ITAAC Closure Notification on Completion of ITAAC 2.6.09.08 (Index Number 6501)
ML22047A294
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 02/16/2022
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ITAAC 2.6.09.08, ND-22-0103
Download: ML22047A294 (6)


Text

,

Michael J. Vox 7825 River Road Southern Nuclear Regulatory Affairs Director Waynesboro, GA 30830 Vogtle 3 & 4 706-848-6459 tel ND-22-0103 10CFR 52.99(c)(1)

FEB 1 6 2022 Docket No.:

52-025 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of ITAAC 2.6.09.08 [Index Number 6501 Ladies and Gentlemen:

In accordance with 10 CFR 52.99(c)(1), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtle Electric Generating Plant (VEGP) Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.6.09.08 [Index Number 650].

This ITAAC confirms that the illumination in isolation zones and exterior areas within the Protected Area is a minimum of 0.2 foot candles measured horizontally at ground level or, alternatively, sufficient to permit observation. The closure process for this ITAAC is based on the guidance described in Nuclear Energy Institute (NEI) 08-01, "Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52," which was endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99.

If there are any questions, please contact Kelli Roberts at 706-848-6991.

Respectfully submitted, Michael J. Vox Regulatory Affairs DirectorA/ogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 2.6.09.08 [Index Number 650]

MJY/RLB/sfr

U.S. Nuclear Regulatory Commission ND-22-0103 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena III Mr. D. L. McKinney Mr. H. Nieh Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. J. B. Williams Mr. M. J. Yox Mr. A. S. Parton Ms. K. A. Roberts Ms. J.M. Coleman Mr. C. T. Defnall Mr. C. E. Morrow Mr. K. J. Drudy Mr. J. M. Fisher Mr. R. L. Beiike Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:

Nuclear Reouiatorv Commission Ms. M. Bailey Mr. M. King Mr. G. Bowman Ms. A. Veil M

M M

M Ms. N. C. Coovert M

M M

M M

M M

M M

M M

M M

M C. P. Patel G. J. Khouri C. J. Even B. J. Kemker

. C. Welch

. J. Gaslevic

. O. Lopez-Santiago

. G. Armstrong

. M. Webb

. T. Fredette

. C. Santos

. B. Davis

. J. Vasquez

. J. Eargle

. T. Fanelli Ms. K. McCurry J. Parent B. Griman V. Hall

U.S. Nuclear Regulatory Commission ND-22-0103 Page 3 of 3 Qqlethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Daiton Utilities Mr. T. Bundros Westinqhouse Electric Company. LLC Dr. L. Oriani Mr. D. 0. Durham Mr. M. M. Corletti Mr. Z. 8. Harper Mr. J. L. Coward Other Mr. 8. W. Kline, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, inc.

Mr. 8. Roetger, Georgia Pubiic Service Commission Mr. R. L. Trokey, Georgia Pubiic Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Baich Bingham

U.S. Nuclear Regulatory Commission ND-22-0103 Enclosure Page 1 of 3 Southern Nuclear Operating Company ND-22-0103 Enclosure Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 2.6.09.08 [Index Number 650]

U.S. Nuclear Regulatory Commission ND-22-0103 Enclosure Page 2 of 3 ITAAC Statement Design Commitment

8. Isolation zones and exterior areas within the protected area are provided with illumination to permit observation of abnormal presence or activity of persons or vehicles.

I nspections/T ests/Analvses Inspection of the illumination in the isolation zones and external areas of the protected area will be performed.

Acceptance Criteria The illumination in isolation zones and exterior areas within the protected area is 0.2 foot candies measured horizontally at ground level or, alternatively, sufficient to permit observation.

ITAAC Determination Basis An inspection was performed to verify the Vogtle Electric Generating Plant (VEGP) Unit 3 isolation zones and exterior areas within the protected area are provided with illumination to permit observation of abnormal presence or activity of persons or vehicles. The inspection confirms the illumination in isolation zones and external areas within the protected area is a minimum of 0.2 foot candies measured horizontally at ground level or, alternatively, sufficient to permit observation, and satisfy the applicable illumination requirements of the VEGP Unit 3 and Unit 4 Physical Security Plan associated with 10CFR 73.55(i)(6)(ii). The VEGP Unit 3 Plant Security System ITAACs only cover the Unit 3 plant security system design commitment scope.

ITAAC Technical Report SV3-SES-ITR-800650 (Reference 1) documents the measurements taken of the illumination in isolation zones and exterior areas within the protected area. The measurements were taken horizontally at ground level with a calibrated light meter during clear weather conditions at night with no full moon. Ground level is considered to be approximately 6 inches above the ground or surface being tested.

The VEGP Unit 3 isolation zones and exterior areas of the protected area were divided into grid sections. Measurement of illumination levels in each section were taken at locations as determined in Reference 1. Criteria for selection of the measurement locations in each section included points on the extreme boundary of the section being measured, midpoints between the outdoor security lighting luminaries, corners at the intersection of exterior building walls, isolation zone corners, exterior area access doors to vital areas, and other exterior areas within the protected area and isolation zone areas of apparent low light within the section.

The results of the Unit 3 isolation zone and protected area lighting system inspection are documented in Reference 1 and confirm that the illumination in isolation zones and exterior areas within the protected area is a minimum of 0.2 foot candles measured horizontally at ground level or, alternatively, sufficient to permit observation of abnormal presence or activity of persons or vehicles, utilizing low-light technologies referenced in the VEGP Unit 3 and Unit 4 Physical Security Plan.

Reference 1 is availabie for NRC inspection as part of the Unit 3 ITAAC 2.6.09.08 Completion Package (Reference 2).

U.S. Nuclear Regulatory Commission ND-22-0103 Enclosure Page 3 of 3 ITAAC Finding Review In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company (SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions. This review found there were no relevant ITAAC findings associated with this ITAAC. The ITAAC completion review is documented in the ITAAC Completion Package for ITAAC 2.6.09.08 (Reference 2) and is available for NRC review.

ITAAC Completion Statement Based on the above information, SNC hereby notifies the NRC that ITAAC 2.6.09.08 was performed for VEGP Unit 3 and that the prescribed acceptance criteria was met.

Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

References (available for NRC inspection)

1. SV3-SES-ITR-800650, SES Isolation Zone and Protected Area Illumination: ITAAC 2.6.09.08 (Security Related Information)
2. 2.6.09.08-U3-CP-Rev0, ITAAC Completion Package