Loss of 1NPS-SWG1B 7 - Loss of 1NPS-SWG1C 8 - Loss of 1NNS-SWG1A 9 - Loss of 1NNS-SWG1B 10 - Loss of 1NNS-SWG1C 11 - Loss of 1 ENS *SWG1A 12 - Loss of 1 ENS *SWG1B 13 - Loss of 1E22*S004 14 - Loss of 1EJS*SWG1A 15 - Loss of 1EJS*SWG1B 16 - Loss of 1EJS*SWG2A 17 - Loss of 1EJS*SWG2B 18 - Loss of 1E22*S002 19 - Loss of 1NJS-LDC1A 3 - Tests to be performed during calendar year 1996 1 - Loss of 1NJS-LDC1B 2 - Loss of 1NJS-LDC1C 3 - Loss of 1NJS-LDC1D 4 - Loss of 1NJS-LDC1E 5 - Loss of 1NJS-LDC1F 6 - Loss of 1NJS-LDC1G 7 - Loss of 1NJS-LDC1H 8 - Loss of 1NJS-LDC1J 9 - Loss of 1NJS-LDC1K 10 - Loss of 1NJS-LDC1L 11 - Loss of 1NJS-LDC1M 12 - Loss of 1BYS-SWG1A 13 - Loss of 1BYS-SWG1B 14 - Loss of 1ENB*SWG1A 15 - Loss of 1ENB*SWG1B 16 - Loss of 1E22*S001 17 - Loss of 1SCM-PNL01A 18 - Loss of 1SCM-PNLO1B 19 - Loss of 1VBS*PNL01A 1

ATTACllMENT ,

~ '

./

o 4 - Tests to be performed during calendar year 1997 1 - Loss of 1VBS*PNL01B 2*- Loss of 1VBN-PNL01A1 3 - Loss of IVBN-PNL01B1 4 - Loss of RPS-A 5 - Loss of RPS-B 6 - Loss of Offsite Power 7 - 1CNS-H/A103 Fails Low 8 - 1CNS-H/A104 Fails Low 9 - 1CNS-H/A103 Fails High 10 - 1CNS-H/A104 Fails High 11 - Main Condenser Vacuum Loss 12 - Loss of NSW Pump / Loss of NSW 13 - RHR Pump Trip 14 - Loss of CCP Pump / Loss of CCP 15 - Loss of CCS Pump / Loss of CCS 16 - Feedwater Regulating Valve Failure 17 - Feedwater Pump Trip 18 - RPS Failure to SCRAM on Low Water Level 19 - Control Rod Drifts In 5 - Tests to be performed during calendar year 1998 1 - Control Rod Drifts Out 2 - Control Rod Accumulator Failure 3 - Stuck Control Rod 4 - Control Rod Uncoupled 5 - CRD Pump Trip 6 - Fuel Cladding Failure 7 - Turbine Trip 8 - Generator Trip 9 - EHC Pressure Regulator Fails Low 10 - EHC Pressure Regulator Fails High 11 - SRM Failure - Inoperative 12 - IRM Failure - Inoperative 13 - APRM Failure - Inoperative 14 - Feedwater Master Level Controller Fails Low 15 - MSR Level Controller Fails 16 - RCIC Fails to Auto Start 17 - HPCS Fails to Auto Start 18 - RPS Fails to SCRAM 19 - Turbine Bypass Valves Fail Closed 20 - Turbine Bypass Valves Fail Open 2  !