Text
,
y UNIVERSITY OF CALIFORNIA, BERKELEY BERKELEY
- DAVIS
- 3RVINE
- LOS ANCELES
- RIVER $IDE
- SAN DIECO
- MN F14ANOW SANTA BARBARA
- SANTA CRVI.
.c3 2^ ~' 9'
COLLEGE OF ENGINEERINC BERKELEY, CALIFORNIA 94720 DEPARTMENT OF NUCLEAR ENCINEERING March 14, 1985
Docket No. 50-224 l
License No. R-101 Director l
U. S. Nuclear Regulatory Comission, Region V l
Office of Inspection 4 Enforcement l
l' 1450 Maria Lane, Suite 210 Walnut Creek, California 94596
Dear Sir:
Enclosed is a copy of the, Berkeley Research Reactor Annual Report for the calendar year 1984.
The Report is prepared for the Nuclear Regulatory Commission as required by our Technical Specifications.
j Sincerely, G A n ~.d,I..
J. - l-Thomas H. Pigford Reactor Administrator
'mP:sf Enc.
I 8612180366 861216 PDR FOIA GEORGE 86-811 PDR
&([hb lE2Y gQ.
r, u-
>?
e; L:
- '!. flyi,
1: :
h0 CLEAR ENGINEElllNG REACIUll IA10llNIORY TRIGA MARK III 1:ACI1.I'lY 115 lua r.
p'. v
'~'
UNIVLRSl'lY 01: CALil:0RNI A BERKELEY, CALIFORNIA
_.+ C;i..,
i I
I l
1 l
l BERKEIE( RESEARQi REACTOR ANNUAL REPORT OF OPERATIONS January 1, 1984 through December 31, 1984 (BRR Technical Specifications 6.7 2) l l
Tek 11. Lim Reactor Supervisor m
,y
( ',;
ht O
.s
~. ' ' '
i s
(
f Energy Production and Fuel Burn-up o,
The Berkeley Research Reactor produced 138,521 kW-hours or 5.77 MW-days of energy during 1984 As there were 161 operating days in 1984, this cor-t responds to an average daily energy production of 860 kW-hours per operating l
day.
In 1984, the Berkeley Research Reactor was critical approximately 205 hours0.00237 days <br />0.0569 hours <br />3.38955e-4 weeks <br />7.80025e-5 months <br /> and was operated at full power (1 MW) fc approximately,126 hours0.00146 days <br />0.035 hours <br />2.083333e-4 weeks <br />4.7943e-5 months <br />.
The total burn-up in 1984 was 6.2 grams elemental and 7.2 grams of isotope U-235.
T The total cumulative encigy production since initial criticality is, approximately 272.1 MW-days.
t a-Nuclear Regulatory Commission Inspection Inspections of the Berkeley Research Reactor operations and safety were performed by the Nuclear Regulatory Commission Region V off3cc in Decem-ber of 1984. No items of noncompliance to the Technical Specifications and Nuclear Regulatory Commission regulations were found during the ins,Tctions.
l t
Umergency Plan The revised upgraded Berkeley Research Reactor Emergency Response Plan was approved by the NRC on November 17, 1984.
lhergency Shutdowns ant! Inadvertent Serams Date Scram Circuit Reason 5-14-84 Period Scram Operator lirror 9-16-84 Linear Power Scram, Operator Error Operator's Training i
In August 1984, one senior operator passed the Nuclear Regulatory Com-mission Reactor Operator's Examination.