FLOWCHARTS 1

OF THE i

l BWR EMERGENCY PROCEDURE GUIDELINES i

,i OEI Document 8390-8 Draft Revision 4 AE

May 22,1986 I

i i

Prepared for i BWR Owners Group Emergency Procedures Committee and d

General Electric Company Uy 1 i  !

. Operations Engineering, Inc.

39510 Paseo Padre Parkway Fremont, California 94539 l jq. ; jf

,y j-e /c i

(als) 194-0770 I i K /:2 i I l 0,{[z42'f{ll1.#af0417PDR

{

7ycu7-10

. t OEI Document 8390-8 TABLE OF CONTENTS EPG Interrelationships . . . . . . . . . . . . . . . . . . . 1 RPV Control Overview . . . . . . . . . . . . . . . . . . . . .. . . 2 RPV Water Level Control . . . . . . . . . . . . . . . 3 RPV Pressure Control . . . . . . . . . . . . . . . . . 5 Reactor Power Control . . . . . . . . . . . . . . . . 9 Primary Containment Control Overview .. ..................... 11

. Suppression Pool Temperature Control . . . . . . . . . 12 Drywell Temperature Control . . . . . . . . . . . . . 13 Containment Temperature Control . . . . . . . .. . . 14 Primary containment Pressure Control . . . . . . . . . 15 Suppression Pool Water Level Control . . . . . . . . . 16

!!ydrogen and Oxygen Control . . . . . . . . . . . . . 19 Secondary Containment Control overview . ...................... 22 Area Temperature Control . . . . . . . . . . . . . . . 24 Area Radiation Level Control . . . . . . . . . . . . . 25 Sump / Area Water Level Control . . . . . . . . . . . . 26 Radioactivity Release Control . . . . . . . . . . . . . . . 27 Contingency 01: Alternate Level Control . . . . . . . . . 29 Contingency #2: Emergency RPV Depressurization . . . . . . 31 Draft Rev. 4AE i

s l

l OEI Document 8390-8 TABLE OF CONTENTS (Continued)

Contingency 43: Steam Cooling . . . . . . . . ... . . . 33 Contingency 44: RPV Flooding . . . . . . . . . . .. . .. 35 Contingency f5: Level / Power Control .. . . . .. . . .. 38 Contingency $6: Primary Containment Flooding .. . . . .. 40 ATTACUMENTS Attachment As Flowchart Abbreviations and Acronyms i

' l l

Draft Boy. 4AC 11

OEI Document 8390-8 i

i GUIDELINE INTERRELATIONSHIPS RPV CONTROL OUlDELINE I l Water Level l Pressure l Power l ( RC/L)  ! (RC/P) (RC/0)

A A A A A A l 7

j C3 Steam Cooling T

Cl Ir 1r Alternate Level C2 Control Emergency RPV Depressurtration

-? 7 T C4 RPV Flooding

{ A l 7 V~ YI C5 Level / Power Centrol T i V V V C6 Drtmary Cantainment Flooding A

L 4

PRIMARY CONTAINMENT CONTROL OUl0ELINE Suppression '

Prtmary Suppression Hydrogen Orywell 001 Temperature, Temper aturel Temcerature I Containment l Containment Poo1 Water Oxycen

, Pre:sure Level Ccncentration (SP/T) I (DW/7) t (CN/T) ,

(PC/P) l (SP/L) (PC/H)

I 4

SECONDARY CONTAINMENT RADICACTIVITY RELEASE

CONTROL OUIDELINE CONTROL OUIDELINE Area l Area l Area Offstte redtoactivity Temperature Roctation Level! Weter Level release

( SC/T) l (SC/R) l ( SC/L) (RR)

{

Draft Rev. 4AE 1

. e

! OEI Document 8390-8 RPV CONTROL Entry:

o Low RPV water level o High RPV pressure o High drywell pressure o Condition requiring scram, and reactor power > 3% or cannot be determined v

If not initiated, Initiate reactor scram I

Y Y T l Monitor and Monitor and fionttor and control APV control RPV control reactor l water level pressure power (RC/L) (AC/P) (AC/0) i l

1 Draft Rov. 4AE l

I

, e l

OEI Document 8390-8 RPV CONTROL RPV Water Level Control Concition Action 4

Initiate those which should have but did not: .

9 o l'Aletion oECCS oEDO

- I v

Restore / maintain RPV *CR/I*

water level between *0R/2*

LLSS and HLTS *0R/3e o Uw preferred systems o Augment with alternate systems l

f Y

jx P P .' s i

water level \'s".. " (opf;)

s rn.u n t e rm & Metntain RPV water ggfg

LLy level above TAF s s (OR/3)

I s I

. .: , T

. N

./ppy N i

'wate:r levei's' No '

l \ m Unf110'YJ ,

Exit to Cl l 'Ny2 TAF - ,-

/

N/

{ 1**3 4 e, T

ADS timer Prevent depressurtzation init otat

  • by recetting ADS timer Y

Cold Shutdown arruMure enteret from RC/P & Procets1 to Cold Shutawn

)

Draft Pov. 4AE 3

. e OEI Document 8390-8 RPV CONTROL t

RPY Water Level Centrol - Overrides Condttion Action OR/1:

l l

Any control rod not l inserted to/berond > Extt to C5 l MSSWP l OR/2:

RPV water tevel cannct be determined Exit to C4

, OR/3:

l l

l 3rimary ccntatnment irrespective of ACC, water level end termtnote injectton sus::restien ch!mber , into RPV from I cce::ure cannot te sources external to matr*11ned below DrImary contatnment

[ MPCWLL until below MPCWLL l

l l I l l 8

l i

l 1

i Draft Pov. 4 A1: 4

. e l OEI Document 8390-8

, RPV CONTitOL RPV Pressure Control Condition Action l

l SRV yg *0R/l*

cycling > InitleteIC *0R/2*

? *0R/3*

h *0R/4*

"O fienuelly open SRYs l a Y *0R/5*

Control RF V pressure wittr *0A/6*

Dypass valves; eugment *0R/7*

I with mMitional systems *0R/8*

(OR/1)

I' (CR/2)

I I l

Y Y Y (OA/3) i (OR/4) l All r:cs "

C50W I in:ertej shut down U

to/te/cnd Wlth no MSSWP I IU # bcron .ggjg.

I I l Depressurt c at (OR/1)

T Y Y , CR/2) cooltwn rete LCO (

(OR/3) l (OR/4)

! (OR/5)

_-Y (CA/6)

.  ! Inittete

LnutJewn cxling ! y shutdown (CR/7) l aging (04/8) l treeNx(s c!cer l l l 1 r

s Y

l 's j N

shi trwn s y,, j F ur thor'\. yg5 Continue croh);w n

< cnAing >.- orIS,wn '

, & with systems u911

.t e li ,nn t./ s r. ,:o ir a) -

for drore, ur :stten

/

.,h. ,,,, ' No 7

i ,_____.4 ,

__Y Y l All run CLB W in er tol of bmn I

to / te/crd M;gwp t hlMlat!

T y p f A tt to Cold

.' __$.hutchun pe._rs

. . _ . .twfor e..

Draft Pov. 4At 5

.f OEI Document 8390-8 l

RPV CONTROL RPY Pressure Control - Overrides Condition Actson Oil /1:

High DW pressure ECCS signal l

T Before trpressurizing Prevent in)% tion from telow LPCl/LPC5 > LPCI and LPCS pumps not me<. injectson pret ure required to 'isture ACC 0 14 / 2 :

Emergency APV Ccrc3:urization enticipated l

v All ran ins % Residly c: pre surize toe te cnr1M38WP ,j with byI ass valves I

i Oft / .5 E r ;rne, lapy I l :t: muritatmn re:wra1 l t =

l Y

un tron tr e numter cynunvumen

}

[s""gg_m y!"P Draft 14cv. 4At 6

OEI Document 8390-8 RPV CONTROL RPV Pressure Control - Overrtdes Condition Action l

0 11 / 4 :

RPV water level cannot be determined l

/

/

/ Les3

, than the number Y"3 > Ewit ta C2 of ADS SRVs ./

cpen /

? /

/

l N3 l Exit to C4 l OR/5:

Paul temo cannot te  ! Maintain RPV meWeinerj teicw HCTL *i pre:ture below HCTL i

t OR/6:

i

'm1 watea level canr,ot t e ~

t M aintain RPv m eintainol telow CAV iPLL

"{ crenure below SAV TPLL OR/ /.

l _.

ep-mmw..v ime

'; team Cwling is recuir(C Cast ft)C3 I.

I Draft Pov. 4Af; 7 i

OEI Document 8390-8 l

i RPV CONTROL RPV Pressure Control - Werrtchs l

Condition Actton DR/U:

Scrcn InJn: tion is requiral l

V Mein tenenter is evso. ore l

V I

? O Ind!Calton of Open MSivs to reestablish i 0 0rou f uel f ailure >

main condenser os heet sink o Stcom line Dres(

OR/9:

l

%wtcr is nat j Return to RC/P-2 t *.sti a n l

  • ( Terminate deressucitation)

I l

l l

I l

l l l l

l Draft Fev. 4At: 0

l OEI Document 8390-8 RPV CONTROL Reactor Power Control Condition Action

~

l Positton mode switch

  • 0R/1* l to SHUTOOWN
  • 0R/2*

l

. TO N e. ' M5:Vk \ s yes (OR/1) on line , >( ct n ,

Run back rectrc (OR/2)

N ,

N,/ .-

No { Na 4

Y Power \ Yet (OR/l) above > Trtp rectrc pumps (OR/2) 3%

?

No 4

  • (OR/l) f Intert controt roth (OR/2)

T Aextc.c canec: te , (ca/ )

thut cown tef 7e * (OA/2) rethingBili 9 Prevent auto A05

  • CR/3*

>; Inj tt baron i

I (OA/l)

(cn/2)

_ _ _ . _ _ _ _ _ _ .J I

I .I

/ N

/ 00ron \

- inleticn N Ho

( via

) M, lu) late RWCU h 4WCU

/.

o ,' l

' T (OA/1)

> InlKt C08W of boren (OA/2)

(04/3) l

.,....,_..t.. .-

Enit to 9:rnm Procedure

Draft Env. 4Al 9 l

OEI Document 8390-8 RPV CONTROL Reoctor Power Control - Overrides Condition Mtton OR/l:

All rods intr ted l Terminate baron

o/Devend NSBWP iniettion l

Y Exit to Screm Procedure OR/2:

Aecctor shut down with Exit to Scram

  • Procedure no toren inJccted .

OR/3:

SLC tvk wver level f y0;c to le* level limit > irto SLC pump:

L .- k Draft Fev. 4AE 10

l -

1

) OEI Document 8390-8 l

I PRIMARY CONTAINMENT CONTROL l

l j Entry:

1 o Hign suppression pool temperature j o High drywell temperature j o High containment temperature j o High drywell pressure ,

0 High suppression pool water level l

o Low suppression pool water level o HIgn ortmary containment hydrogen concentratton I

j Monitor end Monitor and j contral contral

suppression e y primary j pool contatnment j temperature pressure
(SP/T) (PC/P) i I

i Monttor and Monitor end control centrol  !

suppression 4

drywell c  ;

pool water l temCersture j level

( OW/T)

! (SP/L) i Monitor and Montter and control controf l

contsinment 4 , c hydrogen l temperSture and oxygen l

concentration l

(CN/f)

(PC/H)

I r

! Draft Rev. 4AE 11 f

OEI Document 8390-8 PRIMARY CONTAINMENT CONTROL Suppression Pool Temperature Control Condition Action Control pool temperature below LCO ustng evelleble pool cooling l

v Pact temcerature cannot m Operate all eveilable

te maintaired Delow LCO pool cooling l

Y Befcre rerhing Bili e Enter RPV Control OL i

end execute concurrently i

T

, g! 'emce 3ture end EMERGENCY RPV e . ;res:u e arrct te

- ,. . - ,' ~ ~ 31 n t y ,," DEPRESSURIZATION

~ "'if. ] L 7,.

IS REQUIRED l

l Draft Rev. 4AE 12

OEI Document 8390-8 PRIMARY CONTAINMENT CONTROL Drywell Temperature Control i

Condition Action Control DW temperature using eveilable DW coolers l

e i

v DW temperature cennot be Operate all available maintained below LCO (or > DW cooling max r,crmal temp) l Y

Befcre reaching ADS quehf tcation (cr DW cesign) temp I

T

/^\

l . ' Within

.'\ SDre/

limits /

Yes Initiate DW Sprays, ACC permitting

's. o N

N/'Nc I

l 4 Y

DW temo cannet be maintained telcw EMERGENCY RPV

  • P ON (cr DW mstgn) temp IS RECulRED .

l m

Enter RPV Contro10L and execute concurrently i

Draft Rev. 4AE 13 ,

l

1 OEI Document 8390-8 PRIMARY CONTAINMENT CONTROL 5

Containment Temperature Control Condition Action i

Control CNT temperature

, using evailable CNT cooling I

I T

CNT temp cennot be m Operate all eveileble i maintained below LCO CNT cooling l

l

. y

, Sorore reecning

CNT cesign temp l

Y f'

/ / ove Ab Yes Mk 111 m Operate SP spreys,

=

CSiPL

/ ACC permitting

' ,/

N,-

IM s,

j l l

T l CNT temp cannot be EMER0ENCY RPV maintainec below  : 5 DEPRESSURIZATION CNT cesign temp IS REQUIRED 1

1 Enter RPV Centrol 5 -

GL and execute concurrently i

Draft Rev. 4AE 14 -

{

OEI Document 8390-8 PRIMARY CONTAINMENT CONTROL l Primary Conteinment Pressure Control

) Condition Action i

.1 Control primary containment l pressure below scram setpoint using o CNT pressure control sys oSBOT o DW purge j

v i Operate SP spre/s, Before PSP /SCSIP j ACC permitting l

! T 5 Operate DW spreys, Abwe SCSIP ACC permitting

'l l

l 1 Y EMERGENCY RPV Cannot maintain  ; ] DEPRESSURIZATION below psp -

4 IS REQUIRED 1

1 f

v Before PCPL Vent primary containment l

l l

l T Cannot maintain _ m Operate SP spre/s, j

, below PCPL irresp. of ACC '

4

, Operate DW sprays, irresp. of ACC Draft Rev. 4AE IS i

i f

OEI Document 8390-8 PRIMARY CONTAINNENT CONTROL I Suppression Pool Water Level Control Condition Action Maintain between *0R/1*

i high and low LC0 l

I v

Maintain above HCLL b L

, s i

! 1r Cannot maintain m EMERGENCY RPV ebove HCLL DEPRESSURIZATION IS REQUIRED l

m Enter RPV Contro1 GL 1 and execute concurrently

! I l

m MSintain aDove

! ' HPCI exhaust i

Y Cannot maintain Secure HPCI ICR/I)

>l j 20we HPCt irresp. of ACb exhaust I i

I

! e Draft Rev. 4AE 16 i

i

OEI Document 8390-8 PRIMARY CONTAINNENT CONTROL Suppression Pool Water Level Control Condition Action 1

T Cannot maintain

) below high LCO O Maintain below SRV TPLL i

i i

T Cannot maintain m Enter RPV Control GL

below SRV TPLL and execute concurrently 1 i V

Terminate injection Cannot maintain -

' from externel sources, below SRV TPLL ACC permitting i

i

?

Cannot restore / .

EMERCENCY RPV

, maintain belcw 5 DEPRESSURIZATION i SRV TPLL IS REQUIRED l

4 l , d Maintain below - l l vec breekers l  !

4 ,  !

Y nno mamtam

y Terminate DW sprays below vac breakers i Terminate injmtien

> from sources external to PC irreep of ACC f

m Maintain below MPCWLL

, I i'

Y Cannot maintain Terminate injection

! below MPCWLL

  • from sources external
to PC trresp of ACC l

Draft Rev. 4AE 17 1

l

OEI Document 8390-8 PRIMARY CONTAINMENT CONTROL Suppression Pool Water Level Control - Overrides Candition Action OR/1: ,

Primary Containment Flooding is reautred Exit to C6 l

l l

l Draft Rev. 4AE 18 l

l l

s '

1 1

OEI Document 8390-8 l PRIMARY CONTAINMENT CONTROL Hydrogen and Oxygen Contr01 8 Condition Action i

H2reaches min. detectable I

/

/

Release g

! rate to be N Yes *0R/l*

l below > Vent and purge PC *0R/2+

3

\ LW s ,

i

  • 0R/3*

N0 i

l i 1  ?  ?

i (OR/1)

Control WW H Control DW H2 below 6% end below 6% and NU 02 below 5% 02 below 5%

l with recombiners wHh mixers and recombiners

! I I i

7  ?

?

l WW cr DW W reaches 6I .

Secure mixers (CR/l) and WW cr DW 02 is aDave 5% end recombiners (OR/2)

EMERGENCY RPV O DEPRESSURIZATION

, IS RECulRED l d Enter RPV ControlGL end execute ccccurrently i

Operate SP/DW spreys, *0R/4*

, m 4 '

ACC permitting 0

m Vent and purge PC, (OR/1) irresp. of release rate (OR/2) t WW or DW H, not restored /

meintained below 6%, and Operate SP/DW spreys, (OR/4) m  ;

WW cr DW 02 nct restored / "

irrespective of ACC '

maintained below 5%

i Draft Rev. 4AE 19 I

i

OBI Document 8390-8 PRIMARY CONTAINMENT CONTROL ffydrogen end Oxygen Control - Overrides Condition Action OR/l:

H, or 0, monitoring j sample DW and WW

$ stem' unavailable for H2and 07 OR/2:

DW or WW H2 cannot i be determined to a

be below 6%

l V

l DW or WW 0, cannot EMERGENCY RPV be determiiied to e > DEPRE55URIZAilCN be below 5% IS REQUIRED ,

p Er.te- RPV Control GL and execute centurrently I

I

! Secure mixers m l and recom b:ners t

, Ven* and purge PC, trres cf release rete I

Y OW end WW H 2 determined to be below 6% or DW and > Secure PC vert and purge WW 09 determined to be'below SZ Draft Bev. 4AE 20

O

. o OEI Document 8390-8 PRIMARY CONTAINMENT CONTROL Hydrogen and Oxygen Control - Overrides Condition Action I

OR/3:

Release rete reaches LC0 Isolate PC vent and purge OR/4:

DW/SP sprays initiated T

WW pressure below high DW pressure > Terminate SP sprays scram setpoint Y

DW pressure belcw serem setpctnt e.rm mate DW som/s l

i Draft Rev. 4AE 21

OEI Document 8390-8 i

! e SECONDARY CONTAINMENT CONTROL i

Entry: Secondary Containment conditions as follows o High differential pressure o High eres temperature o High HVAC cooler differential temperature o High HVAC exhaust radiation o High eres radiation a High sump water level o High eree water level f

4 l;

l V v v

  • 0R/1* *0R/1* *0R/!*

Monitor and Monitor end l

  • 0R/2* control *0R/2* Monitor and *0R/2+

t control control containment containment enW t

radiation contelnment I temperature er M (SC/T) mfg I{CIS )

I

~

Draft Rev. 4AE 22

l l

l l

I

! OEI Document 8390-8 1

l SECONDARY CONTAIN11ENT CONTROL Overrides Condition Action UR/ l:

! SC HVAC exhaust Confirm / initiate radiation level exceecs > SC HVAC isolation i isolation setpoint l

l m Confirm / initiate SBOT i

OR/2:

SC HVAC isolates Y

Restart SC HVAC, SC HVAC exhaust defeat high DW pressure redtetion level telow isolation and b W wate." bel e p r., isoleticn interlocks if necessery Draft Rev. 4AE 23

j . .

i OEI Document 8390-8 SECONDARY CONTAINMENT CONTROL Area Temperature Control 4

Condition Action i

! Operate coolers 1

i 9

SC HVAC exhaust radietton level below  : Operate SC HVAC isolation setpoint L

l .

1 Y isolate systems that are Any area temperature m d1Scnerging*Into the area, above MNO temperature "

reactor shutdown, ACC, and

) fire suppression permitting

?

I  : l i

V _

! MSO temperature

exceeded in more then i Shut down the reactcr j one area

! r 1

f t

i Primary system discherging into

secondary contatnment l

V Enter RPV Control i

3 Befcre reaching MSO j temperature in any area Ot. and execute concurrently i

I l l

s

?

i MSO temperature ENER0ENCY RPy exceeded in more O DEPRESSURIZATION

{

l i than one area IS REQUIRED I

e l Draft Rev. 4AE 24 I

1 i

'.___._ _ , . _ _ _ _ - . _ , . _ _ _ _ . . . _ _ _ _ _ _ . _ . _ _ _ . . . . _ _ , . . . . , . , _ . _ . , , _ . . - . . . _ . . . _ . _ . _ _ _ _ _ , _ _ . _ _ _ , __._..._-m_...

i i

4 .

OEI Document 8390-8

, SECONDARY CONTAINMENT CONTROL i

Area Radiation Level Control I Condition Action t

4 Isolete systems that are f Any area radiation j m discharging into the cree, level exceeds MNO '

i reactor shutdown, ACC, and radiatton level fire suppression permitting

. l ,

7 1

Y MSO radiatton level 1 exceeded in more then 5 Shut down the reactor

' one area I f

T

Primary system

} discharging into y secondary containment i

{ r t n - Enter RPY Control OL

' end execute concurrently level in any aree

! i 1

! l i

v f i150 radiaticn level EMER0ENCY RPV i

exceeded in more & DEPRESSURIZAIl0N l than one area IS REQUIRED i  !

4 f

I I

1 i l 1

i a

Draft Rev. 4AE 25

._ ________ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ . , _ _ _ _ , - , _ _ _ _ _ . _ . _ . . - . _ . _ . = _ _ - - _ .

+

  • i i

! OEI Document 8390-8 SECONDARY CONTAINMENT CONTROL Sump / Ares Water Level Control i Condition Action Any sump / area Operate eveilable m

water level above '

sump pumps MNO water level l i I

t v

j Any sump / area water , Isolate systems that are level cannot be restored m discharging into the area,

! and maintained below reactor shutdown, ACC, and MNO water level fire suppression permttting

]

l '

t i

l I

j MSO water level j exceeded in more than

  • Shut Down the reactor one erea j

i t

?

Prime 7 system discher ging into

{ secencary centainment l

1 1

1, 9

' * * ' "9 l ,r Enter RPV Centrol OL level in eny eres and execute concurrently f

I i y

! M50 water level EMER0ENCY RPV

! exceeded in more O DEPRESSURIZATION

' thar1 one erea IS REQUIRED i

}

i i

I i

  • Draft Rev. 4AE 26

! I 1

Il

.. - -, ~ ,., - ..- , - -, . . - , - . - .. - .. -.- - - . _ , - . _ - , , , . _ , - . .

- - - - - - - ' - - - ~ - - - - - - - - - - - - - - - - --

  • d l

l l

OEI Document 8390-8 RADIOACTIVITY RELEASE CONTROL Condition Action isolete primery systems *0R/1*

discharging outside the Entry. primary and secondary o Offsite radioactivity > containment except releese rete above systems required to A!ert release rate o essure ACC o shut down reactor i

Y Cffstte releese ra's e Generel Emergenc/

release rate l

Y I

Primary system EMER0ENCY RPV (CR/l) cr ar 3. .d n '/

DEPRESSURIZATION

, ccntatr. ment m

Enter RPY Control OL and execute concurrer.tly l

l Draft Rev. 4AE 27

)

OEI Document 8390-8 RADIOACTIVITY RELEASE CONTROL Overrides Condition Action OR/1:

r Turbtne Building Restert Turbine Butiding H#C thut down & HVAC; defeat isolation

[ or isolated) tnterlocks if neces:ary Draft Rev. 4AE 28

OEI Document 8390-8 CONTINGENCY "I Alternate Level Control Candition Action Entry from RPV m *0R/I*

Centrol OL (RC/L)

- Initiate IC *0R/2*

  • 0R/3*

^

T '0R/4*

Maximize inlection with 2 *0R/5*

or more subsystems i

Y l RPV ;R ESSUR E ,

l LOW j HIGH /ny A

/ subsystem No Start pumps in alternate '

inj ecting f' injection Subsystems l

YeSh

/ < cR /.o (CR/5)

Y RPV water level dr00s to TAF I

a

^Y No d STEAM COOLING 15

' C

/ ] REQUIRED

/ EMERGENCY RPV RPV oressure i Yes y DEPRESSURIZATICN 15 l LOW REQUIRED '

, i .

i Y J Maximize injection witn m ' )

] all systems / subsystems (OR'2)

(OR/I)

Y (0R/4)

RPV neter level EMER0ENCY RPV (CR/5) c:e: :a ;AF  : 5l DEPRESSURIZATION 15 REQUIRED ,

d Maximize injection with ' (CR / ;

IC4#2)

] ell systems /suusystems (OR/3)

Y (OR/4) l RPV water level (GR/5) cannot De restored /  : PRIMARY CONTAINMENT maintained above TAF l FLOODINO IS REQUIRED l

Nl: Exit to C6 l l!

Draft Rev. 4AE 29 l l

OEI Document 8390-8 CONTINGENCY *1 Alternate Level Contr01 - Overrides Condition Action 1

OR/1; i .

l Any control rod not l inserted to/beyond > Extt to C5 l MSBWP OR/2; I  !

RpV water lesel ,

cannot te determined "

OR/3:

, RPV wa:er level inc eastrg - Exit to RC/L lt OR/4:

! RPy wete- level crcas below auto y P revent auto l initiation of ADS ADS setoo:nt l

OR/S Cannot maintain Terminate in). : tion below MPCWLL from sources externai to PC trresp. of ACC Draft Rev. 4AE 30

OEI Document 8390-8 CONTINGENCY '2 Emercyncy RPV Depressurization Condition Action Entry from RC/P, C3 i

Y f o All control rods to/beyond MSBWP, or l0 In etion terminated and prevented i

Y

/ '

/ High Prevent in;ect:en

/DW pressure \Yes , from LPCS cnd LPCI ECCS signal pumps not recutrec exists to essure ACC I

Y

>l Inittate IC l l

l

/SPWL

/ 3bove top a Ye3

\ SRV dischargej k Open all ADS valv5 N device

?

No m s,

Y I - At .

I

'Ist the Rapidly ae;;ressurice j number of No h

RPV using cther l

'N ADS SRys systems, defeat I

'\ 0;:en interlocks if rewirM j f

y r

o All control rrxM to/beyond MSBWP, or Exit to RPV o CSBW of boron injected, or & Control OL l *0R/1*

o Reactor shutdown and no boron injected at RC/P-4 I

I Draft Rev. 4AE 31 t

OEI Document 8390-8 I

CONTINGENCY '2 Emergency RPV Depressurization - Overrides Condition Action OR/1:

RPy water level cennot

> Exit to C4 be determined f

i t

i Draft Rev. 4AC 32

OEI Document 8390-8 CONTINGENCY #3 Steam Cooling Condition Actton Entry from RC/P > Confirm initiation *0R/1*

cfIC l

v IC cannot be initteted I

v RPY water level Open min SRys drecs to Min Z-1 &l recuired for Steem(OR/1) l Cooling l

I -

y RPY pressure crops to MSCP q[ Exit to C2 Draft Rev. 4AE 33

I '

OEI Document 8390-8 CONTINGENCY #3 Steam Cooling - Overrides Condttion Action OR/l:

Emergency RPV Depressurizatien >

ts recuired RPV water level cannot be determined 5 > Exit to C2 Any System, rubsystem, alternate injection >

SubWstem evolleble l l

l l

l Draft Rev. 4AC 34 l

l l

OEI Document 8390-8 CONTINGENCY "4 RPV Flooding Condition Action Entry from RPv Control GL ( RC/L .

RC/P ), C1, C2, C5 l

./g j j's q,/ rciu 's'u ,

J Terminate injection

  • 0R'2'

.OR/2*

\? / ,

[

\/y ,. , i y

RPV premre below MAAFP t

t

' At'N l ' le25t N(yes (opfg)

N 3 SAv: / > teclete steem lines (OR/2)

N caen .

\

S k I'0 Sicwly reestabilsh (OR/1) and incree e injection (OR/2) o Preferred systems o Other systems k

7 j At 3

, , Iert '

1 SRV c.;er' \

N No Exit to C6 and

\ and CPV prezure , b RC/P-4 (CR/2)

, \ cove 9 MAUP/

x -

v Yes Thrcitle injection to

%l maintain condittons i

i Y

All rocs in to/ beyond MSBWP I

>Q Draft Rev. 4AE 35 l

l l

=

l OEI Document 8390-8 l I

CONTINGENCY "4 RPV Flooding Condition Action

/

/

Yes (OR/1)

/ SRVs > isolate steam lines open j/ (04/2)

?/ &

'No Y Commence and (CR/1) increase injection (OR/2)

,/HPCS ye3 with motor-driven

' or motor . tnjection systems FW7/

[

j

>,no T i I

3

  • SRys cpen and above Na Exit to C6 and j > RC/P- 4 titn RPV FP/

Yes

  • l Tr.rcttle injection to OS/I)

((OR/2) l maintain condittens i

(

T Level able to be determinej l

Y Ab \

ppy p g 7 Re0 ace water level q i

Level yg No '/ indication within -

  • Exit to RPV Contrel OL ( RC/L, RC/P) f1CUTL 7

Draft Rev. 4AE 36

0

  • s l

OEI Document 0390-8 CONTINGENCY "4 RPV Flooding - Overrides Condition Action OR/1:

RPV water level can te deterr.ined I

y

,'\

N Exit to CS

\rN in?. j '

N,'-

m Exit to RPV Control OL, Step RC/P-4 Exit to RPV Contr01

>- OL, Steps RC/L and RC/P-4 OR/2:

I Terminate injection i Cannot ma:ntain l l Delcw MPCWLL from sources externel l to PC trress of ACC i

I Draft Rev. 4AE 37

1

- 1 l , .

i l 1

i On had 83W8 '

CONTINGENCY *5 Level / Power Control Mte 4

  • 0R/l*

{$

Entry from RC/L, C1, C4 *0R/2*

  • 0R/3*

j hI a

p poo (OR/1)

' Lower RPV

,!above Yes temp Yes SRV Yes water level by

-~

f0 downscalef eDove

]n terminating 4  ;

4 trtp/ Bili injection 1  ?,-

j ' No No No y 9 No jt) essurgYes 4

above f i i

xrem/ '

J

?

T T T

! Pawer i SRVs closed arc DW pressure below Level at i below 3'? l TAF

! scram setpoint i

, *0R/ i*

? 9 T C Maintain RPV water *0R/5*

I '

level in range (OR/1)

, (CR/2) i  ? (OR/3)

) ,7 s i Les el N

! EMERGENCY RPV i A maint31radh Na

. , , O DEPRESSURIZATION

'\. s%(/ y, (A IS REQUIRED

\ T > Terminate inlectton (CR/1)  !

! 1 03 (OR/2) l

I

{ , (OR/3)  :

i T [

l RPV pressure

]  ; Reesteblish and slowly (OR/1)  !

j ,

j telow MARFP ,

increese inlection (OR/2) t j

l 1 (OR/3) l l

l (OR/4) .

j / I I

I

/ Level

/ maintained .No I l above O Exit to C6 i

I i MSCWL j  ? -

l Yes j T c Proceed to cold j shutdown 1

] Draft Rev. 4AE 38 4

i

081 Document 8390-8 CONTINGENCY *5 Level / Power Control - Overrides Condition Action OR/1:

RPV water level g gg j cannot be determined OR/2.

f All ccntrol rods inserted m Exit to RPV Control

tc/tevend M5BWP OL at Step RC/L OR/3

! Cannot maintain Terminate injection frcm

! below MPCWLL i sources external to PC I

trresp of ACC OR/4:

Eme pnw RPV i 3

De:ressurization 5 l

requlred 1-Continue at(3 i t

I OR/5.

%wer aDave

ewn5cale tria I

T

, RIV Water level t atse TAF I

T f' cal ternperature aDove Bili l

I J Y Y SRV DW pressure above open scram setpoint

! I T T f Continue et h Draft Rev. 4AE 39

1 l

OEI Document 8390-8 CONTINGENCY "6 Primary Containment flooding Condition Action Entry from SP/L, *0R/1*

C1,C4,C5 5 initiate SPMS *0R/2+

l V

Operate injectton (CR/1) systems with suction (OR/2) external to PC l

V I(OR/1)

Inject with PC fill systems (OR/2) l V

PC water levei l l rehes recirc cicing Yent RPV l

Y

?C water level Ma'ntain PC water 'df rernes TAF elevaticn

  • 1evel Detween TAF elevation and MPCWLL Draft Rev. 4AE 40

4

.OEI Document 8390-8 CONTINGENCY '6 i Primary Containment Flooding - Overrides J

Condition Action OR/1:

Cannot maintain ,

Terminate injection from sources external to PC below P1PCWLL frresp of ACC t

.I OR/2:

RPV water level can be .

restored / maintained m -

Exit to RPV Controf GL ebove TAF et RC/L i

)

iI i

i i

i 1

i 1

< \

i l

l Draft Rev. 4AE 41 i

l I

f 4

.m.m--v. , _ . . - - y , . , - . . . . . . . . _ _ . . . .r,. _ . . _ . . ,_ -

._,,_,-,.--_.---.c .

, . s OEI Document 8390-8 --

ATTACBMENT A: --

FLOWCHART ABBNEVIATIONS AND ACRONYMS 1

o' 4

4 m

W t;

v g J

?- --

i OEI Document 8390-8 Attachment A I

' ,b J'- FLCWCHART ABBREVIATIONS AND ACRONYMS ACC -

adequate core cooling i

j ADS -

Automatic Depressurization System BIIT -

Boron Injection Initiation Temperature

+, .

    • ~ ',.

.~ CNT -

Containment (Mark III) l CSBW -

Cold Shutdown Boron Weight CSIPL -

Containment Spray Initiation Pressure Limit DW -

drywell ECCS -

Emergency Core Cooling Systems EDG -

Emergency Diesel Generator i FW -

Feedwater i

GL -

Guideline f

.HCLL -

Heat Capacity Level Limit HCTL -

Heat Capacity Temperature Limit HLTS -

' High Level Trip Setpoint

.HPCI -

High Pressure Coolant Injection HPCS -

Hight Pressure Core Spray HVAC -

Heating, Ventilating, and Air Conditioning IC -

Isolation Condenser LCO -

Limiting Condition for Operation LLTS -

Low Level Trip Setpoint LPCI -

Low Pressure Coolant Injection LPCS -

Low Pressure Core Spray 1 MARFP -

MMinimum Alternate RPV Flooding Pressure I MCFI -

Minimum Core Flooding Interval MCUTL -

Maximum Core Uncovery Time Limit Draft 4AE A-1 7

~--

> s ,

9 OEI Document 8390-8 Attachment A FLOWCHART ABBREVIATIONS AND ACRONYMS l (Continued)

Min RPV FP - Minumum RPV Flooding Pressure Min Z-I -

Minimum Zero-Injection RPV Water Level MNO -

maximum normal operating MPCWLL - Maximum Primary Containment Water Level Limit MSBWP -

Maximum Subcritical Banked Withdrawal Position MSCWL - Minumum Steam Cooling RPV Water Level MSCP -

Minumum Steam Cooling Pressure MSIV - Main Steam Isolation Valve maximum safe operating MSO -

i PC - Primary Containment PCPL -

Primary Containment Pressure Limit

. Pwr -

power PSP -

Pressure Suppression Pressure RPV -

Reactor Pressure Vessel RWCU - Reactor Water Cleanup SBGT - Standby Gas Treatment SC -

Secondary Containment SCSIP -

Suppression Chamber Spray Initiation Presssure i

t SLC -

Standby Liquid Control

SP -

suppression pool SPMS -

Suppression Pool Makeup Sysetem SRV -

safety / relief valve TAF -

top of active fuel temp -

temperature TG -

turbine generator Draft 4AE A-2 i

,..s OEI Document 8390-8 Attachment A FLOWCHART ABBREVIATIONS AND ACRONYMS (Continued)

TPTL - Tail Pipe Temperature Limit WW -

wetwell l

l i l Draft 4AE A-3 l 1

l l

~-v I

.3 ENCLOSURE 1 VERMONT YAS F E CONTAINMENT SIUDY Y RESiONSE TO NRC REQUEST FOR ADDITIONAL INFORMATION QUESTION 1 What is your estimate of the overall uncertainty of conditional containment failure probability and its basis?

RESPONSE

The scope of the Vermont Yankee conditional containment failure probability evaluation was defined to provide a "best estimate" value for the containment conditional failure probability. Because of this scope, a quantitative uncertainty evaluation was not performed. In fact, a comprehensive uncertainty evaluation of the containment conditional failure probability has not been performed in any published BWR PRA.

Current on-going work by the NRC in the NUREG-1150 Program and other programs (e.g., MELCCR) may provide greater insights into this area.

The NRC state:ent from Page 3 that "the licensee's estimates appear optimistic considering the uncertainties..." is not appropriate. The containment conditional failure probability point estimate was derived using a realistic "best estimate" analysis, reflecting the best information available. This estimate, therefore, is considered neither

>ptimistic nor pessimistic. The statement also implies an attempt to chose optimistic outcomes during the core melt progression. On the contrary, an attempt was tr.ade to use both IDCCR and NRC developed codes and assumptions to provide a balanced assessment. The outcome of that assessment is presented in the Vermont Yankee Containment Safety Study as the "best estimate."

, , , jJ.G/C

[C S d K//

5:0.R

- J

. --v

. T QUESTION 2

'a'ha t is the effect on core damage frequency when accident sequences TPUV, TPQUV, T PQX, T O ' , are nc u e n e dominant E E m ace; dent sequences based on reduced battery life, the number and type of SRVs compared to Peach Bottom, and on the CCFP? (Note: The question originally included T,QUV and not T,PQUV; however, since the question appears to be directed at stuck open valves, we believe it should have been T,PQUV.)

RESPONSE

There are a number of considerations associated with stuck open relief valves leading to accident sequences. These sequences could potentially be of sufficiently high frequency to result in a change in the character of the dominant sequences in a plant-specific analysis. However, many of these considerations were examined in the Vermont Yankee evaluation. A discussion of each item follows.

o Type of SRVs Both Vermont Yankee and Peach Bottom have Target Rock three-stage relief valves. This is identified on Page A-4 of the Containment Safety Study. Because the designs are the same no change was made to the surrogate plant quantification for stuck open relief valves (50RVs). In addition, the Vermont Yankee experience with their modified three-stage SRVs is substantially better than that for Peach Bottom. Therefore, the Vermont Yankee plant is less susceptible to the postulated SRV failures than those from the surrogate plant.

o Number of SRVs The number of SRVs is different between Vermont Yankee and Peach Bottom. This is identified on Page A-4 of the Containment Safety Study as follows:

1 5104R l

.. f I

No. SRVs No. ADS Total Valves

[ Peach Bottom 11 5 Vermont Yankee 4 4 j

j There are two effects which could impact the sequences identified by the NRC:

1

  • j - The smaller number of SRVs results in a lower likelihood of an 1

j Inadvertent Open Relief Valve (IORV) given a13 other considerations are equal. This would reduce the frequency of sequences such as T QUV g ,

I, i

- The smaller number of SRVs should also have a similar impact on the SORV conditional failure probability. This is because more j SRVs could be called upon to operate following a transient at

) Peach Bottom than at Vermont Yankee.

I

} Therefore, the smaller number of SRVs would appear to reduce the f impact of the sequences identified by the NRC. However, these 1

l censiderations were not factored into the Vermont Yankee

! quantification.

o Secuence Considerations 1

f The IPE methodology treats similar sequences together. Specifically,

! the IPE methodology bins together accident sequences caused by an 10RV and those which result from a transient induced SCRV. Therefore, the l Vermont Yankee Containment Safety Study includes sequences from both j these categories. The sequences are labeled as T QUV 7 in the Vermont i Yankee study and appear in Class ID. The TgQUV sequences in the i Vermon: Yankee Study include:

I f

i T gQUV j -

T PQUV C

TMPQUV t

l 5104R

]

1 1

l 1

j

a f TTPQUV TFPQUV Therefore, these sequences are addressed as suggested bv the NRC.

Please refer to the BWR IPE methodology for further discussion of this binning scheme.

t o Station Blackout Sequences T PQUX. T E E The BWR IPE methodology addresses these specific issues on Pages 4-42 through 4-44 The conclusion from the BWR IPE is that sequences of this nature have frequencies in the range of 3E-7/yr. The NRC is correct that these sequences should be reassessed for Vermont Yankee and shown in the tables summarizing the accident sequences. This reassessment for Vermont Yankee indicates that a f requency of approximately SE-8/yr should be added to that reported in the Vermont Yankee Containment Study for the total core melt frequency and for Class IB. This increase represents an increase of:

0.16% for total frequency 0.S1% for Class IB This would not alter the qualitative or quantitative cenclusions of the evaluation, o Reduced Battery Life The battery life used for Vermont Yankee is judged to be equal to or greater than that used for Peach Bottom and not to be a factor in the assessment of any of the sequences identified by the NRC.

o Recovery of RHR Pumps (TPW)

TPW sequences are long-term loss of containment heat removal sequences. These sequences can be effectively mitigated by any containment heat removal pathway, i.e.:

l 5104R I

l

e

- f RHR Main condenser Containment venting It can be shown that whether an SORV exists or not would have little or no impact on the course of this particular sequence. Therefore, the consideration of TV sequences is sufficient to account for the frequency and source term impacts associated with TPW sequences.

4 5104R 1

)

1

a f QUESTION 3 Given that the national average value for frequency of loss of off-site power is on the order of 0.22/yr, justify on the basis on the Bayesian estimate that the frequency of loss of off-site power at Vermont Yankee is 0.07/yr.

t

RESPONSE

The Containment Safety Study conservatively estimated the frequency of loss of of f-site power as 0.07 events / year based on Vermont Yankee's record of having no total loss of off-site power events in over 14 years of operation. In Appendix D of the study, " Evaluation of Vermont Yankee's Electrical Power System Capability Relative to Station Blackout," we estimated the frequency of total loss of off-site power using the NRC's f

recommended methodology in NUREG-1032, " Evaluation of Station Blackout Accidents at Nuclear Power Plants." Using the NRC's methodology, the frequency is 0.05 events / year.

The NRC states that industry average value for loss of off-site power is 0.22 events / year without providing the reference. NUREG-1032 states that the frequercy of loss of off-site power is about 0.1 events per year and in Table 3.1 provides a summary of the data on total loss of off-site power events through 1953. Table 3.1 indicates that the frequency of occurrence of loss of off-site power is 0.088 events / year.

We also disagree with the statement that the Vermont Yankee frequency of loss of off-site power should be adjusted using Bayes theorem. Again, NUREG-1032 states " design characteristics, operational features, and the location of nuclear power plants withir. dif ferent grids and meteorological areas can have a significant effect on the likelihood and duration of loss off-site power." Thus, site-specific analysis and site experience j provides a more accurate estimate of frequency of loss of off-site power than generic or average data. The estimate used in the Containment Safety Study of 0.07 events / year is more conservative than the f requency as calculated using NUREG-103: and does not deviate significantly from industry experience of about 0.1 events / year.

6-110aR

, e.

QUESTION 4 Verify that the total battery capacity available at Vermont Yankee is greater than 2,175 ampere-hours, and that it could be maintained at a voltage greater than 1.75 volts / cell in high ambient temperature during the accident for six to eight hours.

f

RESPONSE

The Class 1E 125 volt station batteries consist of two 2,175 ampere hour station batteries and one 330 ampere hour station battery (all ratings at the eight hour discharge rate). In addition, a non-Class 1E Alternate Shutdown System battery rated at 495 ampere hours is available to supply the RCIC System loads. Therefore, the total 125 volt system battery capacity is 5.175 ampere hours.

We have conservatively calculated the de load requirements and have 1

included motor inrusa currents. Our calculations indicate that the re, quired load can be supplied for eight hours with the available sources of battery capacity with cell voltage remaining greater than 1.75 volts / cell.

The ambient temperature for the batteries is not expected to increase at all during the station blackout scenarici however, if the tempersture did increase, the effect would be to increase battery capacity not reduce it.

, In additien, note that a battery rated at 2,175 ampere hours at the eight hour discharge rate can supply 271 amperes for eight hours, 603 amperes for three hours,1,221 amperes for one hour, or 2,660 amperes for one i

minute. In a battery calculation a load profile is created for the required duty cycle. For each interval in the duty cycle, the battery discharge is calculated and the calculation verifies that the battery can support the lead profile for the entire duty cycle.

l 1

~7-5104R l

e s CUESTION 5 How of ten are the RHR/RHRS'd interconnecting valves actuated to assure that the valves work properly?

RESPONSE

4 The RHR/RHRS'd interconnecting valves are stroked mcnthly ("RHR Valve Operability Surveillance," OP-4124) to assure that the valves work properly.

.q.

5104R i

. 6 Qt'ESTION 6 How often are the interecqnecting valves between the RHRSW and the Fire Protection System (fire pu=ps) actuated to assure that the valves work properly?

RESPONSE

The interconnecting valve SW-8, between the Fire Protection (FP) System and Service Water (SW) System is tested annually (" Surveillance of FP Equipment," OP-4020 Page 45). All other interconnecting valves between the SW System and the RHRSW/RHR crosstie valves are normally open.

5104R l

e I

t ,

I  !

I QUESTION 7 How readily can the MSIVs be reopened following closure at operating conditions? What interlocks must be bypassed and how complicated are the procedures (e.g., Must the differential pressure across the MS1Vs be reduced for the valves to be reopened?)?

RESPONSE

l

a. How readily the MSIVs can be reopened is determined by both the cause for MSIV isolation and by present overall plant conditions. The MS1Vs are closed upon any of the following conditions:
1. Rx Low-Low Water Level - 82.5 Inches
2. Main Steam Line High Radiation - 3x Normal Full Power Background (NFPB)
3. Main Steam Line High Flow - 14CL (Rx Mode Switch in RUN) or 40%

(Rx Mode Switch in STARTUP. SHUTDOWN, or REFUEL) 4 Main Steam Line Tunnel High Temperature - 212 F

5. Main Steam Line Low Pressure - <800 psi (Rx Mode Switch in RL*N)
6. Low Main Condenser Pressure - <12" HgA
b. Under emergency conditions, the operator is permitted by the Emergency Operating Procedures (EOPs) to bypass all valid isolation signals except 2 and 3 provided the main condenser is available as a heat sink. Under normal operating conditions, the operator is directed to wait until the cause of the isolation is cleared.

Conditions 5 and 6 may be cleared by the operator by placing the reactor mode switch out of RUN and by use of a keylock bypass switch

on a Control i

5104R i

(

r

Room back panel, respectively. All other isolation conditions can be tjpassed by initiatir.g liftad lead and ju.erer procedurea (Appendix.

OE-3100). The following five-step procedure must then be carried out:

1. Place valve control switches (total of 11) in the CLOSED or SHUT

' position to satisfy the inadvertent opening / reset permissive relay logic.

I

2. Reset the PCIS Group I isolation logic (three-position switch).
3. Open the outboard MSIVs (4) via control switches.

! 4 Open MSL drain valves (2) to equalize upstream and downstream pressures to within approximately 50 psig.

5. Open the inboard MS!Vs (4) via control switches.

4 510aR

.f l

l OUESTION 8 It is not clear how the CCFPs given on Page 74 of the report were d

obtained. Please explain.

1

RESPONSE

l ,

The basis of conditional probability of early containment failure (CI) for each class of accident is as follows:

Accident Class CI IA 10~38 IB 10~

  • b IC .31 ID 10~38

$  !! 1.0*

~38 111 10 IV 1.0" i

Notes j

a. Failure mode was estimated to be hydrogen burn. The probability is based on a Shoreham PRA study.

1

b. Failure probability was estimated as the fraction of accident sequences in Class IC that would result in elevated containment pressure (140 psia) before reactor vessel f ailure.
c. Given the large probability of drywell failure by overpressure (see containment event tree for Classes !! and IV).

i

< 510 '+R i

l i

i i

.. _ = . _ ._ .- - . -

' i a

QUESTION 9 4

What SLCS modifications are proposed for Vermont Yankee? Page 86 discusses the advantages of two different possible modifications, but gives no commitment to either.

RESPONSE

At the present time the preliminary design proposed for Vermont Yankee is to utilize two 43 gpm pumps for injection. However, a final design has not been approved as yet. Our present commitment to address i Item 50.62(c)(4) of 10CFR50.62 is outlined in our letter, dated September 29, 1985, titled " Generic Letter 85 ATWS Compliance i Schedule (10CFR50.62)." The letter states that Vermont Yankee will implerent a design or operational modification of its Standby Liquid I

Control System during its second refueling outage after July 26, 1984 I (summer 1987 outage).

i, 1

-)

I 5104R

D %

QUESTION 10 Identify the testing and maintenance requirements you use for the

. diesel-driven fire pump. Do these requirements conform to those contained i

in the Natior.31 Fire Codes? Also, identify any reliability information for the system such as outages and failures to start on demand. What

, outage time limitations do you use for the system while at powerf i

j RESPONSE

a. The testing and maintenance requirements for the diesel-driven fire pump are:
1. Diesel Fire Pump (DTP) starting battery - weekly - electrolyte level, voltage.
2. CFP operational check - monthly - lube and fuel oil, auto and
manual starting.

, a

3. CFP operational performance and capacity - annual - pressure, ficw rate, pump protection, and alarm circuitry.

4 OFP starting battery - once per cycle - cleaning and inspection.

j 5. DFP - A0 rounds (each shif t) - battery charger and f uel oil level.

/ b. Although the above testing and maintenance requirements do not conform 3

2h[\ to the 1995 edition of the NFC for diesel-driven fire pumps, they are

, consistent with Vermont Yankee's maintenance and surveillance N practices for safety-related equipment.

c. The FP System is considered operable with:

1

1. Two fire pumps operable and lined up to the fire suppression loop (Notes one electric, one diesel-driven).

1 5104R i

i I

i

2. Water available from the Connecticut River.
3. An operable flow path capable of taking suction from the Connecticut River and transferring the water through the distribution piping with operable sectionalizing control or isolation.

The following table indicates those periods when the diesel fire pump has not been available.

$104R

Date Duration Reason 6s23/80 6.0 hrs Preventative Maintenance (PMs) 5/14/80 2.0 Calibration 10/06/81 1.5 Check operation of generator

, 4/21/82 8.0 PMs 5/21/82 7.0 Battery charger 7/29/82 6.0 PMs 3/03/83 3.5 Hx repair i i 8

_/23/83 _

7.0 PMs i 12/08/83 1.5 (7) i 7/24/94 / 3.0 PMs 12/06/84 S.0 PMs j 6/28/85 6.5 Replace battery terminals 8/09/85 1.0 DFP battery

( \ - 10/29/85/ 2.0 Replace exhaust muffler

\ \.-:~ 2/10/9Ij 2.0

) (?)  ;

l \~ _-

I 6/11/86 , 1.5 (?)

a r 70!AL DURATION: 71.5 hrs

\

/

l 1

) i No!F.S

1. This information pertains to the period 6/29/80 to 6/11/86.
2. Dates and durations for occasions CFP is 005 due to failure-to-start (2) are not included here, but are in the following table.

4 y e . . , v.

e.w. ~ )wi.. t. ~.m. c, M

i i

l 4

5104R i

. _ - . - _ - _ . _ - - - - - - =- - . __ _

l 1

I The following information indicates the reliability of the diesel fire pumps A. FAILURE TO START l l

Date __ Reason 8/10/16 Starting solenoid relay i

9/30/85 Poor battery connections B. STARTING BATTER!ES DECRADED Date Reason  :

5/13/90 Bad cells on one batteryl battery charger timer 9/30/85 Bad connection to one of two starting batteries 1/07/86 Low voltage both batteriest blown battery charger fuse

d. With the Fire Suppressicn Water Supply System inoperable, a backup Fire Suppression Water System must be established within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, or the reactor must be placed in hot standby within the next six hours and cold shutdown within the following thirty hours.

$104R

QUESTION 11 Identify the scope of modifications required to the spray system or increases in the pumping capacity, to assure a uniformly distributed spray with proper droplet size (as opposed to a dribble) if the diesel fire pump were used in a core melt event. Approximately what would the costs be of such modifications?

RESPONSE

At this time, Vermont Yankee has notycImined-4 hat-any modifications would be required to assure an adIquate spray pattern We are reviewing thetestdata(pictures)fromMdnti nd ar sidering further evaluation of Vermont Yankee's spray design.

j i e w

i (. e, G

v.C '$->

\ O (, ,,,'s',

ag, N 1 g ,x . ,

(( , },o

s, i,

b u o a.,

j, e

if;

?> \

/

')-

Cp

n i

r. /

i S lot.R

qtlESTION 12 i

i Can portable AC generators be used effectively to power vital valves and/or small pumps for station blackout accidents? If so, what modifications would be required, and what would be their approximate costs?

RESPONSE

a. The most " vital" valves under station blackout conditions will be those which are required by steam-driven pumps (HPCI. RCIC) supplying makeup to the RPV. and those valves (SRVs) which provide a means for i

removal of the heat generated by the core (e.g., decay heat, assuming a successful reactor scram). Of next importance are those valves i which would permit venting or spraying of the primary containment to

! preclude overpressurization from the heat load imposed on it as it I

performs the function if primary heat sink throughout this accident scenario.

1 l I l

4 t

1 Frimary containment vent valves are air-operated with oc solenoid valve control (f ait close upon loss of either ac or low air pressure). 1.ocal manual operation of these valves is considered the mest effective of various options considered provided it is performed

precore melt. It has been targeted for further study, as discussed in l the Containment Safety Study.

1 ,

i The containment spray valves are ac powered motor-operated valves. A I conceptual study is underway to investigate options to aid the j

operators in aligning the diesel fire pump for vessel / containment Injection.

) -19 310;k l

l

{

, s

b. Modifications and inventory requirements to support these options will ,

be developed if design change options are pursued.  !

l l.

I l

1 1

i l

I i

l f

$ 101.R I

I l

QUEST!0N 13 In Section 2.2.1 you conclude that the containment can be " expected to withstand pressures approximately two times design prior to failure."

Provide the bases for your conclusion.

RESPONSE

The allowable stress limit used in the primary containment design (Reference A) was 17.5 ksi. The minimura yield strength of the shell material (SA516. C70) is 38 kai at 100 F and 33.9 kai at 281"y (design temperature). Therefore, the f actor of safety between yield stress and allowable stress is 2.17 at ambient temperature and 1.94 at design temperature. When primary yielding is conservatively used as a failure criteria. it can be stated the primary containment can be " expected to withstand pressures approximately two times design prior to failure."

In addition, the SWROC on Mark 1 Containment Ultimate Strength Analysis is presently involved in an effort that will att'ehpt~to'determini~Ihe actual vessel failure pressure for Mark I containments. The group will also attempt to show that early overpressure containment failure under severe accident conditions is unlikely.

1 Reference As Vermont Yankee Project - Containment. Contract 7-6202 General Design Criteria. Revision 1. Chicago Bridge and Iron Company. February 25, 1969.

$104R l_ _ _ _

QUESTION 14 In Section 2.2.10.3, is the water supply f rom at least a portion of the cooling towers also available?

RESPONSE

The deep basin under t... west cooling tower is available to parts of the Service Water (SW) System via the RHRSW System. This system would provide cooling for the following emergency cooling loads:

j o RHR Heat Exchangers o Emergency Diesel Generators

, o RECCWI

- Recire Pumps

- CRD Pumps 3

- Fuel Pool Heat Exchangers

- PC Air Compressor

- RHR Pumps

- Rx Building Sump Coolers o ECCS Corner Rocm Coolers o Station Air Compressor (s) l l

i i

{

2:-

5104R i

1 QUESTION 15 i

The use of the Vernen Hydroelectric Station is referenced in Section 2.2.11.1, and discussed in more detail in Section 4.4.2.3. Reliability estimates are presented on Page 62. Please provide the basis for the i reliability estimates with reference to both the historical operation of i ,Vernon Hydro, and the transmission line and substations to Vermont Yankee.

RESPONSE

i In addition to Vermont Yankee's diesel generators, a direct line from the nearby Vernon Hydroelectric Station can be aligned manually from the Main Control Room to either of the emergency buses. The loads of either emergency bus can be met with this supply. The ten-unit Vernon Hydroelectric Station is located less than one mile from Vermont Yankee.

A dedicated, normally energized, insulated tie line can be connected directly to either Emergency Bus 3 or 4 via remote manual breaker operations from the Vermont Yankee Control Room. There is a direct telephone circuit between the Main Control Room and the Vernon Hydroelectric Station. Use of the Vernon tie is part of operator training and is well known to the operators.

The unavailability of the Vernon tie to supply either of the emergency buses can be written as:

U=8+0+V+C where:

1 H - represents the unavailability of the hydroelectric stations and any required active breaker transfers at the hydroelectric plant.

0 - represents operator errors defeating the successful connection.

V - represents active and passive electrical system hardware failures i at Verment Yankee.

$104R

l 1

. s l

C -

represents those convron events, such as extreme wind conditions, that cause loss of power at Vermont Yankee and defeat the Vernon tie line.

Determination of H

'The best available information indicates that the Vernon Hydroelectric Station was unavailable for a total of 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and 24 minutes in a 21-year period making the average unavailability 1.3 x 10-5'.

{ In response to a grid collapse, the hydroelectric station would have to separate from the grid to allow the tie line to remain available. The only active action identified is the automatic opening of a single l normally closed feed breaker. The probability of failure associated with

$ the opening of this normally closed feed breaker is 6.5 x 10 . This is

based on the Seabrook Probabilistic Safety Assessment. Therefore. H can

, be approximated as:

)

H = 1.3 x 10-5 + 6.5 x 10-'

  • i = 6.6 x 10 '

1 j Determinatten of 0 i

I j The estimates for operator inappropriate action are as follows:

j _0,,*

  • Phase 1 0-2 hours .1 Phase II 2-4 hours .05 2

Phase III 4-10 hours .01

, Phase IV 10-24 hours .01 i

  • It should be noted that only two events were recorded: one of 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and 20 minutes and one of 4 minutes. The station recovered quickly from the

) latter event which was initiated by a lightning strike.

    • The values above are taken from the following documents:

f (1) BWR Individual Plant Evaluation Methodology.

1

! (2) A. D. Swain and H. E. Guttman Handbook of Human Reliability Analysis i '41th Emphasis on Nuclear Power Plant Applications, NUREC/CR-1278.

I l $104R l

t I s

\

The information above had to be taken from the referenced material because no Vermont Yankee-specific human error probability was estimated for this study.

I

\

Determination of V Two breakers have to close to feed either bus. In addition, it is assumed ..

that the d'iesel breaker must open (this is conservative since failure of this breaker to close may have been the cause of " diesel failure to supply emergency bus"). Therefore, V can be approximated as 1.7 x 10~. This value was supplied by one of our consultants whose exp'ertise is in the ~

area of PRA analysis.

Determination of C The factor C reflects those loss of off-site power events that would also render the Vernon Hydroelectric Station unavailable. A review of 114 1 off-site power events identified 24 that were> caused by extreme external 1

phenomena (e.g., lightning, ice storms, heavy snow, tornadoe's, etc.).

Events such as saltwater spray and Florida grid instabilities'Cire assessed not be be applicable to the Vermont Yankee site. 1.

., , n 4

~3 C could range from 4 x 10 to .1. These values were also supplied by -l our PRA consultant. This information had to be taken from the referenced ,,

] material because no Vermont 9.inkee-specific data was available.

The upper estimate (0.1) is used for the point estimate quantific'ation in this analysis. -

Summarv .

y s

The unavailability of Vernon Hydro as an effective AC power sour'ce o the emergency buses given a station blackout is: ,

U=H+0+V+C --

U = 6.6E-4 + 0 + 1.7E-3 + IE-1 '

1

.l 510tR s
. ? ,

a l

- ._ . - . - ._. - - . _ , , ,_ :s . _

. o e Vernon Hydro Unavailability For Extreme External Phenomena Events (H + 0 + V + C)

Phase I 0-2 hours .2 Phase II 2-4 hours .15 Phase III 4-10 hours .11

' Phase IV 10-24 hours .11 5104R I

p 4

  • QUESTION 16 The Nitrogen Containment Atmosphere Dilution (N CAD)2 System is referenced on Pages 25 and 115. What maintenance and surveillance procedures are used to ensure operability?

l RESPONSE i

The Nitrogen Containment Atmosphere Dilution (N CAD) at Vermont Yankee 2

provides the capability to inject nitrogen gas into the primary containment and to vent the containment gas mixture at a controlled rate j

I through the Standby Oas Treatment System. This method of reducing the hydrogen and oxygen gas concentrations in the containment provides a

" defense in-depth" design approach to combustible gas control as a backup 4

to the inert containment.

The N2 CAD System consists of nitrogen supply piping and valves, as well as vent gas piping and valves. Nitrogen gas from the inerting system's nitrogen supply tank or other on-site or of f-site bulk storage sources can be manually cross-connected to the Ng CAD nitrogen supply piping from outside the Reactor Building.

The only vital active components of the N CAD 2 System located in the Reactor Buildi..g re nitrogen supply valves and vent gas valves. The valves must operate remotely to align N 2CAD flow paths and to provide containment isolation.

The following maintenance and surveillance procedures apply to the Nitrogen CAD System:

o Remote valve operability - monthly (OP-4125).

o Local / remote valve indication test - each refueling outage (OP-4102).

o Type A - Primary Containment Integrated Leak Rate Testing (OP-4029).

l e Inservice Testing Program - Type A and 3 Valve Operability (AP-4024).

5104R

{

. . . .- - - . __ ~ _ _

QUESTION 17 i

In Section 4.1.4 MARCH /RMA and MAAP code package for Vermont Yankee is

! referenced. Were calculations made for Vermont Yankee, or were the results of computation for other reactors evaluated for the Vermont Yankee design? What calculations were made?

8

RESPONSE

a) Calculations were made specifically for Vermont Yankee utilizing the '

above codes. The different calculations and the code utilized for each are' detailed below.

4 b) The following accident sequence analyses were performed specifically i

for Vermont Yankee using the MARCH /RMA code:

1. T,C ,C2 (ATWS sequence).
2. Station blackout and further failures to the HPCI and RCIC Systems or their support systems.
3. Station blackout for more than six hours, coupled with failure of HPCI, RCIC, and the diesel fire pump after six hours.

The following accident sequence analyses were performed specifically for Vermont Yankee using the MAAF code:

1. Station blackout for more than six hours, coupled with failure of HPCI and RCIC and the diesel fire pump after six hours.
2. Station blackout and further failures to the HPCI and RCIC Systems or their support systems. Water injection became available at the time of vessel failure.
3. Similar to (2) but without the addition of water on the debris after vessel failure.

510kR i

l

,, ,,,,,--r, , , - . - , . .- - - - - , - , , . ., ~, -,-e .--- ---, --

, - -n- -r, -

I .

QUESTION 18 In-vessel and ex-vessel steam explosions were not considered credible (Page 55, first paragraph) based upon research. Identify the research that forms the basis for this conclusion.

I

RESPONSE

IDCOR has studied in-vessel and ex-vessel steam explosions [1], [2] and 4

found that the energy transfer mechanisms sufficient to threaten the

! reactor vessel or the containment of current LWRs do not exist. Also, information published in NUREG-1116 [3] supports the conclusion that the loads from steam explosions which potentially might fail the containment (Alpha mode failure), are thought to be sufficiently unlikely to be neglected in source term determination.

a) In-Vessel Steam Explosion The energy release from large scale steam explosions has been hypothesized to be sufficient to cause containment failure.

Generally, this has been conceived to result from in-vessel steam explosions which fail the primary system and subsequently the containment. The issue to be addressed is whether large scale steam explosions of this magnitude could occur during degraded core accidents.

t A review of the literature regarding in-vessel steam explosion was performed to allow quantitative characterization of this potential containment failure mode [1-10]. The principal sources of information used in the Vermont Yankee assessment and the conclusions drawn f rom t

i those sources are as follows:

i l o IDCCR Reports (1, 11, 12]

l

, o Steam Explosion Review Group (SERG) (3]

l 1 l 5104R I

- , , . . - _ _ , - - - ,.-r - - , - - - - - . - - - . m - - - - _ - - - - - - , - - - - , _ _ . , , . , _ - .<c~, - - -

. - - . = . . . . _ . - - . . -_ . --. _ ... -. -._

i j .- .

1 o American Physical Society Study Group (6] .

1 o Mark I Containment Event Tree for Application in NUREG-il50 (9]

i Based upon the information presented in these sources, the conclusion

  • j was reached that the probability of a steam explosion sufficient to

{ cause RPV and containment failure is small. In addition, the failure l probability at elevated RPV pressure may be zero and at low pressure j may be lE-3 to zero depending upon the modeling assumptions. Most of the sequences in the Vermont Yankee analysis would be at high pressure and therefore a value of IE-4 is used consistent with Steam Explosion Review Group (SERG), a flow type melt model (MELPRI), and the lack of j sufficient energy released in a very short time.

I i

b) Ex-Vessel Steam Explosion I

I It has been postulated that energetic steam explosions caused by molten material dropping into shallow water pools in the drywell could i lead to containment failure, i

i For the purposes of the Vermont Yankee containment failure probability

{ calculation, a review of published evaluations was made to establish.

j the current state of knowledge. The following sources were considered

in the Vermont Yankee quantification
'

i I

o IDCOR Reports [1, 11, 12]

! o American Physical Society (6] i s

1 o Sandia Preparation of CET for NUREG-ll50 [9]

4

There appears to be less general agreement regarding the possibility and impact of ex-vessel steam explosions as opposed to in-vessel i

explosions. It does appear, however, that the likelihood of a j sufficiently severe ex-vessel steam explosion to threaten containment j is impossible if the core melt process is a flow type.

I i

l

)

1 5104R-l

. I References

1. Technical Support for Issue Resolution. Fauske and Associates, FAI/85-27, dated July 1985.
2. IDCOR Task 14.1. '
3. ' Steam Explosion Review Group (SERG), "A Review of the C'rrentu Understanding of the Potential for Containment Failure Arising From In-Vessel Steam, Explosions," NUREG-1116 U.S. Nuclear Regulatory Commission, June 1985.

4 L. S. Nelson and P. M. Duda, Steam Explosion Experiments With Single

, Drops of Iron Oxide Melted with a CO Laser: Part II Parametric Studies, NUREG/CR-2718, dated April 1985.

5. J. B. Rivard, et al., Identification of Severe Accident Uncertainties, NUREC/CR-3440, dated September 1984 i
6. Richard Wilson, et al., Radionuclide Releases from Severe Accidents at
  • Nuclear Power Plants, Report to tne American Physical Society, dated February 1985.
7. Snyder, A. M., A Current Perspective on the Risk Significance of Steam Explosion, Vortrag Jehrestagung Kerntechnik, Mannheim, 1982.
8. Shoreham Nuclear Power Station Probability Risk Assessment. Long Island Lighting Company, Docket No. 50-3, dated June 1983.
9. C. N. Ames, et al., Containment Event Analysis for Postulated Severe Accidents at the Peach Bottom Atomic Power Station (Preliminary Draft for Review), SAND 86-1135, dated May 12, 1986.
10. Reactor Safety Study, WASH-1400, October 1975.

5104R i

i I-

l. -. -. . - - . -. - -
11. IDCOR Technical Su. mary Report, November 1984
12. IDCOR Technical Report 14.lB, " Key Phenomenalized Models for Assessing Nonexplosive Steam Generation Rates." June 1983.

t 5104R

s QUESTION 19 As we understand Tables 4.7 through 4.10, the designations E. L, and NCF refer to early (E) or late (L) containment failure estimates, and NCF refers to no containment failure. The second designators H. M, and L refe'r to high, medium, and low releases, respectively. To what extent can

, mitigation through manual actions in the time available, and in the temperature and radiation environments associated with such accident types be expected to be successful for early failures; for late failures?

Specifically, for the combustible gas control, spray, and venting evaluations, what do you judge the effectiveness of the existing plant and procedures to be versus the possible improvements for early and late sequences?

RESPONSE

The probabilistic analysis results are provided in Tables 4.7 through 4.10 and take into account the existing plant design and procedural guidance.

Mitigation through manual actions as presently prescribed in emergency procedures (based upon BWROG EPG, Revision 3) are designed to maximize the plant capability to deal effectively with all severe accident scenarios.

Manual actions for containment failures are limited to ATWS sequences.

For these sequences, the prescribed manual actions to reopen MSIVs, scram rods, and inject SLC are each considered highly successful means of dealing with the ATWS event and preventing early containment failure. In addition, if all of these actions are unsuccessful in the early phases of the event, the symptom based procedures provide guidance on controlling the plant to delay ultimate containment failure which will allow time to succeed in reactor shutdown. All such manual actions for preventing early failures are acccmplished from the Control Room, which is a mild environment.

Sequences that could result in late failures are equally suited to manual actions that can successfully mitigate the event. Containment spray, venting, and combustible gas centrol (via N CAD2 System) can all be 5104R

. e

, accomplished by manual actions outside the Reactor Building provided ac power is available. For the station blackout scenario, the existing plant design does not support remote operation. Local operation of containment 4

spray valves in the Reactor Building is considered the most feasible containment pressure control method for a sustained station blackout situation. The valves in the Reactor Building can be operated prior to a ' core damage and the diesel fire pump can be operated from outside the j Reactor Building. Additionally, Vermont Yankee is presently performing a conceptual design study to evaluate options to increase the availability j of these valves under station blackout events. The N CAD 2 and vent valves are not currently remotely operable under station blackout events.

However, the N2 CAD System would not be expected to be needed due to our inert containment. Although venting may be an option, we believe xcontainment spray is more desirable.

As our engineering studies progress, we will determine which improvements are to be recommended. At this time, it is difficult to judge the relative effectiveness of potential design improvements.

i i

l 4

5104R I

QUESTION 20 NPSH during spraying is identified as a concern on Page 117. To what extent will further investigation be undertaken to determine whether NPSH is an issue? Verify that procedures exist for the operator to line up ECCS water sources outside the containment in the event NPSH requirements

,are not met. If analysis indicates it is an issue, what do you propose be done to eliminate or reduce the level of concern?

RESPONSE

The ECCS systems were analyzed at full-rated flow conditions to determine what the available NPSH (ANPSH) for each would be with suppression pool water temperature ranging from 60 F to 200 F.

The analysis assumed that suppressien pool water level was 6.5 feet which is sufficient to ensure submergence of all ECCS suction strainers. Torus airspace pres.ure was assumed to be 14.7 psia.

The results of this analysis were used to generate curve T/L-5 in OE-3104 (Torus Temperature and Level Control). This curve is referenced in Step T/L-14, which directs the operator to line up for injection those systems which take a suction external to primary containment if the combination of torus pressure and water temperature cannot be maintained above curve T/L-5.

Our analysis indicates that the suppression pool water temperature has a marked negative effect upon ANPSH, particularly above approximately 175 F. Efforts to quantify this effect and to provide additional guidance to operators will be based on industry and BWROG studies.

5104R l

l l

l

. . _- - .~_- --_ . _ . . - . . _ . . . ._- .-

. =

l QUESTION 21 j Venting is considered for the station blackout sequences only. Please

] discuss your rationale for not considering other events when venting may be beneficial.

l RESPONSE i

j Venting is discussed for both the station blackout and ATWS severe l accident sequences in Sections 5.4.3, 5. 7.3, 5. 7.4, and 5. 7.5.

Section 5.4.3 summarizes the results of our survey of two reports that provided considerable information relative to venting (References (21) and I (22)), as well as the analysis performed specifically for Vermont Yankee (Reference (11)). Section 5.7.3 provides the recommendations regarding the NRC's integrated five-element proposal relative to the station blackout event. The conclusion was that wetwell venting could be utilized a for containment pressure control in lieu of containment spray, but further study was required to determine the most appropriate procedural / design

changes to pursue. Section 5.7.4 provides the recommendations regarding

]

the NRC's integrated five-element proposal relative to the ATWS event. I The conclusion here was that a certain limited set of conditions may I

result in which venting would be beneficial, but it is generally not advisable during an ATWS event unless no other method of pressure control is available. In addition, further studies were recommended to determine the ancertainties/ risks associated with venting as compared to other I

containment pressure control methods such as containment spray. Finally,

Section 5.7.5 draws the conclusions for the five issues proposed by the NRC. It states that, "the current industry position on venting suggests

, that it may be desirable to vent under long-term loss of decay heat 1 removal scenarios, but only if no core damage / source term is involved.

Vermont Yankee should perform additional plant-specific analysis to insure any decisions on venting are based on a sound engineering foundation."

i 1

l 5104R I

4 I I l

t

l

'l 1

i QUESTION 22 4

i

~

1 Since there is a substantial difference between the heights of the VYNPS plant stack (318 feet) and the reference plant stack (500 feet), indicate j how this was taken into account in the comparison of the two plants.

l

-l

RESPONSE

i j

4 Stack height was not a consideration in our study. The focus of our study was on the containment failure probability. Only plant characteristics

{ that influence containment integrity were evaluated.

)

  • 1

] As noted in our response to Question 23. source term and off-site

} consequence considerations were outside the scope of this study. However,

} information on the relative differences between ground level and stack releases has been provided in the response to that question.

t

]

}

l -

i j

i t

1 i

4 5

l 1

1 J

5104R 1

i i

l

Il e

QUESTION 23 Evaluate the differences in off-site dose consequences due to venting at ground level versus through the stack. Using site-specific meteorology and topography, provide an estimate of the off-site dose differences between the two types of releases as a function of distance from the site.

RESPONSE

Although not a part of the Vermont Yankee containment study, the following data is provided as insight to release characteristics at the Vermont Yankee site.

The differences in off-site dose consequences due to ground level venting versus a primary vent stack release can be estimated by comparing the atmospheric diffusion factors (CHI /Q values) from these two release pathways. Cumulative probability distributions of hourly CHI /Q values at the site area boundary (0.16 to 0.44 miles) and at distances of one, two, three, and four miles from the site were generated for both release pathways using site-specific meteorological and topographical data. The median values from these probability distributions are presented below:

Median CHI /O Value (sec/m )

Distance Ground Stack Ratio (Gnd/Stk)

~

Site Boundary 1.4x10 ' 7.2x10-l' l.9x10 9 1 Mile 2.5x10 ' 2.2x10

-6 17,4 2 Miles 9.9x10 -6 6.3x10-6 1.6 3 Miles 5.8x10 -6 4.8x10 -6 1.2 4 Miles 3.9x10

-6 -6 3.5x10 1,7 The above table indicates that doses from a ground level release would be significantly higher out to approximately two to three miles, beyond which doses frem both release pathways would be similar.

5104R

. - - . . - -- . - - - ~ . . . - - . -

. s

+

d f.

QUESTION 24 i

on Page 125, rapid containment depressurization which could fail the l dryvell is offered as an uncertainty relative to containment venting.

What analysis and/or tests are being conducted to reduce this uncertainty? If no analysis or tests are contemplated, what actions are j . proposed to minimize the uncertainty?

l I

1 RESPONSE 1

l The uncertainty referred to results from a concern addressed by the BWROG on Emergency Procedure Guidelines (EPGs) in their draf t report, f

" Development of BWR Containment Venting Procedures." The failure postulated would originate from a suppression pool swell which would j result from the clearing of the drywell vents or downcomers and the flashing of the suppression pool liquid. This concern is primarily with

the opening of large lines in MARK I or MARK II containments where the rate of depressurization is largest.

1

] There are presently no analyses and/or tests being conducted to reduce this uncertainty. However, as mentioned above, the issue is being l addressed by the BWR Owners Group and our future actions will consider 4

l, their final response. '

4 i

4 i

a 1

; 5104R i

i i

. . . , - - . . ~ . - . . . - - - . . , .

- .. .- - - _ _ - _. - -- - . - . . - -_. __ ~-. __ -

QUESTION 25 Remote manual valve operation is discussed in Section 5.3.5.1.1, primarily with respect to station blackout. To what extent can the remote vent

' valve and any spray valve alignment be counted on for the other classes of a

sequences you assessed? That is, if remote manual operation is not

,available, would the local environment the operators would encounter allow successful local operation?

RESPONSE

The remote manual valve operation discussed in Section 5.3.5.1.1 deals with RHR valves 183, 184, 26A, and 31A. These valves are necessary to line up the diesel fire pump for spraying the drywell after the initial i five hours of a station blackout. The valves are located in the Reactor i

Building and may not be accessible if severe fuel failure occur' red prior

! to taking action to open them due to area radiation dose rates. AC power i

independent remote manual control for these valves is being studied as described in our response to Question 19.

  • For the other classes of sequences assessed in the report, the diesel fire pump would not be necessary for spraying the drywell. The RHR System with the torus water inventory as the primary source of water would be utilized until the torus water temperature exceeded the specified maximum value.

At this point, the Service Water System could be crosstied into the "A" l

loop of the RHR System to provide an ultimate backup capability to inject water into the reactor vessel and/or containment frem the Connecticut a

River. The valves required to utilize both spray paths are operable from j the Control Roem; however, should remote manual operation from the Control Rocm not be available, these valves may not be accessible if severe fuel failure has occurred prior to taking action to open them since they are

, located in the Reactor Building.

l The remote vent valves required for the six vent paths discussed in Section 5.4.4 are all operable f rom the Control Rcom. However, operation of these valves frem the Control Room would not be possible in the event j of a station blackout since they are all ac powered. (Operation would be i

f 510tR j

1

, s l

possible for the postulated ATWS scenario.) In addition, if severe fuel f ailure has occurred prior to taking action to open the valves, they valves may not be accessible since they are located in the Reactor l

l i

Building and the torus area. The capability to manually open these

).

valves, should it be necessary precore melt, may exist depending on vent path integrity. However, this would require manual actions and temporary I

, connections. It is Vermont Yankee's position that the primary method of i

contal wnt pressure control in severe accident sequences should be the t

j use of containment sprays.

l ij t

1 1

i i

i f

i j r i

i I

~

~41-5104R a

i i

,__ __ _ - . . . _ . _ . - _ _ _ - . _ _ _ __._.______m - __ . _.

y

. +

)

l l i

QUESTION 26 1

i f

Severe accident venting discussed in Section 5.4 does not include an i

evaluation of the reliability of the ADS System. Given the types of severe accident challenges you have described, provide your estimates of I

the reliability of ADS valves; i.e., their potential as a suppression pool

, bypass path. Can battery packs or portable generators be used to assure high reliability? If so, at what approximate cost?

4

RESPONSE

l I

In the severe accidents discussed in Section 5.4, the ADS valves (main steam safety / relief valves (SRVs)) are relied upon to transfer energy from the reactor to the torus. These valves would be subject to harsh I

environmental conditions, including high pressure, temperature and possibly radiation during the postulated severe accidents. DC control power to the solenoids, as well as sufficient instrument nitrogen gas

pressure, is needed to insure proper operation of the SRV valves, t

The reliability of our ADS valves fcr severe accident service is primarily influenced by three factors: (1) valve failure rate history at Vermont Yankee, (2) de control power availability, and (3) instrument nitrogen gas supply availability.

i Vermont Yankee's experience with their SRVs is that they have always actuated during "as found" testing. However, there have been five occasions when the valves did not lift within the code required : 1% of 1

the nameplate set pressure. In addition, there have been three instances l when the air operators associated with the valves failed inspection testing. The last occurrence was in July of 1976. These three failures were attributed to the diaphragms on the operators. The diaphragm j material was changed in 1976 and their replacement frequency was also I

increased. Since that time, there have been no additional failures.

i.

DC control power is provided from reliable redundant battery banks. The i

de solenoid valves require very little power to operate. It is expected l

5104R J

i l

, e 1

1 that evan if the battery banks become depleted in eight hours post-station blackout, the ba*.tery voltage would =till be sufficient tc sperate the SR*.*

solenoid valves for a long period of time. Therefore, battery packs or portable generators need not be considered.

The instrument nitrogen gas is supplied from an on-site liquid nitrogen 1

storage tank. No electric power is needed to maintain this supply system operable. The Nitrogen Gas Supply System is comprised of very few active components, and operating experience has been very good.

For a postulated suppression pool bypass path accident scenario, one of the SRVs fails to reclose after being activated and the associated discharge line has ruptured somewhere along its run in the wetwell airspace. The steam and potential radioactivity may bypass the suppression pool and release to the containment. This safety concern was studied by the Brookhaven National Laboratory and reported recently in NL' REG /CR-4594, " Estimated Safety Significance of Generic Safety Issue 61." The best estimated core melt frequency of an SRV line-break accident repor,ted in that study is less than 1.0 x 10 ~13 / reactor year, which is small compared to the other accident types reported in the Vermont Yankee Containment Safety Study.

5104R i

l 1

l l

J

, o QUESTION 27 What is the approximate cost for improving the valving for the diesel fire pump?

RESPONSE

t A conceptual design study is underway that will address the cost of improving certain valves to aid the operators in aligning the diesel fire pump for vessel / containment injection. Our cost estimate is not available at this time.

Several options require further review before a realistic cost can be estimated.

i l

l l

l l

~ ~

510aR

6 I

l QUESTION 28 For the improvement options you have evaluated, what maintenance and surveillance guidelines would you propose to use?

RESPONSE

'A number of design improvements are being considered by Vermont Yankee.

As our engineering studies progress, we will determine which improvements are to be recomended. Maintenance and surveillance guidelines will be addressed as part of the detailed design change process to imple:nent the recommended ipprovement. Maintenance and surveillance requirements are generally determined witt) consideration of a number of factors including importance to safety, equipment reliability, vendor recommendations, etc.

l l

5101.R f

l l

l l

1 J

QUESTION 29 ,

I To what extent do you consider the option of drywell flooding to be effective? If effective, would you include the option in future revisions to your Emergency Operating Procedures.

RESPONSE

a) The greatest benefit of drywell flooding is to establish and maintain RPV water level above TAF if RPV flooding / injection (core cooling) capability is lost at some subsequent point in time. To be effective the following conditions would need to exist:

1. A means to flood the primary containment to the desired water level.
2. Communication between the primary containment and the RPV to permit flow of water into the RPV from the containment.
3. The elevation and size of the drywell vent must be such that:
a. With primary containment water level above that corresponding to TAF, the vent is not submerged.
b. Dryvell vent size is capable of flow rates necessary to preclude overpressure failure of the containment due to increasing hydrostatic head and permit removal of heat frem the RPV (assuming the RPV is venting to the drywell atmosphere).

! 4 Capability to vent the RPV outside the primary containment to ensure that the RPV will be flooded via containment flooding by reducing the pressure within the RPV to as close to atmospheric pressure as can be achieved.

SloaR

All of these conditions must exist simultaneously for an appreciable amaunt of time (cpproxin.ately 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />) before core cooling can be effectively achieved by this means. If all other means of core cooling are lost prior to this, it still provides a means for core debris centrol and protection of the primary containment structure,

,b ) This option is set forth in Contingency No. 6 of Revision 4 of the Emergency Procedure Guidelines. Vermont Yankee is committed to implement Revision 4 of the EPGs following NRC approval.

l

~ ~

5104R

m. _ ._. _ .. _ .._- _ _ ._ __._ - - _ . . _ _ _ _ _ . _ _ . _ . _ _ _ __.

i 8 1

, I l

l f

U QUESTION 30

)

i lt is estimated that the maximum debris layer thickness on the drywell floor would be approximately 1.1 inches (Page 136). Provide the bases for .

4 such a conclusion.

RESPONSE

l.

} At the time of vessel melt-through, it was assumed in an analysis of

]

MARCH /RM that the debris was separated into two layers - the upper layer being the lighter melted metallic materials and the lower layer being the denser oxide. The debris temperature was calculated to be higher than the I

j liquidus temperature of the metallic melt and lower than the liquidus temperature of the oxide layer. Therefore, it is assumed that metallic j melt would spread out on the drywell floor when the debris melts through j the vessel. The oxide layer is calculated to be of such a low temperature I

that its viscosity would prevent spreading to the drywell wall.

I~

t i

The metallic haterial calculated by MARCH /RMA consists of approximately 58,000 pounds of zirconium (145 ft3) and 56,000 pounds of steel (115

) ft ). The total area of the drywell floor is approximately 1.240 ft l (see Figure 5-13). In addition, there are two sumps whose total volume is

! 156 ft 3 Therefore, assuming the sumps fill completely, there will 3

f still be 104 ft of metallic material available to spread over the j

drywell floor. Based on this, it can be shown that the maximum metallic ,

{ 1ayer thickness would be approximately 1.1 inches.

i J

l i

i i

i 1

}

l l

5104R i

)

I l

f 1

QUESTION 31 Wat is the thickness of the vent duct between torus and drywell (Figure 1. Page F-6)?

RESPONSE

'The vent duct is 1/4 inch thick with a 6-foot 9-inch inside diameter.

t

~ ~

5104R

=

l QUESTION 32 It is stated that " additional physical barriers are believed to be counter-productive as they may prevent containment spray from cooling the debris while it is confined in the Subpile Room." Please elaborate how such a barrier would prevent the spray from effectively cooling the debris (Page 137).

t

RESPONSE

The basis for the above statement was that the physical barriers will confine the debris in the Subpile Room where little, if any, water can be sprayed on them to provide cooling. If the debris is allowed to exit the Subpile Room and spread over the drywell floor, more water will be available to cool the debris and there will be more debris surface area to be cooled.

$104R

i ,

l i

I j QUESTION 33 j

i It is indicated that, with the exception of the one-inch nitrogen CAD line and the six-inch nitrogen purge line, the pipe lines associated with four j potential vent paths are likely to fail. Provide background information which led to this conclusion (Page 131). ~

RESPONSE

i 1

i The basis for the statement on Pages 131 and 132 that "with the exception

! of the one-inch nitrogen CAD line and the six-inch nitrogen purge line, f these lines are likely to fail in the Reactor Building when venting at l elevated pressures" is as follows:

a. Section 5.4.4.1, 18-inch Atmospheric Control System vent path (via RTF-5). This path contains a Reactor Transfer Fan RTF-5 "which was not designed to withstand any significant pressure and would leak and probably totally fail under the estimated venting pressure."
b. Section 5.4.4.2, three-inch Atmospheric Control System vent path.

! This path includes the Standby Gas Treatment System (SGTS) which "is i

not capable of handling steam; the manufacturer has stated that the j IfEPA filters would be blown out if steam passed through them. In addition, the housing for the SGTS has a design pressure rating of only 2 psig positive pressure."

4 i

j c. Section 5.4.4.3, 18-inch Atmospheric Control System vent path. This i

l path " ties into duct work prior to exiting the Reactor Building. The duct has been tested to eight inches water gauge." Due to the low structural capability of this ducting, we assumed that it would fail j at elevated pressures. In addition, the ducting is not designed as a leak tight installation.

I

d. Section 5.4.4.4, 20-inch and 18-inch ventilation supply vent path.

These lines tie into duct work prior to exiting the Reactor Building.

i The discussion in (c) above applies here as well.

! i 5104R l

l

. o QUESTION 34 It is implied that a layer of debris (1.1 inch thick) would not penetrate the drywell steel shell and enter the torus (Page 136). If such is the conclusion, please discuss why such a burn through is unlikely while core debris is attacking the drywell floor. There is a gap between the drywell

' steel shell and the concrete shield. If the molten core were to burn through the steel shell at the indicated corium elevation, what would prevent the fission gas from entering the Reactor Building since the concrete shield outside the drywell shell is not designed as a pressure boundary?

4

RESPONSE

a) Drywell Shell Thermal Attack Given that a core melt accident has been postulated, the conditional j failure probability for the drywell shell due to direct contact with molten material is a function of the type of accident sequence which led to core melt and the available mitigation. The Vermont Yankee CET uses drywell shell conditional failure probability values of .01 and 0.1 for sequences with drywell water injection and without water injection, respectively.

The chain of events and phenomena occurring that determine the Vermont Yankee technical evaluation of drywell shell integrity and conditional failure probabilities can be categorized as follows:

o Core melt process l o RPV bottom head failure mechanism j o Heat sinks for rapid heat transfer t

o Debris spreading o Drywell water injection o Drywell shell temperature rise i,

f 5104R i

i

, - - - .. . - - - - . - . . . - ., , , - - - , - - - - ,. -- , -..-g -4, -

..,c

c . _ _ - _ . -__.

, g 4

- v o

s Each of these is discussed as follows: '

o Core Melt Process The core melt process can be postulated to occur in a variety of ways. Thebestestimateassessbentoftheprocessisthat

. portions of the core can become molten and move to the RPV bottom head in fractions of core from 10% to 50%. If less than 10% of the core materici is molten, it would most likely te quenched; greater than 50% of the core material being molten is probably not possible in view of the_ radiative cooling that can occur from the outer fuel assemblies. .

This type of core me'it process is of the slow flow type melt '

mechanism and is consistent with the model presented in the NRC "

containment event tree write-up for the NUREG-1150 Mark I . 5' evaluation (Preliminary Draft, SAND 86-1135, May 12, 1986).

o RPV Bottom Head Failure As soon as molten material reaches the reactor vessel bottom head, it may form an insulated mass that can begin to heat up the RPV bottom head penetrations even with a water overburden. The potential temperature rise can result in attack and failure of some of the multitude of penetrations in the BWR reactor vessel bottom head, e.g., instrumentation or CRD housings.

The best estimate model for this attack mechanism is that individual CRD and instrumentation penetrations would fail due to localized debris temperature in the range of 2500 K. This debris temperature is calculated in MAAP to be at the eutectic formed between UO 2 and zircaloy. The saaterial is also near the melting point of the debris and could be solidified by heat transfer to available heat sinks with changes in temperature of several hundreds of degrees.

5104R l

Once the debris causes local seal penatration failure, the debris

\

is anticipated t'o fall or be ejected (depending upon the kPV pressure).

o Mass Transport to the Drywell Floor i

During the process of material ejection from the RPV, the material must make its way through the maze of CRD housings, piping, and steel support structure below the RPV and fall approximately 30 feet to the drywell floor. As a result of the energy exchange with the structures in the pedestal and radiative heat loss from the debris during the transport process, it is anticipated that the debris would cool more than 300 C.

~ ~

If continuous drywell water injection is available from either drywell sprays or RPV injection and through the RPV breach, then additional quantities of the debris would be quenched and prevent

, debris contact with the drywell shell wall.

s o Debris Spreading Because the debris is nearly at its freezing temperature without any water quenching, it is found that the debris would not reach the drywell walls because of its high viscosity and the large amount of radiative heat transfer to the drywell atmosphere.

o Drywell Shell Temperature Rise In the unlikely event that molten debris reaches the drywell wall with no drywell injection (e.g. drywell sprays) then the drywell wall temperature could be high, i.e., on the order of 1500 F.

If the drywell shell is not adequately restrained (and the judgment is that the shell in this area is adequately restrained) then a high temperature creep-rupture, failure mechanism could result.

I l

-5 ,

5104R l 1

1

o O However, if a water overburden exists due to drywell sprays, then the temperatures of the drywell shell are substantially less and the failure probability due to creep rupture is judged to be less than .01 conditional on the fact that the slurry could even reach the drywell shell wall.

1 i In summary, the best estimate evaluation of the conditional failure probability of the drywell shell due to direct thermal attack (using MARCH and MAAP analyses) concludes that:

1) With water injection to the drywell: The chain of adverse events that must occur to result in a thermal attack of drywell shell results in an assessed failure probability of this containment failure mode of .01.

1

2) With no water injection: The same chain of adverse events is required to occur, but there is no water quenching from external sources. The failure probability is judged to be a factor of 10 higher. .

b) Fission Product Pathway The molten debris direct thermal attack on the containment shell at the interface of the drywell floor and the shield is considered in the Vermont Yankee evaluation. The consequential fission product pathway into the Reactor Building is also included. The following description i of the flow path is judged to be the best estimate failure mcde and path if it were to occur:

o The failure would tend to be a local failure at one drywell location, o It would produce a leakage pathway through sand and air gaps into the Torus Room (the lowest elevation of the Vermont Yankee Reactor Building).

5104R

- - - . - . - . - . - . - - - - - .- _ _ . . - . _ - - - _ - , - - -. .~

, t

, o The pathway would be restricted and would promote refreezing of the interface debris that could seep through the containment drywell failure pathway. Therefore, it can be modeled as an intermittent gas flow path through a tortuous path and into the Reactor Building.

Based upon both the supporting MAAP and MARCH calculations, the ,

radionuclide releases associated with such a leakage pathway into the lowest Reactor Building elevation are found to be low releases. If-the Reactor Building is effective, as it is judged to be at Vermont

, Yankee for this sequence. the radionuclide releases would be characterized by a containment leakage failure with a Reactor Building effective in reducing releases to the environment. Both alternatives i

j are addressed in the Vermont Yankee CET.

l 4,

I e

d 4

1 4

J 5

5104R l

t i

i l

l

.,.. .--~_-

. 8 l

b i

QUESTION 35 1 It is stated that 135 psia is a reasonable value for the Vermont Yankee ecntainment failure pressure (Page F-5).

a. What is the uncertainty range associated with this value?

] b. What would be a change in core melt and conditional containment failure probabilities associated with the uncertainty?

j c. Provide references for the Ames and Sandia calculations mentioned in the Appendix F (Page F-1).

1

! RESPONSE i

] a) In this study, time did not permit the detailed structural analysis i required to produce exact failure pressure along with variance. The structural capacities shown on Page F-4 were estimated in a simple j conservative manner to support the accelerated schedule. Structural characteristics such as actual yield strength, strain hardening, coupling of sections, and possible benefits of drywell concrete in

! limiting deflection was not evaluated.

i The 135 psia failure pressure was selected based on WASH-1400 i

j published values and other plant reports. After performing simplified calculations, considering the above mentioned conservatisms, and considering the results of more detailed analysis by Ames and Sandia

] (NUREG/CR-3653 ) 135 psia was determined to be a reasonable approximation. No uncertainty range calculations were performed.

3 However, as stated in the response to Question 13, the BWROG on Mark 1 Containment Ultimate Strength Analysis is currently performing a study i

to determine the actual vessel failure pressure including uncertainty calculations.

l b) Given that no uncertainty evaluation is performed for the containment failure pressure, no formal change in core melt frequency or conditional containment failure can be estimated.

5104R 4

, _,, , - - , - - , - - - ---,-,.,,.-m,,- ----,m,------.-...e.-.- ,,,..----_.~.,,r y...-.-,-wn ,v._ . , - - --e,-,.___.__,_.,._my . , . ,r,- - . - _ -

. . ._ _ _ _ _ _ ~ . . .

4 c) The source of data from the Ames and Sandia calculations is from NI"AEG/CR-3653 :

1

., NUREG/CR-3653, SAND 83-7463, " Final Report Containment Analysis

,i Techniques - A State-of-the-Art Summary " March 1984'.

, o Browns Ferry by Ames Laboratory. Section 16.1.

i i

o Peach Bottom Containment by Sandia National laboratory, i Section 17.1.

I I

s i

4 I

i i

l 1

4 i

l j

i 4

l I 5104R t

_ . _ . _ _ _ _ _ _ . . _ _ _ . . . _ _ . ____._m._- . . _ . - . _ . _ - _ _ _ _ . _ . _ . _ _ _ . _ _ _ _ _ . - _ . . .. _

Primary Containment Deinertion During Power Operation -

REACTOR POWER REACTOR PRESSURE DATE REASON DURATION (ENTRY /EXID (ENTRY / EXIT) l 6/8/82 RRU-3, -4 Repair  ? S/D <l4.7 psia i 8/27/82 Recirc Pmap Seal Replaced  ? S/D <14.7 1/7/83 Turbine Moisture Separator 1.cak and CU-19 Line Leak 14.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> S/D <l4.7 2/2/83 Ifigh Drywell Sump Leakage Indicated Valve Packing Leakage 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> 701 1020 3/4/83 Refueling 14 hours1.62037e-4 days <br />0.00389 hours <br />2.314815e-5 weeks <br />5.327e-6 months <br /> S/D 5

<l4.7 6/22/83 MSIV-80C and -86A Timing Out of 3

Range 14 hours1.62037e-4 days <br />0.00389 hours <br />2.314815e-5 weeks <br />5.327e-6 months <br /> 231 1020 8/27/83 Inspection of RV-70B, High Tailpipe  !

l Temperature 19 hours2.199074e-4 days <br />0.00528 hours <br />3.141534e-5 weeks <br />7.2295e-6 months <br /> S/D 800 1/5/84 HP Surveys Y 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> S/D <14.7 N '* "o 1/20/84 RV-65B Packing Leak e 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> IRM Range I p0 '2,A ' 1020

(<ll) 4/16/84 MSIV-800, Partial Cl t -

Failure N 25 hour2.893519e-4 days <br />0.00694 hours <br />4.133598e-5 weeks <br />9.5125e-6 months <br /> S/D 800 6/15/84 Refueling -

23.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> S/D <14.7 8/9/84 MSIV-80A Indication Ground - EQU y l Connector 12.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> S/D l <14.7 9/18/84 Rx Shroud Lift 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> S/D <14.7 .

9/30/84 MSIV-80D Timing Failure 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> S/D <14.7 9/20/85 Refueling (and Recire Pipe Replacement) 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> S/D <l4.7 8/20/86 B-Recirc Pump Vibration Monitor and '

Motor Oil I.evel Switch Piohlem 20, hours 561 1020

,N

  • Duration is defined as the total time the containment oxygen concentration is above 4 Tech. Spec. 3.7.A 7(b)).

5104R - .h\, .

.) y%

c/c j'N \, ' *

  • \ , [- '

,-----,oP ,

i 4

I 1

QUESTION 37 i

) Please provide your estimates of pressure and temperatures as a function of time for the accident sequences you analyzed for CCFP estimates.

RESPONSE 37 3

Attached Figures 1 through 11 show some of the key thermohydraulic parameters calculated by MARCH /RMA as functions of time for T,C,C2 j (ATWS) sequence. Attached Figures 12 through 21 show some of the key thermohydraulic parameters calculated by MARCH /RMA as functions of time i for a station blackout sequence (station blackout for more than six hours, coupled with failure of HPCI, RCIC, and diesel fire pump after six hours).

a i

l i

4 5104R I..-..,_.,_._.-_.. _ . . . - . _ _ - . _ . . . . _ . . _ - . _ . _ . , _ . , . _ . , _ _ _ _ _ , . - , . _ _ . . _ - . . _ , , . . _ , - - - - , . _ _ . _ _ . . . , , - -

a c

C I

C i .N t

6 i

lcC i . g

.w D

j .

t o

i C t

O

.D m

} m E

<i t e 1

m o i

d

.i z m, x

i 1

.; E o

- a H .O cW e

i v:

v. o,s x -)-
. y z .

b er C

--: C e

i 5 .N W

$ mI 6 +

0 c 2 o

, z d, x .

.:  ; "N 5

~~2 i  :

! 8 8 o

O 1

d 2 q .c~~

, x

! R <

1  :

1 a.

1 _ c i 1 c

=

.dm 1 -5 4

=

i = c i 2 o

'00*i2 00'dI 00 '2'E 00 8 00 0 00 'd- 00 '9I d l ~ 1.d ' 13 A31 831VM N3T10MS i

c c

=.

.N 6

o c

d v

, ~c l C

o m d i'< .c tn M

F o E C z .

I o

.ca

. w is!

6-O E C (f)

N d LU w

> .ow s

g 5 Z E .-

cI O

5 & d.

9 ,, .m La

4 mx

.?. h._*._. ~

c Wm-c a

g W d w

w ~m x

c =

N o

. . !.W $

m . kW -

x . - -

=

5

'+6

  • c C _ _ _ - a MY _d c: I
  • ~8'Niis-e-

~M.* --

5 o a

w.1 n ,

00*0rII 00'00d! 00 '09 t'! 00 *02I'I 00*080'I 00 'Or0't ' 00 *000't

'VISd '3 MOSS 3Md W31SAS 801]V38 l

h m

N Y

-g l

C

\ ,:

L-aC

, i M '

I

< C m

e lC-:

w <l' Iw b 4 lLC C e ,

C

< li d <

l'C I

<, l C > ,

+

tr. ,, Q C T

5. . < , lI w <:

> 4 i

, a 4

g

.w

>'C,,

C c <li l c. w- .--

Lw -

S lNm

    • < l'I  %

6 a

l} -y

<l C d ,

, N" w

Z- <, -., ,

k p" t

= -

L. Pr

  • 2 4 4 -

M '~

x <;

2_ < ,,_-

a ,i

'>N a

,0

  • l w

Y q m jlX w-M .==

[

x <

d l

~ ll A ,

m N

Me W.W.s-s J-m

_a I W 7 6C

$7 *C C7 *C 26 *C 72 *C 9[ *C SC *C CC*

~

s # NPI.'.'v8_J m _ ,v C d ~i P, _J _u - . . < ' e' _O. v,n_ _J O. c' n-"

. i a

o O

~

t'.

o C

Q

.w e

O Q

--?d .,e

.m y -

i e- ,a

. a i I

.io E

- wH e

a '

x

- o iti $

  • Ln

.oW e

Jw CHa d

E.i Vs

. mi -

6 x -

$  %'O2

.  % a 4

~

-55 d .

a ~w 5

@"Z y -

=M H d & Io

< o 1 - .

4I C

$x 9F5 i i 3

v.

N ~ l c

g

=a c i i

e

= a

_w

. a x =

a C w .

W -

a

--- 4 1 - C h . z ;; -E w .a- T"~

~ s=r c-m,r---s aw. c

-- ,_ o 00 '2't 00Y

00 'O'! 00'8 00'9 CO '? 00'2

,OI. 'J3S/W8 i '31YM M0ld ABS

- - - ,- _ . _ _ _ _ _ . _ , - _ .- - , - - - -- _ .-. _.n- . . ,

C c

Q

.N 5

a O

c

. ~t C

o o

<i a 49 al .O C

R <i

< <\

<l V:

w <i a

t~

0

<l .

  • 0 a

<\

z ,, .c w

  • <l

=

z

~

<l al p c E N

  • Ui

= <,

aw w .C w li

  • D Z

w al i

~

r W

'l c2 m <i o x <\ C

- <i _m w

3. , <\ m1

+

e

<t l

<l a

o E <i .

<1 o F

a

  • 5

<i N

- <\

<\

<\

.- <r 4

<\

e c x

C E

w _

i N' <a e

o ,

l.c

<12 41

<l 4

<l

<i

o

' ' i , A l

' s 72'O 02'O 9I 'O 2i 'O 90*0 70'O CO 'u 031]V3B OYl] 30 NOI1]VEd

c c

o

.~

b C

C O

C

,a a

m Y .2 ; d Le s 2 1D

v. 2 \

d -m D .

- C 5 r i o

  • S d

.& m.,, D,

_x H -"

E r.

x ia-c aD e oW

' W r, a s u  :

k -= 3, s - -

r --

r.: m -r 9

s E~

w _s Q

.d.

_m W x =2 mI

= m =-~

4 4 O r*

  • 5 - ,o b

E 'N~ -

-3 m. ,

v .

- . . .. A c 1 C e ,.

e d

w I x

w E <

w . s.a

-_ .a-x

~

-- I i

C -

Ic lc ,

CD 'd! 00 'O't 00'8 00'9 00 't 00 2 00 0 2 0I+ 335/W81 '31VE NOI1]n00Ed NV315

,m

C C

C

.c:

I C

C C

.c

-t C

C O

v M

g 1 C m C

'A .

b C E .N

~

1

~

x C

.M

$ CW G c+

x ~D C Z c2 E C ,

.r

- .O W

! cc 1 5 w

_?

C

'ia C 3 C

- c 2

I N

O C

.a 4" 3

i

~

C C 1 4N l O

C 00 'Or'2 CO'002 00*0'8 00'0? 00'N 00 'OdI,V I S d00'ONI

'3MnSS38d

1 l

i l

. 1 l

I l

=

c c

.=_

o C

, .D .

O z i. a f C

< 4 i i- _v ~

z .

W t.

5 o r a

.J c

_r .N_

r z

Li C

$

  • Ln

. a tu

.o w d

~D Z

N

- o2 i: o

  • 7~ .c Le DX 5 -

- s a

H C 5 o x .o

= c I

x w

x 5

"ci n

W C

c c

.N s

kw !s I-

.a 00'OSE CO'02E 00'092 CO'Ot2 00*002 CO'09: 00 '02 t~

d '930 '3Bn1VB3dW31

c C

d

.c o

C o

t .C.

<1 e

o d

"b 1

M o C

A .

= o z .N

=A

.M.

e O Z

y o@

oW x .o  %

x -

5 Z m

w a2 C

5 .

m z .c W y CI c

H a

a C

h C z

3 .dC i

e y 'aC R .

-- .c

- w a

c

.dN I

41 C

a i i .

00 f 00'OP2 00'002 00'091 00*02I 00 '08 00 'Or

'VISd '3bnSS3bd

o e C c

_c:

C c

O

_c m

E

< C 8

o m o a _w t- ~

E r

. O w

z c

=

  • 0

_N v: "

z m

x 4

> c

' (.A O

c _O g 5 Z E -

< Z x c

.- a b dLd

+

a1-H G H E

w 3

c C

- ie o.

w 5 C u

- c A .

_ow a

C

_O N

O c

. i i . , i - .a 00 'OSE 00 *00E 00*052 00*002 00*05t 00 *00 t 00'0 7

.d ~ 0 30 '38n1Y83dH31 l

. s c

O d

.c-o O

M .

E C

< .c t

M W

$ 0 o

z I O J .w r

r-v.

m o E C W *

> C

4. -3 I

~-

C J Q i

H d(f)w

.c H I ~ -)

t

=

z N Z C

~i O x .

I _o W

= CZ

= ~

G H v.

E o E- o

.o g

e i

C w C x .

=

a, 3

w I

o C

AN O

o

. . i 4

00 *02't 00 'OdC 00*00'E 00 *0t2 00*00! 00'02I 00'0 7 3'930 '38n1V83dW31 100d NOISS38ddnS l

=

c Y

-=

-c c ,

$wd -

lC ax .

s amm n e.

o: @ l 6E .

C Uw

-a ,

M ,=

ia

= .

n .n a.

t-c I x ?e

' o 5- .

x .m ~

x

= l ro y C

  • r -

z . o, a C x .

t-

.o z m E LU

. W

~

.- s r l -

s 1 g .6-

r. L . :.

2 se i

A

.r .

_: .aw w

> I ".

l.

a 'C l

x 3 ,

.,. c

~

, -r a s 3

m i

2  %. ,a C

M } rj n

= ,

w i

a

'a 03 'O'? 00 'OE 00'02 CO *OI C0 'O 03 'O I'- 03 'Op U

  • 1d 'l3A37 d31VM N371 CMS

l l

l l

FIGURE 13 -REACTOR SIEAM PHESSUME. PSI A VERSUS TIME. MINUTES-STATION Bl ACKOUT WITH RCCIC Fl.0W & MANUAI, D$ PRESSURIZATION ,

C1 O

N

~

^ ^ ^ ^ ^

^'

,7

^_ ^ ^ ^ ^^

.s

.c g

U1 O '

(L g-til Z

]o Ln a U) ._

til U

Z j fL in 't U)

Z .

OO l-UW 9

til Z

o O .

L 00 I.00 4'.00 d. 00 d. 00 l'O. 00 l'E 00 l'4.00 l'6.00 10.00 fIME. MINUTES *10'

c c

az . .$.

<c

=-

n-5<

m

.N

.a x C C

5 E m?

aw .6.:-

w=

C U *a:.

-c U

=

- c P c 3 .n ~

t-x s

1 E C c

3 - .N e

H es

  • O
'0 C Ce t- .

a =

E ~ (n

-

  • W y +

CZ Z -

a x

d ~:-

W

.H -

R-E CC a

.: -d x

a

.a. _.

g

> C x . ., .

z i

%e 4

~

a b .

% ~- - E.& u y:QR.; 1~

~

-9 i

--S{A.; .- mLT,{ 2.4s a*;r .

1

% m g , ] 5 I 4lh* ' e r , ,

'u.'.7. M 0.C .

l 00'OSE CC'OCE CO'O?2 00*08I 00 *02't 00'09 00'0

'335/H81 '3.lV8 MOl.d ABS

i FIGURI 15 _ FRACTION OF CLAD REAC1FD VERSitS TIttE HINUTES-STATION BLACKOUT WITH RCIC FLOW & IIANilAL DEPRESSURIZA TION o

m nn

  • 1 cs

^^

d' O

1 S LJ '

! ta Um

< d-LAJ 1 ,

O

<m

_J - -

Ug.

LL '

O b3 ...

> C3 U

fr tt .,

an a

g. ,

o ,

o g

O.00 2. tal 4.00 6.00 8.00 10.00 12.00 14.00 16.00 10. UD tit 1E. MINllTES *10' l

l

1 FIGURE 16 STIW1 PRODt?CTION RATE, I.hM/SFC VERSUS TIME, HINilTES-ItLACKOUT MANifAL DEPRESSURIZATION RCIC FLN o

o -

rJ_

m b8 - .

+ 9-o ist U) o xo r ai-(;

2 tri g_a g

tr $

Z o

"o 5a u ...

a*

O o

rr CL o

n- O

  • C PJ 141 l--

tn Sh%k)3 it on 2. on t

i.00

6. on LA - --
n. on 10.00
14. on 16.oc l o. on TIMF. MINUTES
  • 1 0, 12.00

Fit;trRE 17 -DRYWP.I.I. I'RESSURe ggI A VS. TIME. MINUTES-STATION Bl.ACKOUT.WITil RCIC FI.OW & MANUA1. ,

DEPRESStlRIZATION I o

O" r-

. O O

O d.

o O

o N-e-,

<n j u_ o O

-d til =t rr a

tn (J) O LLJ p it -

LLQ-O O

Y~ ......... /

6 ~~I~ ^~F-~---~ ---

$3$3

~i.l.00 ' 4 00 n. un

a. on 3'g, og

l TIME. MINilTES a10' 1

=

c

~e sP zc

~

l

@Nx _

.a z .

2m m :aa w w J CG

  • w c. .c w -

uc u '

= '

I e-- a 2 c

r. .n ..

C w I u

5

=

w g a

~

.N -

l-=

T ~

e w a E

=

i o*

o

<\

d e . LD z

1 y

<1 41

> a

[* 4 $

, C_

C v

, -4 ~ .

u <

x .

=-

w w I

.c 4

= <

r c

<c

=w 4

e

~

i!

4 A l

s =

c

?  : ..

T <

l*

3 l l Z o w h C

1 l=

~ i  !-

. -d 4

1 i .

1 l

O 1'- =

. .a i 00*095 00 *09't 00'007 CO '02'E 00*0i2 Oc *C9I CD'C9~

d '030 '38n1V83dW31 l

L

.t t

1 i

1 l i 1 1

  • I FictlRE 19 -WETWEI.I. PHESStrHi:,1*SI A VS TIME, ilINt!TES-STATION Ill.ACK0llT.WITH RCIC FLOW & MANIIAI.

DEPRESStfRIZATION t I

(

! o o

i d_

o i T t 1 o .
o ,

t d

m-  !

r' o

,I o

o
.m f <

i' in Ro 1

o t

.d to ,,--

tr a

! m  ;

i ma i 1 td o

. [E .

o g-- -

l J

1 t

1 1

o o

i d-ru . ______

i

, o l .

o _
u. 00 2. 00 4.00 6'.00 o'. on l'a. oo l'2. 00 l'4. on is.00 ls' ao j

' TIME. MINilTES

  • I D' '<

i 1

_ _. _-____rn_ _ _ _ . _. -,-- - ,

1 1

I,

~

FIGURE .20 -WEWELL TDIPERATURE IWG, F VERSt!S Tit!E. HINUTES-STATION PLACKOUT.WITil RCIC FLOW & MANUAL o DEPRESSURIZATION 4

o N.

M i i

a

o I

d m

N a

1 a it d L. . . g . - 3 . 2 ' S * '

j (3"~ #

i. tal o ,

o

,o .

Lild 4,

tr o..

-jN H

i fr o ,

go Eh6 e o_ ,i y- -

I---

o l o

, d .

N.

-e ,

3. --

4 ,

i o

oo i .

4 o. _ _

l *0.00 2'.00 4'.00 o' on e' oo i o. oo l'4.00 l's. 00~ l'O. 00 ,

[ I ME. MINUTES *1 0' i2.00 _

4 1

.. .. - . - . = - . _ . _ . . ~ ~ , - ~ . - . . . _ . _ . - - - - . . _ _ _ ~ . - - . _ - . . _ - _ . - . - _ - - _ - . . -. _ . - _ - - . - - - - - . . ~ _ .

1

- i i

FIGURE 21 -SUPPRESSION l'tXE TEMPERATURE,DEC F VERSt!S T1HE, HINT!TES-STATION BIACKOUT ,WITH RCIC FLOW & MANtfAL DEPPESSITRIZATION i o

o d

N, en o

Lt. O

.d

(_3 (D.

ti1N O

.O tJo i Za d,- - - - -

, t- N  !

s i

4 ..

i ttJ o (L o Z-l118 pa 1

0 -

og ---- -

o. O.

t Z *- .

a m

ln in O U tii mo n, N.,

0. "

,' D in 2

o on

"-- i . . . ,

  • 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 TIME. MINUTES *10' k
  • 4 4

4 , --,, m , . - , , _ _ , _ _ . _

. I L

QUESTION 38 It is not clear from your evaluation why the probability estimates of early failures with higher releases are lower than for Class IV events.

Please explain if venting of ATWS sequences before core melting was assumed.

y RESPONSE 38 a) Comparison of Class IV Low Release Frequencies Versus High or Medium Release Frequencies

, There are many types of accident frequencies which could lead to a core melt accident. For the spectrum of accidents, each accident has a conditional probability of leading to a containment failure that could result in a high or medium release by defeating active and passive mitigation features such as drywell sprays and the Reactor Building, respectively. Therefore, Class I, II, III and IV sequences can all result in higher releases if and only if minimum mitigation is encountered on the release pathway. In particular for Class IV, active and passive mitigation processes also exist.

Class IV accidents are one part of the overall accident sequence spectrum. Class IV sequences are those in which an ATWS is not successfully mitigated and containment could be challenged. However, as noted by the Class IV containment event tree there remain a number of mitigation measures possible to reduce or minimize the radionuclide releases even after containment is failed due to an ATWS event. Class IV accident sequences represent a relatively small fraction of the total core melt frequency, i.e., less than 10%. The remaining 90% of the accident sequences also have the potential to produce large radionuclide releases under special circumstances.

There are several alternative paths throuth the containment event tree which could result following a class IV accident sequence. These paths vary in their potential consequences from low to high. The

' 510tR

8 1

I mitigation measures which are effective in reducing the radionuclide source terms include:

o Passive

- Wetwell airspace failures (i.e., the containment failure mode identified in WASH-1400)

- Reactor Building decontamination o Active

- Drywell sprays or coolant injection to drywell Each of the mitigation measures has the capability to reduce the radionuclide source terms to the low category (L). Calculations using both MAAP and MARCH /RMA indicate that radionuclide releases for severe accidents can be maintained below a 1.0% I equivalent release when an active or passive mitigation measure is available during the core melt and ex-vessel interaction process.

In summary, the low release frequency of the ATWS Class IV sequence can be greater than that of higher releases because the Class IV containment event tree has several mitigation measures which tend to reduce the potential consequence of an ATWS release leading to the high (H) or medium (M) category. This is demonstrated by both MAAP and MARCH /RMA.

5104R

a 4 <a 4

b) Venting During ATWS Venting as a mitigation measure for ATWS was not used for two reasons:

4 o The current Vermont Yankee procedures require that there be no unusual radionuclide activity before venting could be performed.

, For ATWS scenarios thee could be substantial radionuclides present in containment even though the core is essentially covered and effectively cooled (i.e., peak clad temperatures below 2200 F).

o Adequate venting capability to vent the excess steam to the envir'onment does not currently exist. There are a multitude of pathways to vent at Vermont Yankee but most are through ductwork in the Reactor Building (see Response to Question 33).

1 4