Notification of NRC Triennial Heat Exchanger/Sink Performance Inspection (05000313/2022003 and 05000368/2022003) and Request for Information
ML22159A324
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 06/09/2022
From: Vincent Gaddy
NRC Region 4
To: Sullivan J
Entergy Operations
References
IR 2022003
Download: ML22159A324 (9)


See also: IR 05000313/2022003

Text

June 9, 2022

Mr. Joseph Sullivan

Site Vice President

Entergy Operations, Inc.

N-TSB-58

1448 S.R. 333

Russellville, AR 72802-0967

SUBJECT: ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - NOTIFICATION OF NRC

TRIENNIAL HEAT EXCHANGER/SINK PERFORMANCE INSPECTION

(05000313/2022003 AND 05000368/2022003) AND REQUEST FOR

INFORMATION

Dear Mr. Sullivan:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

staff will conduct the triennial portion of the heat exchanger/sink performance inspection at your

Arkansas Nuclear One, Units 1 and 2 from August 22-26, 2022. The onsite phase of the

inspection will consist of two reactor inspectors from the NRCs Region IV office for one week.

The inspection will be conducted in accordance with NRC Inspection Procedure (IP) 71111,

Attachment 07, Heat Exchanger/Sink Performance, dated October 21, 2020.

The objectives of the inspection are to verify that: 1) any potential heat exchanger deficiencies

which could mask degraded performance are identified, 2) any potential common-cause heat

sink performance problems that have the potential to increase risk are identified, and 3) the

licensee has adequately identified and resolved heat sink performance problems that could

result in initiating events or affect multiple heat exchangers in mitigating systems and thereby

increase risk.

To minimize the impact the inspection has on the site and to ensure an efficient inspection, we

have enclosed a request for information needed for the inspection. It is important that these

requests are fulfilled as completely and accurately as possible to minimize any additional

requests during the preparation week or during the onsite inspection. The requests have been

divided into three groups.

  • The first group lists information necessary for our initial inspection scoping activities.

This information should be available to the lead inspector no later than July 11, 2022.

After reviewing the information, the lead inspector will communicate the selected 2-4 risk

significant or safety-related heat exchanger and/or heat sink samples as soon as

practical. The lead inspector will also communicate whether only a subset of the second

group information requests is required.

J. Sullivan 2

  • The second group of information requested includes those items needed to support our

in-office preparation activities. This set of documents should be available no later than

August 5, 2022. This information should be separated for each selected component.

Note that the inspector(s) may identify during the preparation week additional

information needed to support the inspection and will communicate those requests as

soon as practicable.

  • The third group of information requested includes the additional documentation identified

during in-office preparation activities as well as other resource requests necessary to

support our onsite inspection activities. The additional information or resources should

be available throughout the week of onsite inspection activities beginning on August 22,

2022.

If a request does not apply (or there are no responsive documents) for any heat exchanger/heat

sink sample, no response is necessary though a brief explanation is beneficial. Include all

attachments, addendums, enclosures, etc. to the requests as applicable. Please organize

responses in the manner presented in the enclosure.

We have discussed the schedule for this inspection with your staff and understand that our

regulatory contact for this inspection will be Mr. Michael Hall of your Licensing organization. If

there are any questions about this inspection or the documents requested, please contact the

lead inspector, Mr. Ronald Kopriva, by telephone at 817-200-1104 or by email at

Ron.Kopriva@nrc.gov as soon as practicable.

PAPERWORK REDUCTION ACT STATEMENT

This letter contains mandatory information collections that are subject to the Paperwork

Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB)

approved these information collections (approval number 3150-0011). Send comments

regarding this information collection to the Information Services Branch, Office of the Chief

Information Officer, Mail Stop: T6 A10M, U.S. Nuclear Regulatory Commission, Washington, DC

20555-0001, or by email to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of

Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office of Management and

Budget, Washington, DC 20503.

PUBLIC PROTECTION NOTIFICATION

The NRC may not conduct nor sponsor, and a person is not required to respond to, a request

for information or an information collection requirement unless the requesting document

displays a currently valid OMB control number.

J. Sullivan 3

This letter, its enclosure, and your response (if any) will be made available for public inspection

and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document

Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public

Inspections, Exemptions, Requests for Withholding.

Sincerely,

Signed by Gaddy, Vincent

on 06/09/22

Vincent G Gaddy, Chief

Engineering Branch 1

Division of Reactor Safety

Docket No(s). 05000313 and 05000368

License No(s). DPR-51 and NPF-6

Enclosure:

Request for Information

Distribution via Listserv

ML22159A324

SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: RAK Yes No Publicly Available Sensitive NRC-002

OFFICE DORS/EB1 DORS/EB1

NAME RKopriva VGaddy

SIGNATURE /RA/ /RA/

DATE 6/9/2022 6/9/2022

Request for Information

Triennial Heat Exchanger/Sink Performance Inspection

Arkansas Nuclear One, Units 1 and 2

Inspection Report: 05000313/2022003 AND 05000368/2022003

Inspection Dates: August 22-26, 2022

Inspection Procedure: IP 71111.07, Triennial Heat Exchanger/Sink Performance

Lead Inspector: Ronald A. Kopriva, Senior Reactor Inspector

I. Information Requested by July 11, 2022:

1. Copy of any heat exchanger/heat sink program documents including Generic Letter (GL) 89-13 programs or aging management programs (AMPs).

2. Copy of any original and/or supplemental responses to GL 89-13.

3. Copy of any current requirements and/or commitments related to GL 89-13 or AMPs.

4. Copy of any heat exchanger/heat sink program self-assessments, audits, etc. since last

NRC triennial heat exchanger/heat sink inspection.

5. Copy of the updated final safety analysis report, technical specifications, technical

requirements manual, preventive maintenance program, and inservice inspection

program. Include bases documents as applicable.

6. List of safety-related, risk-significant, or GL 89-13 program heat exchangers in order of

risk significance.

7. List of corrective action program documents with title and/or brief description related to

heat exchangers/heat sinks since last NRC triennial heat exchanger/heat sink

inspection.

II. Information Requested by August 5, 2022.

1. For the selected heat exchangers that are directly cooled by the service water (or open

water) system:

a. Documentation of performance testing (i.e., heat transfer, temperature

effectiveness, etc.) and/or monitoring methods (i.e., pressure loss, temperature

difference, etc.) such as technical reports, complete work orders, implementing

procedures, etc. Limit response to last six of each.

b. Documentation of as-found/as-left periodic flow testing and/or flow balancing

such as technical reports, complete work orders, implementing procedures, etc.

Limit response to last six of each.

2

c. Documentation of visual inspections, non-destructive examinations (i.e., eddy-

current, ultrasonic testing, etc.), and cleanings such as technical reports,

complete work orders, implementing procedures, etc. Limit response to last six of

each.

d. Documentation of biotic fouling and/or macrofouling treatment such as technical

reports, complete work orders, implementing procedures, etc. Limit response to

last six of each.

e. Copy of the tube plugging map, tube plugging criteria, and heat exchanger

margin if based upon tube plugging.

f. Copy of any relevant design basis calculations including any evaluations of the

potential for water hammer.

g. Copy of the applicable system health report, design basis document, and/or

system description.

h. Copy of any relevant system piping and instrumentation diagrams.

i. Copy of the heat exchanger design specification, heat exchanger data sheet, and

any relevant vendor manuals.

j. Copy of the heat exchanger (and motor/fan if an air-to-water heat exchanger)

preventive maintenance (PM) schedule including the frequency of those PM

activities and their bases.

k. Copy of documentation of completed PM activities if not already provided. Limit

response to last six of each.

2. For the selected heat exchangers that are directly cooled by a closed loop cooling water

system:

a. Documentation of performance testing (i.e., heat transfer, temperature

effectiveness, etc.) and/or monitoring methods (i.e., pressure loss, temperature

difference, etc.) such as technical reports, complete work orders, implementing

procedures, etc. Limit response to last six of each.

b. Documentation of as-found/as-left periodic flow testing and/or flow balancing

such as technical reports, complete work orders, implementing procedures, etc.

Limit response to last six of each.

c. Documentation of visual inspections, non-destructive examinations (i.e., visual,

eddy-current, ultrasonic testing, etc.), and cleanings such as technical reports,

complete work orders, implementing procedures, etc. Limit response to last six of

each.

d. Copy of the tube plugging map, tube plugging criteria, and heat exchanger

margin if based upon tube plugging.

e. Results from chemical treatments such as technical reports, complete work

3

orders, implementing procedures, etc. Limit response to last six of each.

f. Copy of any relevant design basis calculations including any evaluations of the

potential for water hammer.

g. Copy of the applicable system health report, design basis document, and/or

system description.

h. Copy of any relevant system piping and instrumentation diagrams.

i. Copy of the heat exchanger design specification, heat exchanger data sheet, and

any relevant vendor manuals.

j. Copy of the heat exchanger (and motor/fan if an air-to-water heat exchanger) PM

schedule including the frequency of those PM activities and their bases.

k. Copy of documentation of completed PM activities if not already provided. Limit

response to last six of each.

3. For the selected ultimate heat sink (UHS):

a. Forced draft cooling tower or spray pond UHS:

i. Copy of any calculations that demonstrate sufficient reservoir capacity.

ii. Documentation of periodic monitoring and trending of sediment such as

technical reports, complete work orders, implementing procedures, etc.

Limit response to last six of each.

iii. Documentation of any performance monitoring of heat transfer capability

such as technical reports, complete work orders, implementing

procedures, etc. Limit response to last six of each.

iv. Documentation of UHS structural integrity monitoring such as technical

reports, complete work orders, implementing procedures, etc. Limit

response to last six of each.

b. Operation of the service water system (SWS) and UHS:

i. List of modifications to the SWS and UHS.

ii. Copy of procedures for a loss of SWS or UHS.

iii. Copy of the applicable system health report, design basis document,

and/or system description.

iv. Documentation of biotic fouling and macrofouling treatments such as

technical reports, complete work orders, implementing procedures, etc.

Limit response to last six of each.

v. Documentation of chemistry monitoring such as technical reports,

4

complete work orders, implementing procedures, etc. Limit response to

last six of each.

vi. Copy of any evaluation of strong-pump to weak-pump interactions.

c. Performance testing of the SWS and UHS:

i. Documentation of inservice testing of SWS/UHS pumps, valves, and fans

such as technical reports, complete work orders, implementing

procedures, etc. Limit response to last six of each.

ii. Documentation of SWS flow balance testing such as complete work

orders, implementing procedures, etc. Limit response to last six of each.

iii. Documentation of diagnostic testing for valves that interface with safety-

related service water and nonsafety-related or nonseismic piping systems

such as complete work orders, implementing procedures, etc. Limit

response to last six of each.

iv. Documentation of performance testing of risk-significant nonsafety-related

functions (or alignments) of the SWS such as complete work orders,

implementing procedures, etc. Limit response to last six of each.

d. Service water and/or closed cooling water system:

i. Documentation of inaccessible pipe testing, inspection (i.e., visual,

ultrasonic, etc.), and/or monitoring such as technical reports, complete

work orders, implementing procedures, etc. Limit response to last six of

each.

ii. Copy of any evaluations of active thru wall pipe leaks.

iii. Copy of any corrective action documents related to thru wall pipe leakage

including trend evaluations since last NRC triennial heat exchanger/heat

sink inspection.

iv. For closed cooling water systems, copy of any trend data on make-up to

the system since last NRC triennial heat exchanger/heat sink inspection.

v. Documentation of protective coatings inspections such as technical

reports, complete work orders, implementing procedures, etc. Limit

response to last six of each.

vi. For deep draft vertical pumps, documentation of diagnostic testing (or

equivalent method) such as, technical reports, complete work orders,

implementing procedures, etc. Limit response to last six of each.

e. Service water intake structure (SWIS):

5

i. Copy of the PM schedule for traveling screens and strainers the

frequency of those PM activities and their bases.

ii. Copy of any corrective action documents related to traveling screens,

strainers, trash racks, etc. since last NRC triennial heat exchanger/heat

sink inspection.

iii. Copy of any SWS/UHS normal and abnormal operating procedures.

iv. Documentation of SWIS inspections regarding structural integrity and

silting such as technical reports, complete work orders, implementing

procedures, etc. Limit response to last six of each.

v. Copy of any service water pump bay water level instrument

documentation related to setpoints and calibrations such as calculations,

complete work orders, implementing procedures, etc. Limit response to

last six of each.

vi. Copy of any SWS/UHS water temperature instrumentation documentation

related to setpoints and calibrations such as calculations, complete work

orders, implementing procedures, etc. Limit response to last six of each.

vii. Copy of any evaluations of the potential for frazil ice formation.

viii. For underwater weir walls, copy of any evaluations of potential of silt

introduction.

III. Additional Requests During Inspection Activities Beginning August 22, 2022:

1. Supplemental requests identified during in-office preparation activities.

2. Additional requests identified during onsite inspection activities.

3. Discussions with relevant subject matter experts.

4. Walkdowns of selected heat exchanger/heat sink samples.

5. Corrective action program documents generated as a result of this inspection.

If the information requested above will not be available, please contact Mr. Ronald A. Kopriva as

soon as possible.

Inspector Contact Information:

Ronald Kopriva Mailing Address: Fabian Thomas

Senior Reactor Inspector U.S. NRC, Region IV Reactor Inspector

817-200-1104 Attn: Ronald A. Kopriva 817-200-1126

Ron.Kopriva@nrc.gov 1600 East Lamar Blvd. Fabin.Thomas@nrc.gov

Arlington, TX 76011-4511

6