ND-21-0286, ITAAC Closure Notification on Completion of ITAAC 3.3.00.07d.iii.a (Index Number 803)

From kanterella
Jump to navigation Jump to search

ITAAC Closure Notification on Completion of ITAAC 3.3.00.07d.iii.a (Index Number 803)
ML22210A074
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 07/29/2022
From: Coleman J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ND-21-0286
Download: ML22210A074 (6)


Text

J ami e M. Co leman 7825 River Road Regu latory Affairs Director Waynesboro, GA 30830

>-. Southern Nuclear Vogtle 3 & 4 706-848-6926 tel

JUL 2 9 2022

Docket No.: 52-025

ND-21-0286 10 CFR 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001

Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of ITAAC 3.3.00.0?d.iii.a [Index Number 8031

Ladies and Gentlemen :

In accordance with 1 O CFR 52.99(c)(1 ), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtle Electric Generating Plant (VEGP)

Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 3.3.00.0?d.iii.a

[Index Number 8031. This ITAAC verified that physical separation is maintained between Class 1 E divisions and between Class 1 E divisions and non-Class 1 E cables inside containment. The closure process for this ITAAC is based on the guidance described in NEl-08-01, "Industry Guideline for the ITAAC Closure Process under 1 O CFR Part 52," which is endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 1 O CFR 52.99.

If there are any questions, please contact Kelli Roberts at 706-848-6991.

Respectfully submitted,

~ [Pu~

Jamie M. Coleman Regulatory Affairs Director Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 3.3.00.0?d.iii.a [Index Number 8031

JMC/CMK/sfr U.S. Nuclear Regulatory Commission ND-21-0286 Page 2 of 3

To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena Ill Mr. D. L. McKinney Mr. H. Nieh Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. D. Pitts Mr. J.B. Williams Mr. A. S. Parton Ms. K. A. Robe rts Ms. J. M. Coleman Mr. C. T. Defnall Mr. C. E. Mor row Mr. K. J. Drudy Mr. J. M. Fisher Mr. R. L. Beilke Mr. S. Leighty Ms. A. C. Chambe rlain Mr. J. C. Haswell Document Services RTYPE: VND. LI.L06 File AR.01.02.06

Nuc lear Regulatory Commission Mr. M. King Mr. G. Bowman Ms. A. Ve il Mr. C. P. Patel Mr. G. J. Khouri Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. We lch Mr. J. Gaslevic Mr. 0. Lopez-Santiago Mr. G. Armstro n g Mr. M. Webb Mr. T. Fredette Mr. C. Santos Mr. B. Davis Mr. J. Vasquez Mr. J. Eargle Ms. K. Mccurry Mr. J. Parent Mr. B. G riman Mr. V. Hall U.S. Nuclear Regulatory Commission ND-21-0286 Page 3 of 3

Oglethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen

Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson

Dalton Utilities Mr. T. Bundros

Westinghouse Electric Company, LLC Dr. L. Oriani Mr. D. C. Durham Mr. M. M. Corletti Mr. Z. S. Harper Ms. S.L. Zwack

Other Mr. S. W. Kline, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GOS Associates, Inc.

Mr. S. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton, Balch Bingham U.S. Nuclear Regulatory Commission ND-21-0286 Enclosure Page 1 of 3

Southern Nuclear Operating Company ND-21-0286 Enclosure

Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 3.3.00.07d.iii.a [Index Number 803]

U.S. Nuclear Regulatory Commission ND-21-0286 Enclosure Page 2 of 3

ITAAC Statement

Design Commitment

7.d) Physical separation is maintained between Class 1 E divisions and between Class 1 E divisions and non-Class 1 E cables.

Inspections, Tests, Analyses

Inspections of the as-built raceways that route Class 1 E cables will be performed to confirm that the separation between raceways that route Class 1 E cables of different divisions, and between raceways that route Class 1 E cables and raceways that route non-Class 1 E cables is consistent with the following:

iii) Where minimum separation distances are not maintained, the circuits are run in enclosed raceways or barriers are provided.

Acceptance Criteria

Results of the inspection will confirm that the separation between raceways that route Class 1 E cables of different divisions, and between raceways that route Class 1 E cables and raceways that route non-Class 1 E cables is consistent with the following:

iii.a) Where minimum separation distances are not met inside containment, the circuits are run in enclosed raceways or barriers are provided.

ITAAC Determination Basis

Multiple ITAAC are performed to ensure that physical separation is maintained between Class 1 E divisions and between Class 1 E divisions and non-Class 1 E cables. In accordance with this ITAAC, physical separation for circuits that do not meet the separation distance criteria of ITAAC 3.3.00.0?d.ii.a may be provided by enclosed raceways or barriers. For circuits requiring enclosed raceways or barriers, the subject ITAAC requires inspections of the raceways that route Class 1 E cables and raceways that route non-Class 1 E cables inside containment to confirm that circuits are run in enclosed raceways or have barriers provided. The Class 1 E cables and raceways and non-Class 1 E cables inside containment are designed to be appropriately separated in accordance with APP-GW-E1-001 (Reference 1 ). Installation specifications provided to the constructor identify the separation criteria, consistent with the ITAAC commitment.

Class 1 E electrical cables, raceways, and barriers were installed in accordance with design drawings, installation specifications issued for construction, and work package requirements.

Completed raceway installation, in-progress and completed cable installation, completed cable terminations, and barriers were inspected to ensure the separation installation specifications are satisfied. Inspections were performed in accordance with the Construction Quality Verification Program, 26139-000-4MP-T81C-N7101 (Reference 2), or the Quality Control Inspection Program, ND-EN-VNP-020 (Reference 5). The completed inspection records document the satisfactory separation between raceways that route Class 1 E cables of different U.S. Nuclear Regulatory Commission ND-21-0286 Enclosure Page 3 of 3

divisions, and between raceways that route Class 1 E cables and raceways that route non Class 1 E cables.

Additional inspections were performed and documented following completion of Class 1 E raceway in each room to confirm that separation requirements between raceways that route Class 1 E cables of different divisions, and between raceways that route Class 1 E cables and raceways that route non-Class 1 E cables are met. Reference 3 identifies the inspections performed and confirms that the separation between raceways that route Class 1 E cables of different divisions, and between raceways that route Class 1 E cables and raceways that route non-Class 1 E cables is consistent with the following:

Where minimum separation distances are not maintained inside containment, the circuits are run in enclosed raceways or barriers are provided.

Exceptions to the subject ITAAC are not included within the scope of this ITAAC and are addressed within the scope of ITAAC 3.3.00.0?d.iv.a or ITAAC 3.3.00.0?d.v.a.

Unit 3 Cable Separation Report (Reference 3) is available for NRC inspection as part of the Unit 3 ITAAC 3.3.00.0?d.iii.a Completion Package (Reference 4)

ITAAC Finding Review

In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company (SNC) performed a review of all ITAAC findings and associated corrective actions.

This review found no relevant ITAAC findings associated with this ITAAC and is documented in Reference 4.

ITAAC Completion Statement

Based on the above information, SNC hereby notifies the NRC that ITAAC 3.3.00.0?d.iii.a was performed for VEGP Unit 3 and that the prescribed acceptance criteria are met.

Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

References (available for NRC inspection)

1. APP-GW-E1-001, Electrical Systems Design Criteria
2. 26139-000-4MP-T81 C-N7101, Bechtel Construction Quality Verification Program
3. SV3-1100-ITR-CTMT, Unit 3 Cable Separation Report for the Containment Building
4. 3.3.00.07d.iii.a-U3-CP-Rev0, ITAAC Completion Package
5. ND-EN-VNP-020, Quality Control Inspection Program