ND-20-0801, ITAAC Closure Notification on Completion of ITAAC 3.3.00.01 (Index Number 759)

From kanterella
Jump to navigation Jump to search

ITAAC Closure Notification on Completion of ITAAC 3.3.00.01 (Index Number 759)
ML21312A420
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 11/08/2021
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ND-20-0801
Download: ML21312A420 (1)


Text

^

Southern Nuclear NOV 0 8 202t Docket No.:

52-025 Michael J. Yox Regulatory Affairs Director Vogtle 3 & 4 7825 River Road Waynesboro, GA 30830 706-848-6459 tel ND-20-0801 10CFR 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of ITAAC 3.3.00.01 (Index Number 7591 Ladies and Gentlemen:

In accordance with 10 CFR 52.99(c)(1), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtle Electric Generating Plant (VEGP) Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 3.3.00.01 [Index Number 759]. This ITAAC verified the as-built nuclear island structures, the annex building, radwaste building, turbine building, and the diesel generator building conforms with the physical arrangement as described in the COL Appendix C Section 3.3, Design Description and Figures 3.3-1 through 3.3-14. The closure process for this ITAAC is based on the guidance described in NEI 08-01, "Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52," which was endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99.

If there are any questions, please contact Kelli A. Roberts at 706-848-6991.

Respectfully submitted.

Michael J. Yox Regulatory Affairs Director Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 3.3.00.01 [Index Number 759]

MJY/JFV/sfr

U.S. Nuclear Regulatory Commission ND-20-0801 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena III Mr. D. L. McKinney Mr. H. Nieh Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. M. J. Yox Mr. A. S. Parton Ms. K. A. Roberts Ms. J.M. Coleman Mr. C. T. Defnall Mr. C. E. Morrow Mr. K. J. Drudy Mr. J. M. Fisher Mr. R. L. Beiike Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 Nuclear Reoulatorv Commission Ms. M. Bailey M

M Ms. A. Veil M

M M

M Ms. N. C. Coovert M

M M

M M

M M

M M

M M

M M

M M

. M. King

. G. Bowman

. C. P. Patel

. G. J. Khouri C. J. Even B. J. Kemker

. C. Welch

. J. Gaslevic

. O. Lopez-Santiago

. G. Armstrong

. M. Webb

. T. Fredette

. C. Santos

. B. Davis

. J. Vasquez

. J. Eargle

. E. Davidson

. T. Fanelli Ms. K. McCurry J. Parent B. Griman V. Hall

U.S. Nuclear Regulatory Commission ND-20-0801 Page 3 of 3 Qqlethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Dalton Utilities Mr. T. Bundros Westinqhouse Electric Company. LLC Dr. L. Oriani Mr. D. 0. Durham Mr. M. M. Corletti Mr. Z. 8. Harper Mr. J. L. Coward Other Mr. 8. W. Kline, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, Inc.

Mr. 8. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Baich Bingham

U.S. Nuclear Regulatory Commission ND-20-0801 Enclosure Page 1 of 3 Southern Nuclear Operating Company ND-20-0801 Enclosure Vogtle Electric Generating Plant (VEGP) Unit 3 ITAAC Closure Notification on Completion of ITAAC 3.3.00.01 [Index Number 759]

U.S. Nuclear Regulatory Commission ND-20-0801 Enclosure Page 2 of 3 ITAAC Statement Desion Commitment

1. The physical arrangement of the nuclear island structures and the annex building is as described in the Design Description of this Section 3.3 and Figures 3.3-1 through 3.3-14. The physical arrangement of the radwaste building, the turbine building, and the diesel generator building is as described in the Design Description of this Section 3.3.

Inspections. Tests. Analyses An inspection of the nuclear island structures, the annex building, the radwaste building, the turbine building, and the diesel generator building will be performed.

Acceptance Criteria The as-built nuclear island structures, the annex building, the radwaste building, the turbine building, and the diesel generator building conform with the physical arrangement as described in the Design Description of this Section 3.3 and Figures 3.3-1 through 3.3-14.

ITAAC Determination Basis An inspection of the as-built nuclear island structures, the annex building, radwaste building, turbine building and the diesel generator building is conducted after completion of construction to confirm the physical arrangement as described in the Design Description of Combined License (COL) Appendix C Section 3.3. This inspection encompasses the structures, systems, and components (SSCs) identified in the COL Appendix C Section 3.3, Design Description, including those in Figures 3.3-1 through 3.3-14.

The inspection (walkdown) was completed in accordance with ND-RA-001-012, Functional and Physical Arrangement Scoping Process (Reference 1), which required the preparation of a detailed inspection plan. This inspection plan included the use of detailed drawings such as architectural drawings and room numbering plans to perform visual observations and compare the as built structures to the Design Description and Figures 3.3-1 through 3.3-14.

The inspection results are documented in the Unit 3 Principal Closure Document (Reference 2) supporting the Unit 3 ITAAC 3.3.00.01 Completion Package (Reference 3) and verified the SSCs are physically arranged and located to perform the functions described in the Design Description and referenced figures. The inspection results confirm that the as-built nuclear island structures, the annex building, radwaste building, turbine building, and the diesel generator building conform with the physical arrangement as described in the COL Appendix C Section 3.3, Design Description and Figures 3.3-1 through 3.3-14.

The Unit 3 Principal Closure Document (Reference 2) is available for NRC inspection as part of the Unit 3 ITAAC 3.3.00.01 Completion Package (Reference 3).

U.S. Nuclear Regulatory Commission ND-20-0801 Enclosure Page 3 of 3 ITAAC Finding Review In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company (SNC) performed a review of all ITAAC findings pertaining to the subject ITAAC and associated corrective actions. This review found that there are no relevant ITAAC findings associated with this ITAAC. The ITAAC completion review is documented in the ITAAC Completion Package for ITAAC 3.3.00.01 (Reference 3) and is available for NRC review.

ITAAC Completion Statement Based on the above information, SNC hereby notifies the NRC that ITAAC 3.3.00.01 was performed for VEGP Unit 3 and that the prescribed acceptance criteria are met.

Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

References (available for NRC inspection)

1. ND-RA-001-012, Version 6.0, Functional and Physical Arrangement Scoping Process
2. SV3-APP-ITR-800759, Rev 1, Unit 3 Inspections for Physical Arrangement: ITAAC 3.3.00.01 NRC Index Number 759
3. 3.3.00.01-U3-CP-RevO, ITAAC Completion Package