ML20245H888

From kanterella
Jump to navigation Jump to search
Forwards Suppl Response to Notice of Violation & Imposition of Civil Penalty EA 88-16.Clearance Procedure Reviewed & Revised to Provide Clarification of Methods & Accountabilities for Boundary Verification by Personnel
ML20245H888
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 06/26/1989
From: Cutter A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
EA-88-316, NLS-89-183, NUDOCS 8906300135
Download: ML20245H888 (3)


Text

~

} , , a s

'1-p .

4.' ...~ , . . -

Carogne Power & Light Company ll

.1 P.O. Box 1551

  • Raleigh. N.C. 27602 -

lJUN 2 61989  !

. A. S' CUTTER Vice President .

l'

' Nuclear Services Department -

3:

SERIALi NLS-89 183- :l

' Director, Office of Enforcement United: States Nuclear. Regulatory Commission

' Washington,-DC'.20555 BRUNSWICK STEAM ELECTRIC' PLANT, UNIT NO. 1 N - DOCKET NO.'50-325/ LICENSE NO. DPR-71 SUPPLEMENTAL RESPONSE TO A NOTICE OF.VIOIATION (EA 88-316)

Gentlemen:

On April 17, 1989, Carolina Power & Light Company (CP&L) provided a response to two violations: addressed in Notice ofLViolation and L

Imposition of Civil penalty EA 88-16. In the response to Violation B,

' CP&L committed to provide supplementary information to address the results;of the clearance task forces and provide a schedule for

. implementation of r.ny. required actions'. This information is provided in Enclosure 1.

.Please. refer any. questions regarding this submittal to Mr. William R.

Murray at (919)'.546-4661.

Yours very truly, l l}

'/'f/.

A. B. Cutter g .

.j BAB/bab (\cor\vresp) y

- Enclosure 1 l

cc: Mr. S. D. Ebneter Mr. W. H. Ruland '

Mr. E. G. Tourigny ,

NRC Document Control Desk '

l g 1

8906300135 890626 5 g

'PDR ADOCK 05000325

~

1.:. ;o - PDC ,

irs i ii n ;u .

.in.k' 'su 3 ..- r i.,,r.. .. . . .. . - ,f.

ENCLOSURE'l BRUNSWICK STEAM ELECTRIC. PLANT, UNIT 1 .

NRC DOCKET 50-325 /

OPERATING LICENSE DPR-71  !

SUPPLEMENTAL RESPONSE TO A NOTICE OF VIOLATION (EA 88-316) t As stated in the April 17, 1989 response, two task forces were established in an effort-to resolve clearance problems. One task force l was made up of Operations personnel, reporting to the Manager 0perations. l The other was comprised of unit managers or supervisors from Operations, {

Maintenance, Technical Support, and Outage Management, and reported to l the Plant General Manager. As a result of these task forces. the i following changes are being made. I CLEARANCE CENTER t

A " Clearance Center" is being developed to remove the responsibility for .i clearance reviews from the Operations personnel staffing the control l room. The Center is expected to be staffed Monday through Friday,  !

excluding back shifts, by a minimum of one licensed senior reactor '

operator (SRO). Additional personnel will be assigned to the Center's staff, as appropriate, to support periods of increased clearance requests (i.e., outages). In addition to Operations personnel, personnel from other organizations (Maintenance, Technical Support, l etc.) will be used as appropriate.  !

l The task force made up of unit managers is acting as the steering l committee for the developm :1t of the Clearance Center. The task force l will establish the Center's objectives and ensure their implementation. {

Current objectives for the Center are as follows: l (1) Receive clearance requests from the appropriate planning and .)

scheduling groups, l l

(2) Deliver a clearanca request work package to the control room  !

personnel specifyfig a) required plant conditions, b) work scope, j and c) required LC0 actions, j l;

The Center will be responsible for evaluating the work scope, determining the required boundaries, and performing operability reviews .

on equipment affected by a clearance request. '

The Operations personnel staffing the Control Room vill be responsible  ;

for establishing the plant conditions specified by the Clearance Center l personnel and for hanging the clearance once these conditions are j established. l Carolina Power & Light Company believes that establishment of the  ;

Clearance Center should prevent future events similar to those cited in j the Notice of Violation resulting from improper clearance l l implementation. The Center will be established by July 9, 1989.  ;

i*

l El 1 f L.  :

L 1____ _ _ _ _ _ _ _ ____________________________i

n- -_

1 q

1 PROCEDURE REVISIONS j The clearance procedure will be reviewed =and revised as necessary~to j provide clarification of methods and accountabilities for boundary I verification by Operations and Maintenance personnel and to provida a. j method of. correlating the work scope on the clearance to the approved {

work. , Appropriate. Operations and Maintenance personnel'will receive i training'on revisions made to the clearance procedure. Procedure

-revisions.will be completed by July.9, 1989, and training for the  !

appropriate personnel will be completed by August 31, 1989.  !