O PRIMARY CONTAINMENT -

LEAK RATE TESTING PROGRAM for Vermont Yankee Nuclear Power Corporation Vermont Yankee Unit 1 Description, Program, and Examination Schedule Applicable to:

10CFR50, Appendix J Type B Testing Type C Testing Prepared by:

G. CAPPUCCIO _

4 o ,

tl 1 44 I Plant Manager PORC (/

h -

Manager ~of Operatio$s

(

Controlled Copy No.

Original Issue: Issued to:

f[kh P

O

2 PRIMARY CONTAITMENT LEAK RATE TESTING PROGRAM y Record of Changes INITIALS INITIALS Change Date Plant Change Date Plant Number Entered PORC Manader MOO . Number Entered PORC Mannear- MOO i

P f

0

+

l l

l l

l 1( '

i w  % w m - - . . n m .. e-.-.- -

T

~

p -

2 PRIMARY CONTAINMENT LEAK RATE TESTING PROGRAM j

- Table of Contents -

Beginning Page No.

A. INTRO D UCTIO N . . . . . . . . . . . . . . . . . . . . . . . . . . . . i _-

, B . N O T ES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-1 i

s C. PROGRAM I 1. Penetrations -

X-1 t hr u X-8 . . . . . . . . . . . . . . . . . . . . . . . . . C-1 X-9 A t h ru X-2 0 . . . . . . . . . . . . . . . . . . . . . . . . C-2 X-21 t hru X-2 8 F . . . . . . . . . . . . . . . . . . . . . . . C-3 .

X-2 9 A t hru X-3 4 B . . . . . . . . . . . . . . . . . . . . . . C-4 X-3 4 C t hru X-4 2 . . . . . . . . . . . . . . . . . . . . . . . C-5 X-4 3 t hru X-5 2 D . . . . . . . . . . . . . . . . . . . . . . . C-6 X-52E thru Shear Lug Access Covers A-H . . . . . C-7 X-10 0 A thru X-10 5 D . . . . . . . . . . . . . . . . . . . . C-8 X-2 0 0 A thru X-2 0 9 D, X-5 0 A-C . . . . . . . . . . . . . C-9 X-210 thru X-210B . . . . . . . . . . . . . . . . . . . . . C-10 X-211 A thru X-2 2 5 . . . . . . . . . . . . . . . . . . . . . C-11 X-2 2 6 A thru X-2 2 7 . . . . . . . . . . . . . . . . . . . . . C-12 D. RELIEF REQUEST BASES:

R R B No. D-1 thru D . . . . . . . . . . . . . . . . . . . . D-1 i.

1 ,

a l -

h

2

[. c

. INTRODUCTION -

VERMONT YANKEE PRIMARY CONTAINMENT LEAK RATE TESTING PROGRAM The Primary Containment serves as a leak tight barrier against the f uncontrolled release of radioactivity to the environment.

The leak rate testing program verifies the integrity of the primary reactor 4 containment, related systems and components penetrating the primary containment pressure boundary.

The VY PCLRT program conforms to regulations set forth by 10CFR50 Appendix J, entitled " Primary Reactor Containment Leakage Testing for

  • Water-Cooled Power Reactor".

There are three types of tests which make up'the VY PCLRT program; they are: Type A,-B and C tests. The Type A test is implemented by O.P. 4029 whereas the Type B and C test are implemented by O.P. 4030.

The Type A test measures the primary reactor containment overallintegrated ,

leakage rate. The Type B test measures the localleakage across the primary containment penetrations and seals, which ar'e listed in the VY PCLRT Program.

,The Type C test measures the localleakage across the containment isolation I 0alves, which are listed in the VY PCLRT Program.

L

3 j NOTES s

1. - Type C testing is not required for the 1-inch diameter lines with *

- at least one isolation valve and a cap in series, which is under administrative control or where plug-in test taps form the second barrier, which is also under edministrative control.

' 2.' - Type ~ C testing is not required for lines forming a closed, seismic qualified loop totally within the reactor building, whose 30-days water supply is assured via the torus or reactor vessel and no single active failure can preclude the continuous availablility of a water seal.

3.' Type C testing is not required for valves which remain open with the system operating at pressures greater than Pa throughout the 30-day post-accident period, considering possible single active failure.

4. Type C testing is not required for instrument lines of 1-inch or less .

that meet the provisions of Regulatory Guide 1.11.

5. Type C testing is not required for instrument . lines of 1-inch or less forming a closed system within containment with no interface with containment atmosphere, has no automatic isolation, but remote manual

. Isolation upon failure of a line.

6. Type C testing is not required for standby liquid control system lines equipped with normally closed valves, leak tight against reactor system

. pressure with explosive charges to open the valves under certain conditions.

7. Appendix J permits testing of isolation valves in the direction opposite the direction of accident pressure, where the leakage is equivalent in -

either direction.

0 t

.?

Vermont Yankee's Leak Test Program List In order to verify containment isolation, the Type A, B, and C

' Tests are performed in accordance with 10CFR50, Appendix J. The Type B and C tests are used to quantify the ability of the containment penetrations and isolation valves to pe.rform their intended function.

The progrsm list includes all the penetrations which are to be tested as per the requirements of Appendix J. Where the requirements of Appendix J do not apply, the program's comment section provides ,

.(h' t reference notes which contain the applicable explanations.

. Where exemptions to Appendix J are required, the program's comment

~

section will provide the relief ~ request number.

h t

vu _

v a c o -a VERMONT YANKEE - 1.0 CAL LEAK TEST PROCRAM Sh*2C I f f 12 Contrinnent System Reference Appendix J First Second P netrition or Drawing Required VY Proposad Isolation Site Isolation Size '

Numbir Function Number Testing Testing Valve (s) (in) Valve (s) (in) Comments -

X-1 Equipment Access B - Air or B llatch C-191148 Nitrogen Air X-2 Airlock C-191148 B - Air or B 16-19-13A 3/4 Strongback Req. for full C-191175 Nitrogen Air 16-19-138 3/4 16-19-56 3/4 prean test - testing not required for 16-19-56; see Note 1.

X-3 Drywell head B - Air or B Testing not required for flange C-191175 Nitrogen Air test tap; see Note 1.

X-4 Drywe'l head B - Air or B , Testing not required for

.aucu hatch C-191148 Nitrogen Air test tap; see Note 1.

X-5 A thru 11 Chk. viv. covers . B - Air or B Testing not required for vent from torus C-191175 Nitrogen Air test tap; see Note 1.

X-5 A thru 11 Check valve B - Att or B Testing not required for shaft seals C-191175 Nitrogen Air test tap; see Note 1.

X-6 CRD Removal 'B - Air or B Testing not required for Ita cch C-191148 Nitrogen Air test tap; see Note 1.

X-7A "A" Steam C - Air or C* 2-86A 18 Testing not required for line C-191167 Nitrogen Air 2-80A 18 2-83A 3/4 viv. 2-83A; see Note 1.

X-7A "A" Steam B - Air or B Testing not required for line ballows Nitrogen Air test tap; see Note 1.

X-7B "B" Steam C - Air or C* 2-868 18 Testing not required for line C-191167 Nitrogen Air, 2-808 18 2-838 3/4 viv. 2-838; see Note 1.

X-78 "B" Steam B - Air or B TestinR not required for lina bellows ,

Nitrogen Air test tap; see Note 1.

X-7C "C" Steam C - Air or C* 2-86C 18 Testing not required for line C-191167 Nitrogen Air 2-80C 18 2-83C 3/4 viv. 2-83C; see Note 1.

X-7C "C" Steam B - Air or B Testieg not required for line bellows Nitrogen Air test tap; see Note 1.

X-70 "D" Steam C - Air or C* 2-86D 18 Testing not required for line y C-191167 Nitrogen Air 2-80D 18 2-83D 3/4 viv. 2-83D, sco Note 1.

X-7D "D" Steam B - Air or B Testing not required for line bellows Nitrogen Air test tap; see Note 1.

X-8 Main steam C - Air or C 2-77 3 Testing not required for drain ,

C-191167 Nitrogon Air 2-74 3 2-75 3/4 test tap; see Note 1.

  • See reli ef request D-2.

i

t. e**

t .

I

, wu ,;, - ,

-n m m .

f r . .Q Sheet 2 ef 12 VERHOFT YANKEE - LOCAL LEAK TEST PROCRAN Containment System Reference Appendix J VY Proposed First Size Second Size P m tration or Drawing -Required Testing Isolation. (in) Isolation (in)-

Numbst Function Number Testing Valve (s) Valve (s) Coritents X-9A "A" Feedwater C-191157 C - Air or C 2 - 28A 16~ 2-27A 16 Testing not required for G-191167 Nitrogen Air 2 94A 3/4 ' viv. request see 2-28A; D-1 relief C-191169 Testing not required for See Comments viv. 2-94A; see Note 1.

%-98 "B" Feedwater' C-191157 C - Air or C 2 - 28B 16 2-96A 16 Testing not required for C-191167 Nitrogen Air 2-945 3/4 viv. 2-28B; nue rollef C-191174 request D-1 Testing not required for C-191178 See Comments viv. 2-948; see Note 1.

X-10 RCIC Steam C-191167 C - Air or C 13 - 15 3 13-16 3 Testing not required for supply C-191174 , Nitrogen Air 13-46A 3/4 viv.13-46A; see Note 1.

13-150A/B 1 X-11 HPCI Steam C-191167 C - Air or C 23 - 15 10 23-16 10 Testing not required for supply C-191169 . Nitrogen Air 23-27A 3/4 viv.23-27A; see Note 1.

23-160A/B 1 X-12 Ri!R - Shut. C-191172 0 - Air or See Comments 10 - 18 20 10-17 20 Testing not required for cool, supply Nitrogen 10-84 3/4 the system; see Note 2.

X-13A LPCI C-191167 C - Air or See Comments 10 - 46B 24 10-25B 24 Testing not required for injection C-191172 Nitrogen- 10-78B 1/4 the system: see Note 2.

X-13B See Comments 10 - 46A 24 10-25A 24 Testing not required for 10-78A 3/4 the sytem; see Note 2.

X-14 kWcu C-191167 C - Air or 12 - 15 4 12-18 4 Testing not required for Suction C-191178 Nitrogen SeeComment1 12-16 3/4 the system; see Note 2.

Sparu U-191419 A - Air A None X-1$

Air ,

Core C-191167 C - Air or See Comments' 14 - 138 8 14-12B 8 Testing not required for X-16A Spray C-191168 Nitrogen 14 - 30B 2 the system: see Note 2.

14 - 13A 8 14-12A 8 Testing not required for X-168 See Comments the system; see Note 2.

14 - 30A 2 X-17 RHR llead C-191167 C 10 - 29 4 10-33 4 {NIY6_EN @ "N{N h Spray C-191172 None Air 10 - 32 4 10-83 3/4 gpgr . f pvs.

Drywell C-191177 C - Air or C 20 - 82 3 20-83 3 Testing not required for X-18 Nitrogen Air 20 - 78A 3/4 20-79A 3/4 A vivs.20-79A. 78A, 78B; Floor drain Sh. 1 i

20-788 3/4 see Note 1.

X-19 Drywell C-191177 C - Air or C 20 - 94 3 20-95 3 Testing not acquired for Equip. drain Sh. 1 Nitrogen Air 20 - 93A 3/4 20-92A 3/4 v1vs.20-92A, 93A, 93B;20-938 3/4 see Note 1.

Spare C-191148 4 - Air A - Air 6 None X-20

---e f-

{\ n .+

,s.,p-ssu

  • m sw. - w a ww.mQr u.-

.? .

VERMONT YAN(EE - f.OCAL LEAK TES1 PROCRAM Sheet 3 of 12 .

C$tainaeat' System Re f erence Appendix J ,

First . Second Penetration or . Drawing Required VY Proposed Isolation. . Size Isolation Size

  • Numbc g _ Function Number. Testina Testina Valvo (s) (in) Valvo (m) (in)- Conmenta x-21 Surviro Air C-191160 Sh6 A = Air A - Air 72-375 2 See Comment- Walded cap outsido dryvell.

X-22 innt. Att C-1911t,0 Sh4 C - Air or C - Air 72-89C 2 72-898 2 72-152 Testing not uquired for Nitrogen 3/4 72-103 2 72-153A 3/4 heg, b X-23 Inlet 70-113 8 None Testing not required for the See Comments system; see Note 3.

HBCCW C - Air or X-24 70-117 8 None Outlet C-191159 Sh3 Nitrogen

~' ~

X-25 Atmosphere C-191175 C - Air or C - Air 16-19-7A 18 16-19-7 Testing not required for Control & CAD VY-E-75-002 Nitrogen 16-19-6A 3 16-19-6 VC-12A, 17A; see Note 1.

16-19-12A 1 VC-22A 1 Valves 16-19-6A, 7A is VC-9A 1 VC-17A 1 tested in the rev. direction See Note 7.

Ih-4U-31 J 9 X-26 Atmosphere C-191175 C - Air or 16-19-8 18 16-19-338 3f4 Testing not required for Control & CAD VY-E-75-002 . Nitrogen C - Air 16-19-51/52 2 16-19-35A 3/4 v1vs NC-19, AC-228, 30,31 16-20-228 1 16-19-9 18 16-19-33A, 33R, 35A; see NC-13A/B 1 16-19-23 6 Note 1.

16-20-30 3/4 16-19-53 1 valve 16-19-8 is tested NC-19 1 NC-11A/B 1 in thr reverse direction; 16-19-33A 3/4 16-20-20 1 see Note 7.

AC-22B 1 XT27'A Core Spray C-191267 C - Air or S t.- esting not mquired for See Conunents Instrument C-191168 Nitrogen .None vive. SL-25, -27; see Note 4 X-278 SL -27 1

  • l Core Sprpy C - Air or See Conments SL-31A 1 None *
  • E I " E "* * '*9 " I " ' #

7C Delta l* C-191168 Nitrogen 1 vivs. S 1A,31B; see Note 4 X-27D SL-318 X-27E IIPCI Aut Testing not required for See Comments SL-37A 1 None Isolation C - Air or v1vs. , SL-37A.SL-378; see X-27F Signal C-191169 Nitrogen SL-378 1 Note 4 X-28A RV Press & C - Air or Testing not required for Level C-191267 Nitrogen See Conments SL-19A 1 None viv. SL-19A; see Note 4.

X-28B Reactor C - Air SL-17A 1 None Testing not required for X-28C Vessel or gt,g33 g whs. , St.4 7A, M A,13A, X-28D Ixvut C-191267 Nitrogen Seu coienents  !!; sco Note 4.

X-28E g S L-13A 1 SL-11 1 X-28F RV llead C - Air or Testing not required for Leakage

  • C-191167 Nitrogen See Corments SL-23 1 viv. SL-23; see Note 4.

e g p

-- ., , n A'

~' Sheet 4 of 12 +

VERHONT YANKEE - LOCAL LEAK TLST PROCRA)I Conceinment -System Reference Appendix J First Second P3m tration .or Drawing Required VY Proposed Isolation Size Isolation Size Number ~ Function- Number Testing Valve (s)

Testing _(in) Valve (s)- (in) Comments X-29A SL-19B 1 kracter Ste295 1 X-293 gg,.g73 g Teating not required for

. Voanel C - Air or . viva. Slal98, 293, 178, X-29C I"vut C-191267 Nitrogen iuu Communtd Sle15B 1 None 15n,13n; seu Note 4 S L-138 1-X-29D X-30A tuin Steam C - Air or See Comments SL-73A 1 None Testing not required'for X-305 Ftw "A"

  • 191167 Nitrogen Ste735 1 v1vs.Str73A. MB; see Note 4 X-30C tuin Steam 'C - Air or SL-73C 1 None Testing not required for X-30D Flow "B" C-191167 Nitrogen See Comments 'SL-73D 1 vivs. SL-73C, 73D; See Note 4.

X-30E Recirc. Loop C - Air or SL-305A 1 None Testing not required for 3.)gy Pruunuro C-191167 Nitrogen Sco Comments Ste3058 1 vive. SL-305A 305n; see Note 4.

X-31A Recire. Pump C - Air or S L-62 A 1 None

, Testing not required for X-318 cita P C-191167 Nitrogen Soo Comments SL-628 1 v1vs. SL-62A, 62B; see Note 4.

X-31C kuc t rc. Imop C - Air or Ste64A 1 None Tentjng not required for Flow C-191167 Nitrogen Sco Communts SI.-645 vivm. SL-64A, 648; see

-X-3tD 1

~

Note 4.

X-31E v-J-9&UA Recirc. Pump SL-2-7A, SL-2 38A;for viv5.

Testing r.ot te C-191167 V-3-413A V-3-408A see X-31F Seal Leak SL-2-7A rec t ion / scal C-191159 sh.5 C - Air or Nitrogen See Commente 1 V-3-412A ytc,, egg, Q[3*

'X-32A

{.-2]A 1 y-3-4134

%e Note 1. NQM Recirc. Pump C - Air or 8 1 Testing not required for 3 V-3-4118 X-328 Iwlta P/ scal C-191167 Nitrogen See Comments 1 I 6 purnu C-191159 Sh. 5 y-3-412R X,M.'t%~9 u

V, ,4,3 8

y-3-40gg egg -b 3-407,415a.[ot 41tn:seer h.Note flr viv$

t X-334 CRD C - Air or

    • ""*"
  • Testing not required for Pressure C-191267 Nitrogen SL-35 1 None SL-35; See Note 4.

X-338 IIPCI C - Air or S Co m ts SL-37C 3/4 None Testing not required for X-33C Pressure  ! C-191169 Nitrogen SL-37D 3/4 v1vs. SL-37C, 37D; see Note 4.

X-33D SP are , Cc191148 A - Air A - Air None None None X-33c RCIC C - Air or Ste55C 3/4 None Testing not required for P re s t..' r e , C-191174 Nitrogen SL-55D 3/4 v1vs. SL-55C, 550; see See Comments tN X-3%A

!!ain Steam t C - Air or SL-73E 1 None Testing not required for X-348 Flow "C" .

C-191167 Nitrogen See Comments SL-73F 1 viva. SL-73E, 73F. See '4 *

- .1 ' L 3 w-H

, . O Sheit 5 of-12 '

VERMONT YANKEE s IOCAL LEAK TEST PROCRAM-Contsi_ ment System Reference Appendix J First Second Penetretion or Drawing Required VY Proposed Isolation Numbsr Sise: Isolation Size Function Number -Testing valve (s) (in)

Testing valve (s) (in) Comments X-34 C min Steam C - Air or SL-73C 1 Nane Testing not required for vivs.

X-34 D Flow "D" -G-191167 Nitrogen See f.omments 5L-7311 1- SL-73:, 7311; see Note 4.

I-34E Recirc. Imup C - Air or Ste97A 1 None Testing not required for vive.

y_347 Pressure t,-191167 Nitrogen See Comments St.- 97B 1 St 974,97h see Note 4 2-35A Tip Air Purge /

Flange seal C-191148 C- Air or 1/2" tube / Testing not required for tap; Nitrogen C/B Check 1\" flange Solenoid 1/2" See Note 1.

X-35B Spare C-191148 B A None None Non-test.sble gasket X-35C Tip C-191148 C - Air or X-35D Tubes / Flange Nitrogen / '

Seal Tip Ball 3/8" tube / Testing not required for tap; B C /B Valves 1\" flange None see Note 1.

rX-35E --- --

X-36 SP are C-191170 A - Air or A j Nitrogen Air 4

X-37 CRD inscrt C-191170 None 3-13-138 See Corunents 1 None Testing not required for v1vs.

3-13-126 1 , 3-13-138, 126, 123, 120; see 3-13-123 1 , Relief Request D-3, 3-13-120 1

X-38 CRD Willutraw C-191170 Nono Seu Comment. 3-13-127 1 Nono Testing not requires! for vivs.

3-13-122 1 3-13-127, 122, 120; see 3-13-120 1 Re11ef Request D-3.

X-39A Daywc11 C - Air or 10-318 See cosaments 12 10-26B 12 Testing not required for v1vs.

X-393 S P ray C-191172 Nitrogen 10-31A 12 10-26A 12 10-318, 31 A, 268,26A; see Note 3.

X-40A Drywell C-191172 A - Air or A - Air None None X-40s Pressure See Note 4.

C-191175 Nitrogen X-40C X-40D X-40XX Jet Pump C - Air or (24 Prs) Detta P C-191267 Nitrogen See Comments St-23-XX (48) - 1 None See Note 4.

X-41 Rectrc. C - Air or FCV-40 Sample 3/4 Testing not required for viv.

C-191167 Nitrogen C - Air FCV-39 3/4 V2-41 3/4 2-41; see Note 1.

X-42 Standby C-191167 C - Air or 11-16 See Comments 1-1/2 Testing not required for viv.

1.1q. Control C-191171 Nitrogen 11.-17 1-1/2 11-36 1 11-36A. See Note 1. Testing C-191267 not required for the system; See noto 6 & 2.

9 t' ' '

.g ,L_

,e- _. - .

w-r D '

VERNONT YANKEg - LOCAL LEAK TEST PROCRAN *

~ Cont.inment System Reference Appendix J First Second Penetration or Drawing Required VY Proposed Isolation Size Isolation size Number Function Number Valve (s)

Testing Testing (in) Valve (s) (in) Comments X-53 *

  • ~

._ Spares A- Air A - Air None None None X-li

, X-46 X-47 Drywell air C-191160 Sh4 C - Air or V-72-38A 2 V-72-388 2 Testing not required for Cump. suction Nitrogen C - Air V-72-151 1 viv. 72-151; see Nots 1.

X-43 Spa n. C-191148 (D-13)

X-49A l RCIC C - Air or Ste55A 1 .

Testing not required for 749, , Delta P C-191174 Nitrogen See Comments SL-55B 1 None vivs. SL-55 A, 55 B; see p-Note 4.

X l

_-49C 8 X-49D Srv. Bellows Pressure C-191167 A - Air A - Air None None See Note 4.

X-49F ~~

X-50A VC-78 3/4 ,

VC-80 3/4 See Note I

_X-son CAD VY-E-75-002 C - Air or C - Air VC-21 3/4 VC-23 3/4 Testing not required for

~X-50C Nitrogen VC-26 3/4 viv. VC-21 78,SO.

X-50D Spare C-191148 A - Air A - Air None None None X-51A Post Accident Sam- SL-301C 1 I tooP pling SL-301C Testing not required for X-518 1 viva. SL-301C, 301C, X-5IC~~ g) C-191167 itr r.cn suo comments SL-30lP 1 Nono 30lF, 301R; neu Nato 4 X-51D . :L-3015 1 X-51E Spare A - Air A - Air None None None [

_t X-51F Jet Pump C - Air or Testing not required for Dutta P C-191267 Nitrogen See Commer.ts SL-33 1 None viv. SL-33, see Note 4. .

A~02^ SL-301A Post Ace!Jent Sani. 1 X-522 I IMP SL-3 ole 1 ""EI"E ""' '#9"I'#J I"'

Selection i C - Air or v i v. S t.- 301 A , 301E, 30111, X-52C '

, Innrmut ) C-191167 Nitrogen See Comments SL-30lli 1 Nono 101D; sue Note 4.

X-52D SL-301D 1 t

S g

! g I

- . + - - - m .- _ w. , , .- -

/"~ .

, G Sheet 7 of 12 ,

VEBMONT YA.4KEE - 1.0 CAL LBAK T; ,T PROGRAM -

Containmeng System _Beforence Appendix J First Second Penstration or Drawing Bequired VY Proposed Isolation Size Isolation Size Nunt>s r Function number Testing Testing Valve (s) (in) Valve (s) (in) Commente X-52E Drywell Pressure C-191175 A - Air A - Air None None See Note 4.'

X-52F X-9A A" Feedwater I 5 - Air or Testing not required for Bellows C-191157 Nitrogen B - Air None' None tap; see Note 1.

X-98 "B" Feedwater 8 - Air or .

Testing not required for

Bellows C-191157 Nitrogen B - Air None None tap; see Note 1.

X-11 tiPC: h v3 .. ,

B - Air or Testing not required for Ikilows , C-191167 Nitrogun B - Air None None - tap; see Note 1, X-12 Riin Bellows C-191172 5- t or B - Air None None Testing not required for Nit ren tap; see Note 1.

X-13A  !.PCI B - Alt or . Testing not required for X-135 Bellows C-191167 Nitrogen B - Afr Mone None tap; see Note 1.

X-14 RUCU Suction B - Air or Testing not required for Bellows C-191167 Nitrogen B - Air None None tap; see Note 1.

Core S P ray B - Air or Testing not required for X-16A Bellows C-191167 Nitrogen B - Air None None tap, see Note 1.

X-16B Shear t.ug Access B - Air or Testing not required for Covers ( A = II) 5920-336 Nitrogen B - Air None Nono tap; see Note 1.

. h t g

r R Shest 8 ef 12 VERMONT YANKEE - LOCAL !.EAK TEST PROCRAM ,

Contsinnent '

System Reference Appendix J Tirst Second Praitretton ur Drawing Required VY Proposed Isolation Site Isolation Slee ements Numbir Function

  • Number Testing Testing Valve (s) (in) Valve (s) (in)

X-100A X-1005 Drywell B - Air or B - Nitrogen Testing not required for Electrical Nitrogen . Cap; see Note 1.

X-100C X-1000 X-101A X-101C Drywell B - Air or Testing not rquired for Electsteal Nitrogen B - Nitrogen tap; sco Note 1.

X-101D .

X-101B Spare A - Air A - Air Testing not required for tap; see Note 1.

X-102 B - Nitrogen Testing not required for Drywell B - Air or X-103,. Elvetrical Nitrogen tap; see Note 1.

X-104A

'I""' ~^ # ~

' E*" '

"' '"E " '*9" ' #

X-1045 Nitrogen tap; see Note 1.

Electrical X-104C e

X-105A X-1058 Drywell B - Air or B- Testing not required for Electrical Nitrogen Nitrogen tap; see Note 1.

p 05C

. . . . .X-105D

e. 9

.  ; .g *

~..--

r .D Sheet 9'of 12 VERMONT YANKEE - IDCAL 1.EAK TEST PROCRAM Conts11 ment System Reference Appendix J First .Second Psustration or Drawing Required VY Propose $ Isolation Size Function Isolation Size Numbsr Number, Testing Testing Valve (s) (in) Valve (s) (in) Comments X-200A Turus muw.ay B '

X-2005 Torus Nnway C-191175 B - Air . Testing not required for Nitt en tap; see Note 1.

X-201A thru Vent - Torus X-20111 to Drywell g- C-191175 A - Air Air Part of Primary Contain-ment; see X-5A thru 11.

A-202A thru Vacuum it,J,g Breaker Access B - Air or Covers - Also X-5 C-191175 Nitrogen B - Air See X - 5 X-203A thru Vent Line 203F Vacuum Breaker Part of Primary Contain-Connection ment; see X-5A thru 11.

C-191175 A - Air A - Air X-204 No Penetration X-205 CAD VY-E-75-002 C - Air or C - Air 16-19-11A 20 16-19-12A/B 20 C-191175 Testing not required for Nitrogen 16-19-118 20 AC-20A 1 vivs. NC-20, 16-20-28, (ItB to Torus Vent) 16-20-22A 1 AC-19B 1 AC-20A, 198, 22B; See 19-10 18 16-19-9 18 Noto 1.

16-20-28 1

  • NC-12A/B 1 '

AC-22B 1 Valve 16-19-10 tested in NC-20 1 16-20-20 1 the reverse direction;-

NC-11A/B 1 see Note 7.

16-19-23 6 X-206A thru Torus Water C-191169 A - Air or 206F tavut C-191175 Nitrogen See Comments None None See Note 4.

X-207A thru V""E 207tt I.ine Drains Part of Primary A - Air A = Air None None Containment X-208A thru SRV Discharge 20!D to Torus C-191167 None None Part of Containment System X-209A Torus Pressure C-191175 A - Air or See Comments Nono 1 None Testing not required for Nitrogen viv. AC-100. Seu Note 4.

X-2098 Torus Water Temperature External temperature X-209C C-191175 A A probes-no penetration X-209D CAL VY-E-75-002 A - Air or A None None (X50A,B,C) See Note 4.

Nitrogen g P .

.___ , , , - . -- ~ , , . - - - - ~ c - r '-- ' ' -

^

^

y - -

n f, N -

Sheet 10 of 12..

o .VERMDNT YANKE.! - LOCAt. LEAK TEST PROCkAH

, .q il i Containawnt Systum Mcforence Appendix J Firet . Second- 1 i Peuctr. stim ~ ur

  • Drawing . Required. VY Proposed isolation -Siso isolation Slac '

. Numil.w r . FuncLlan' -Number Testing Testinr. ~

Valve (s) . (In) . _ . Valve.(ej)_ _. (in) a .. .

8'""*"'"~

' ~ ~ ~ ' ~ ~~~

20-84C/D 1.5" l

' 20-85C/D 1.5" I-2toA min C-191168 C - Air . See comments- 10-168 4"10-19D 4" See Note 2.

hturn C-191169 or 10-348 10"10-198 4"

'C-191172 ' Nitrogen 14- 58 3"10-39B 12" C-191177 14-268 .8"10-160 3/4"

, 23-62 4" 23-25 4" l 20-319C 1 1/2" j 20-319D 1 1/2" i

l X-2105 mix C-191172' C.- Air. See Comments10-16A 4"10-19A .4" See Note 2.

l Aturn C-191168 or 20-310A 1 1/2"10-19C 4" I C-191174 Nitrogen ' '

20-310B 1 1/2". 13-27 2"

! C-191177 14-26A 8"10-39A 12" l 14- 5A 3" 20-85A/B 1.5"

! 13-29 2" 20-84A/B 1.5"10-34A 10" e

i l

e t

  • "t *

, . , /

_. - - _ . - . ~ - - ._ : .. .. . -. .

p q  %

  • Sh nt 11 cf 12 VERMONT YANKEE - LOCAL LEAK TEST PROCRAM Cont:inment System Scicrence Appendix J First Second Penetration or Drautng Required VY Proposed Isolation Size Isolation Siza Number Function Number Testing Testing Valve (s) (in) Valve (s) (in) Comments X-211A Torus C - Air or 10-388 4 10-398 12 Testing not required for vivs.,

X-2115 S Pray C-191172 Nitrogen See Comments ~10 38A 4 10M9A 12 10-38A,B,39A,8; see Note 3.

RciC Turbine C - Air or SSC-9 8 13-52A 8 Testing not req. for v1vs,13-817, X-212 See Comments Enhaust C-191174 Nitrogen 13.gg7 g 13 50 8 52A,50,818,SS C-9 see Note 2.13-818 1 X-213A Torus Torus Testing not req. for v1vs 20-400A, Drain / Drain I C - Air or 20-400A 1 20-402A/401A 1 B,20-402A/401A, 20-4018/4028 &

Valves Flanges C-191175 Nitrogen See Comments --20-4005 1 20-401B/4028 1 flanges; see Note 2. Testing not required for tapgg see Notu 1.

X-214 Torus B - Air or Testing not required for tap; Electrical Nitrogen B - Air See Note 1.

X-215 C-191175 A - Air or A - Air Not locally testable.

Turus Electrical Nitrogen X-215 CAD VY E-75-002 C - Air or C - Air 76-A 1 76-B 1 Testing not required for viv. 78A; Nitrogen 78-A 1 See Note 1.

X-217 Torus A - Air or , Testing not required. See Note 4.

Pressure C-191175 Nitrogen A - Air None I X-218 CAD 6 16-19-6B 3 SB-6 14 Valves SB-6&7 are tested in the Atmosphere C-191175 C - Air or 16-19-75 18 SB-7 14 reverse direction. See Note 7.

Control VY-E-75-002 Nitrogen C- Air 5C-12B 1 VC-178 1 g

'I

_ , e f AC-21A,128,178. See Note 1.

X-219 S P are A - Air A - Air None X-220 (see: CAD VY-E-75-002 C - Air or C - Air VC-21 3/4 VC-23 3/4 Testing not required for viv.

X50,A,B,C) Nitrogen VC-26 3/4 VC-21; see Note 1.

X-221 ifrCI Turbine C - Air or SSC-12 20 23-65 20 Esta.us t C-191169 Nitrogen See Comments23-842 1 23-843 1 See Note 2,23-63A 1 X-222 lirci Drain C - Air or 23-56 2 rot A191169 Nitrogen See Comments SSC-13 2 p,-g Q,, See Note 2.

X-223 RCic Drain C - Air or Pot C-191174 Nitrogen See Comments SSC-10 2 13-38 2 528 3/4 See Note 2.

S tion C-191172 Nitt en See Comments 0 0 24 10 A , C See Note 2.

10-206B 24

~ lirCI C - Air or 23-58 16 23-57 16 Suction C-191169 8C" C"""*"C" 23-153A 3/4

Nitrogen 23-59A 1 See Note 2.

, t, ,.

,i n .e _

c' . 1 p n- .

Sheet 12 cf 12

' VERNONT YAtEEE - LOCAL LEAK TEST PROCRAM ,

Containment Systee ' Reference 'Appendia J First . .

Second Penetration or .

Drauing Required YY Preposed Isolation . Size Isolation Size Function , Number Mer Testing Testing . Valve (s) (in). Valve (s)' (in) Comments X-226A Core Spray C - Air or ~ *

  • 16 A/

X-2268 Suction C-191168 Nitrosen See Co.amente CS-7A, 6A - 12, 1 See Note 2 X.237 BCIC C - Air or 13-41 6 13-39 6.

Suction C-191174 Nitrogen See Comments 13-143A' 1 13-42A 1 See Note 2.

9 e-G t

t ,

e i

3 I

e

$ g 0

  • h RELIEF REQUEST BASIS  ;

1

{' . Number: D-1 System: Feedwater Valve: 2-28A, 2-28B Penetration No.: X-9A, X-9B Size: 16" 7 Function: Check Valve for Reverse Flow Isolation Test Requirement: Appendix J, Type C Basis for Relief: Type C testing of the inboard feedwater check valves is g

not required based on the following:

1. The closing of the outboard check valves is very reliable.

~

The outboard valves will fail to close only if they are -

physically blocked by some foreign material or as a result of serious mechanical binding.

2. Even if the outboard valve fails to close, the inboard valve will remain water covered until all remaining feedwater has leaked through, providing a period of time to shut the motor-operated valves before there is any

{ escape of containment atmosphere.

3. Even if the outboard valve fails to close, and the motor-operated valves are left open, system operating pressure greater than Pa can be maintained which will prevent leakage through the inboard valve out into the system. -
4. VYNPC found that significant effort was required in re-q placing the outboard feedwater check valves. Both VYNPC

~

and NRC agree that anticipated radiation exposures associated with replacing the inboard check valves far k exceed the benefits of replacing these valves (ie ALARA) bas'ed on the outboard feedwater check valve experience.

P Alternate Testing: None k

~

r:

! e e n RELIEF REQUEST BASIS

) <

Number: D-2 -

System: MSIV s Valve: 2-80A, 80B, 800, 80D, 86A, 86B, 86C, 86D

, Penetration No.: 7A, 7B, 7C, 7D Size:- 18 '.'

' Function: Main Steam Line Isolation Testing Requirements: Appendix J, Type C ,

Basis for Relief: The design of the main steam isolation valves is such that testing between the inboard and outboard -

valves at 44 psi would lift the disc of the in-board valve.

Alternate Testing: Valves will be leak tested at 24 psi with an acceptance criteria of 11.5 scfh.

C

+

k 9

e l

l

. 6 m

--___________.______m. _ _ _ _ _ _ _ _ _ . _ _ _ _ _ . _ _ _ _ _ _ _ _ . - _ _ _ . _ . _ . _ _ . _ _ . . _ _ _ _ _ _ _ _ _ _ . _ . . _ . _ . . - . . . _ _ _ _ _ _ _ _ _ . . _ _ _ _ . _ - - _ _ _ _ _ _ _ _ . - - _ _ _ . . _ _ . _ _ _ . _ _ _ _ _

.I: _

i RELIEF REQUEST BASIS

. (~'r <

Number: D-3 ,

System: CRD Valve: '3-13-120, 122, 123, 126, 127, 138 Penetration No.: X-37, X-38 Z Size: 1" Function: Insert and Withdraw Control Rods Testing Requirements: Appendix J, Type C Basis for Relief: The CRD System is designed to reactor coolant pressure boundary criteria and continuously operates at reactor ,

coolant pressure, which is ciders of magnitude higher than post-accident containment pressure. Any system leakage would be identified during plant operation and, subsequentJy repaired so that it can be relied upon to contain post-accident pressure should the need arise.

Alternate Testing: None

. 1 E .

(