MONTHYEARML20211D7501999-08-23023 August 1999 Responds to NRC Re Violations Noted in OI Rept 3-98-043 & EA 99-183.Corrective Actions:Oversight of Training Program & Contractor Policies That Implement Parts of Security Program Have Been Increased by Addl Position ML20205M9421999-04-13013 April 1999 Forwards Emergency Response Data System Implementation Documents.Data Point Library Updates for Kewaunee (271), San Onofre (272) & Clinton (273) Encl.Also Encl Plant Attribute Library Update for Grand Gulf (274).Without Encls ML17230A3661999-03-18018 March 1999 Forwards Listed Nelia Insurance Policy Endorsements for Kewaunee Nuclear Power Plant,Per Requirements of 10CFR140.15 ML20203F2541999-02-10010 February 1999 Informs That Beginning 990216,DE Hills Will Be Chief of Operations Branch Which Includes Operator Licensing Function ML20155F7951998-11-0303 November 1998 Second Partial Response to FOIA Request for Documents. Records Subj to Request Encl & Identified in App C ML20154F1481998-10-0202 October 1998 Forwards Insp Rept 50-305/98-15 on 980831-0904.No Violations Noted.Insp Exam of Activities Conducted Under License Re Physical Security & to Compliance with Commission Rules & Regulations & with Conditions of License ML20237E0881998-08-24024 August 1998 Clarifies Info Provided Re Containment Ventilation Sys & Use of Mixing Factor of 0.5,in Response to NRC Request Made During Telcon ML20237A2301998-08-0707 August 1998 Forwards Original & Three Copies of Rev 11 to Knpp Security Manual.Screening Criteria Form for Each Change W/Description & Criteria of Review Has Been Included as Attachment A. Reissued Security Manual Included in Attachment B.W/O Encls ML20236R9051998-07-21021 July 1998 Informs That Document Entitled, WCAP-14677,Rev 1 F* & Elevated F* Tube Alternate Repair Criteria for Tubes W/Degradation within Tubesheet Region of Kewaunee Sgs, Will Be Withheld from Public Disclosure,Per 10CFR2.790 ML20249B7471998-06-23023 June 1998 Forwards RAI Re 980601 Proposed Amend to Revise F* & Ef* Criteria for SG Tubes in Kewaunee Tss.Proposed Amend Would Revise Existing F* & Ef* Distances in TS 4.2.b to Reflect Changes to Primary to Secondary Differential Pressure ML20249A8751998-06-16016 June 1998 Forwards Request for Addl Info Re Proposed Amend to Redefine Parent Tube Pressure Boundary for Westinghouse Mechanical Hybrid Expansion Joint SG Tube Sleeves,Submitted by Util ML20248M2521998-06-0909 June 1998 Forwards Assessment of Kewannee Cycle 22 Alternate Repair Criteria 90 Day Rept,For Info ML20217F3401998-04-23023 April 1998 Forwards Annual Environ Monitoring Rept Jan-Dec 1997, Per TS 6.9.b.1.Results of 1997 Land Use Census,Iaw Plant ODCM, Section 3/4.7.1,included in Rept ML20216B3281998-04-0707 April 1998 Discusses Amend 132 to License DPR-43.Requested Revised Analysis Reflecting Higher Source Term Encl.Results of Analysis Conclude That Potential Thyroid Doses to Public Continue to Be Less than Guideline Values of 10CFR100 ML20217J2131998-04-0202 April 1998 Forwards Copy of Each Revised Forms 398,personal Qualifications Statement & 396,certification of Medical Exam by Facility Licensee.Due to Error on Instructions for Form 398,addendum for Completing Form Are Provided ML20217H4031998-03-27027 March 1998 Informs That NRC Staff Has Initiated Variety of Activities Re Mgt of Licensing Basis Info as Result of Problems Encountered at Millstone & Maine Yankee Facilities ML20217G1461998-03-25025 March 1998 Responds to NRC Re Violations Noted in Insp Rept 50-305/98-03 on 980128-0203.Corrective Actions:Controlling & Properly Securing SGI ML20203C8481997-12-10010 December 1997 Forwards Emergency Response Data Sys Implementation Documents for Plants.W/O Encl ML20212H0121997-11-0404 November 1997 Forwards Insp Rept 50-305/97-14 on 970915-19.No Violations Noted.Rept Identifies Areas Examined within Security Program ML20217P3511997-08-26026 August 1997 Ack Receipt of & Check for $50,000 in Payment for Civil Penalty Proposed by NRC in . Corrective Actions Will Be Examined During Future Insp ML20217J9641997-08-11011 August 1997 Responds to NRC Re Violations Noted in Insp Rept 50-305/97-02 on 970106-31.Corrective Actions:Will Revise IST Procedures to Use More Accurate Instrumentation Satisfying Requirements & to Include Acceptance Criteria ML20140E8861997-06-0707 June 1997 Forwards Amend 133 to License DPR-43 & Safety Evaluation. Amend Establishes New Design Basic Flow Rate for AFW Pumps Consistent W/Assumptions Used in Reanalysis of Limiting Design Basis Event for AFW Sys ML20140F2171997-04-30030 April 1997 Final Response to FOIA Requests for Documents.Records in App B Encl & Will Be Available in PDR IA-97-130, Final Response to FOIA Requests for Documents.Records in App B Encl & Will Be Available in PDR1997-04-30030 April 1997 Final Response to FOIA Requests for Documents.Records in App B Encl & Will Be Available in PDR ML20140F2211997-04-0404 April 1997 FOIA Request for Documents Re Recently Issued TIA for Plant Concerning Safety Question on Auxiliary Feedwater Sys ML20137A2111997-03-14014 March 1997 Transmits Info Pertaining to NRC Staff Review of Weld Defects in CE Designed SG Tube Sleeves ML20134Q0981997-02-21021 February 1997 Ninth Partial Response to FOIA Request for Documents. Forwards Documents Listed in App P.App Q Documents Partially Withheld (Ref FOIA Exemption 6).Documents Also Available in PDR ML20134Q1251997-02-20020 February 1997 Forwards Original & Three Copies of Rev 10 to Knpp Security Manual.Manual Is Being Changed to Incorporate Use of Vehicle Barrier Sys,Per 10CFR73.55 & 73.1(a).Encl Withheld ML20133E7031997-01-0606 January 1997 Forwards Insp Rept 50-305/96-12 on 961118-27 & Notice of Violation ML20133G2291997-01-0606 January 1997 Ltr Contract:Task Order 115, Kewaunee Safety Sys Operational Performance Insp, Under Contract NRC-03-93-026 ML20129K1131996-11-0505 November 1996 Forwards Copy of Master Bwr/Pwr Gfes Exam W/Answer Key for Info.W/O Encl ML20129J2641996-10-29029 October 1996 Ack Receipt of 960613 & 1024 10CFR50.54(a) Submittals Re Changes to Quality Assurance Program Description.Based on Review,Nrc Concludes That Revision Continues to Meet Requirements of 10CFR50,App B & Acceptable ML18065B0081996-10-14014 October 1996 Informs That Overheads Will Be Presented by Licensee at 961016 Meeting at NRC Headquarters in White Flint.Encl Withheld ML20117P6861996-09-20020 September 1996 Forwards Rev 9 to Security Manual.Encl Withheld ML20117L7171996-09-0505 September 1996 Forwards Proposed Tech Specs Re Amend for Use of Westinghouse Laser Welded Steam Generator Tube Sleeves,Per Discussion W/Nrc ML20100M7451996-02-29029 February 1996 Provides Revised Description of Proposed Vehicle Control Measures.Encl Withheld ML20217H4281996-01-24024 January 1996 Discusses Review of Nuclear Energy Inst Guidance Document, Guideline for Managing NRC Commitments, Rev 2,dtd 951219 ML20094H8491995-11-0606 November 1995 Forwards Rev 8 to Security Manual.Rev Withheld ML20091P4951995-08-28028 August 1995 Forwards Clarification of Rev 7 to Security Manual.Encl Withheld ML20094D9291995-08-10010 August 1995 Forwards Scenario Package for 951011 Emergency Exercise at Plant,Per from Cj Paperiello ML20087K2451995-08-0202 August 1995 Forwards Revised Description of Proposed Vehicle Control Measures.Primary Change in Design Is Use of Jersey Barriers in Lieu of Combination Cable & Rock Design.Encl Withheld ML20084L1091995-05-30030 May 1995 Forwards Rev 7 of Kewaunee NPP Security Manual.Encl Withheld ML20080N0061995-02-28028 February 1995 Forwards Summary Description of Plant Proposed Vehicle Control Measures & Results of Vehicle Bomb Comparison.Encl Withheld ML20078R3291994-12-19019 December 1994 Discusses Results & Conclusions of Osre Conducted During 940815-18.Weakness Noted as Being Unique & Only Possible During Specific Time Periods ML20072J3401994-08-22022 August 1994 Responds to NRC Re Violations Noted in Insp Rept 50-305/94-09 on 940516-0704.Corrective Actions:Memo,Stating That Turbine Driven AFW Pump Should Be Declared Inoperable Whenever AFW-10A or 10B Closed or Inoperable,Issued ML20070P5811994-03-29029 March 1994 Requests Meeting W/Nrc & Appropriate Members of NRC Dept Re Disposal of high-level Radwaste from NPP ML20059E9511994-01-0707 January 1994 Requests Addl Info Re Graded Approach for GL 89-10, Safety-Related Motor-Operated Valve Testing & Surveillance ML20058E6581993-12-0101 December 1993 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 940209.Informs That Facility Must Submit Ltr Identifying Individuals Who Will Take Exam ML20058A1291993-11-16016 November 1993 Forwards Safeguards Info Referenced in Preliminary Draft Guide Re Proposed Rule for Protection Against Manevolent Use of Vehicles at Nuclear Power Plants.Encl Withheld ML20059D2761993-10-26026 October 1993 Forwards Copy of Master Bwr/Pwr Gfes Exam W/Answer Key.W/O Encl 1999-08-23
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20211D7501999-08-23023 August 1999 Responds to NRC Re Violations Noted in OI Rept 3-98-043 & EA 99-183.Corrective Actions:Oversight of Training Program & Contractor Policies That Implement Parts of Security Program Have Been Increased by Addl Position ML17230A3661999-03-18018 March 1999 Forwards Listed Nelia Insurance Policy Endorsements for Kewaunee Nuclear Power Plant,Per Requirements of 10CFR140.15 ML20237E0881998-08-24024 August 1998 Clarifies Info Provided Re Containment Ventilation Sys & Use of Mixing Factor of 0.5,in Response to NRC Request Made During Telcon ML20237A2301998-08-0707 August 1998 Forwards Original & Three Copies of Rev 11 to Knpp Security Manual.Screening Criteria Form for Each Change W/Description & Criteria of Review Has Been Included as Attachment A. Reissued Security Manual Included in Attachment B.W/O Encls ML20217F3401998-04-23023 April 1998 Forwards Annual Environ Monitoring Rept Jan-Dec 1997, Per TS 6.9.b.1.Results of 1997 Land Use Census,Iaw Plant ODCM, Section 3/4.7.1,included in Rept ML20216B3281998-04-0707 April 1998 Discusses Amend 132 to License DPR-43.Requested Revised Analysis Reflecting Higher Source Term Encl.Results of Analysis Conclude That Potential Thyroid Doses to Public Continue to Be Less than Guideline Values of 10CFR100 ML20217G1461998-03-25025 March 1998 Responds to NRC Re Violations Noted in Insp Rept 50-305/98-03 on 980128-0203.Corrective Actions:Controlling & Properly Securing SGI ML20217J9641997-08-11011 August 1997 Responds to NRC Re Violations Noted in Insp Rept 50-305/97-02 on 970106-31.Corrective Actions:Will Revise IST Procedures to Use More Accurate Instrumentation Satisfying Requirements & to Include Acceptance Criteria ML20140F2211997-04-0404 April 1997 FOIA Request for Documents Re Recently Issued TIA for Plant Concerning Safety Question on Auxiliary Feedwater Sys ML20134Q1251997-02-20020 February 1997 Forwards Original & Three Copies of Rev 10 to Knpp Security Manual.Manual Is Being Changed to Incorporate Use of Vehicle Barrier Sys,Per 10CFR73.55 & 73.1(a).Encl Withheld ML18065B0081996-10-14014 October 1996 Informs That Overheads Will Be Presented by Licensee at 961016 Meeting at NRC Headquarters in White Flint.Encl Withheld ML20117P6861996-09-20020 September 1996 Forwards Rev 9 to Security Manual.Encl Withheld ML20117L7171996-09-0505 September 1996 Forwards Proposed Tech Specs Re Amend for Use of Westinghouse Laser Welded Steam Generator Tube Sleeves,Per Discussion W/Nrc ML20100M7451996-02-29029 February 1996 Provides Revised Description of Proposed Vehicle Control Measures.Encl Withheld ML20094H8491995-11-0606 November 1995 Forwards Rev 8 to Security Manual.Rev Withheld ML20091P4951995-08-28028 August 1995 Forwards Clarification of Rev 7 to Security Manual.Encl Withheld ML20094D9291995-08-10010 August 1995 Forwards Scenario Package for 951011 Emergency Exercise at Plant,Per from Cj Paperiello ML20087K2451995-08-0202 August 1995 Forwards Revised Description of Proposed Vehicle Control Measures.Primary Change in Design Is Use of Jersey Barriers in Lieu of Combination Cable & Rock Design.Encl Withheld ML20084L1091995-05-30030 May 1995 Forwards Rev 7 of Kewaunee NPP Security Manual.Encl Withheld ML20080N0061995-02-28028 February 1995 Forwards Summary Description of Plant Proposed Vehicle Control Measures & Results of Vehicle Bomb Comparison.Encl Withheld ML20078R3291994-12-19019 December 1994 Discusses Results & Conclusions of Osre Conducted During 940815-18.Weakness Noted as Being Unique & Only Possible During Specific Time Periods ML20072J3401994-08-22022 August 1994 Responds to NRC Re Violations Noted in Insp Rept 50-305/94-09 on 940516-0704.Corrective Actions:Memo,Stating That Turbine Driven AFW Pump Should Be Declared Inoperable Whenever AFW-10A or 10B Closed or Inoperable,Issued ML20070P5811994-03-29029 March 1994 Requests Meeting W/Nrc & Appropriate Members of NRC Dept Re Disposal of high-level Radwaste from NPP ML20056C5071993-02-19019 February 1993 FOIA Request for Documents Re Meeting Minutes,Summaries, Transcripts or Other Documents Resulting from NRC Meeting Held 930209 at Region III Ofc in Glen Ellyn,Il to Discuss Kewaunee Engineering Activities & Other Items of Interest ML20128H9271993-02-13013 February 1993 Advises That All Actions Necessary to Ensure Compliance W/ 10CFR50,App E,Section VI Re ERDS Completed.Installation of ERDS Hardware in Technical Support Ctr Complete & Temporary Telephone Line Replaced W/Permanent Line ML20128D2721993-02-0202 February 1993 Provides Listed Submittal Describing Actions Currently Being Performed & Schedule for Completion of Actions Associated W/ Resolution of long-term Recommendation GL-4,per ML20126E7221992-12-28028 December 1992 Forwards Response to NRC Re Weaknesses & Followup Items Noted in Insp Rept 50-305/92-21 of Annual Emergency Plan Exercise.Corrective Actions:More Mgt Involvement Will Be Provided & Emergency Plan Will Be Revised ML20095G9561992-04-27027 April 1992 Forwards Rev 5 to Security Manual,Revised to Reflect Requirements of New Access Authorization Rule.Rev Withheld ML20091M5531992-01-27027 January 1992 Forwards Rev 4 to Security Manual,Reflecting Recent Organizational & Title Changes & Adding Vehicle Insp Portal on North Gate.Rev Withheld ML20086E3411991-11-21021 November 1991 Forwards Response to Security Concern RIII-91-A-0056,per NRC .Investigation Determined That No Violation of Burns fitness-for-duty Program Occurred & That Burns Program Meets NRC Guidance for Overtime ML20079L0391991-10-29029 October 1991 Forwards Rev 3 to Security Manual to Address Issues Identified in NRC .Manual Withheld ML20079K8081991-10-28028 October 1991 Forwards Emergency Response Data Sys Implementation Program Plan.Implementation Program Plan Indicates That Sys May Be Operational as Early as Feb 1992 Provided No Obstacles Encountered During Hardware/Software Implementation ML1116610971991-08-30030 August 1991 Forwards Rev 3 to WCAP-11476, Handbook on Flaw Evaluation Kewaunee,Unit 1 Steam Generators Upper Shell to Cone Weld. Proprietary Suppl 1 to Kewaunee Unit 1 Steam Generator Upper Shell to Cone Welds Steam Generator... Withheld ML20091B6991991-07-25025 July 1991 Forwards Exercise Scenario Manual Minus Inject Messages Addressing Ingestion Pathway Objectives on Day 2 & 3 of 910924 Annual Emergency Exercise at Plant,Per NRC Requesting Advance Submittal of Exercise Objective.W/O Encl ML20073C2761991-04-0505 April 1991 Forwards Rev 2 to Security Manual,Reflecting Expanded Protection Area Boundary.Rev Withheld (Ref 10CFR73.21) ML1116610051990-10-0909 October 1990 Forwards Nonproprietary WCAP-12712 & Proprietary WCAP-12711, Reevaluation of U-Bend Tube Fatigue for Kewaunee Plant Steam Generators, Per NRC Bulletin 88-002 ML1116610071990-09-17017 September 1990 Requests Withholding of Proprietary WCAP-12711, Reevaluation of U-Bend Tube Fatique for Kewaunee Plant Steam Generators. ML1116506681990-08-17017 August 1990 Forwards Pages Inadvertently Deleted from 1990 Rev to Updated FSAR Submitted on 900720 ML20055C9811990-06-29029 June 1990 Forwards Response to Violations Noted in Insp Rept 50-305/90-04.Response Withheld (Ref 10CFR73.21) ML1116609691990-04-11011 April 1990 Requests That WCAP-12558 Kewaunee Steam Generator Tubesheet Crevice Indications Return to Power Rept, Be Withheld (Ref 10CFR2.790) ML1116609671990-04-0606 April 1990 Forwards Nonproprietary WCAP-12559 & Proprietary WCAP-12558, Kewaunees Steam Generator Tubesheet Crevice Indications Return to Power Rept, as Followup to 900328 Meeting. Proprietary Version Withheld (Ref 10CFR2.790) ML20012A4031990-03-0101 March 1990 Informs That Revised Listed Drawings Sent to Region III for Filing ML20006E8641990-02-19019 February 1990 Suppl Response to NRC 890725 Ltr Re Safeguards Info Violation Noted in Insp Rept 50-305/89-09.Corrective Action: Section V of General Employee Training Manual Security Removed ML1116609341990-01-15015 January 1990 Forwards Nonproprietary WCAP-12441 & Proprietary WCAP-12440, Presentation to NRC Re Kewaunee (Wps) SECY-83-472 LOCA Analysis Effort. Wiesemann 891204 Request for Withholding Also Encl.Proprietary Rept Withheld (Ref 10CFR2.790) ML20005D9601989-12-27027 December 1989 Forwards Response to Allegation RIII-A-89-A-0137.Encl Withheld (Ref 10CFR73.21) ML20005D8131989-12-22022 December 1989 Forwards Status & Proposed Schedule for Security Mod Completion.Implementation Schedule for Proposed Mods Extended Until Oct 1990 Due to Several Major Project Increases.Encl Withheld (Ref 10CFR73.21) ML20011D9111989-12-20020 December 1989 Forwards Executed Amend 8 to Indemnity Agreement B-53 ML19332E6091989-12-0404 December 1989 Forwards Rev 1 to Security Manual.Rev Withheld (Ref 10CFR73.21) ML1116609361989-12-0404 December 1989 Submits Application for Withholding of Proprietary WCAP-12440, Presentation to NRC Re Kewaunee (Wps) SECY-83-472 LOCA Analysis Effort, Per 10CFR2.790.Affidavit Supporting Request Encl ML20247J7721989-07-19019 July 1989 Forwards Rept for Unannounced off-hours Drills on 881020 for State of WI,site-specific to Zion,Point Beach,Kewaunee & Prairie Island Nuclear Power Stations.No Deficiencies or Areas Requiring Corrective Actions Noted 1999-08-23
[Table view] Category:PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA TO NRC
MONTHYEARML20213F7381986-10-0101 October 1986 FOIA Request for All Agency Documentation & Info Re Radioactive Gas Released at Plant ML19289D1481979-01-18018 January 1979 Co-intervenors' Request for 30-day Extension of Time to Respond to Applicant'S Motion for Summary Disposition.Svc List Encl ML19289C8661979-01-0505 January 1979 Reaffirms Intentions of co-intervenors Lakeshore Citizens & Safe Haven to Expedite Proceedings Re Storage of Spent Fuel. Intervenors Are Prepared to Negotiate Settlement Agreement ML19289C3511978-12-0606 December 1978 Requests Info Re Reliability of Neutron Absorber Plate Proposed for Use at Facility & Why This Info Has Been Classified Proprietary.Questions Licensee'S Request for Payment for Documents 1986-10-01
[Table view] |
Text
_ _ _ _ _ _
s GOVERNMENT ACCOUNTABILITY PROJECT 1555 Connecticut Avenue, N.W., Suite 202 Washington. D.C. 20036 (202)232-8550 Government Accountability Project i Midwest Office l
3424 N. Marcos Lane Appleton, WI 54911 (414) 730-8533 t
October 1, 1986 FREEDOM OF INFORMATION ACT REQUEST ERttuuM OF INFORMATON ACI REQUESI Director f0/A* N Office of Administration Nuclear Regulatory Commission
/d/7/[f Washington, D.C. 20555
=
TO WHOM IT MAY CONCERN:
Pursuant to the Freedom of Information Act (FOIA), 5 U.S.C.
552, the Go'ernment Accountability Project (GAP) requests copies of cny and all agency records and information, including but not limited to , notes, letters,' memoranda, drafts, minutes, diaries, logs, calendars, tapes, transcripts, summaries, interview reports, procedures, instructions, engineering analyses, drawings, files, graphs, charts, maps, photographs, agreements, handwritten notes, studies, data sheets, notebooks, books, telephone messages, comp-utations, computer runoffs, any other data compilations, interim l
and/or final reports, status reports, and any and all other records relevant to and/or generated in connection with any information known to the.NRC about Radioactive gas released at the Kewaunee nuclear power plant.
This request includes all agency records as defined in 10 C.F.R. 9.3a(b) and the NRC Manual, Appendis 0211, Parts 1.A2 and A.3 (approved October 8, 1980) whether they currently exist in the NRC official " working", investigative or other files, or at any other location, including private residences.
If any records as defined in 10 C.F.R. 9.3(b) and the NRC Manual, supra, and covered by this request have been destroyed and/or removed after this request, please provide all surrounding records, including but not limited to a list of all records which have been or are destroyed and/or removed, a description of the action (s) taken relevant to, generated in connection with, and/or issued in order to implement the action (s).
8611170080 661001 PDR FOIA DAUMAN86-724 PDR
. ~b-__-- - --
, (2)
GAP requests that fees be waived, because " finding the information can be considered as primarily benefitting the general public," 5 U.S.C. 552 (a)(4)(a). GAP is a non-profit non-partisan public interest organization concerned with honest and open government. Through public outreach, the Project promotes whistleblowers as agents of government accountability. Through its Environmental Whistleblowers clinic, GAP offers assistance to local public interest and citizens groups seeking to ensure the health and safety of their communities. The Environmental Whistleblower Clinic is currently assisting citizens groups, local governments and intervenors in the concern for safety at nuclear power plants.
W We are requesting the above information as part of an ongoing monitoring project on the adequacy of Region III and the NRC's efforts to protect public safety and health at nuclear power plants in the Midwest.
For any documents or portions that you deny due to a specific FOIA exemption, please provide an index itemizing and describing the documents or portions of documents withheld. The index should provide a detailed justification of your grounds for claiming each exemption, explaining why each exemption is relevant to the document or portion of the document withheld. This index is required under Vaughn v. Rosen (I), 484 F.2d 820 (D.C. Cir. 1973), cert. denied, 415 U.S. 977 (1974).
We look forward to your response to this request within ten working days Sincerely, Linda Bauman FOIA Coordinator Midwest Office