ITAAC Closure Notification on Completion of ITAAC 2.3.10.11a (Index Number 878)
ML22054A175
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 02/23/2022
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ITAAC 2.3.10.11a, ND-22-0046
Download: ML22054A175 (7)


Text

A MichaelJ. Yox 7825 River Road mSL SOUtnBrn Nucl6ar Regulatory Affairs Director Waynesboro, GA 30830 Vogtle 3 & 4 706-848-6459 tel FEB 2 3 2022 Docket No.:

52-025 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 ND-22-0046 10CFR 52.99(c)(1)

Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of ITAAC 2.3.10.1 la [Index Number 8781 Ladies and Gentlemen:

In accordance with 10 CFR 52.99(c)(1), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtle Electric Generating Plant (VEGP)

Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria ITAAC item 2.3.10.1 la [Index Number 878] for verifying that the Class IE components identified in Combined License Appendix C, Table 2.3.10-1 are powered from their respective Class 1E division. The closure process for this ITAAC is based on the guidance described in NEI 08-01, "Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52," which was endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99.

If there are any questions, please contact Kelli Roberts at 706-848-6991.

Respectfully submitted.

4:

Michael J. Vox Regulatory Affairs Director Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 2.3.10.11a [Index Number 878]

MJY/CMK/sfr

U.S. Nuclear Regulatory Commission ND-22-0046 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena III Mr. D. L. McKinney Mr. H. Nieh Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. J.B. Williams Mr. M. J. Vox Mr. A. S. Parton Ms. K. A. Roberts Ms. J.M. Coleman Mr. C. T. Defnall Mr. C. E. Morrow Mr. K. J. Drudy Mr. J. M. Fisher Mr. R. L. Beiike Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 Nuclear Reoulatorv Commission Ms. M. Bailey Mr. M. King Mr. G. Bowman Ms. A. Veil Mr. C. P. Patel Mr. G. J. Khouri Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. O. Lopez-Santiago Mr. G. Armstrong Mr. M. Webb Mr. T. Fredette Mr. C. Santos Mr. B. Davis Mr. J. Vasquez Mr. J. Eargle Mr. T. Fanelli Ms. K. McCurry Mr. J. Parent Mr. B. Griman Mr. V. Hall

U.S. Nuclear Regulatory Commission ND-22-0046 Page 3 of 3 Qqlethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Dalton Utilities Mr. T. Bundros Westinqhouse Electric Company. LLC Dr. L. Oriani Mr. D. 0. Durham Mr. M. M. Corletti Mr. Z. 8. Harper Mr. J. L. Coward Other Mr. 8. W. Kline, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, inc.

Mr. 8. Roetger, Georgia Pubiic Service Commission Mr. R. L. Trokey, Georgia Pubiic Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Baich Bingham

U.S. Nuclear Regulatory Commission ND-22-0046 Enclosure Page 1 of 4 Southern Nuclear Operating Company ND-22-0046 Enclosure Vogtle Electric Generating Plant (VEGP) Unit 3 ITAAC Closure Notification on Completion of ITAAC 2.3.10.11a [Index Number 878]

U.S. Nuclear Regulatory Commission ND-22-0046 Enclosure Page 2 of 4 ITAAC Statement Design Commitment 11.a) The Class 1E components identified in Table 2.3.10-1 are powered from their respective Class 1E division.

I nspections/Tests/Analvses Testing will be performed on the WLS by providing a simulated test signal in each Class IE division.

Acceptance Criteria A simulated test signal exists at the Class IE components identified in Table 2.3.10-1 when the assigned Class 1E division is provided the test signal.

ITAAC Determination Basis Testing is performed on the Class IE components (equipment) identified in the VEGP Unit 3 COL Appendix C Table 2.3.10-1 (Attachment A) to demonstrate they are powered from their respective Class IE division. This ITAAC performs testing on the Liquid Radwaste System (WLS) by providing a simulated test signal in each Class 1E division.

Class 1E power verification testing of the Protection and Safety Monitoring System (PMS) cabinets, that provide power to the components identified in Attachment A, is verified through the applicable portion of ITAAC 2.5.02.05a testing (Reference 1) and confirms the PMS cabinets are powered from their respective Class 1E division. SV3-WLS-ITR-800878 (Reference 2) documents completion of power verification activities from the PMS cabinets to the components identified in Attachment A. This testing verified that power supply cables/wiring are installed and terminated from the applicable PMS cabinet to the respective component identified in Attachment A. The component testing performed in Reference 2 confirms that the components identified in Appendix A are powered from their respective Class IE division.

The Unit 3 testing documented in References 1 and 2 confirm that a simulated test signal exists at the Class IE equipment identified in Table 2.3.10-1 when the assigned Class 1E division is provided the test signal.

References 1 and 2 are available for NRC inspection as part of the Unit 3 ITAAC Completion Package (Reference 3).

ITAAC Finding Review In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company (SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC.

ITAAC Completion Statement Based on the above information, SNC hereby notifies the NRC that ITAAC 2.3.10.1 la was performed for VEGP Unit 3 and that the prescribed acceptance criteria were met.

U.S. Nuclear Regulatory Commission ND-22-0046 Enclosure Page 3 of 4 Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

References (available for NRG inspection)

1. SV3-PMS-ITR-800527-1 Rev. 0, "Unit 3 Protection & Safety Monitoring (PMS) System Equipment by Assigned Class 1E Division"
2. SV3-WLS-ITR-800878, "Unit 3 WLS System Components Powered by Assigned Class 1E Division"
3. 2.3.10.11a-U3-CP-RevO, ITAAC Completion Package

U.S. Nuclear Regulatory Commission ND-22-0046 Enclosure Page 4 of 4 Attachment A COL Appendix C Table 2.3.10-1 Equipment Name*

Tag No.*

WLS Auxiliary Building Radiologically Controlled Area (RCA) Floodup Level Sensor WLS-400A WLS Auxiliary Building RCA Floodup Level Sensor WLS-400B

'Excerpted from COL Appendix C Table 2.3.10-1