ND-22-0085, ITAAC Closure Notification on Completion of ITAAC 2.3.07.06a (Index Number 399)

From kanterella
Jump to navigation Jump to search

ITAAC Closure Notification on Completion of ITAAC 2.3.07.06a (Index Number 399)
ML22054A297
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 02/23/2022
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ITAAC 2.3.07.06a, ND-22-0085
Download: ML22054A297 (7)


Text

Southern Nuclear FEB 2 3 2022 Docket No.:

52-025 Michael J. Yox Regulatory Affairs Vogtle 3 & 4 7825 River Road Waynesboro, GA 30830 706-848-6459 tel ND-22-0085 10 CFR 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of ITAAC 2.3.07.06a [Index Number 3991 Ladies and Gentlemen:

In accordance with 10 CFR 52.99(c)(1), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtle Electric Generating Plant (VEGP) Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.3.07.06a [Index Number 399], for verifying that the Class 1E components Identified in the Combined License (COL), Appendix C Table 2.3.7-1 are powered from their respective Class IE division. The closure process for this ITAAC is based on the guidance described in NEI 08-01, "Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52," which was endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99.

If there are any questions, please contact Kelli Roberts at 706-848-6991.

Respectfully submitted.

Michael J. Yox Regulatory Affairs Director Vogtle 3 & 4

Enclosure:

MJY/MSV/sfr Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 2.3.07.06a [Index Number 399]

U.S. Nuclear Regulatory Commission ND-22-0085 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena III Mr. D. L. McKinney Mr. H. Nieh Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. J.B. Williams Mr. M. J. Vox Mr. A. S. Parton Ms. K. A. Roberts Ms. J.M. Coleman Mr. C. T. Defnall Mr. C. E. Morrow Mr. K. J. Drudy Mr. J. M. Fisher Mr. R. L. Beiike Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 Nuclear Reouiatorv Commission Ms. M. Bailey Mr. M. King Mr. G. Bowman Ms. A. Veil Mr. C. P. Patel Mr. G. J. Khouri Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. O. Lopez-Santiago Mr. G. Armstrong Mr. M. Webb Mr. T. Fredette Mr. C. Santos Mr. B. Davis Mr. J. Vasquez Mr. J. Eargle Mr. T. Fanelli Ms. K. McCurry Mr. J. Parent Mr. B. Griman Mr. V. Hall

U.S. Nuclear Regulatory Commission ND-22-0085 Page 3 of 3 Oqlethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Dalton Utilities Mr. T. Bundros Westinqhouse Electric Company. LLC Dr. L. Oriani Mr. D. 0. Durham Mr. M. M. Corletti Mr. Z. 8. Harper Mr. J. L. Coward Other Mr. 8. W. Kline, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., CDS Associates, inc.

Mr. 8. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Baich Bingham

U.S. Nuclear Regulatory Commission ND-22-0085 Enclosure Page 1 of 4 Southern Nuclear Operating Company ND-22-0085 Enclosure Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 2.3.07.06a [Index Number 399]

U.S. Nuclear Regulatory Commission ND-22-0085 Enclosure Page 2 of 4 ITAAC Statement Desion Commitment 6.a) The Class 1E components identified in Table 2.3.7-1 are powered from their respective Class 1E division.

Inspections. Tests. Analvses Testing will be performed on the SFS by providing a simulated test signal in each Class IE division.

Acceptance Criteria A simulated test signal exists at the Class IE components identified in Table 2.3.7-1 when the assigned Class IE division is provided the test signal.

ITAAC Determination Basis Testing was performed on the Class IE components identified in the VEGP Unit 3 COL Appendix C Table 2.3.7-1 (Attachment A) to demonstrate that they are powered from their respective Class IE division. This ITAAC performed testing on the Spent Fuel Pool Cooling System (SFS), by providing a simulated test signal in each Class IE division.

Class 1E power verification testing of the Protection and Safety Monitoring System (PMS) cabinets, that provide power to the components identified in Attachment A, are verified through the applicable portion of ITAAC 2.5.02.05a testing (Reference 1) and confirms the PMS cabinets are powered from their respective Class 1E division. SV3-SFS-ITR 800399 (Reference

2) documents completion of power verification activities from the PMS cabinets to the components identified in Attachment A. Reference 2 first verified that power supply cables/wiring were installed and terminated from the applicable PMS cabinet to the respective component identified in Attachment A using approved construction drawings and cable/wiring termination documentation. Reference 2 then confirmed, via cable/wiring termination inspection documentation, that continuity testing was performed on each of the installed cables/wiring to confirm current flow within the installed cable/wiring. The combination of cable/wiring installation and termination verification, with the installed cable/wiring continuity testing, confirmed that the components identified in Appendix A are powered from their respective Class 1E division.

The results of the testing are documented in SV3-SFS-ITR 800399 (Reference 2) and confirmed that a simulated test signal exists at the Class IE components identified in Table 2.3.7-1 when the assigned Class 1E division provided the test signal.

References 1 and 2 are available for NRC inspection as part of the Unit 3 ITAAC 2.3.07.06a Completion Package (Reference 3).

U.S. Nuclear Regulatory Commission ND-22-0085 Enclosure Page 3 of 4 ITAAC Finding Review In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company (SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC.

The ITAAC completion review is documented in the Vogtle Unit 3 ITAAC Completion Package for ITAAC 2.3.07.06a (Reference 3) and is available for NRC inspection.

ITAAC Completion Statement Based on the above information, SNC hereby notifies the NRC that ITAAC 2.3.07.06a was performed for VEGP Unit 3 and that the prescribed acceptance criteria were met.

Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

References (available for NRC Inspection)

1. SV3-PMS-ITR-800527-1 Rev. 0, "Unit 3 Protection & Safety Monitoring (PMS) System Equipment by Assigned Class 1E Division: ITAAC 2.5.02.05a"
2. SV3-SFS-ITR-800399 Rev. 1, "Unit 3 Spent Fuel Pool Cooling System: ITAAC 2.3.07.06a NRC Index Number 399"
3. 2.3.07.06a-U3-CP-Rev 0, ITAAC Completion Package

U.S. Nuclear Regulatory Commission ND-22-0085 Enclosure Page 4 of 4 Attachment A COL Appendix C Table 2.3.7-1 Component Name' Tag No.'

Spent Fuel Pool Level Sensor SFS-019A Spent Fuel Pool Level Sensor SFS-019B Spent Fuel Pool Level Sensor SFS-019C Excerpted from COL Appendix C Table 2.3.7-1