Cover Letter - Set 16 of Requests for Additional Information for Management Measures for the TRISO-X License Application Review
ML25157A157
Person / Time
Site: Triso-X
Issue date: 08/13/2025
From: Matt Bartlett
NRC/NMSS/DFM/FFLB
To: Wheeler J
Triso-X
Shared Package
ML25157A156 List:
References
EPID L-2022-NEW-0005
Download: ML25157A157 (1)


Text

OFFICIAL USE ONLYSECURITY-RELATED INFORMATION c

OFFICIAL USE ONLYSECURITY-RELATED INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Jennifer K. Wheeler Director, Regulatory Affairs TRISO-X, LLC 801 Thompson Avenue Rockville, MD 20852

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION AS SET 16 FOR MANAGEMENT MEASURES PORTION OF THE LICENSE APPLICATION FOR THE TRISO-X, LLC FUEL FABRICATION FACILITY (ENTERPRISE PROJECT IDENTIFICATION NUMBER L-2022-NEW-0005)

Dear Jennifer Wheeler:

The U.S. Nuclear Regulatory Commission (NRC) staff has developed requests for additional information (RAIs) as set 16 to support the review of the TRISO-X, LLC safety and safeguards license application. Your application for a new fuel fabrication facility located in Oak Ridge, Tennessee was submitted via letter dated April 5, 2022 (Agencywide Documents Access and Management System [ADAMS] Accession No. ML22101A200) and supplemented by letters dated October 13, 2022 (ML22286A144) and November 4, 2022 (ML22308A251) and revised license application submitted by letters dated December 30, 2024 (ML24365A254) and January 31, 2025 (ML25031A449).

Our review of your license application has identified the need for additional RAIs to support the review. The additional information requested in the non-public enclosure to this letter should be provided by August 29, 2025. Note: The draft RAIs were emailed to you on July 8, 2025, to confirm mutual understanding of the issues and comments received during the clarification calls held on July 16, 2025, July 24, 2025, and July 29, 2025, have been incorporated.

Please let us know if you have an interest in holding a call to discuss the draft responses prior to formal submittal, consistent with the NRC staff RAI process described in LIC-FM-3, section 2.10.1(b) (ML22208A272). Extending the formal responses beyond the September 1 due date, the need for supplements, or a second round of RAIs may result in an extension of the proposed review schedule beyond May 2026 (ML23305A193).

The Enclosure transmitted herewith contains Security Related Information. When separated from the Enclosure, this document is decontrolled.

August 13, 2025

OFFICIAL USE ONLYSECURITY-RELATED INFORMATION J. Wheeler 2

OFFICIAL USE ONLYSECURITY-RELATED INFORMATION In accordance with Title 10 of the Code of Federal Regulations, Section 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records component of the NRCs ADAMS. The PDR is open by appointment only. You may submit your request to the PDR via email at PDR.Resource@nrc.gov or call 1-800-397-4209 between 8:00 a.m. and 4:00 p.m. (EST), Monday through Friday, except Federal holidays. The NRCs ADAMS is accessible from the NRC website site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If you have any questions regarding this communication, please contact me at 301-415-7154, or via email to Matthew.Bartlett@nrc.gov.

Sincerely, Matthew Bartlett, Senior Project Manager Fuel Facility Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards Docket No. 07007027

Enclosure:

Request for Additional Information (Non-Public) cc: trisox@listmgr.nrc.gov Signed by Bartlett, Matthew on 08/13/25

ML25157A156(pkg, non-public), ML25157A157(ltr),

ML25157A158(encl, non-pubic)

OFFICE NMSS/DFM NMSS/DFM NMSS/DFM NAME SPoy JGoodridge MBartlett DATE 06/13/2025 06/16/2025 06/13/2025 OFFICE NMSS/DFM NMSS/DFM NAME SLav MBartlett DATE 08/13/2025 08/13/2025