Similar Documents at Fermi |
---|
Category:Manual
MONTHYEARNRC-24-0049, Inservice Testing Program for Pumps and Valves, Part 11: 1st Program Valve Basis, Revision 22024-06-27027 June 2024 Inservice Testing Program for Pumps and Valves, Part 11: 1st Program Valve Basis, Revision 2 ML23030A3402023-01-12012 January 2023 Technical Requirements Manual - Volume 1, Revision 133 ML22138A1742022-04-27027 April 2022 Technical Requirements Manual, Volume I ML22081A0282022-03-0909 March 2022 Technical Requirements Manual, Vol 1, Rev. 131 ML22032A1572022-01-19019 January 2022 Technical Requirements Manual - Vol. 1 Revision 130 Dated 01/19/2022 ML21362A1602021-12-0909 December 2021 Technical Requirements Manual - Volume 1, Revision 129 ML21307A0832021-10-12012 October 2021 Rev. 128 to Technical Requirements Manual Vol. I ML21251A1602021-08-17017 August 2021 Technical Requirements Manual - Vol 1 - (Revision 127 Dated 08/17/2021) ML21230A2592021-07-29029 July 2021 Technical Requirements Manual, Vol. I ML21118A0262021-04-0101 April 2021 Technical Requirements Manual - Vol. I ML21053A2022021-02-0101 February 2021 Technical Requirements Manual, Vol 1 - Revision 124 Dated 02/01/2021 ML20132A1152020-04-16016 April 2020 Technical Requirements Manual, Volume 1 ML20013E5302019-12-20020 December 2019 Technical Requirements Manual, Vol 1 ML20024D8252019-12-0707 December 2019 Technical Requirements Manual - Vol 1 ML18334A0992018-11-14014 November 2018 Technical Requirements Manual, Vol. 1 ML18319A0942018-10-15015 October 2018 Technical Requirements Manual, Volume 1, Revision 117 ML18302A1162018-10-12012 October 2018 Technical Requirements Manual - Vol. 1 ML18302A1172018-10-11011 October 2018 Technical Requirement Manual - Vol. 1 ML18291A9122018-09-21021 September 2018 Technical Requirements Manual, Vol. 1 ML18262A2082018-09-0707 September 2018 Technical Requirements Manual ML18192B9842018-06-26026 June 2018 Technical Requirements Manual, Vol. 1, Revision 112 ML17305A0382017-10-16016 October 2017 Enclosures 1-6: 10CFR50.59 Evaluation Summary Report, Commitment Management Report, Revisions to Technical Requirements Manual and Technical Specifications Bases ML17145A2862017-05-0303 May 2017 Licensing Document Transmittal - Fermi 2 Technical Requirements Manual, Vol. 1, Rev. 111 ML15351A4072015-11-20020 November 2015 Technical Requirements Manual, Volume I ML14224A0092014-07-24024 July 2014 Technical Requirements Manual, Volume I, Revision 108 ML14177A6472014-06-12012 June 2014 Technical Requirements Manual, Volume 1 ML14098A2542014-03-19019 March 2014 Transmittal of Technical Requirements Manual - Vol I, Revision 106 ML13339A3352013-11-21021 November 2013 Licensing Document Transmittal Fermi 2 Technical Requirements Manual - Vol I ML13079A3362013-03-0606 March 2013 Technical Requirements Manual, Vol I ML12110A0862012-04-0404 April 2012 Technical Requirements Manual Volume I ML11277A0122011-09-20020 September 2011 Technical Requirements Manual, Volume I ML11168A1322011-05-0202 May 2011 Revision 101 to Technical Requirements Manual, Volume I and Revision 1 to Core Operating Limits Report, Cycle 15 ML1032800602010-11-15015 November 2010 Technical Requirements Manual - Vol I., Rev. 100 Dated 11/12/10 ML1028104832010-09-28028 September 2010 Technical Requirements Manual, Vol 1, Revision 99 ML1015404262010-05-25025 May 2010 Technical Requirements Manual - Vol 1, Revision 98 ML1011004632010-04-0707 April 2010 Technical Requirements Manual, Vol. 1, Revision 97 ML1008301842010-03-15015 March 2010 Technical Requirements Manual, Volume 1, Revision 96 ML0912701872009-04-27027 April 2009 Technical Requirements Manual - Volume I ML0911302252009-04-15015 April 2009 Revision 94 to Technical Requirements Manual Volume I ML0908503452009-03-12012 March 2009 Revision 93 to Technical Requirements Manual, Volume I ML0823408562008-08-12012 August 2008 Technical Requirements Manual, Volume 1, Revision 91 ML0822707012008-08-0606 August 2008 Technical Requirements Manual, Title Page Rev. 90, List of Effective Pages LEP-1 Through LEP-4 Rev. 90, and Cycle 13 Rev. 1 ML0823408572008-08-0404 August 2008 Revision to Technical Requirements Manual, Volume 1 ML0816403162008-06-0505 June 2008 Licensing Document Transmittal, Technical Requirements Manual - Vol. 1, Rev. 89 ML0811306852008-04-11011 April 2008 Technical Requirements Manual, Volume I, Revision 88 NRC-08-0031, Technical Requirements Manual Offsite Dose Calculation Manual Volume II2008-01-0303 January 2008 Technical Requirements Manual Offsite Dose Calculation Manual Volume II ML0801505592008-01-0303 January 2008 Licensing Document Transmittal of Revision 87 to, Technical Requirements Manual, Volume 1 ML0732700552007-11-0808 November 2007 Revision 86 to Technical Requirements Manual, Volume I ML0732000662007-11-0707 November 2007 Revision 85 to Technical Requirements Manual, Volume I ML0722002532007-07-26026 July 2007 Technical Requirements Manual, Volume I, Revision 84 2024-06-27
[Table view] |
Text
DETROIT EDISON - FERMI 2 AUTOMATED RECORDS MANAGEMENT DISTRIBUTION CONTROL LIST To: 00935 US NRC DOCUMENT CONTROL DESK WASHINGTON, DC 20555 Media: 8 1/2 X I1 Number Cnt Issue DTC Doc. Serial Number Page Rev Copies Lv1 Date Sec Status TMTRM TRM VOL I 68 11 ST 06/29/04 AFC Retain the attached corrective memo in the front of the Technical Requirements Manual until you receive a new revision.
Please destroy or mark all revised, superseded, or cancelled documents as such. CONTROLLED stamps must be voided by lining through and initialing.
Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166.
(734) 586-4338 OR (734) 586-4061 for questions or concerns.
A00I
Date: July 7, 2004 0801.26 NANL-04-0031 To: Holders of the TRM Vol I From: Carol Capps 5 t-'e ° Analyst, Nuclear Licensing
Subject:
Technical Requirements Manual (TRM) Vol I, Revision 68 TRM Vol I, Revision 68 was distributed to all holders of TRM Manual, Vol I on June 29, 2004.
The instructions for removing and inserting' new pages contained the following error:
3.6 Containment Systems Page 3.6.3-1 Rev 31 10/99 Page 3.6.3-1, Rev 68 06/04 You were instructed to remove non-existent page 3.6.3-1; this should have read as follows:
B3.6 Contaihnment Systems Page B3.6.3-1 Rev 31 10/99 Page B3.6;3-1, Rev 68 06/04 The TRM revision did contain the correct page. Please ensure that you did insert page B3.6.3-1, Rev 68 06/04 in the correct location. If you have any questions, please contact Nuclear Licensing on extension 64322.
/csc cc: Correspondence File (140 NOC) '