Letter Sequence RAI |
---|
|
|
MONTHYEAR2CAN071902, Request for Alternative ANO 2-PT-002 End-of-Interval System Leakage Test for Extended Reactor Coolant Pressure Boundary Piping2019-07-25025 July 2019 Request for Alternative ANO 2-PT-002 End-of-Interval System Leakage Test for Extended Reactor Coolant Pressure Boundary Piping Project stage: Request 2CAN091901, Entergy Operations, Inc. - Request for Alternatives Subject to the Fifth 10-Year Interval of the Inservice Testing Program2019-09-0303 September 2019 Entergy Operations, Inc. - Request for Alternatives Subject to the Fifth 10-Year Interval of the Inservice Testing Program Project stage: Request ML19275E2792019-10-0101 October 2019 NRR E-mail Capture - ANO-2 - Acceptance Review of Alternative Requests PRR-ANO2-2019-1, PRR-ANO2-2019-2, SRR-ANO2-2019-1, and VRR-ANO2-2019-1 (Epids: L-2019-LLR-0085, -0086, -0087, and -0088) Project stage: Acceptance Review ML20036D3092020-02-0505 February 2020 NRR E-mail Capture - ANO-2 - Final RAI Alternative Request VRR-ANO2-2019-1 Project stage: RAI 2CAN022001, Response to Request for Additional Information Related to Alternative VRR-ANO2-2019-12020-02-11011 February 2020 Response to Request for Additional Information Related to Alternative VRR-ANO2-2019-1 Project stage: Response to RAI 2CAN042001, Withdrawal of Inservice Testing Requests for Alternative2020-04-0909 April 2020 Withdrawal of Inservice Testing Requests for Alternative Project stage: Request ML20121A1932020-05-0606 May 2020 Alternative Requests for the Fifth 10 Year Interval Inservice Testing of Low Pressure Safety Injection Pumps and Service Water Valves Project stage: Other 2020-02-11
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML23269A0232023-09-22022 September 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 2 - TSTF-505 Audit Questions ML23240A3412023-08-28028 August 2023 NRR E-mail Capture - ANO-2, Grand Gulf, and River Bend - Acceptance Review of LAR Revising TSs to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23194A1752023-07-13013 July 2023 NRR E-mail Capture - ANO-1 - Acceptance Review of Alternative Request ANO1-ISI-037 ML23187A0432023-07-0303 July 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 1 - TSTF-505 Audit Agenda ML23166A0132023-06-14014 June 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 1 - TSTF-505 Audit Questions ML23130A2752023-05-10010 May 2023 NRR E-mail Capture - ANO Unit 2- Acceptance of Requested Licensing Action LAR to Adopt TSTF-505 Revision 2 ML23118A0692023-04-28028 April 2023 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action LAR to Modify ANO-1 TS 3.3.1, Reactor Protection System Instrumentation (L-2023-LLA-0048) ML23104A1052023-03-10010 March 2023 NRR E-mail Capture - ANO-2 Final RAI Alternative Request for Life-of-Repair of RVCH Pen. 46 ML23072A3672023-03-0909 March 2023 NRR E-mail Capture - Entergy Fleet - Acceptance Review of Quality Assurance Program Manual Reduction in Commitment ML23039A0872023-02-0808 February 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 2 - Acceptance Review of Relief Request ANO2-RR-23-001, Half-Nozzle Repair of RVCH Penetration 46 (L-2023-LLR-0000) ML23026A1322023-01-26026 January 2023 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action LAR to Adopt TSTF-505 Revision 2 ML22354A0122022-12-19019 December 2022 NRR E-mail Capture - ANO-1 and ANO-2 - Acceptance Review of Request for Alternative ANO-CISI-002 Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (L-2022-LLR-0080) ML22349A0112022-12-14014 December 2022 NRR E-mail Capture - Final RAI Relief Request ANO1-ISI-035 ML22341A1202022-12-0707 December 2022 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action LAR to to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation (L-2022-LLA-0161) ML22273A0982022-09-30030 September 2022 NRR E-mail Capture - ANO Units 1 and 2 - Acceptance of Requested Licensing Action Emergency Plan Staffing Requirements ML22265A2012022-09-22022 September 2022 NRR E-mail Capture - ANO-1 - Acceptance Review of Relief Request ANO1-ISI-036 ML22188A1782022-07-0707 July 2022 NRR E-mail Capture - ANO-1 - Acceptance Review of Relief Request ANO1-ISI-035 ML22174A1362022-06-23023 June 2022 NRR E-mail Capture - ANO-2 Final RAI Relief Requests ANO2-ISI-023 Through -028 (EPIDs L-2022-LLR-0022 Through -0027) ML22151A3262022-05-31031 May 2022 August 2022 Emergency Preparedness Exercise Inspection - Request for Information ML22124A2452022-05-0404 May 2022 NRR E-mail Capture - ANO-1 and ANO-2 - Final RAI 2 License Amendment Requests to Implement Provisions of 10 CFR 50.69 (L-2021-LLA-0105/-0106) ML22108A1642022-04-18018 April 2022 NRR E-mail Capture - ANO-1: Final RAI License Amendment Request Concerning TS Changes Due to Revised Dose Calculations (L-2021-LLA-0181) ML22081A3902022-03-22022 March 2022 NRR E-mail Capture - ANO-2 - Acceptance Review of Relief Requests ANO2-ISI-023, -024, -025, -026, -027, and -028 (Epids: L-2022-LLR-022, -023, -024, -025, -026, and -027) ML22034A5482022-02-0303 February 2022 NRR E-mail Capture - Final RAI License Amendment Requests to Implement Provisions of 10 CFR 50.69 (L-2021-LLA-0105/-0106) ML22020A0822022-01-19019 January 2022 NRR E-mail Capture - ANO-1 and 2 - Final RAI 2 License Amendment Requests to Allow the ECP to Remain Operable on a One-Time Basis for Up to 65 Days to Perform Piping Upgrade (L-2021-LLA-0015) ML22020A0742022-01-13013 January 2022 NRR E-mail Capture - ANO Unit 2 - Acceptance of Requested Licensing Action Alternative ANO2-PT-003 ML21314A1212021-11-0909 November 2021 Verbal Authorization of Relief Request ANO2-RR-21-002 ML21312A4792021-11-0505 November 2021 Email: NRC Staff Preliminary Questions Regarding X Energy LLC Xe-100 Topical Report: Risk-Informed Performance-Based Licensing Basis Development ML21312A0382021-11-0505 November 2021 NRR E-mail Capture - ANO-2 RAI Relief Request ANO2-RR-21-002 ML21308A5602021-11-0404 November 2021 NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, Grand Gulf, River Bend, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML21292A0112021-10-18018 October 2021 NRR E-mail Capture - ANO, 1 and 2, Grand Gulf, River Bend, Waterford, 3 - Acceptance Review of LAR to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21287A1692021-10-13013 October 2021 Record of 10-13-21 Verbal Authorization of ANO2-R&R-012 (L-2021-LLR-0082) ML21298A1562021-10-11011 October 2021 NRR E-mail Capture - ANO-2 Final RAI Relief Request ANO2-R&R-012 Concerning Rv Closure Head Penetration 46 ML21273A0672021-09-29029 September 2021 NRR E-mail Capture - ANO-2 Final RAI 2 License Amendment Request to Adopt a Safety Function Determination Program ML21238A3742021-08-23023 August 2021 RFI Email - Cyber PI&R Inspection (ANO) ML21252A0052021-08-20020 August 2021 NRR E-mail Capture - ANO-1 and 2 Final RAI License Amendment Request to Allow the ECP to Remain Operable on a One-Time Basis for Up to 65 Days to Perform Piping Upgrade (L-2021-LLA-0015) ML21217A3302021-08-0505 August 2021 (ANO) Problem Identification and Resolution (PIR) Request for Information Combined ML21202A1662021-07-20020 July 2021 NRR E-mail Capture - ANO Unit 2 - Acceptance of Requested Licensing Action Alternative ANO2-PT-003 ML21201A0062021-07-19019 July 2021 NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21197A0372021-07-16016 July 2021 NRR E-mail Capture - ANO-1 and 2 - Final RAI Final Response to GL 2004-02 ML21179A0052021-06-25025 June 2021 NRR E-mail Capture - ANO Unit 2 - Acceptance of Requested Licensing Action License Amendment Request to Adopt 10 CFR 50.69 ML21179A0042021-06-25025 June 2021 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action License Amendment Request to Adopt 10 CFR 50.69 ML21174A0342021-06-22022 June 2021 NRR E-mail Capture - Entergy Fleet (ANO, Ggulf, Rbend, & Waterford) - Acceptance Review for Relief Request to Use a Provision of a Later Edition of the ASME Code, Section XI for Periodic System Pressure Tests Exemptions ML21116A1092021-04-26026 April 2021 NRR E-mail Capture - ANO-1 and ANO-2: Final Supplemental RAI Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of ECP Supply Piping ML21105A0122021-04-0909 April 2021 NRR E-mail Capture - ANO-2 Final RAI License Amendment Request to Adopt a Safety Function Determination Program ML21074A2552021-03-15015 March 2021 NRR E-mail Capture - ANO-1 and ANO-2 - Acceptance of Requested Licensing Action LAR for One-Time Change to Support Upgrade of the ECP Supply Piping ML21071A2172021-03-10010 March 2021 NRR E-mail Capture - ANO-1 and ANO-2 - Final RAI Proposed Change to Quality Assurance Program Manual ML21022A1692021-01-22022 January 2021 NRR E-mail Capture - Entergy Fleet (ANO, Grand Gulf, River Bend, and Waterford) - Acceptance Review for RR EN-20-RR-003, Proposed Alternative to Use ASME Code Case N-711-2 ML21019A5142021-01-14014 January 2021 March 2021 Emergency Preparedness Exercise Inspection - Request for Information ML20356A1142020-12-17017 December 2020 NRR E-mail Capture - ANO Unit 2 - Acceptance of Requested Licensing Action LAR Concerning LCO 3.0.6 and Proposed Adoption of SFDP ML20350B7602020-12-14014 December 2020 NRR E-mail Capture - Arkansas Nuclear One, Unit 2 - Acceptance Review of Request to Use Alternative Examination Requirements - ANO2-ISI-022 2023-09-22
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23130A2972023-05-17017 May 2023 Notification of Inspection (NRC Inspection Report 05000313/2023003) and Request for Information ML23104A1052023-03-10010 March 2023 NRR E-mail Capture - ANO-2 Final RAI Alternative Request for Life-of-Repair of RVCH Pen. 46 ML23019A0672023-01-19019 January 2023 Inservice Inspection Request for Information ML22349A0112022-12-14014 December 2022 NRR E-mail Capture - Final RAI Relief Request ANO1-ISI-035 ML22213A1662022-08-0101 August 2022 Information Request, Security IR 2022401 ML22208A0542022-07-26026 July 2022 Request for Information ML22174A1362022-06-23023 June 2022 NRR E-mail Capture - ANO-2 Final RAI Relief Requests ANO2-ISI-023 Through -028 (EPIDs L-2022-LLR-0022 Through -0027) ML22159A3242022-06-0909 June 2022 Notification of NRC Triennial Heat Exchanger/Sink Performance Inspection (05000313/2022003 and 05000368/2022003) and Request for Information ML22151A3262022-05-31031 May 2022 August 2022 Emergency Preparedness Exercise Inspection - Request for Information ML22122A2952022-05-0404 May 2022 Notification of Inspection NRC Inspection Report 05000368/2022003 and Request for Information ML22124A2452022-05-0404 May 2022 NRR E-mail Capture - ANO-1 and ANO-2 - Final RAI 2 License Amendment Requests to Implement Provisions of 10 CFR 50.69 (L-2021-LLA-0105/-0106) ML22108A1642022-04-18018 April 2022 NRR E-mail Capture - ANO-1: Final RAI License Amendment Request Concerning TS Changes Due to Revised Dose Calculations (L-2021-LLA-0181) ML22034A5482022-02-0303 February 2022 NRR E-mail Capture - Final RAI License Amendment Requests to Implement Provisions of 10 CFR 50.69 (L-2021-LLA-0105/-0106) ML22020A0822022-01-19019 January 2022 NRR E-mail Capture - ANO-1 and 2 - Final RAI 2 License Amendment Requests to Allow the ECP to Remain Operable on a One-Time Basis for Up to 65 Days to Perform Piping Upgrade (L-2021-LLA-0015) ML21312A0382021-11-0505 November 2021 NRR E-mail Capture - ANO-2 RAI Relief Request ANO2-RR-21-002 ML21286A7132021-10-15015 October 2021 ANO2022010 Tfp RFI Stg, Arkansas Nuclear One, Units 1 and 2 - Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000313/2022010 and 05000368/2022010) and Request for Information ML21273A0672021-09-29029 September 2021 NRR E-mail Capture - ANO-2 Final RAI 2 License Amendment Request to Adopt a Safety Function Determination Program ML21236A3222021-09-19019 September 2021 Request for Information ML21252A0052021-08-20020 August 2021 NRR E-mail Capture - ANO-1 and 2 Final RAI License Amendment Request to Allow the ECP to Remain Operable on a One-Time Basis for Up to 65 Days to Perform Piping Upgrade (L-2021-LLA-0015) ML21217A3302021-08-0505 August 2021 (ANO) Problem Identification and Resolution (PIR) Request for Information Combined ML21204A0842021-07-28028 July 2021 ANO Phase 4 2021013 RFI Gap ML21197A0372021-07-16016 July 2021 NRR E-mail Capture - ANO-1 and 2 - Final RAI Final Response to GL 2004-02 0CAN042105, Supplement to Response to Request for Additional Information Reduction of Commitment to the Entergy Operation'S Quality Assurance Program Manual Description2021-04-30030 April 2021 Supplement to Response to Request for Additional Information Reduction of Commitment to the Entergy Operation'S Quality Assurance Program Manual Description ML21116A1092021-04-26026 April 2021 NRR E-mail Capture - ANO-1 and ANO-2: Final Supplemental RAI Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of ECP Supply Piping ML21105A0122021-04-0909 April 2021 NRR E-mail Capture - ANO-2 Final RAI License Amendment Request to Adopt a Safety Function Determination Program ML21071A2172021-03-10010 March 2021 NRR E-mail Capture - ANO-1 and ANO-2 - Final RAI Proposed Change to Quality Assurance Program Manual ML21026A2682021-01-26026 January 2021 Request for Information ML21022A0842021-01-22022 January 2021 Request for Additional Information - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling Pond Supply Piping - Arkansas Nuclear One,Units 1 and 2 -Entergy Operations, Inc. NON-PROPRIETARY Redacted ML21019A5142021-01-14014 January 2021 March 2021 Emergency Preparedness Exercise Inspection - Request for Information ML20324A6412020-11-19019 November 2020 NRR E-mail Capture - ANO-1 - Final RAI Relief Request ANO1-ISI-034 ML20316A0102020-11-0202 November 2020 NRR E-mail Capture - ANO-1 and ANO-2 - Final RAI Concerning Relief Request EN-20-RR-01 ML20262H0752020-09-17017 September 2020 NRR E-mail Capture - ANO-2 Final RAI 2 License Amendment Request Concerning Proposed Technical Specification Additions, Deletions, and Relocations ML20260H4762020-09-0909 September 2020 NRR E-mail Capture - ANO-1 Final RAI License Amendment Request to Revise Lov Relay Allowable Values ML20154K7622020-06-0101 June 2020 NRR E-mail Capture - ANO-2 Final RAI License Amendment Request Concerning Proposed Technical Specification Additions, Deletions, and Relocations ML20119A0982020-04-28028 April 2020 Notification of Inspection (NRC Inspection Report 05000368/2020003 and Request for Information ML20106E8522020-04-13013 April 2020 Information Request, NRC Inspection Report 05000313/2020410 and 05000368/2020410 ML20065H7992020-03-0606 March 2020 Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Request to Revise Loss of Voltage Relay Allowable Values ML20055E9092020-02-24024 February 2020 NRR E-mail Capture - ANO-2 Final RAI License Amendment Request to Revise Control Element Assembly Drop Time ML20036D3092020-02-0505 February 2020 NRR E-mail Capture - ANO-2 - Final RAI Alternative Request VRR-ANO2-2019-1 ML20013C7472020-01-10010 January 2020 NRR E-mail Capture - ANO-1 and 2 -- Final RAI #2 LAR to Incorporate Tornado Missile Risk Evaluator (TMRE) Into Licensing Basis ML19316A0242019-11-0707 November 2019 NRR E-mail Capture - ANO-1 - - Final RAI Concerning Relief Request ANO1-ISI-033 (L-2019-LLR-0100) ML19280A0402019-10-0707 October 2019 NRR E-mail Capture - ANO-1 and 2 - Final RAI #1 License Amendment Request to Incorporate Tornado Missile Risk Evaluator (TMRE) Into Licensing Basis ML19339F5902019-09-23023 September 2019 Request for Information: Arkansas Nuclear One, IR 05000313/2019-004 Occupational Radiation Safety Inspection ML19281E0032019-08-0505 August 2019 ANO 2019 PIR Request for Information ML19203A0122019-07-16016 July 2019 Request for Information - Inservice Inspection Activities (NRC Inspection Report 05000313/2019004) ML19106A4322019-04-16016 April 2019 NRR E-mail Capture - ANO-2 Final RAI Re LAR to Add TS Actions to Address Inoperability of the Containment Building Sump ML19058A8332019-02-27027 February 2019 NRR E-mail Capture - ANO-1 - Final RAI Relief Request ANO1-ISI-032 ML18324A8052018-11-19019 November 2018 Notification of an NRC Triennial Fire Protection Baseline Inspection Report 05000313/2019010 and 05000368/2019010) and Request for Information ML18263A3022018-09-19019 September 2018 NRR E-mail Capture - ANO-1 - Final RAI License Amendment Request to Adopt TSTF-425, Revision 3 ML18263A1482018-09-11011 September 2018 NRR E-mail Capture - ANO-2 - Final RAI #2 LAR to Update the RCS Pressure-Temperature Limits 2023-05-17
[Table view] |
Text
From: Wengert, Thomas Sent: Wednesday, February 5, 2020 8:16 AM To: Arnold, Timothy Cc: BICE, DAVID B (ANO); Dixon-Herrity, Jennifer
Subject:
ANO Final RAI RE: Alternative Request VRR-ANO2-2019-1 (EPID L-2019-LLR-0088)
Attachments: Final RAI for ANO-2 Alternative Request VRR-ANO2-2019-1.pdf On February 3, 2020, the U.S. Nuclear Regulatory Commission (NRC) staff sent Entergy Operations, Inc. (the licensee) the draft Request for Additional Information (RAI) identified below. This RAI relates to the Arkansas Nuclear One, Unit 2, alternative (relief) request described below.
On February 4, 2020, the licensee informed the NRC staff that a clarification teleconference was not necessary and that the licensee would respond to this RAI within 30 days of this correspondence. A publicly available version of this final RAI (attached with Draft removed) will be placed in the NRCs Agencywide Documents Access and Management System (ADAMS).
From: Wengert, Thomas Sent: Monday, February 03, 2020 12:49 PM To: Arnold, Timothy Cc: BICE, DAVID B (ANO) ; Dixon-Herrity, Jennifer
Subject:
ANO Draft RAI RE: Alternative Request VRR-ANO2-2019-1 (EPID L-2019-LLR-0088)
By letter dated September 3, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19246B361), Entergy Operations, Inc. (the licensee) requested approval of alternative testing associated with the inservice testing (IST) program fifth 10-year interval for Arkansas Nuclear One, Unit 2 (ANO-2). Specifically, the licensee requested an alternative (VRR-ANO2-2019-1) to a requirement of the American Society of Mechanical Engineers (ASME) Code for Operation and Maintenance of Nuclear Power Plants (OM Code) related to the test frequency of certain Service Water system valves.
The U.S. Nuclear Regulatory Commission (NRC) staff has determined that additional information, as described in the attached request for additional information (RAI), is required for the staff to complete its review of this alternative request. This RAI is identified as draft at this time to confirm your understanding of the information that the NRC staff needs to complete the evaluation. If the request for information is understood, please respond to this RAI within 30 days of the date of this request. Please contact me if you would like to set up a conference call to clarify this request for information.
Tom Wengert U.S. Nuclear Regulatory Commission Project Manager - Arkansas Nuclear One NRR/DORL/LPL4 (301) 415-4037
Hearing Identifier: NRR_DRMA Email Number: 430 Mail Envelope Properties (MN2PR09MB49725572CE95CC864DF5AEDF8F020)
Subject:
ANO Final RAI RE: Alternative Request VRR-ANO2-2019-1 (EPID L-2019-LLR-0088)
Sent Date: 2/5/2020 8:15:48 AM Received Date: 2/5/2020 8:15:00 AM From: Wengert, Thomas Created By: Thomas.Wengert@nrc.gov Recipients:
"BICE, DAVID B (ANO)" <DBICE@entergy.com>
Tracking Status: None "Dixon-Herrity, Jennifer" <Jennifer.Dixon-Herrity@nrc.gov>
Tracking Status: None "Arnold, Timothy" <TARNOLD@entergy.com>
Tracking Status: None Post Office: MN2PR09MB4972.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2239 2/5/2020 8:15:00 AM Final RAI for ANO-2 Alternative Request VRR-ANO2-2019-1.pdf 138577 Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
REQUEST FOR ADDITIONAL INFORMATION (RAI)
BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO ALTERNATIVE REQUEST VRR-ANO2-2019-1 FOR THE INSERVICE TESTING PROGRAM FIFTH 10-YEAR INTERVAL ENTERGY OPERATIONS, INC ARKANSAS NUCLEAR ONE, UNIT 2 DOCKET NO. 50-368 By letter dated September 3, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19246B361), Entergy Operations Inc. (Entergy, the licensee), requested approval of alternative testing associated with the inservice testing (IST) program fifth 10-year interval for Arkansas Nuclear One, Unit 2 (ANO-2). The U.S. Nuclear Regulatory Commission (NRC, the Commission) staff has determined the following additional information is needed to complete its review of alternative request VRR-ANO2-2019-1.
RAI VRR-ANO2-2019-1 Applicable Regulations Title 10, Section 50.55a, of the Code of Federal Regulations (10 CFR 50.55a), Codes and Standards, lists all the American Society of Mechanical Engineers (ASME) Codes that have been incorporated by reference, including the ASME Code for Operation and Maintenance of Nuclear Power Plants (OM Code) with conditions, that the NRC has approved for use. The regulation in 10 CFR 50.55a defines the requirements for applying industry codes and standards to nuclear power facilities. Each of these facilities is subject to the conditions in paragraphs (a), (b), and (f) of 10 CFR 50.55a, as they relate to inservice testing (IST).
The regulation in 10 CFR 50.55a(f)(4)(ii) requires that an IST activity conducted during each 120-month interval following the initial interval must be conducted in compliance with the requirements of the latest edition and addenda of the OM Code incorporated by reference in the version of 10 CFR 50.55a(a) that is in effect 12 months before the start of the interval and subject to the conditions listed in 10 CFR 50.55a(b). This Code Edition is called the Code of Record. Therefore, the applicable Code of Record for the ANO-2 fifth 10-year IST interval is the 2012 Edition of the OM Code.
Appendices A and B of 10 CFR Part 50, require that licensees provide confidence that safety-related equipment are capable of performing their safety functions under design-basis conditions.
Pursuant to 10 CFR 50.55a(z)(1) and (2), the Commission may authorize the licensee to implement an alternative to Code requirements if: (1) the applicant or licensee can demonstrate that the proposed 1
alternative would provide an acceptable level of quality and safety, or (2) the Code requirement presents a hardship without a compensating increase in the level of quality and safety.
Background
Service Water (SW) valves 2CV-1541-1 and 2CV-1560-2 are normally closed motor-operated, 18 Tricentric stainless steel butterfly stop valves that have a primary active open safety function to direct SW return flow to the Emergency Cooling Pond (ECP), a secondary active close function to isolate a ruptured SW header to ensure long-term cooling capability is maintained, and to serve as SW boundary isolation valves. These valves are leak tested to verify that seat leakage does not exceed the leakage allowed based on maintaining the minimum volume of water in the ECP to meet design basis accident requirements. As required by ASME OM Code, the licensee has set valve leakage acceptance criteria for the close safety function as follows:
- 1) Inventory analysis for the ECP assumes a total loss of 30 gallons per minute (gpm) from the SW boundary valves of both units combined. Currently, the analysis assumes the allowable leakage to be evenly distributed among the valves or 2.5 gpm per valve.
- 2) A maintenance limit intended to initiate corrective maintenance has been established to be less than or equal to 1.5 gpm.
- 3) Valve operability threshold is greater than or equal to 9.0 gpm.
The ASME OM Code leak test is required to be completed once every 2 years. The leak test is normally performed during refueling outages, which are typically every 18 months. In its alternative request VRR-ANO2-2019-1, Entergy proposes to test one valve each refueling outage with the individual valve test frequency of once every two refueling outages. Refueling outages at ANO-2 occur on an 18-month cycle. Therefore, this would alter the leak testing frequency to approximately three (3) years, depending on outage durations and/or unscheduled outages.
Issue The alternative request is similar to a previously-approved request with respect to the ANO-2 Fourth 10-year IST interval (
Reference:
NRC letter to Entergy dated January 21, 2010, Arkansas Nuclear One, Unit 2 - Request for Alternative VRR-ANO2-2009-1 for the Fourth 10-Year Inservice Testing Interval (TAC No. ME2407) (ADAMS Accession No. ML093370316)). In the previous alternative request, the licensee committed to perform leak testing of 2CV-1541-1 and 2CV-1560-2 on a rotating basis (once every 3 years for each valve) in accordance with plant procedures. In its previous request, the licensee stated, If problems are found with the sample valve that results in leakage in excess of the limiting value for operability described in the test procedure, both valves will be tested during the same outage to verify operability. However, a similar statement is not included in the current alternative request.
2
Request Please explain the actions that Entergy will take should a valve leakage test value exceed the valve operability threshold, and/or explain why the commitment to leak test the other valve, should the sample valve exceed the operability threshold, is not included in current alternative request VRR-ANO2-2019-1.
3