MONTHYEARW3F1-2024-0049, Notification of Readiness for Supplemental Inspection2024-10-21021 October 2024 Notification of Readiness for Supplemental Inspection W3F1-2024-0042, License Amendment Request to Extend Allowable Outage Times for One or More Control Room Air Conditioning Units Inoperable2024-10-16016 October 2024 License Amendment Request to Extend Allowable Outage Times for One or More Control Room Air Conditioning Units Inoperable W3F1-2024-0038, Response to Request for Additional Information - Proposed Alternative WF3-RR-24-01 for Examinations of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2024-09-24024 September 2024 Response to Request for Additional Information - Proposed Alternative WF3-RR-24-01 for Examinations of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds W3F1-2024-0039, Response to Request for Additional Information - Proposed Alternative WF3-RR-24-02 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles2024-09-24024 September 2024 Response to Request for Additional Information - Proposed Alternative WF3-RR-24-02 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles W3F1-2024-0041, Reply to a Notice of Violation, EA-24-0522024-09-19019 September 2024 Reply to a Notice of Violation, EA-24-052 W3F1-2024-0040, Special Report SR 2024-001-00 Radiation Monitor Inoperable Greater than 7 Days2024-09-0303 September 2024 Special Report SR 2024-001-00 Radiation Monitor Inoperable Greater than 7 Days W3F1-2024-0019, (Waterford 3) - Steam Generator Tube Inspection Report for the 25th Rf Inspection Performed During Operating Cycle 25 / Refuel 252024-07-22022 July 2024 (Waterford 3) - Steam Generator Tube Inspection Report for the 25th Rf Inspection Performed During Operating Cycle 25 / Refuel 25 W3F1-2024-0032, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2024-07-17017 July 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation W3F1-2024-0025, Automatic EFAS Actuation During Surveillance Test2024-07-10010 July 2024 Automatic EFAS Actuation During Surveillance Test W3F1-2024-0024, Special Report SR 2023-004-02 Radiation Monitor Inoperable Greater than 7 Days2024-06-17017 June 2024 Special Report SR 2023-004-02 Radiation Monitor Inoperable Greater than 7 Days W3F1-2024-0013, Manual Reactor Trip Due to Engineered Safety Features Actuation System Relay Failure2024-05-15015 May 2024 Manual Reactor Trip Due to Engineered Safety Features Actuation System Relay Failure W3F1-2024-0011, Licensee Amendment Request to Modify Surveillance Requirements in Support of Surveillance Frequency Control Program2024-05-0808 May 2024 Licensee Amendment Request to Modify Surveillance Requirements in Support of Surveillance Frequency Control Program W3F1-2024-0018, Submittal of Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 25 / Refuel 252024-05-0101 May 2024 Submittal of Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 25 / Refuel 25 W3F1-2024-0014, Report of Facility Changes, Tests, and Experiments and Commitment Changes for Two Year Period Ending April 28, 20242024-04-29029 April 2024 Report of Facility Changes, Tests, and Experiments and Commitment Changes for Two Year Period Ending April 28, 2024 W3F1-2024-0015, Annual Radioactive Effluent Release Report (ARERR) 2023 with Revised ODCM and Revised Process Control Program Procedure2024-04-24024 April 2024 Annual Radioactive Effluent Release Report (ARERR) 2023 with Revised ODCM and Revised Process Control Program Procedure W3F1-2024-0016, Annual Radiological Environmental Operating Report (AREOR) - 20232024-04-24024 April 2024 Annual Radiological Environmental Operating Report (AREOR) - 2023 W3F1-2024-0017, Annual Report of Individual Monitoring of Radiation Exposure for 2023 Per 10 CFR 20.22062024-04-23023 April 2024 Annual Report of Individual Monitoring of Radiation Exposure for 2023 Per 10 CFR 20.2206 W3F1-2024-0020, Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 20232024-04-11011 April 2024 Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2023 W3F1-2024-0008, Proposed Alternative WF3-RR-24-01 for Examinations of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2024-03-18018 March 2024 Proposed Alternative WF3-RR-24-01 for Examinations of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds W3F1-2024-0009, Proposed Alternative WF3-RR-24-02 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles2024-03-18018 March 2024 Proposed Alternative WF3-RR-24-02 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles W3F1-2024-0012, Response to NRC Integrated Inspection Report 05000382/20230042024-03-11011 March 2024 Response to NRC Integrated Inspection Report 05000382/2023004 W3F1-2024-0006, Special Report SR-2023-004-01, Radiation Monitor Inoperable Greater than 7 Days2024-02-28028 February 2024 Special Report SR-2023-004-01, Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0056, Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 242023-12-19019 December 2023 Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 24 W3F1-2023-0055, Reply to a Notice of Violation2023-12-14014 December 2023 Reply to a Notice of Violation W3F1-2023-0052, Core Operating Limits Report (COLR) - Cycle 26, Revision O2023-11-0707 November 2023 Core Operating Limits Report (COLR) - Cycle 26, Revision O W3F1-2023-0049, Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability - Withdrawal2023-09-28028 September 2023 Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability - Withdrawal W3F1-2023-0048, Special Report SR 2023-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2023-09-25025 September 2023 Special Report SR 2023-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0035, Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program2023-07-26026 July 2023 Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program W3F1-2023-0036, Special Report SR-2023-003-01 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2023-05-0404 May 2023 Special Report SR-2023-003-01 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0032, Annual Radioactive Effluent Release Report (ARERR) 20222023-04-27027 April 2023 Annual Radioactive Effluent Release Report (ARERR) 2022 W3F1-2023-0033, Submittal of Annual Radiological Environmental Operating Report - 20222023-04-27027 April 2023 Submittal of Annual Radiological Environmental Operating Report - 2022 W3F1-2023-0025, Annual Report of Individual Monitoring of Radiation Exposure for 2022 Per 10 CFR 20.22062023-04-11011 April 2023 Annual Report of Individual Monitoring of Radiation Exposure for 2022 Per 10 CFR 20.2206 W3F1-2023-0018, Updated Final Supplemental Response to NRC Generic Letter 2004-022023-03-30030 March 2023 Updated Final Supplemental Response to NRC Generic Letter 2004-02 W3F1-2023-0022, Registration of Dry Fuel Storage Cask Use2023-03-22022 March 2023 Registration of Dry Fuel Storage Cask Use W3F1-2023-0021, Submittal of Special Report SR 2023-003-00 Radiation Monitor Inoperable Greater than 7 Days2023-03-17017 March 2023 Submittal of Special Report SR 2023-003-00 Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0016, Registration of Dry Fuel Storage Cask Use2023-03-0303 March 2023 Registration of Dry Fuel Storage Cask Use W3F1-2023-0014, Reply to a Notice of Violation; EA-22-1192023-02-20020 February 2023 Reply to a Notice of Violation; EA-22-119 W3F1-2023-0013, Notification of Readiness for Supplemental Inspection2023-02-15015 February 2023 Notification of Readiness for Supplemental Inspection W3F1-2023-0007, Registration of Dry Fuel Storage Cask Use2023-02-0606 February 2023 Registration of Dry Fuel Storage Cask Use W3F1-2023-0010, Special Report SR 2023-002-00, Radiation Monitor Inoperable Greater than 7 Days2023-01-25025 January 2023 Special Report SR 2023-002-00, Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0002, SR 2023-001-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 30 Days2023-01-0505 January 2023 SR 2023-001-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 30 Days W3F1-2022-0067, Commitment Change Notification for Generic Safety Issue 191 and Generic Letter 2004-022022-12-20020 December 2022 Commitment Change Notification for Generic Safety Issue 191 and Generic Letter 2004-02 W3F1-2022-0054, Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability2022-11-0101 November 2022 Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability W3F1-2022-0063, Submittal of Emergency Preparedness Documents. Includes EP-001-001, Revision 372022-10-27027 October 2022 Submittal of Emergency Preparedness Documents. Includes EP-001-001, Revision 37 W3F1-2022-0059, Response to Clarification Questions Concerning Supplement to License Amendment Request to Adopt TSTF-5052022-10-13013 October 2022 Response to Clarification Questions Concerning Supplement to License Amendment Request to Adopt TSTF-505 W3F1-2022-0058, Reply to a Notice of Violation; EA-22-0332022-10-12012 October 2022 Reply to a Notice of Violation; EA-22-033 W3F1-2022-0049, Response to Request for Additional Information Regarding License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-5052022-08-19019 August 2022 Response to Request for Additional Information Regarding License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-505 W3F1-2022-0037, Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 242022-08-0808 August 2022 Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 24 W3F1-2022-0044, SR-2022-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2022-07-0606 July 2022 SR-2022-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2022-0042, SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2022-06-27027 June 2022 SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days 2024-09-03
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARW3F1-2024-0042, License Amendment Request to Extend Allowable Outage Times for One or More Control Room Air Conditioning Units Inoperable2024-10-16016 October 2024 License Amendment Request to Extend Allowable Outage Times for One or More Control Room Air Conditioning Units Inoperable W3F1-2024-0011, Licensee Amendment Request to Modify Surveillance Requirements in Support of Surveillance Frequency Control Program2024-05-0808 May 2024 Licensee Amendment Request to Modify Surveillance Requirements in Support of Surveillance Frequency Control Program ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions W3F1-2023-0035, Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program2023-07-26026 July 2023 Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program W3F1-2021-0061, Supplement to License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual2021-10-14014 October 2021 Supplement to License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21266A1612021-09-23023 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated W3F1-2021-0039, Application for Technical Specification Change to Revise Pressure/Temperature and Low Temperature Overpressure Protection for 55 Effective Full Power Years2021-08-25025 August 2021 Application for Technical Specification Change to Revise Pressure/Temperature and Low Temperature Overpressure Protection for 55 Effective Full Power Years W3F1-2021-0055, Supplement to License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual2021-08-20020 August 2021 Supplement to License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual ML21182A1582021-07-0101 July 2021 Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections ML21175A3622021-06-24024 June 2021 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions ML21148A1042021-05-28028 May 2021 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program W3F1-2021-0032, Revised License Amendment Request - Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2021-05-21021 May 2021 Revised License Amendment Request - Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System W3F1-2021-0027, Supplement to Application for Technical Specification Change to Adopt Risk-Informed Extended Completion Times - RITSTF Initiative 4b2021-04-0808 April 2021 Supplement to Application for Technical Specification Change to Adopt Risk-Informed Extended Completion Times - RITSTF Initiative 4b W3F1-2021-0026, Open Item Response, License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2021-03-19019 March 2021 Open Item Response, License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System W3F1-2021-0003, Application for Technical Specification Change to Adopt Risk-Informed Extended Completion Times - RITSTF Initiative 4B2021-02-0808 February 2021 Application for Technical Specification Change to Adopt Risk-Informed Extended Completion Times - RITSTF Initiative 4B W3F1-2021-0002, Open Item Response - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2021-01-22022 January 2021 Open Item Response - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System W3F1-2020-0038, License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2020-07-23023 July 2020 License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System W3F1-2020-0017, Transmittal of Slides for Fourth Partially Closed Pre-submittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification2020-03-12012 March 2020 Transmittal of Slides for Fourth Partially Closed Pre-submittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification W3F1-2019-0073, (Waterford 3) - License Amendment Request to Revise Technical Specification 3.8.1.1 Surveillance Requirements2019-10-24024 October 2019 (Waterford 3) - License Amendment Request to Revise Technical Specification 3.8.1.1 Surveillance Requirements W3F1-2019-0062, License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual2019-09-20020 September 2019 License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual W3F1-2019-0047, Application for Technical Specification Change to Control Room Air Conditioning System2019-08-27027 August 2019 Application for Technical Specification Change to Control Room Air Conditioning System CNRO-2019-00003, Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 42019-01-31031 January 2019 Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4 W3F1-2018-0043, Amendment 2 to License Renewal Application2018-07-30030 July 2018 Amendment 2 to License Renewal Application W3F1-2018-0031, Supplemental Information Supporting the License Amendment Request Regarding Use of the Tranflow Code for Determining the Pressure Drops Across the Steam Generator Secondary Side Internal Components2018-06-13013 June 2018 Supplemental Information Supporting the License Amendment Request Regarding Use of the Tranflow Code for Determining the Pressure Drops Across the Steam Generator Secondary Side Internal Components W3F1-2018-0025, (Waterford 3) - Supplemental Information Supporting the License Amendment Request Regarding Proposed Change to Technical Specification 3/4.7.4 for Ultimate Heat Sink Design Basis Update2018-05-17017 May 2018 (Waterford 3) - Supplemental Information Supporting the License Amendment Request Regarding Proposed Change to Technical Specification 3/4.7.4 for Ultimate Heat Sink Design Basis Update W3F1-2018-0014, License Amendment Request for Use of the Tranflow Code for Determining the Pressure Drops Across the Steam Generator Secondary Side Internal Components2018-04-12012 April 2018 License Amendment Request for Use of the Tranflow Code for Determining the Pressure Drops Across the Steam Generator Secondary Side Internal Components W3F1-2017-0050, License Amendment Request - Proposed Change to Technical Specification 3/4.7.4 for Ultimate Heat Sink Design Basis Update2018-03-26026 March 2018 License Amendment Request - Proposed Change to Technical Specification 3/4.7.4 for Ultimate Heat Sink Design Basis Update W3F1-2018-0011, License Amendment Request to Update the Results for the Inadvertent Loading of a Fuel Assembly Into the Improper Position (Fuel Assembly Misload) Event2018-03-0808 March 2018 License Amendment Request to Update the Results for the Inadvertent Loading of a Fuel Assembly Into the Improper Position (Fuel Assembly Misload) Event W3F1-2017-0067, License Amendment Request to Remove Technical Specification 3/4.3.2 Table 4.3-2 Note 3 Exemption for Testing Relays K114, K305, and K3132017-12-0606 December 2017 License Amendment Request to Remove Technical Specification 3/4.3.2 Table 4.3-2 Note 3 Exemption for Testing Relays K114, K305, and K313 W3F1-2017-0065, License Amendment Request for Use of RAPTOR-M3G Code for Neutron Fluence Calculations2017-11-28028 November 2017 License Amendment Request for Use of RAPTOR-M3G Code for Neutron Fluence Calculations W3F1-2017-0081, Amendment 1 to License Renewal Application (Laa)2017-11-15015 November 2017 Amendment 1 to License Renewal Application (Laa) ML17268A2132017-09-21021 September 2017 ISFSI, River Bend Station Unit 1 & ISFSI, Waterford 3 Steam Electric Station & ISFSI, Grand Gulf Nuclear Station & ISFSI, Application for Order Approving Transfers of Licenses and Conforming License Amendments W3F1-2017-0025, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.2017-03-28028 March 2017 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control. W3F1-2016-0055, License Amendment Request to Revise Technical Specification 3/4.3.2 to Relocate Surveillance Frequency Requirements for Engineered Safety Features Actuation System (ESFAS) Subgroup Relays to the Surveillance Frequency Control Program2016-09-0101 September 2016 License Amendment Request to Revise Technical Specification 3/4.3.2 to Relocate Surveillance Frequency Requirements for Engineered Safety Features Actuation System (ESFAS) Subgroup Relays to the Surveillance Frequency Control Program W3F1-2016-0036, Application to Revise Technical Specifications to Adopt TSTF-545, Rev 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and to Request an Alternative to the ASME Code2016-07-25025 July 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Rev 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and to Request an Alternative to the ASME Code W3F1-2016-0049, Supplement to the Risk-Informed Surveillance Requirements License Amendment Request (LAR)2016-07-12012 July 2016 Supplement to the Risk-Informed Surveillance Requirements License Amendment Request (LAR) ML16088A3312016-03-23023 March 2016 License Renewal Application Waterford Steam Electric Station, Unit 3 (Waterford 3) (Part 1 of 9) ML16088A3252016-03-23023 March 2016 License Renewal Application Waterford Steam Electric Station, Unit 3 (Waterford 3) (Part 3 of 9) W3F1-2016-0012, License Renewal Application Waterford Steam Electric Station, Unit 3 (Waterford 3) (Part 9 of 9)2016-03-23023 March 2016 License Renewal Application Waterford Steam Electric Station, Unit 3 (Waterford 3) (Part 9 of 9) ML16088A3292016-03-23023 March 2016 License Renewal Application Waterford Steam Electric Station, Unit 3 (Waterford 3) (Part 7 of 9) ML16088A3282016-03-23023 March 2016 License Renewal Application Waterford Steam Electric Station, Unit 3 (Waterford 3) (Part 6 of 9) ML16088A3262016-03-23023 March 2016 License Renewal Application Waterford Steam Electric Station, Unit 3 (Waterford 3) (Part 4 of 9) ML16088A3272016-03-23023 March 2016 License Renewal Application Waterford Steam Electric Station, Unit 3 (Waterford 3) (Part 5 of 9) W3F1-2015-0040, License Amendment Request to Revise Control Element Assembly Drop Times Associated with Technical Specification 3.1.3.42015-07-0202 July 2015 License Amendment Request to Revise Control Element Assembly Drop Times Associated with Technical Specification 3.1.3.4 W3F1-2015-0037, License Amendment Request, Cyber Security Plan Implementation Schedule2015-06-29029 June 2015 License Amendment Request, Cyber Security Plan Implementation Schedule ML15170A1232015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 2 of 5 W3F1-2015-0006, Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part2015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 3 of 5 ML15170A1252015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 4 of 5 ML15170A1262015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 5 of 5 2024-05-08
[Table view] Category:Technical Specification
MONTHYEARW3F1-2024-0042, License Amendment Request to Extend Allowable Outage Times for One or More Control Room Air Conditioning Units Inoperable2024-10-16016 October 2024 License Amendment Request to Extend Allowable Outage Times for One or More Control Room Air Conditioning Units Inoperable W3F1-2023-0035, Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program2023-07-26026 July 2023 Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program ML23032A5062023-02-0101 February 2023 Technical Specification Index and Bases Update to the NRC for the Period November 11, 2021 Through July 25, 2022 W3F1-2022-0054, Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability2022-11-0101 November 2022 Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability W3F1-2021-0061, Supplement to License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual2021-10-14014 October 2021 Supplement to License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21266A1612021-09-23023 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated W3F1-2021-0055, Supplement to License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual2021-08-20020 August 2021 Supplement to License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual ML21182A1582021-07-0101 July 2021 Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections ML21148A1042021-05-28028 May 2021 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program W3F1-2021-0038, Technical Specification Index and Bases Update to the NRC for the Period June 11, 2019 Through March 3, 20212021-05-18018 May 2021 Technical Specification Index and Bases Update to the NRC for the Period June 11, 2019 Through March 3, 2021 W3F1-2021-0004, License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to the Technical Requirements Manual2021-04-0505 April 2021 License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to the Technical Requirements Manual W3F1-2021-0003, Application for Technical Specification Change to Adopt Risk-Informed Extended Completion Times - RITSTF Initiative 4B2021-02-0808 February 2021 Application for Technical Specification Change to Adopt Risk-Informed Extended Completion Times - RITSTF Initiative 4B W3F1-2019-0062, License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual2019-09-20020 September 2019 License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual W3F1-2019-0047, Application for Technical Specification Change to Control Room Air Conditioning System2019-08-27027 August 2019 Application for Technical Specification Change to Control Room Air Conditioning System W3F1-2018-0013, Supplement to License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.2018-02-28028 February 2018 Supplement to License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control. W3F1-2017-0079, Technical Specification Index and Bases Update to the NRC for the Period June 2, 2016 Through November 30, 20172017-12-0606 December 2017 Technical Specification Index and Bases Update to the NRC for the Period June 2, 2016 Through November 30, 2017 W3F1-2017-0080, Submittal of Technical Requirements Manual Update2017-12-0606 December 2017 Submittal of Technical Requirements Manual Update ML17341A6512017-12-0606 December 2017 Technical Specification Index and Bases Update to the NRC for the Period June 2, 2016 Through November 30, 2017 ML15170A1262015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 5 of 5 ML15170A1252015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 4 of 5 W3F1-2015-0006, Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part2015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 3 of 5 ML15170A1232015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 2 of 5 ML15170A1222015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 1 of 5 W3F1-2014-0067, Technical Specification Index and Bases Update to the NRC for the Period June 30, 2013 Through November 3, 20142014-11-0505 November 2014 Technical Specification Index and Bases Update to the NRC for the Period June 30, 2013 Through November 3, 2014 W3F1-2014-0052, License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years2014-08-28028 August 2014 License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years W3F1-2013-0040, Technical Specification Index and Bases Update to the NRC for the Period May 1, 2012 Through June 30, 20132013-07-0909 July 2013 Technical Specification Index and Bases Update to the NRC for the Period May 1, 2012 Through June 30, 2013 W3F1-2011-0080, Technical Specification Bases Update to the NRC for the Period January 25, 2011 Through October 31, 20112011-11-0909 November 2011 Technical Specification Bases Update to the NRC for the Period January 25, 2011 Through October 31, 2011 W3F1-2011-0067, License Amendment Request, Proposed Change to Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train.2011-10-13013 October 2011 License Amendment Request, Proposed Change to Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train. ML11224A0102011-07-20020 July 2011 License Amendment Request, Technical Specification Change Regarding Steam Generator Tube Integrity W3F1-2011-0010, Submittal of an Update to All Changes Made to Technical Specification Bases for the Period May 25, 2010 Through January 24, 20112011-01-24024 January 2011 Submittal of an Update to All Changes Made to Technical Specification Bases for the Period May 25, 2010 Through January 24, 2011 W3F1-2011-0005, Withdrawal of Technical Specification Change Regarding Steam Generator Program2011-01-19019 January 2011 Withdrawal of Technical Specification Change Regarding Steam Generator Program W3F1-2010-0051, Technical Specification Bases Update to the NRC for Period July 2, 2009 Through May 24, 20102010-05-25025 May 2010 Technical Specification Bases Update to the NRC for Period July 2, 2009 Through May 24, 2010 W3F1-2010-0010, . Technical Specification Change Regarding Containment Building Penetrations During Refueling Operations2010-02-22022 February 2010 . Technical Specification Change Regarding Containment Building Penetrations During Refueling Operations W3F1-2009-0031, Technical Specification Bases Update to the NRC for the Period November 11, 2008 Through July 1, 20092009-07-0909 July 2009 Technical Specification Bases Update to the NRC for the Period November 11, 2008 Through July 1, 2009 ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions2009-04-27027 April 2009 Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions W3F1-2008-0051, Entergy'S Response to Nrc'S Request for Additional Information Regarding License Amendment Request to Modify Requirements Regarding Control Room Envelope Habitability, Waterford Unit 32009-01-0808 January 2009 Entergy'S Response to Nrc'S Request for Additional Information Regarding License Amendment Request to Modify Requirements Regarding Control Room Envelope Habitability, Waterford Unit 3 W3F1-2008-0073, Technical Specification Bases Update to the NRC for the Period February 16, 2008 Through November 10, 20082008-11-11011 November 2008 Technical Specification Bases Update to the NRC for the Period February 16, 2008 Through November 10, 2008 W3F1-2008-0045, License Amendment Request Relocation of TS 3.7.8 and Addition of LCO 3.0.8 the Inoperability of Snubbers2008-09-18018 September 2008 License Amendment Request Relocation of TS 3.7.8 and Addition of LCO 3.0.8 the Inoperability of Snubbers W3F1-2008-0052, Transmittal of Waterford Steam Electric Station, Unit 3, License Amendment Request to Modify Technical Specification Section 5.6, Fuel Storage and Add New Technical Specification 3/4 9.12, Spent Fuel Pool Boron Concentration2008-09-17017 September 2008 Transmittal of Waterford Steam Electric Station, Unit 3, License Amendment Request to Modify Technical Specification Section 5.6, Fuel Storage and Add New Technical Specification 3/4 9.12, Spent Fuel Pool Boron Concentration W3F1-2008-0016, Technical Specification Bases Update to the NRC for the Period June 2, 2007 Through February 15, 20082008-02-20020 February 2008 Technical Specification Bases Update to the NRC for the Period June 2, 2007 Through February 15, 2008 W3F1-2008-0001, License Amendment Request NPF-38-275, Containment Isolation Valves.2008-01-0202 January 2008 License Amendment Request NPF-38-275, Containment Isolation Valves. W3F1-2007-0036, License Amendment Request NPF-38-270 to Modify Diesel Generator Fuel Oil Testing Surveillance Requirements2007-07-0303 July 2007 License Amendment Request NPF-38-270 to Modify Diesel Generator Fuel Oil Testing Surveillance Requirements W3F1-2007-0031, Technical Specification Bases Update to the NRC for the Period 07/02/2006 Through 06/01/20072007-06-13013 June 2007 Technical Specification Bases Update to the NRC for the Period 07/02/2006 Through 06/01/2007 ML0624201532006-08-29029 August 2006 Amendment Technical Specification Pages, Moderator Temperature Coefficient W3F1-2006-0037, Technical Specification Bases Update to the NRC for the Period of November 1, 2005 Through July 1, 20062006-07-18018 July 2006 Technical Specification Bases Update to the NRC for the Period of November 1, 2005 Through July 1, 2006 W3F1-2006-0005, License Amendment Request NPF-38-267, Reactor Coolant System Leakage Detection Instrumentation2006-02-15015 February 2006 License Amendment Request NPF-38-267, Reactor Coolant System Leakage Detection Instrumentation W3F1-2005-0075, License Amendment Request NPF-38-266, Remove Limitation to Perform Various Surveillance Only During Shutdown2005-10-27027 October 2005 License Amendment Request NPF-38-266, Remove Limitation to Perform Various Surveillance Only During Shutdown ML0513003032005-05-0909 May 2005 Technical Specifications, Issuance of Amendment No. 200 Modification of TS 5.3.1, Fuel Assemblies; TS 5.6.1, Criticality; TS 6.9.1.11.1, Core Operating Limits Reports & Deletion of TS Index W3F1-2005-0019, Supplement to Amendment Request NPF-38-249, Extended Power Uprate2005-03-17017 March 2005 Supplement to Amendment Request NPF-38-249, Extended Power Uprate 2024-10-16
[Table view] Category:Bases Change
MONTHYEARW3F1-2024-0042, License Amendment Request to Extend Allowable Outage Times for One or More Control Room Air Conditioning Units Inoperable2024-10-16016 October 2024 License Amendment Request to Extend Allowable Outage Times for One or More Control Room Air Conditioning Units Inoperable W3F1-2023-0035, Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program2023-07-26026 July 2023 Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program ML23032A5062023-02-0101 February 2023 Technical Specification Index and Bases Update to the NRC for the Period November 11, 2021 Through July 25, 2022 W3F1-2021-0061, Supplement to License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual2021-10-14014 October 2021 Supplement to License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement W3F1-2021-0038, Technical Specification Index and Bases Update to the NRC for the Period June 11, 2019 Through March 3, 20212021-05-18018 May 2021 Technical Specification Index and Bases Update to the NRC for the Period June 11, 2019 Through March 3, 2021 W3F1-2021-0004, License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to the Technical Requirements Manual2021-04-0505 April 2021 License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to the Technical Requirements Manual W3F1-2019-0047, Application for Technical Specification Change to Control Room Air Conditioning System2019-08-27027 August 2019 Application for Technical Specification Change to Control Room Air Conditioning System W3F1-2018-0013, Supplement to License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.2018-02-28028 February 2018 Supplement to License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control. W3F1-2017-0079, Technical Specification Index and Bases Update to the NRC for the Period June 2, 2016 Through November 30, 20172017-12-0606 December 2017 Technical Specification Index and Bases Update to the NRC for the Period June 2, 2016 Through November 30, 2017 W3F1-2017-0080, Submittal of Technical Requirements Manual Update2017-12-0606 December 2017 Submittal of Technical Requirements Manual Update ML17341A6512017-12-0606 December 2017 Technical Specification Index and Bases Update to the NRC for the Period June 2, 2016 Through November 30, 2017 ML15170A1262015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 5 of 5 ML15170A1252015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 4 of 5 W3F1-2015-0006, Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part2015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 3 of 5 ML15170A1232015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 2 of 5 ML15170A1222015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 1 of 5 W3F1-2014-0067, Technical Specification Index and Bases Update to the NRC for the Period June 30, 2013 Through November 3, 20142014-11-0505 November 2014 Technical Specification Index and Bases Update to the NRC for the Period June 30, 2013 Through November 3, 2014 W3F1-2014-0052, License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years2014-08-28028 August 2014 License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years W3F1-2013-0040, Technical Specification Index and Bases Update to the NRC for the Period May 1, 2012 Through June 30, 20132013-07-0909 July 2013 Technical Specification Index and Bases Update to the NRC for the Period May 1, 2012 Through June 30, 2013 W3F1-2011-0080, Technical Specification Bases Update to the NRC for the Period January 25, 2011 Through October 31, 20112011-11-0909 November 2011 Technical Specification Bases Update to the NRC for the Period January 25, 2011 Through October 31, 2011 W3F1-2011-0067, License Amendment Request, Proposed Change to Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train.2011-10-13013 October 2011 License Amendment Request, Proposed Change to Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train. W3F1-2011-0010, Submittal of an Update to All Changes Made to Technical Specification Bases for the Period May 25, 2010 Through January 24, 20112011-01-24024 January 2011 Submittal of an Update to All Changes Made to Technical Specification Bases for the Period May 25, 2010 Through January 24, 2011 W3F1-2011-0005, Withdrawal of Technical Specification Change Regarding Steam Generator Program2011-01-19019 January 2011 Withdrawal of Technical Specification Change Regarding Steam Generator Program W3F1-2010-0051, Technical Specification Bases Update to the NRC for Period July 2, 2009 Through May 24, 20102010-05-25025 May 2010 Technical Specification Bases Update to the NRC for Period July 2, 2009 Through May 24, 2010 W3F1-2010-0010, . Technical Specification Change Regarding Containment Building Penetrations During Refueling Operations2010-02-22022 February 2010 . Technical Specification Change Regarding Containment Building Penetrations During Refueling Operations W3F1-2009-0031, Technical Specification Bases Update to the NRC for the Period November 11, 2008 Through July 1, 20092009-07-0909 July 2009 Technical Specification Bases Update to the NRC for the Period November 11, 2008 Through July 1, 2009 W3F1-2008-0051, Entergy'S Response to Nrc'S Request for Additional Information Regarding License Amendment Request to Modify Requirements Regarding Control Room Envelope Habitability, Waterford Unit 32009-01-0808 January 2009 Entergy'S Response to Nrc'S Request for Additional Information Regarding License Amendment Request to Modify Requirements Regarding Control Room Envelope Habitability, Waterford Unit 3 W3F1-2008-0073, Technical Specification Bases Update to the NRC for the Period February 16, 2008 Through November 10, 20082008-11-11011 November 2008 Technical Specification Bases Update to the NRC for the Period February 16, 2008 Through November 10, 2008 W3F1-2008-0052, Transmittal of Waterford Steam Electric Station, Unit 3, License Amendment Request to Modify Technical Specification Section 5.6, Fuel Storage and Add New Technical Specification 3/4 9.12, Spent Fuel Pool Boron Concentration2008-09-17017 September 2008 Transmittal of Waterford Steam Electric Station, Unit 3, License Amendment Request to Modify Technical Specification Section 5.6, Fuel Storage and Add New Technical Specification 3/4 9.12, Spent Fuel Pool Boron Concentration W3F1-2008-0016, Technical Specification Bases Update to the NRC for the Period June 2, 2007 Through February 15, 20082008-02-20020 February 2008 Technical Specification Bases Update to the NRC for the Period June 2, 2007 Through February 15, 2008 W3F1-2008-0001, License Amendment Request NPF-38-275, Containment Isolation Valves.2008-01-0202 January 2008 License Amendment Request NPF-38-275, Containment Isolation Valves. W3F1-2007-0031, Technical Specification Bases Update to the NRC for the Period 07/02/2006 Through 06/01/20072007-06-13013 June 2007 Technical Specification Bases Update to the NRC for the Period 07/02/2006 Through 06/01/2007 W3F1-2006-0037, Technical Specification Bases Update to the NRC for the Period of November 1, 2005 Through July 1, 20062006-07-18018 July 2006 Technical Specification Bases Update to the NRC for the Period of November 1, 2005 Through July 1, 2006 W3F1-2004-0090, Ses, Technical Specification Bases Update to the NRC for the Period of 10/26/04 - 09/30/042004-10-0707 October 2004 Ses, Technical Specification Bases Update to the NRC for the Period of 10/26/04 - 09/30/04 W3F1-2004-0016, Technical Specificaiton Bases Update to the NRC for Period July 24, 2003 Through February 25, 20042004-02-26026 February 2004 Technical Specificaiton Bases Update to the NRC for Period July 24, 2003 Through February 25, 2004 W3F1-2003-0055, TS Bases Update to NRC for Period April 8, 2003 Through July 23, 20032003-07-24024 July 2003 TS Bases Update to NRC for Period April 8, 2003 Through July 23, 2003 W3F1-2003-0002, Technical Specification Bases Update to the NRC for the Period October 1, 2002 Through January 7, 20032003-01-15015 January 2003 Technical Specification Bases Update to the NRC for the Period October 1, 2002 Through January 7, 2003 W3F1-2002-0090, Technical Specification Bases Update to the NRC for the Period January 16, 2002 Through September 30, 20022002-10-14014 October 2002 Technical Specification Bases Update to the NRC for the Period January 16, 2002 Through September 30, 2002 W3F1-2002-0012, Revision to Peak Linear Heat Rate Safety Limit Technical Specification 2.1.1.22002-01-31031 January 2002 Revision to Peak Linear Heat Rate Safety Limit Technical Specification 2.1.1.2 W3F1-2002-0005, Ses, Technical Specification Bases Update to NRC for Period September 1, 2002 Through January 15, 20022002-01-16016 January 2002 Ses, Technical Specification Bases Update to NRC for Period September 1, 2002 Through January 15, 2002 ML18053A6971991-05-0808 May 1991 License Amendment Request Technical Specification Change Request NPF-38-114 2024-10-16
[Table view] Category:Technical Specifications
MONTHYEARML24164A2512024-08-0707 August 2024 Issuance of Amendment No. 271 Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program W3F1-2024-0011, Licensee Amendment Request to Modify Surveillance Requirements in Support of Surveillance Frequency Control Program2024-05-0808 May 2024 Licensee Amendment Request to Modify Surveillance Requirements in Support of Surveillance Frequency Control Program ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting W3F1-2023-0035, Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program2023-07-26026 July 2023 Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML22075A1022022-04-29029 April 2022 Issuance of Amendment No. 264 to Relocate Chemical Detection System Technical Specifications to Technical Requirements Manual ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21148A0522021-06-0808 June 2021 Correction to License Amendment 214 Request to Support Next Generation Fuel; Review and Approval of Revised ECCS Performance Analysis; and Review and Approval of Supplement to the ECCS Performance Analysis ML21116A1432021-04-26026 April 2021 (Waterford 3) - Revision to License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual ML20148M1062020-06-22022 June 2020 Corrections to Technical Specifications Issued in Amendments Nos. 102 and 225 and with the Renewed License ML20113E8362020-04-23023 April 2020 Summary of March 19, 2020, Category 1 Public Meeting with Entergy Operations Inc. a Planned LAR to Install Digital Systems in Accordance with Di&C ISG-06 Revision 2, Licensing Processes at Waterford Steam Electric Station ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19022A3372019-02-13013 February 2019 Issuance of Amendment No. 253 to Revise Section 15.4.3.1 of the Updated Final Safety Analysis Report to Account for Fuel Misload ML17192A0072017-07-27027 July 2017 Issuance of Amendment No. 250 Adoption of Technical Specifications Task Force Traveler TSTF 545, Revision 3 ML16077A2702016-05-10010 May 2016 Issuance of Amendment No. 247 Regarding Cyber Security Plan Milestone 8 Full Implementation Schedule W3F1-2016-0010, Responses to Request for Additional Information Regarding the Risk-Informed Surveillance Requirements License Amendment Request (LAR)2016-03-0303 March 2016 Responses to Request for Additional Information Regarding the Risk-Informed Surveillance Requirements License Amendment Request (LAR) ML15289A1432015-11-13013 November 2015 Redacted - Issuance of Amendment No. 246 Changes to Technical Specification 3.1.3.4 Regarding Control Element Assembly Drop Times ML15244B3862015-09-0303 September 2015 Correction to Issuance of Amendment Extension of the Integrated Leak Rate Testing to 15 Years ML15139A4832015-08-31031 August 2015 Issuance of Amendment No. 245 Change to Updated Final Safety Analysis Report Clarifying Pressurizer Heaters Function for Natural Circulation at the Onset of a Loss of Offsite Power ML15217A1432015-08-24024 August 2015 Issuance of Amendment No. 244 Extension of the Integrated Leak Rate Testing to 15 Years ML15138A4402015-08-14014 August 2015 Orders Approving Transfer of Facility Operating Licenses and Indirect Transfer, Draft Conforming Amendment, and Safety Evaluation W3F1-2015-0061, Provides Supplement to Revise Control Element Assembly Drop Times Associated with Technical Specification 3.1.3.42015-08-14014 August 2015 Provides Supplement to Revise Control Element Assembly Drop Times Associated with Technical Specification 3.1.3.4 ML15174A2272015-07-29029 July 2015 Issuance of Amendment of Technical Specifications s 3.9.6 and 3.9.7 to the Technical Requirements Manual ML14321A7132014-12-10010 December 2014 Issuance of Amendment No. 241, Revise Operating License Condition for Change to Cyber Security Plan Milestone 8 Full Implementation Date W3F1-2014-0052, License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years2014-08-28028 August 2014 License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years CNRO-2012-00009, Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications2012-11-20020 November 2012 Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications W3F1-2012-0084, Technical Specification Change for Dry Cooling Tower Fans Out of Service for Ultimate Heat Sink2012-10-0808 October 2012 Technical Specification Change for Dry Cooling Tower Fans Out of Service for Ultimate Heat Sink W3F1-2012-0028, Supplement 2 of License Amendment Request to Revise Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train2012-05-22022 May 2012 Supplement 2 of License Amendment Request to Revise Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train W3F1-2011-0067, License Amendment Request, Proposed Change to Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train.2011-10-13013 October 2011 License Amendment Request, Proposed Change to Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train. ML1125103192011-09-20020 September 2011 Correction of an Error in Amendment No. 226, Administrative Changes to Technical Specifications 6.9.1.11 and 6.9.1.11.1 Relating to Core Operating Limits Report ML1109501232011-04-0404 April 2011 Attachment 2 to W3F1-2011-0021, Proposed Operating License Change (Mark-up) and Attachment 3, Revised Operating License Page ML1021001582010-09-13013 September 2010 Issuance of Amendment No. 228, Modify Technical Specification Tables 2.2-1 and 3.3-1 to Clarify Notes and Actions ML1021504662010-09-13013 September 2010 Issuance of Amendment No. 227, Modify Technical Specification 3/4.9.7, Crane Travel - Fuel Handling Building to Permit Certain Operations Needed for Dry Cask Storage of Spent Nuclear Fuel W3F1-2010-0065, Response to Request for Additional Information Associated with Technical Specification Table 3.4-1 Isolation Valve Addition2010-08-12012 August 2010 Response to Request for Additional Information Associated with Technical Specification Table 3.4-1 Isolation Valve Addition W3F1-2010-0047, License Amendment Request for Proposed Change to Technical Specification 3.7.1.2, Emergency Feedwater System.2010-07-20020 July 2010 License Amendment Request for Proposed Change to Technical Specification 3.7.1.2, Emergency Feedwater System. 2CAN051001, Response to Request for Additional Information Associated with Core Operating Limits Report References2010-05-17017 May 2010 Response to Request for Additional Information Associated with Core Operating Limits Report References ML1011100352010-04-22022 April 2010 Correction to Technical Specification Page 3/4 3-10 Issued with Amendment No. 225 Technical Specification Change to Relocate Steam Generator Level - High Trip Function ML1005504632010-02-22022 February 2010 Request for Amendment to Technical Specification Table 3.4-1 Isolation Valve Addition W3F1-2010-0011, License Amendment Request, Technical Specification Change Regarding Steam Generator Program2010-02-22022 February 2010 License Amendment Request, Technical Specification Change Regarding Steam Generator Program W3F1-2009-0045, License Amendment Request to Modify Technical Specification Information for Table 2.2-1 and Table 3.3-12009-10-22022 October 2009 License Amendment Request to Modify Technical Specification Information for Table 2.2-1 and Table 3.3-1 W3F1-2009-0021, License Amendment Request to Revise the Departure from Nucleate Boiling Ratio (DNBR) Safety Limit2009-06-0303 June 2009 License Amendment Request to Revise the Departure from Nucleate Boiling Ratio (DNBR) Safety Limit W3F1-2008-0051, Entergy'S Response to Nrc'S Request for Additional Information Regarding License Amendment Request to Modify Requirements Regarding Control Room Envelope Habitability, Waterford Unit 32009-01-0808 January 2009 Entergy'S Response to Nrc'S Request for Additional Information Regarding License Amendment Request to Modify Requirements Regarding Control Room Envelope Habitability, Waterford Unit 3 ML0819904722008-07-30030 July 2008 License and Technical Specification Pages, Issuance of Amendment No. 216, Modify Diesel Generator Fuel Oil Testing Surveillance Requirements ML0812700362008-05-0909 May 2008 Tech Spec Page for Correction to Amendment 214 Request to Support Next Generation Fuel; Review & Approval of Revised ECCS Performance Analysis; & Review & Approval of Supplement to ECCS Performance Analysis ML0803800062008-04-16016 April 2008 License Page 4 and Technical Specification Page 5-5, Issuance of Amendment No. 215 Use of Optimized ZIRLO-TM Fuel Rod Cladding ML0808800152008-04-15015 April 2008 Tech Spec Pages for Amendment 214, Request to Support Next Generation Fuel; Review and Approval of ECCS Performance Analysis; and Review and Approval of Supplement to ECCS Performance Analysis ML0804401272008-02-12012 February 2008 2/12/2008 E-mail from Licensee Enclosing Markup of Technical Specification Page 5-5, Supplement to 4/24/2007 License Amendment Request Use of Optimized ZIRLO-TM Fuel Rod Cladding W3F1-2008-0001, License Amendment Request NPF-38-275, Containment Isolation Valves.2008-01-0202 January 2008 License Amendment Request NPF-38-275, Containment Isolation Valves. W3F1-2007-0033, License Amendment Request NPF-38-273 to Modify Requirements Regarding Control Room Envelope Habitability2007-08-16016 August 2007 License Amendment Request NPF-38-273 to Modify Requirements Regarding Control Room Envelope Habitability ML0711603482007-04-24024 April 2007 License Amendment Request to Allow the Use of Optimized Zirlo Fuel Rod Cladding 2024-08-07
[Table view] |
Text
Phil Couture Senior Manager Fleet Regulatory Assurance - Licensing 601-368-5102 W3F1-2023-0035 10 CFR 50.90 July 26, 2023 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program Waterford Steam Electric Station, Unit 3 NRC Docket No. 50-382 Renewed Facility Operating License No. NPF-38 In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Section 50.90, "Application for amendment of license, construction permit, or early site permit," Entergy Operations, Inc. (Entergy) is submitting a License Amendment Request (LAR) for an amendment to Waterford Steam Electric Station, Unit 3 (Waterford 3), Renewed Facility Operating License, Appendix A, "Technical Specifications."
Entergy requests to modify Surveillance Requirement (SR) 4.3.1.3, listed in Technical Specification (TS) 3.3.1, "Reactor Protective Instrumentation," and SR 4.3.2.3, listed in TS 3.3.2, "Engineered Safety Features Actuation System Instrumentation," to remove conflicting language that should have been removed as part of the Waterford 3 LAR to adopt Technical Specification Task Force (TSTF)-425 (Reference 1) which relocated specific surveillance frequencies to the Surveillance Frequency Control Program (SFCP) (a licensee controlled program). Waterford 3 License Amendment No. 249 (Reference 2) approved the proposed relocation of the surveillance frequencies and the associated administrative controls in accordance with the new SFCP. The proposed removal of the conflicting language from SR 4.3.1.3 and SR 4.3.2.3 will make the Waterford 3 SRs consistent with the previously approved corresponding Arkansas Nuclear One, Unit 2 (ANO-2) SRs (Reference 3).
Entergy has concluded that the proposed change presents no significant hazards consideration under the standards set forth in 10 CFR 50.92, "Issuance of amendments."
The Enclosure to this letter provides an evaluation of the proposed change. Attachment 1 to the Enclosure provides the current affected TS pages for Waterford 3, marked-up to show the proposed change. A minor conforming change to the TS Bases is provided for information only Entergy Operations, Inc., 1340 Echelon Parkway, Jackson, MS 39213
W3F1-2023-0035 Page 2 of 3 in Attachment 2 to the Enclosure. Attachment 3 to the Enclosure provides the revised (clean) retyped TS pages.
Entergy requests approval of the proposed license amendment by September 1, 2024. The proposed change would be implemented within 60 days of issuance of the amendment.
This letter contains no new regulatory commitments.
In accordance with 10 CFR 50.91, "Notice for public comment; State consultation," paragraph (b), a copy of this application, with Enclosure and attachments, is being provided to the designated State Official.
Should you have any questions or require additional information, please contact Leia Milster, Regulatory Assurance Manager, Waterford 3, at 504-739-6250.
I declare under penalty of perjury; the foregoing is true and correct.
Executed on July 26, 2023.
Respectfully, Digitally signed by Philip Philip Couture Couture Date: 2023.07.26 07:48:00
-05'00' Phil Couture PC/chm
Enclosure:
Evaluation of the Proposed Change Attachments to
Enclosure:
- 1. Technical Specification Page Markups
- 2. Technical Specification Bases Page Markups (Information Only)
- 3. Retyped Technical Specification Pages
W3F1-2023-0035 Page 3 of 3
References:
- 1) Entergy letter to U.S. Nuclear Regulatory Commission (NRC) letter, "Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program,"
ML15170A121, dated June 17, 2015
- 2) NRC letter to Entergy, "Waterford Steam Electric Station, Unit 3 -
Issuance of Amendment RE: Adoption of TSTF-425, Revision 3
'Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b,'" ML16159A419, dated July 26, 2016
- 3) NRC letter to Entergy, "Arkansas Nuclear One, Unit 2 - Issuance of Amendment RE: Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-425, Revision 3," ML19063B948, dated April 23, 2019 cc: NRC Region IV Regional Administrator NRC Senior Resident Inspector - Waterford 3 NRC Project Manager Waterford 3 Louisiana Department of Environmental Quality
Enclosure W3F1-2023-0035 Evaluation of the Proposed Change
W3F1-2023-0035 Enclosure Page 1 of 13 TABLE OF CONTENTS 1.0
SUMMARY
DESCRIPTION ............................................................................................... 2 2.0 DETAILED DESCRIPTION ................................................................................................ 2 2.1 System Design and Operation ........................................................................................ 2 2.2 Current TS Requirements ............................................................................................... 3 2.3 Reason for the Proposed Change .................................................................................. 4 2.4 Description of the Proposed Change .............................................................................. 4
3.0 TECHNICAL EVALUATION
............................................................................................... 5 3.1 Waterford 3 Implementation of TSTF-425 ...................................................................... 5 3.2 Waterford 3 and ANO-2 Similarities with TSTF-425 ....................................................... 6 3.3 Minor Conforming TS Bases Change ............................................................................. 8
4.0 REGULATORY EVALUATION
........................................................................................... 8 4.1 Applicable Regulatory Requirements/Criteria ................................................................. 8 4.2 Precedent ....................................................................................................................... 9 4.3 No Significant Hazards Consideration Analysis............................................................ 10 4.4 Conclusions .................................................................................................................. 11
5.0 ENVIRONMENTAL CONSIDERATION
........................................................................... 11
6.0 REFERENCES
................................................................................................................. 12 7.0 ATTACHMENTS .............................................................................................................. 13
W3F1-2023-0035 Enclosure Page 2 of 13 EVALUATION OF THE PROPOSED CHANGE 1.0
SUMMARY
DESCRIPTION In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Section 50.90, "Application for amendment of license, construction permit, or early site permit," Entergy Operations, Inc. (Entergy) is submitting a License Amendment Request (LAR) for an amendment to Waterford Steam Electric Station, Unit 3 (Waterford 3), Renewed Facility Operating License, Appendix A, "Technical Specifications."
Waterford 3 was approved to implement the Surveillance Frequency Control Program (SFCP)
(a licensee controlled program) in License Amendment No. 249 (Reference 1). Technical Specification (TS) Surveillance Requirements (SR) 4.3.1.3 and SR 4.3.2.3 are included in the SFCP. This LAR proposes to modify SR 4.3.1.3, listed in TS 3.3.1, "Reactor Protective Instrumentation," and SR 4.3.2.3, listed in TS 3.3.2, "Engineered Safety Features Actuation System Instrumentation," to remove site-specific out of context language that conflicts with the application of the SFCP controls on the Reactor Protective System (RPS) reactor trip system and Engineered Safety Features Actuation System (ESFAS) response time testing frequencies.
2.0 DETAILED DESCRIPTION 2.1 System Design and Operation The RPS consists of sensors, calculators, logic, and other equipment necessary to monitor selected Nuclear Steam Supply System (NSSS) and containment conditions and to effect reliable and rapid Control Element Assembly (CEA) insertion (reactor trip) if any or a combination of the monitored conditions approach specified safety system settings. The RPS functions are to protect the reactor core and Reactor Coolant System (RCS) pressure boundary for defined anticipated operational occurrences (AOOs) and to provide assistance in limiting the consequences for certain postulated accidents. Four measurement channels with electrical and physical separation are provided for each parameter used in the direct generation of trip signals.
A two-out-of-four coincidence of like trip signals is required to generate a reactor trip signal.
The reactor trip signal deenergizes the control element drive mechanism (CEDM) coils, allowing all CEAs to drop into the core.
The safety related instrumentation and controls of the Engineered Safety Features (ESF) system include:
(1) the ESFAS, which consists of the electrical and mechanical devices and circuitry (from sensors to actuation device input terminals) involved in generating those signals that actuate the required ESF systems, and (2) the arrangement of components that perform protective actions after receiving a signal from either the ESFAS or the operator.
W3F1-2023-0035 Enclosure Page 3 of 13 The following actuation signals are generated by the ESFAS when the monitored variables reach the levels that are indicative of conditions which require protective action:
a) Safety Injection Actuation Signal (SIAS) b) Containment Isolation Actuation Signal (CIAS) c) Containment Spray Actuation Signal (CSAS) d) Main Steam Isolation Signal (MSIS) e) Emergency Feedwater Actuation Signal (EFAS) f) Recirculation Actuation Signal (RAS)
The ESF system device actuation circuitry receives (1) actuation signals from the ESFAS or the operator, and (2) permissive signals from sensors which monitor conditions that affect ESF system performance. The signals from the ESFAS actuate the ESF system equipment. The permissive signals provide additional interlocks, blocks and sequencing necessary to provide proper ESF system operation.
2.2 Current TS Requirements Waterford 3 SR 4.3.1.3 requires response time testing of the RPS reactor trip system instrumentation and SR 4.3.2.3 requires response time testing of the ESFAS instrumentation.
The test frequencies for these SRs are controlled in accordance with the SFCP (a licensee controlled program). Currently, the SRs also include explicit requirements controlled by the TSs that conflict with the controls on the application of the response time testing frequencies in accordance with the SFCP.
SR 4.3.1.3 currently specifies that: "The REACTOR TRIP SYSTEM RESPONSE TIME of each reactor trip function shall be demonstrated to be within its limit in accordance with the Surveillance Frequency Control Program. Neutron detectors, Core Protection Calculators, and CEACs [Control Element Assembly Calculator] are exempt from response time testing. Each test shall include at least one channel per function such that all channels are tested as shown in the 'Total No. of Channels' column of Table 3.3-1."
SR 4.3.2.3 currently specifies that: "The ENGINEERED SAFETY FEATURES RESPONSE TIME of each ESFAS function shall be demonstrated to be within its limit in accordance with the Surveillance Frequency Control Program. Each test shall include at least one channel per function such that all channels are tested as shown in the 'Total No. of Channels' Column of Table 3.3-3."
As written, the current SRs, which were approved in License Amendment No. 249 (Reference 1), are causing confusion when attempting to evaluate risk measures related to the SRs and due to the SRs referring to both the SFCP and TS Tables as providing the controls on the surveillance frequencies for performing the required response time testing. The intent of adopting TSTF-425 was, in part, to relocate the controls for performance of SR 4.3.1.3 and SR 4.3.2.3 from the TSs to the SFCP. Entergy should have requested deletion of the last sentence in SR 4.3.1.3 in the LAR to adopt TSTF-425 (Reference 2) and deletion of the last
W3F1-2023-0035 Enclosure Page 4 of 13 sentence in SR 4.3.2.3 in the Request for Additional Information (RAI) response letter regarding the TSTF-425 LAR (Reference 3).
Waterford 3 has not adopted NUREG-1432, "Standard Technical Specifications, Combustion Engineering Plants," (CE-STS) (Reference 4). The Waterford 3 TS are based on NUREG-0212, "Standard Technical Specifications for Combustion Engineering Pressurized Water Reactors,"
(Reference 5). Notwithstanding, the RPS reactor trip instrumentation response time testing requirements in Waterford 3 SR 4.3.1.3 correspond to the CE-STS requirements in SR 3.3.1.14 and SR 3.3.2.5 and the ESFAS instrumentation response time testing requirements in Waterford 3 SR 4.3.2.3 correspond to the CE-STS requirements in SR 3.3.5.4. However, due to the non-standard nature of the Waterford 3 SRs, the general format, presentation style, and content deviate from the corresponding CE-STS SRs.
2.3 Reason for the Proposed Change As indicated in Attachment 3 to the LAR to adopt TSTF-425 (Reference 2), the proposed changes to Waterford 3 SR 4.3.1.3 included the deletion of the text: "at least once every N times 18 months where N is the total number of redundant channels in a specific reactor trip function" from the last sentence of SR 4.3.1.3. Similarly, as indicated in Attachment 2 to the RAI response letter regarding the TSTF-425 LAR (Reference 3), the proposed changes to Waterford 3 SR 4.3.2.3 included the deletion of the text: "at least once every N times 18 months where N is the total number of redundant channels in a specific ESFAS function" from the last sentence of SR 4.3.2.3. The text that was deleted had provided the method for determining the staggered test basis frequency for performing the RPS reactor trip system and ESFAS instrumentation response time testing on the channels shown in the "Total No. of Channels" column of Tables 3.3-1 and 3.3-3, respectively. The failure to remove the remaining text in the last sentences of SR 4.3.1.3 and SR 4.3.2.3 introduced out of context and conflicting language that make the controls on RPS reactor trip system and ESFAS instrumentation response time testing confusing since the SRs now refer to both the SFCP and TS Table 3.3-1 and Table 3.3-3 as controlling the response time testing frequency.
Removing the conflicting language from the last sentences of SR 4.3.1.3 and SR 4.3.2.3 is intended to eliminate the current uncertainty regarding application of the SFCP controls to the RPS reactor trip system and ESFAS instrumentation response time tests.
2.4 Description of the Proposed Change SR 4.3.1.3 is proposed to be modified by removing the last sentence as indicated in the markup below:
"The REACTOR TRIP SYSTEM RESPONSE TIME of each reactor trip function shall be demonstrated to be within its limit in accordance with the Surveillance Frequency Control Program. Neutron detectors, Core Protection Calculators, and CEACs are exempt from response time testing. Each test shall include at least one channel per function such that all channels are tested as shown in the 'Total No. of Channels' column of Table 3.3-1."
W3F1-2023-0035 Enclosure Page 5 of 13 SR 4.3.2.3 is proposed to be modified by removing the last sentence as indicated in the markup below:
"The ENGINEERED SAFETY FEATURES RESPONSE TIME of each ESFAS function shall be demonstrated to be within its limit in accordance with the Surveillance Frequency Control Program. Each test shall include at least one channel per function such that all channels are tested as shown in the 'Total No. of Channels' Column of Table 3.3-3." to this Enclosure provides markups of TS pages 3/4 3-1 and 3/4 3-13 consistent with the proposed changes to SR 4.3.1.3 and SR 4.3.2.3, as indicated above. The revised clean retyped pages incorporating the changes are provided in Attachment 3 to this Enclosure.
In addition, the current Waterford 3 TS Bases Section 3/4.3.1 and 3/4.3.2, "Reactor Protective and Engineered Safety Features Actuation Systems Instrumentation," is modified as indicated below to remove the phrase "...at the specified frequencies":
"The measurement of response time at the specified frequencies provides assurance that the protective and ESF action function associated with each channel is completed within the time limit assumed in the safety analyses."
A markup of TS Bases page B 3/4 3-1d that is consistent with the change to the TS Bases Section 3/4.3.1 and 3/4.3.2 indicated above is provided in Attachment 2 to this Enclosure for information only. The TS Bases change is consistent with the proposed changes in this LAR and is considered a minor conforming change.
3.0 TECHNICAL EVALUATION
3.1 Waterford 3 Implementation of TSTF-425 Waterford 3 License Amendment No. 249 (Reference 1) modified the TS by relocating specific surveillance frequencies to the SFCP (a licensee controlled program). The changes reflect the adoption of Nuclear Regulatory Commission (NRC) approved TSTF-425, "Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b," Revision 3 (Reference 6). Adopting TSTF-425, Revision 3, provided the controls for the administrative relocation of the applicable surveillance frequencies, which included the addition of the SFCP to the Administrative Controls section of the Waterford 3 TS as TS Section 6.5.18.
Waterford 3 implemented License Amendment No. 249 on October 20, 2016, which relocated the applicable TS surveillance frequencies to the SFCP. Subsequently, while reviewing the Waterford 3 SRs for proposed changes to the Surveillance Test Intervals (STIs) under the SFCP, it was identified that SR 4.3.1.3 and SR 4.3.2.3 do not provide clear guidance and include conflicting language regarding the controls for establishing the required frequencies for response time testing of their respective RPS reactor trip system and ESFAS instrumentation.
The lack of clarity was determined to be caused by the apparent out of context statement in the SRs that "Each test shall include at least one channel per function such that all channels are tested as shown in the Total No. of Channels column of Table 3.3-1 [Table 3.3-3 for the ESFAS
W3F1-2023-0035 Enclosure Page 6 of 13 channels]." The removal of this statement from the SRs should have been included as part of the Waterford 3 LAR to adopt TSTF-425 (Reference 2). The failure to remove this conflicting language introduced uncertainty regarding the controls on RPS reactor trip system and ESFAS instrumentation response time since the SRs currently refer to both the SFCP and TS Table 3.3-1 and Table 3.3-3 as controlling the response time testing frequencies. The purpose of this LAR is to modify Waterford 3 SR 4.3.1.3 and SR 4.3.2.3 to remove the conflicting language by deleting the last sentence in each of the SRs in order to restore clarity regarding the controls on response time testing frequencies.
3.2 Waterford 3 and ANO-2 Similarities with TSTF-425 Arkansas Nuclear One - Unit 2 (ANO-2) submitted a LAR on February 6, 2018 for the relocation of specific TS surveillance frequency requirements to a licensee controlled program (SFCP) by adopting TSTF-425 (Reference 7), similar to the Waterford 3 LAR to adopt TSTF-425 (Reference 2). The ANO-2 and Waterford 3 TS are both based on NUREG-0212 (Reference 5),
and not the NUREG-1432 CE-STS (Reference 4), to which TSTF-425 is marked up. Both the Waterford 3 TS and the ANO-2 TS include RPS reactor trip system and ESFAS instrumentation response time testing SRs that correspond to the CE-STS SRs. Although the SR numbering scheme for the SRs differs slightly between Waterford 3 and ANO-2, the original language of Waterford 3 SR 4.3.1.3 and SR 4.3.2.3 matches the original language of the respective ANO-2 SR 4.3.1.1.3 and SR 4.3.2.1.3. Changes made in the ANO-2 TSTF-425 submittal (Reference 7) are shown here:
ANO-2 SR 4.3.1.1.3 (Waterford 3 SR 4.3.1.3)
The REACTOR TRIP SYSTEM RESPONSE TIME of each reactor trip function shall be demonstrated to be within its limit in accordance with the Surveillance Frequency Control Program at least once per 18 months. Neutron detectors are exempt from response time testing. Each test shall include at least one channel per function such that all channels are tested at least once every N times 18 months where N is the total number of redundant channels in a specific reactor trip function as shown in the "Total No. of Channels" column of Table 3.3-1.
ANO-2 SR 4.3.2.1.3 (Waterford 3 SR 4.3.2.3)
The ENGINEERED SAFETY FEATURES RESPONSE TIME of each ESFAS function shall be demonstrated to be within the limit in accordance with the Surveillance Frequency Control Program at least once per 18 months. Each test shall include at least one channel per function such that all channels are tested at least once every N times 18 months where N is the total number of redundant channels in a specific ESFAS function as shown in the "Total No. of Channels" Column of Table 3.3-3.
Furthermore, the RPS reactor trip system instrumentation response time testing requirements in Waterford 3 SR 4.3.1.3 and ANO-2 SR 4.3.1.1.3 correspond to the CE-STS requirements in SR 3.3.1.14 and SR 3.3.2.5. Also, the ESFAS instrumentation response time testing requirements in Waterford 3 SR 4.3.2.3 and ANO-2 SR 4.3.2.1.3 correspond to the CE-STS
W3F1-2023-0035 Enclosure Page 7 of 13 requirements in SR 3.3.5.4. However, the Waterford 3 and ANO-2 SRs deviate from the corresponding CE-STS SRs since the general format, presentation style, and content of the NUREG-0212 non-standard CE TS are retained. Accordingly, both the Waterford 3 and ANO-2 LARs had to reconcile the differences between their non-standard CE TS and the TSTF-425 markups of the CE-STS. Entergy has previously concluded in the Waterford 3 and ANO-2 LARs that the deviations from the NUREG-1432 CE-STS and TSTF-425 markups have no impact on the NRC staff's model safety evaluation (SE) published in the Notice of Availability, dated July 6, 2009 (74 FR 31996) (Reference 8).
Based on a review of the changes to SR 4.3.1.1.3 and SR 4.3.2.1.3 in the ANO-2 LAR to adopt TSTF-425 (see Attachment 3 to Reference 7), it is apparent that ANO-2 deleted the entire last sentence from both SRs. As indicated in the TS markups in Attachment 3 to the Waterford 3 LAR to adopt TSTF-425 (Reference 2) and Attachment 2 to the RAI response letter regarding the TSTF-425 LAR (Reference 3), the proposed changes to Waterford 3 SR 4.3.1.3 and SR 4.3.2.3 removed some, but not all, of the text in the last sentences of the SRs. See below:
Waterford 3 SR 4.3.1.3 Markup from Reference 2 The REACTOR TRIP SYSTEM RESPONSE TIME of each reactor trip function shall be demonstrated to be within its limit in accordance with the Surveillance Frequency Control Program at least once per 18 months. Neutron detectors [, Core Protection Calculators, and CEACs] are exempt from response time testing. Each test shall include at least one channel per function such that all channels are tested at least once every N times 18 months where N is the total number of redundant channels in a specific reactor trip function as shown in the "Total No. of Channels" column of Table 3.3-1.
Note: The bold green text above within the [ ], was added as part of Waterford 3 TS Amendment 260, dated August 24, 2021 (Reference 14), and does not impact the changes made in support of TSTF-425.
Waterford 3 SR 4.3.2.3 Markup from Reference 3 The ENGINEERED SAFETY FEATURES RESPONSE TIME of each ESFAS function shall be demonstrated to be within the limit in accordance with the Surveillance Frequency Control Program at least once per 18 months. Each test shall include at least one channel per function such that all channels are tested at least once every N times 18 months where N is the total number of redundant channels in a specific ESFAS function as shown in the "Total No. of Channels" Column of Table 3.3-3.
Removal of the additional text, which relates to the staggered testing strategy, from the last sentences of the Waterford 3 SR 4.3.1.3 and SR 4.3.2.3, will align Waterford 3 SRs with the current corresponding ANO-2 SR 4.3.1.1.3 and SR 4.3.2.1.3.
The ANO-2 SRs were approved on April 23, 2019, as part of the ANO-2 License Amendment No. 315 (Reference 9). Aligning the language in the Waterford 3 SRs with the language in the corresponding ANO-2 SRs will eliminate the uncertainty regarding application of the RPS reactor trip system and ESFAS instrumentation surveillance frequencies and allow the SFCP to assess proposed changes to the Surveillance Test Intervals consistent with TSTF-425 and the intent of Nuclear Energy Institute (NEI) 04-10, "Risk-Informed Technical Specifications Initiative
W3F1-2023-0035 Enclosure Page 8 of 13 5b - Risk-Informed Method for Control of Surveillance Frequencies," Revision 1 (Reference 10),
which allows licensees to add or remove the requirement to perform surveillances on a staggered test basis.
3.3 Minor Conforming TS Bases Change The Waterford 3 TS Bases Section 3/4.3.1 and 3/4.3.2 is modified consistent with the proposed changes to the LAR by removing the phrase "...at the specified frequencies" from the description of the purpose for measurement of the RPS reactor trip system and ESFAS instrumentation response times. This TS Bases change is considered a minor conforming change that is necessary because the frequencies have been relocated to the SFCP and, as such, the SRs will no longer contain the specified frequencies for response time testing of the RPS reactor trip system and ESFAS instrumentation. The TS Bases markup is provided for information only in Attachment 2 to this Enclosure.
4.0 REGULATORY EVALUATION
4.1 Applicable Regulatory Requirements/Criteria The proposed changes provided in TSTF-425, Revision 3 (Reference 6), and the NRC's model SE, dated July 6, 2009 (Reference 8), and their relationship to the regulatory requirements, are applicable to and bound the changes to the Waterford 3 SR 4.3.1.3 and SR 4.3.2.3 as proposed in this LAR to the extent practicable given that the Waterford 3 TS are based on NUREG-0212 (Reference 5) and not the NUREG-1432 CE-STS (Reference 4). The SRs are retained in the TS as required by 10 CFR 50.36(c)(3) such that the requirements relating to testing, calibration, and inspection continue to assure that facility operation will be within safety limits and the Limiting Conditions for Operation (LCOs) will be met. Only the controls on surveillance frequencies are relocated to the SFCP (a licensee controlled program). Entergy currently controls changes to the surveillance frequencies using the SFCP, which was added to the Administrative Controls section of the Waterford 3 TS as TS Section 6.5.18 by implementation of the previously approved License Amendment No. 249 (Reference 1).
NRC Regulatory Guide 1.177, "An Approach for Plant-Specific, Risk-Informed Decisionmaking:
Technical Specifications," Revision 1 (Reference 11), provides a framework for evaluating the risk impact of proposed changes to surveillance frequencies which requires identification of the risk contribution from impacted surveillances, determination of the risk impact from the change to the proposed surveillance frequency, and performance of sensitivity and uncertainty evaluations. The application of NEI 04-10, Revision 1, (Reference 10) in accordance with the SFCP administrative controls in Waterford 3 TS Section 6.5.18 satisfies the intent of Regulatory Guide 1.177.
The administrative controls of the SFCP require the application of NEI 04-10, Revision 1, as approved by the NRC, for any changes to surveillance frequencies within the SFCP. In accordance with NEI 04-10, Revision 1, Entergy uses Probabilistic Risk Assessment (PRA) methods to determine the risk impact of the modifications to the TS surveillance frequencies of the applicable plant equipment. This methodology provides a risk-informed, performance based
W3F1-2023-0035 Enclosure Page 9 of 13 approach for establishment of surveillance frequencies, consistent with the philosophy of NRC Regulatory Guide 1.174, "An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis," Revision 2 (Reference 12). Sensitivity studies are performed on important PRA parameters. PRA technical adequacy is addressed consistent with the guidance in NRC Regulatory Guide 1.200, "An Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities," (Reference 13).
The proposed changes in this LAR do not change the SFCP as approved in License Amendment No. 249 and, therefore, the key principles of risk-informed decisionmaking as delineated in Regulatory Guides 1.177 and 1.174 are maintained, in that:
- 1. The proposed change meets the current regulations, unless it explicitly relates to a requested exemption or rule change;
- 2. The proposed change is consistent with the defense-in-depth philosophy;
- 3. The proposed change maintains sufficient safety margins;
- 4. Increases in core damage frequency or risk resulting from the proposed change are small and consistent with the Commission's Safety Goal Policy Statement; and
- 5. The impact of the proposed change is monitored with performance measurement strategies.
The proposed changes to Waterford 3 SR 4.3.1.3 and SR 4.3.2.3 remove conflicting language that make the controls on RPS reactor trip system and ESFAS instrumentation response time testing confusing since the SRs currently refer to both the SFCP and TS Table 3.3-1 and TS Table 3.3-3 as controlling the response time testing frequencies. Removing the conflicting language will eliminate the current uncertainty regarding application of the SFCP controls to the RPS reactor trip system and ESFAS instrumentation response time tests and allow the SFCP to properly assess proposed changes to the Surveillance Test Intervals consistent with TSTF-425 and the intent of NEI 04-10, Revision 1, Step 12-A1-1, which addresses evaluation of test strategies and timing for performing surveillance tests, either staggered or sequential, on redundant components or trains.
4.2 Precedent This LAR is similar to that submitted for ANO-2 on February 6, 2018 (Reference 7) and approved on April 23, 2019 in ANO-2 License Amendment No. 315 (Reference 9). Both Waterford 3 and ANO-2 are CE plants with TS based on NUREG-0212 (Reference 5), which include TS 3.3.1 for RPS reactor trip system instrumentation and TS 3.3.2 for the ESFAS instrumentation. The proposed changes to modify the response time testing language will align the Waterford 3 SR 4.3.1.3 and SR 4.3.2.3 with the current ANO-2 SR 4.3.1.1.3 and SR 4.3.2.1.3. The changes are consistent with the NUREG-1432, CE-STS, to the extent practicable given that the Waterford 3 and ANO-2 TS are based on NUREG-0212.
W3F1-2023-0035 Enclosure Page 10 of 13 4.3 No Significant Hazards Consideration Analysis Entergy Operations, Inc. (Entergy) has evaluated the proposed changes to the TS using the criteria in 10 CFR 50.92 and has determined that the proposed changes do not involve a significant hazards consideration.
Entergy proposes to modify the Waterford 3 TS Surveillance Requirements (SR) to remove conflicting language that makes the controls on Reactor Protective System (RPS) reactor trip system and Engineered Safety Features Actuation System (ESFAS) instrumentation response time testing confusing since the SRs currently refer to both the Surveillance Frequency Control Program (SFCP) (a licensee controlled program) and existing TS requirements as controlling the response time testing frequencies. Removing the conflicting language will eliminate the current uncertainty regarding application of the SFCP controls to the RPS reactor trip system and ESFAS instrumentation response time testing frequencies and allow the SFCP to properly assess proposed changes to the Surveillance Test Intervals (STIs) consistent with Technical Specification Task Force (TSTF)-425 and the intent of Nuclear Energy Institute (NEI) 04-10, Revision 1. The proposed changes will align the Waterford 3 SR response time testing language with the language in the corresponding SR previously approved for Arkansas Nuclear One - Unit 2 (ANO-2).
Basis for no significant hazards consideration determination: As required by 10 CFR 50.91(a),
Entergy analysis of the issue of no significant hazards consideration is presented below:
- 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No The proposed change removes conflicting language affecting the surveillance frequencies for the RPS reactor trip system and ESFAS instrumentation response time testing SRs. Surveillance frequencies are not an initiator to any accident previously evaluated. As such, the probability of any accident previously evaluated is not significantly increased. The RPS and ESFAS system instrumentation is still required to be operable, meet the acceptance criteria for the SRs, and be capable of performing any mitigative function assumed in the accident analysis. As a result, it can be concluded that the proposed change does not affect reactor operations or the accident analyses in a manner that would significantly increase the radiological consequences of any accident previously evaluated.
Therefore, this change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No
W3F1-2023-0035 Enclosure Page 11 of 13 No new or different accidents result from utilizing the proposed change. The changes to the SRs do not involve a physical alteration of the plant (i.e., no new or different type of equipment will be installed) or a change in the methods governing normal plant operation. The changes do not impose any new or different requirements, or alter assumptions made in the safety analysis. The proposed changes do not establish a potential new accident precursor or affect the functional capability of safety-related equipment.
Therefore, this change does not create the possibility of a new or different kind of accident from an accident previously evaluated.
- 3. Does the proposed change involve a significant reduction in a margin of safety?
Response: No The proposed changes to the RPS reactor trip system and ESFAS instrumentation surveillance frequencies do not reduce the margins of safety associated with the design, operation, testing methods, and acceptance criteria of the affected structures, systems, and components (SSCs). The applicable codes and standards will continue to be met as described in the plant licensing basis. No changes to the safety analysis assumptions, safety limits, or limiting safety system settings are being made as a result of the proposed changes and, as such, there is no adverse effect on plant safety.
Therefore, this change does not involve a significant reduction in a margin of safety.
Based upon the reasoning presented above, Entergy concludes that the requested change involves no significant hazards consideration, as set forth in 10 CFR 50.92(c), Issuance of Amendment and accordingly, a finding of no significant hazards consideration is justified.
4.4 Conclusions In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
5.0 ENVIRONMENTAL CONSIDERATION
The proposed change would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR Part 20, and would change an inspection or surveillance requirement. However, the proposed change does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluents that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed
W3F1-2023-0035 Enclosure Page 12 of 13 change meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed change.
6.0 REFERENCES
- 1. NRC letter to Entergy, "Waterford Steam Electric Station, Unit 3 - Issuance of Amendment RE: Adoption of TSTF-425, Revision 3 'Relocate Surveillance Frequencies to Licensee Control - RITSTF initiative 5b,'" ML16159A419, dated July 26, 2016
- 2. Entergy letter to NRC, "Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program," Waterford Steam Electric Station, Unit 3, ML15170A122, dated June 17, 2015
- 3. Entergy letter to NRC, "Responses to Request for Additional Information Regarding the Risk-Informed Surveillance Requirements License Amendment Request (LAR),"
Waterford Steam Electric Station, Unit 3, ML16063A532, dated March 3, 2016
- 4. NRC NUREG-1432, Revision 5.0, "Standard Technical Specifications, Combustion Engineering Plants," ML21258A421, dated September 2021
- 5. NRC NUREG-0212, Revision 3, "Standard Technical Specifications for Combustion Engineering Pressurized Water Reactors," dated December 1981
- 6. TSTF Traveler, TSTF-425, Revision 3, "Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b," ML090850642, dated March 18, 2009
- 7. Entergy letter to NRC, "Application for Technical Specification Change Regarding RiskInformed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)," Arkansas Nuclear One, Unit 2, ML18038B354, dated February 6, 2018
- 8. Federal Register, Vol. 74, No. 127, pages 31996 - 32006, NRC, "Notice of Availability of Technical Specification Improvement to Relocate Surveillance Frequencies to Licensee Control - Risk-Informed Technical Specification Task Force (RITSTF) Initiative 5b, Technical Specification Task Force - 425, Revision 3," (74 FR 31996), dated July 6, 2009
- 9. NRC letter to Entergy, "Arkansas Nuclear One, Unit 2 - Issuance of Amendment RE:
Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-425, Revision 3," ML19063B948, dated April 23, 2019
- 10. NEI Report NEI 04-10, "Risk-Informed Technical Specifications Initiative 5b - Risk-Informed Method for Control of Surveillance Frequencies," Revision 1, ML071360456, dated April 2007
W3F1-2023-0035 Enclosure Page 13 of 13
- 11. NRC Regulatory Guide 1.177, Revision 1, "An Approach for Plant-Specific, Risk-Informed Decisionmaking: Technical Specifications," ML100910008, dated May 2011
- 12. NRC Regulatory Guide 1.174, Revision 2, "An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis," ML100910006, dated May 2011
- 13. NRC Regulatory Guide 1.200, Revision 2, "An Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities,"
ML090410014, dated March 2009
- 14. NRC letter to Entergy, "Waterford Steam Electric station, Unit 3 - Issuance of Amendment No. 260 RE: Digital Upgrade to the Core Protection Calculator and Control Element Assembly Calculator Systems," ML21131A243, dated August 24, 2021 7.0 ATTACHMENTS
- 1. Technical Specification Page Markups
- 2. Technical Specification Bases Page Markups (Information Only)
- 3. Retyped Technical Specification Pages
Enclosure, Attachment 1 W3F1-2023-0035 Technical Specification Page Markups (2 TS Pages Follow)
3/4.3 INSTRUMENTATION 3/4.3.1 REACTOR PROTECTIVE INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.1 As a minimum, the reactor protective instrumentation channels and bypasses of Table 3.3-1 shall be OPERABLE.
APPLICABILITY: As shown in Table 3.3-1.
ACTION:
As shown in Table 3.3-1.
SURVEILLANCE REQUIREMENTS 4.3.1.1 Each reactor protective instrumentation channel shall be demonstrated OPERABLE by the performance of the CHANNEL CHECK, CHANNEL CALIBRATION and CHANNEL FUNCTIONAL TEST operations for the MODES and at the frequencies shown in Table 4.3-1.
4.3.1.2 The logic for the bypasses shall be demonstrated OPERABLE prior to each reactor startup unless performed during the preceding 92 days. The total bypass function shall be demonstrated OPERABLE in accordance with the Surveillance Frequency Control Program during CHANNEL CALIBRATION testing of each channel affected by bypass operation.
4.3.1.3 The REACTOR TRIP SYSTEM RESPONSE TIME of each reactor trip function shall be demonstrated to be within its limit in accordance with the Surveillance Frequency Control Program. Neutron detectors, Core Protection Calculators, and CEACs are exempt from response time testing. Each test shall include at least one channel per function such that all channels are tested as shown in the "Total No. of Channels" column of Table 3.3-1.
4.3.1.4 DELETED 4.3.1.5 DELETED 4.3.1.6 DELETED 4.3.1.7 Perform a test on the CPC DNBR/LPD trip output through the contact interface to the PPS in accordance with the Surveillance Frequency Control Program.
WATERFORD - UNIT 3 3/4 3-1 AMENDMENT NO. 94, 249, 260,
INSTRUMENTATION 3/4.3.2 ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.2 The Engineered Safety Features Actuation System (ESFAS) instrumentation channels and bypasses shown in Table 3.3-3 shall be OPERABLE with their trip setpoints set consistent with the values shown in the Trip Setpoint column of Table 3.3-4.
APPLICABILITY: As shown in Table 3.3-3.
ACTION:
- a. With an ESFAS instrumentation channel trip setpoint less conservative than the value shown in the Allowable Values column of Table 3.3-4, declare the channel inoperable and apply the applicable ACTION requirement of Table 3.3-3 until the channel is restored to OPERABLE status with the trip setpoint adjusted consistent with the Trip Setpoint value.
- b. With an ESFAS instrumentation channel inoperable, take the ACTION shown in Table 3.3-3.
SURVEILLANCE REQUIREMENTS 4.3.2.1 Each ESFAS instrumentation channel shall be demonstrated OPERABLE by the performance of the CHANNEL CHECK, CHANNEL CALIBRATION and CHANNEL FUNCTIONAL TEST operations for the MODES and at the frequencies shown in Table 4.3-2.
4.3.2.2 The logic for the bypasses shall be demonstrated OPERABLE during the at power CHANNEL FUNCTIONAL TEST of channels affected by bypass operation. The total bypass function shall be demonstrated OPERABLE in accordance with the Surveillance Frequency Control Program during CHANNEL CALIBRATION testing of each channel affected by bypass operation.
4.3.2.3 The ENGINEERED SAFETY FEATURES RESPONSE TIME of each ESFAS function shall be demonstrated to be within the limit in accordance with the Surveillance Frequency Control Program. Each test shall include at least one channel per function such that all channels are tested as shown in the "Total No. of Channels" Column of Table 3.3-3.
WATERFORD - UNIT 3 3/4 3-13 AMENDMENT NO. 94, 249,
Enclosure, Attachment 2 W3F1-2023-0035 Technical Specification Bases Page Markups (Information Only)
(1 TS Bases Page Follow)
3/4.3 INSTRUMENTATION BASES 3/4.3.1 and 3/4.3.2 REACTOR PROTECTIVE AND ENGINEERED SAFETY FEATURES ACTUATION SYSTEMS INSTRUMENTATION (Continued) cabinet reference accuracy, calibration equipment errors (M&TE), and RPS/ESFAS cabinet bistable Drift. Periodic testing assures that actual setpoints are within their Allowable Values. A channel is inoperable if its actual setpoint is not within its Allowable Value and corrective action must be taken. Operation with a trip set less conservative than its setpoint, but within its specified ALLOWABLE VALUE is acceptable on the basis that the difference between each trip Setpoint and the ALLOWABLE VALUE is equal to or less than the Periodic Test Error allowance assumed for each trip in the safety analyses.
(EC-26338, Ch. 67)
The Core Protection Calculator, High Logarithmic Power (HLP), and Reactor Coolant System Flow use a single bistable to initiate both the permissive and automatic operating bypass removal functions. A single bistable cannot both energize and de-energize at a single, discrete value due to hysteresis. The CPC automatic bypass removal and permissive for the HLP trip bypass occur at the bistable setpoint (nominally 10-4% power). However, the HLP automatic bypass removal and permissive for CPC trip bypass occur at the reset value of the bistable. Also note if the bistable setpoint is changed as part of the Special Test Exception 3.10.3, the same dead band transition is applicable.
(EC-26338, Ch. 67)
The measurement of response time at the specified frequencies provides assurance that the protective and ESF action function associated with each channel is completed within the time limit assumed in the safety analyses. No credit was taken in the analyses for those channels with response times indicated as not applicable.
(LBDCR 22-034, Ch. 104)
Response time may be verified by any series of sequential, overlapping, or total channel measurements, including allocated sensor response time, such that the response time is verified.
Allocations for sensor response times may be obtained from records of test results, vendor test data, or vendor engineering specifications. Topical Report CE NPSD-1167-A, "Elimination of Pressure Sensor Response Time Testing Requirements," provides the basis and methodology for using allocated sensor response times in the overall verification of the channel response time for specific sensors identified in the Topical Report. The response time may be verified for components that replace the components that were previously evaluated in CE NPSD-1167-A provided that the components have been evaluated in accordance with the NRC approved methodology as discussed in Attachment 1 to TSTF-569, "Methodology to Eliminate Pressure Sensor and Protection Channel (for Westinghouse plants only) Response Time Testing."
Response time verification for other sensor types must be demonstrated by test. The allocation of sensor response times must be verified prior to placing a new component in operation and reverified after maintenance that may adversely affect the sensor response time.
(LBDCR 22-034, Ch. 104)
WATERFORD - UNIT 3 B 3/4 3-1d CHANGE NO. 57, 63, 67, 86, 99, 104,
Enclosure, Attachment 3 W3F1-2023-0035 Retyped Technical Specification Pages (2 TS Pages Follow)
3/4.3 INSTRUMENTATION 3/4.3.1 REACTOR PROTECTIVE INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.1 As a minimum, the reactor protective instrumentation channels and bypasses of Table 3.3-1 shall be OPERABLE.
APPLICABILITY: As shown in Table 3.3-1.
ACTION:
As shown in Table 3.3-1.
SURVEILLANCE REQUIREMENTS 4.3.1.1 Each reactor protective instrumentation channel shall be demonstrated OPERABLE by the performance of the CHANNEL CHECK, CHANNEL CALIBRATION and CHANNEL FUNCTIONAL TEST operations for the MODES and at the frequencies shown in Table 4.3-1.
4.3.1.2 The logic for the bypasses shall be demonstrated OPERABLE prior to each reactor startup unless performed during the preceding 92 days. The total bypass function shall be demonstrated OPERABLE in accordance with the Surveillance Frequency Control Program during CHANNEL CALIBRATION testing of each channel affected by bypass operation.
4.3.1.3 The REACTOR TRIP SYSTEM RESPONSE TIME of each reactor trip function shall be demonstrated to be within its limit in accordance with the Surveillance Frequency Control Program. Neutron detectors, Core Protection Calculators, and CEACs are exempt from response time testing.
4.3.1.4 DELETED 4.3.1.5 DELETED 4.3.1.6 DELETED 4.3.1.7 Perform a test on the CPC DNBR/LPD trip output through the contact interface to the PPS in accordance with the Surveillance Frequency Control Program.
WATERFORD - UNIT 3 3/4 3-1 AMENDMENT NO. 94, 249, 260,
INSTRUMENTATION 3/4.3.2 ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.2 The Engineered Safety Features Actuation System (ESFAS) instrumentation channels and bypasses shown in Table 3.3-3 shall be OPERABLE with their trip setpoints set consistent with the values shown in the Trip Setpoint column of Table 3.3-4.
APPLICABILITY: As shown in Table 3.3-3.
ACTION:
- a. With an ESFAS instrumentation channel trip setpoint less conservative than the value shown in the Allowable Values column of Table 3.3-4, declare the channel inoperable and apply the applicable ACTION requirement of Table 3.3-3 until the channel is restored to OPERABLE status with the trip setpoint adjusted consistent with the Trip Setpoint value.
- b. With an ESFAS instrumentation channel inoperable, take the ACTION shown in Table 3.3-3.
SURVEILLANCE REQUIREMENTS 4.3.2.1 Each ESFAS instrumentation channel shall be demonstrated OPERABLE by the performance of the CHANNEL CHECK, CHANNEL CALIBRATION and CHANNEL FUNCTIONAL TEST operations for the MODES and at the frequencies shown in Table 4.3-2.
4.3.2.2 The logic for the bypasses shall be demonstrated OPERABLE during the at power CHANNEL FUNCTIONAL TEST of channels affected by bypass operation. The total bypass function shall be demonstrated OPERABLE in accordance with the Surveillance Frequency Control Program during CHANNEL CALIBRATION testing of each channel affected by bypass operation.
4.3.2.3 The ENGINEERED SAFETY FEATURES RESPONSE TIME of each ESFAS function shall be demonstrated to be within the limit in accordance with the Surveillance Frequency Control Program.
WATERFORD - UNIT 3 3/4 3-13 AMENDMENT NO. 94, 249,