MONTHYEARML20217N3001999-10-21021 October 1999 Proposed Tech Specs,Correcting Two Textual Errors & Changing Designation of Referenced Figure ML20217K8731999-10-18018 October 1999 Proposed Tech Specs Revising Activated Charcoal Testing Methodology IAW Guidance Provided in GL 99-02 ML20212F6941999-09-21021 September 1999 Proposed Tech Specs,Increasing Required Vol of Stored Fuel in Diesel Fuel Oil Storage Tank ML20211J0211999-08-31031 August 1999 Proposed Tech Specs Bases Page 91,allowing Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line (Predicted) Uncorrected Solution & on-line (Measured) 3D-Monicore Exposure Corrected Solution ML20211B6781999-08-18018 August 1999 Proposed Tech Specs Revising Definition of Surveillance Frequency to Incorporate Provisions That Apply Upon Discovery of Missed TS Surveillance ML20211B7051999-08-18018 August 1999 Proposed Tech Specs Revising Reactor Core Spiral Reloading Pattern to Begin Around SRM ML20210D2481999-07-20020 July 1999 Proposed Tech Specs Revising & Clarifying Operability & SRs of High Pressure Core Cooling Systems ML20210D3371999-07-20020 July 1999 Proposed Tech Specs Re Enhancements to Support Implementation of Increased Core Flow ML20209G1671999-07-12012 July 1999 Proposed Tech Specs Revising Value for SLMCPR & Deleting Wording Which Specifies These as Cycle 20 Values ML20196K2951999-06-29029 June 1999 Proposed Tech Specs Pages for Proposed Change 220,revising Leak Rate Requirements of TS 3.7.A.4 & 4.7.A.4 for Main Steam Line Isolation Valves ML20196H2881999-06-24024 June 1999 Proposed Tech Specs Revising & Clarifying Terminology Re Certain RPS Scram Bypass Permissives ML20195J8691999-06-15015 June 1999 Proposed Tech Specs Increasing Stis,Adding Allowable OOS Times,Replacing Generic ECCS Actions for Inoperable Instrument Channels with function-specific Actions & Relocating Selected Trip Functions from TS ML20195F9531999-06-0909 June 1999 Proposed Tech Specs,Supplementing Proposed Change 213, Allowing Use of ASME Code Case N-560,per GL 88-01 ML20195C8841999-05-26026 May 1999 Proposed Tech Specs Clarifying Suppression Chamber Water Temp SR 4.7.A, Primary Containment & Modifying Associated TS Bases ML20206H3771999-05-0606 May 1999 Proposed Tech Specs Pages ,Eleting Specific Leak Rate Requirements of TS 3.7.A.4 & 4.7.A.4 ML20206J7231999-05-0505 May 1999 Proposed Tech Specs Pages for Proposed Change 212,modifying TS to Enhance Limiting Conditions for Operation & Surveillance Requirements Relating to SLC Sys ML20205S9431999-04-20020 April 1999 Proposed Tech Specs,Revising Reactor Core Spiral Reloading Pattern Such That It Begins Around Source Range Monitor ML20205T4721999-04-19019 April 1999 Marked-up Tech Specs Pages Re Suppl to 990201 Request for Amend to License DPR-28,revising Portions of Proposed Change 208 ML20205S4081999-04-16016 April 1999 Proposed Tech Specs Modifying Inservice Insp Requirements of Section 4.6.E to Allow NRC-approved Alternatives to GL 88-01 ML20205S3121999-04-15015 April 1999 Proposed Tech Specs Revised Bases Pages 90,227,164 & 221a, Accounting for Change in Reload Analysis,Reflecting Change in Condensation Stability Design Criteria & Accounting for More Conservative Calculation ML20202E5451999-01-25025 January 1999 Proposed Tech Specs Re Technical Requirements Manual Content ML20206S0661999-01-22022 January 1999 Proposed TS to Change Number 189,proposing Relocation of Fire Protection Requirements from TSs to TRM ML20198D5381998-12-15015 December 1998 Proposed Tech Specs Page 142,correcting Wording to Reflect Previously Approved Wording,Last Revised in Amend 160 ML20198B7421998-12-11011 December 1998 Proposed Tech Specs Changing Wording of Primary Containment Integrity Definition to State That Manual PCIVs Which Are Required to Be Closed During Accident Conditions May Be Opened Intermittently Under ACs ML20197J4631998-12-10010 December 1998 Proposed Tech Specs Section 4.9.2,revising Info Re Calibr of Augmented Offgas Sys Hydrogen Monitors ML20197H0031998-12-0707 December 1998 Proposed Tech Specs Change 209,resolving Emergency Concern Re Potential Operation Outside of LCO Contained in Current TS & Potential USQ with Respect to Opening of Manual PCIVs During Plant Operation ML20155F7421998-11-0303 November 1998 Proposed Tech Specs Incorporating Minor Corrections or Clarifications Which Enhance Clarity of TSs Without Materially Changing Meaning or Application ML20155G5061998-11-0202 November 1998 Proposed Tech Specs Re ECCS Actuation Instrumentation - LPCI A/B RHR Pump Start Time Delay Requirements & CS Sys A/B Pump Start Delay Requirements ML20196A7851998-10-0909 October 1998 Rev 19 to Vynp IST Program Plan ML20151U0131998-09-0404 September 1998 Proposed Tech Specs,Increasing Spent Fuel Storage Capacity of Util Spent Fuel Pool from 2,870 to 3,355 Fuel Assemblies ML20237E9571998-08-27027 August 1998 Start-Up Test Rept Vynp Cycle 20 ML20236H4551998-06-30030 June 1998 Proposed Tech Specs Modifying Table 4.2.1 to Delete ECC Actuation Instrumentation Re Core Spray Sys & LPCI Sys Auxiliary Power Monitor Calibr Requirement ML20247J8121998-05-0808 May 1998 Proposed Tech Specs Reducing Normal Operating Suppression Pool Water Temp Limit & Adding Time Restriction for Higher Temp Allowed During Surveillances That Add Heat to Suppression Pool ML20247E5671998-05-0808 May 1998 Proposed Tech Specs Page 270,containing Wording Inadvertently Deleted from TS Proposed Change 202 ML20217P4171998-05-0101 May 1998 Proposed Tech Specs Re Administrative Controls Section ML20217G7131998-04-23023 April 1998 Proposed Tech Specs Change 200 Revising Station SW & Alternate Cooling Sys Requirements ML20217C4591998-03-20020 March 1998 Proposed Tech Specs Re Containment Purge & Vent ML20217A1271998-03-13013 March 1998 Proposed Tech Specs Bases Section 3.10.B,updated to Require That Station Battery,Eccs Instrumentation Battery,Or Uninterruptable Power Sys Battery Be Considered Inoperable If Any One Cell Is Below Specification Cell Voltage ML20202H2611998-02-0606 February 1998 Revised TS Pages Re Change 190,w/typos Corrected ML20197E8481997-12-22022 December 1997 Replacement Pages 160 & 279 & mark-up Pages to Proposed TS Change 190 Containing Editorial Changes ML20203F0131997-12-11011 December 1997 Proposed Tech Specs Revising Current Value for SLMCPR for Cycle 20,next Operating Cycle ML20199K8501997-11-21021 November 1997 Replacement Pages 147,156,157 & mark-up Pages to Proposed TS Change 190,removing Ref to Documents Outside of TS That Define Components to Which Program Applies ML20199J7661997-11-20020 November 1997 Proposed Tech Specs Pages,Revising Requirements for Main Station Batteries ML20217H6931997-10-10010 October 1997 Proposed Tech Specs Revising & Clarifying Requirements for Offsite Power Sources ML20211A6461997-09-18018 September 1997 Proposed Tech Specs,Providing marked-up Pages for Proposed Changes 192 & 193 ML20217Q3311997-08-22022 August 1997 Proposed Tech Specs Pages 245 & 252,amending App a to Modify TS to More Clearly Describe Separation of Switchgear Room Into Two Fire Areas & Incorporate Specifications for New Low Pressure CO2 Suppression Sys ML20217N4111997-08-20020 August 1997 Proposed Tech Specs Pages 270 & 270a,updating Section 6 in Order to Add & Revise Ref to NRC Approved Methodologies Which Will Be Used to Generate cycle-specific Thermal Operating Limits to COLR ML20141H1171997-07-11011 July 1997 Proposed Tech Specs,Replacing Pages 147,156 Through 161,168 & 279 of Util TS W/Corrected Pages ML20148J1861997-06-0909 June 1997 Proposed Tech Specs Change 191,updating Section 6.0 Administrative Controls ML20149M7451997-01-24024 January 1997 Startup Test Rept,Vermont Yankee Cycle 19 1999-09-21
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20196A7851998-10-0909 October 1998 Rev 19 to Vynp IST Program Plan ML20132G5781996-12-16016 December 1996 Rev 18 to Inservice Testing Program Plan for Vermont Yankee Nuclear Power Station ML20148P4081996-07-30030 July 1996 Rev 20 to Vynp Off-Site Dose Calculation Manual ML20148P4021996-04-23023 April 1996 Rev 5 to Vynp Process Control Program ML20095J9771995-12-31031 December 1995 1995 Exercise Manual ML20082C7071995-03-22022 March 1995 Rev 17 to IST Program Plan ML20078G1581995-01-26026 January 1995 Rev 16 to IST Program Plan ML20059F2081993-10-28028 October 1993 Self-Assessment Plan, Service Water Operational Performance Insp ML20046C8761993-01-22022 January 1993 Emergency Response Preparedness Exercise;1993 Plume Pathway Exercise Manual. ML20082L8041991-04-0404 April 1991 Rev 10 to ODCM ML19354E8041990-01-16016 January 1990 Alternate Testing for CO2 Full Discharge Test by Pressure Build & Tracer Gas Dilution Testing. ML19354E8071989-11-15015 November 1989 Test Procedure, Cable Vault Room Encl Integrity Test. ML20151M7891988-07-28028 July 1988 Rev 9 to Inservice Testing Program,Vermont Yankee, Including Description,Program,Testing Schedules & Relief Requests ML20154Q2491988-06-0101 June 1988 Amend 1 to Rev 9 to Inservice Insp Program ML20236V2111987-09-0909 September 1987 Surveillance Program Testing Methodology ML20206P2941986-06-30030 June 1986 BWR LOCA Licensing Analysis Method ML20209C6681986-05-22022 May 1986 Draft Rev 4AE to 8390-8, Flowcharts of BWR Emergency Procedure Guidelines. Draft Vermont Yankee Containment Study Response to NRC Request for Addl Info Encl ML20204G7461986-04-0808 April 1986 Rev 1 to XMK-03-100, Procedure for Induction Heating Stress Improvement at Vermont Yankee Nnuclear Power Plant ML20140J2981986-03-27027 March 1986 Preliminary Work Instruction for Walkdown Verification of Seismic Reanalysis Program ML20141C1321986-03-14014 March 1986 Rev 0 to Dcrdr Label Std ML20128Q9731985-05-31031 May 1985 Radiation Control Program ML20116D2731985-01-23023 January 1985 Revised Procedure GP-R-212110R, Procedures Generation Package for Vermont Yankee Nuclear Power Plant ML20100E7991984-11-16016 November 1984 Change 8 to Inservice Insp Program Re Description,Program & Exam Schedule ML20093N6741984-07-30030 July 1984 1984 Refuel Outage Augmented Inservice Insp Program, Final Rept ML20093K6361984-07-20020 July 1984 Rev 0 to Process Control Program ML20092P3851984-06-27027 June 1984 Procedure GP-R-112020, Procedures Generation Package for Vermont Yankee Nuclear Power Plant ML20093A4411984-06-26026 June 1984 Primary Containment Leak Rate Testing Program:Description, Program & Exam Schedule ML20092N8441984-06-12012 June 1984 Detailed Control Room Design Review Program Plan for Vermont Yankee Nuclear Power Plant ML20207L9911984-06-0808 June 1984 Rev 2 to 80A7616, Ultrasonic Exam Procedure for Reactor Vessel Feedwater Nozzle Inner Radius for Vermont Yankee ML20098G9921984-04-30030 April 1984 Procedure AP 0154, Post-Trip Review ML20087H1871984-03-13013 March 1984 Recirculation & RHR Weld Joint Insp Program - 1984 Refueling Outage ML20081B7871984-03-0505 March 1984 Rev 0 to, Vermont Yankee Nuclear Power Station Offsite Dose Calculation Manual ML20083G1191983-11-15015 November 1983 Public Version of Rev 4 to Emergency Plan Implementing Procedure OP 3530, Post-Accident Sampling & Rev 16 to Procedure OP 3506, Emergency Equipment Readiness Check ML20080F0181983-08-0202 August 1983 Public Version of Rev 0 to Emergency Plan Implementing Procedure OP 3514, Activation of Alternate Emergency Operations Facility/Recovery Ctr,Table of Contents & Contact List ML20024E5261983-07-25025 July 1983 1983 Vermont Yankee Nuclear Power Station 'EOF-In' Emergency Response Exercise & Evaluation Plan. ML20024A6831983-06-10010 June 1983 Procedure 5960-3 Responses to NRC Request for Info,Mark I Torus Program Plant Unique Rept. ML20084M4681983-05-26026 May 1983 Insp Program Summary ML20024A0261983-05-0303 May 1983 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures OP 3500 Re Unusual Events, OP 3501 Re Alert & OP 3502 Re Site Area Emergency ML20070T9351983-01-31031 January 1983 Public Version of Rev 5 to Page 7 of Table of Contents ML20084M4831983-01-28028 January 1983 Rev 1 to Procedure 80A7616, Ultrasonic Exam Procedure for Reactor Vessel Feedwater Nozzle Inner Radius ML20070R2691983-01-18018 January 1983 VT Yankee Nuclear Power Station Inservice Insp Program, Rev 7 ML20065T2731982-09-30030 September 1982 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures A.P. 3125 Re Emergency Plan Classification & Action Level Scheme & O.P. 3513 Re Evaluation of Offsite Radiological Conditions ML20063M7201982-07-0909 July 1982 Public Version of Chemistry & Health Physics Dept Instruction 82-25 Incorporating New Phone Number for Ew Jackson Into Emergency Plan Implementing Procedure O.P. 3504 ML20058F6701982-06-29029 June 1982 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures O.P. 3501 Re Alert,O.P. 3502 Re Site Area Emergency & O.P. 3503 Re General Emergency. Receipt Form Encl ML20063C7171982-06-10010 June 1982 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures O.P. 3501 Re alert- Security Shift Supervisor & O.P. 3503 Re General emergency- Security Shift Supervisor ML20052A1061982-03-22022 March 1982 Public Version of Revised Emergency Plan Implementing Procedures Table of Contents ML20042B1641982-02-26026 February 1982 Public Version of Revisions to Emergency Plan Implementing Procedures,Including Procedures OP-3301 Re Unusual Event, OP-3302 Re Alert & OP-3303 Re Site Area Emergency ML20049J1731982-02-12012 February 1982 Public Version of Change 9 to Emergency Plan Implementing Procedures,Consisting of Revision 3 to Procedure AP 3125 Re Emergency Plan Classification & Revision 6 to AP 3712 Re Emergency Plan Training ML20041D1851982-02-11011 February 1982 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures 3500 Re Unusual Event, 3501 Re alert,3502 Re Site Area Emergency & 3503 Re General Emergency ML20041C0081982-02-0202 February 1982 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures O.P. 3500 Re Unusual Event, O.P. 3501 Re Alert & O.P. 3502 Re Site Area Emergency. Instruction Sheet & Revised Table of Contents Encl 1998-10-09
[Table view] |
Text
. _ - - .. - - . - - -
June 10, 1982 N
/
UtPLEMENTING PROCEDURES TO THE VY EMERGENCY PLAN l
Change //13 INSTRUCTIONS -
i
- 1. Under the tab " TABLE OF CONTENTS" remove the table of contents and insert the attached table of contents dated June 10, 1982.
- 2. Under the tab " CONTACT LIST" remove the list dated May 1982 and insert the attached list dated June 1982. (If applicable only) l
- 3. Under the tab " ALERT" incorporate DI 82-16 to 0.P. 3501.
- 4. Under the tab " SITE AREA EMERGENCY" incorporate DI 82-17 to 0.P. 3502.
- 5. Under the tab " GENERAL EMERGENCY" incorporate DI 82-18 to 0.P. 3503.
- 6. Under the tab " EMERGENCY COMMUNICATIONS" incorporate DI 82-19 to 0.P. 3504.
I I
b t
t 9
8206300108 820623 PDR ADOCK 05000271 p PDR
- . , - - - -. -. iw . e y --r -
7-- .,73 ,- ,..- --ep a ? -~-e-- -
-w r~y m -.e--*-? -
t -.-r- r
VERMONT YANKEE EMERGENCY PLAN IMPLEMENTING PROCEDURES TABLE OF CONTENTS June 10, 1982
. Contact List June, 1982 Implementing Procedures:
Emergency Plan Classification and A.P. 3125 Rev. 3 Action Level Scheme Unusual Event 0.P. 3500 Rev. 1 Alert 0.P. 3501 Rev. 2 -
Site Area Emergency 0.P. 3502 Rev. 14 Genersl Emergency 0.P. 3503 Rev. 15 -
Evaluation of Off-Site Radiological 0.P. 3513 Rev. 5 Conditions
, ~ ,
Off-Site and Site Boundary 0.P. 3510 Rev. 9 Monitoring Emergency Radiation Exposure 0.P. 3507 Rev. 12 Control On-Site Medical Emergency Procedure 0.P. 3508 Rev. 10 Emergency Actions by Plant Security 0.P. 3524 Rev. 2 Personnel Release of Public Information A.P. 0835 Rev. 3 l Radiological Coordination 0.P. 3525 Rev. 1 Environmental Sample Collection 0.P. 3509 Rev. 7 During an Emergency Supplemental Procedures:
l Emergency Plan Training 0.P. 3712 Rev. 6 I
(
Emergency Preparedness Exercises 0.P. 3505 Rev. 9 l and Drills Emergency Equipment Readiness Check O.P. 3506 Rev. 14 ,
Emergency Communications 0.P. 3504 Rev. 14 - -
i l
g _,
-,_3- m,,-, - - - - c. . - - m - ++
MEMORANDUM To Plant Procedure Manual Holders Vernon May 24, 1982 CG *e89 94 LWT9Ep.
FROM C. D. Wevman Vernon FRE 6.1.5 SU BJECT Change to Plant Procedure Manual Chem & HP DEPARTMENT INSTRUCTION 82-16 Concurring Individual: N. .
M M Date: C/rz,/PU -
SRO Concurring: , s / Date: !PA Second SRO Concurri : M Date: _ Mt' ['
Chemistry and Health Phy s Supervisor or Plant Health Physicist:
Date: >[J//fL This instruction becomes effective on the date that a Second Senior Licensed Operator signs above, unless a Health Physics procedure is involved, in which case this instruction becomes effective on the date that a Senior Licensed Operator and.the Chemistry and Health Physics Supervisor or the Plant Health Physicist signs above.
Instruction Cancelled: Rev. 3 of OP 3501 Scope of Instruction: Replace Appendix II, page 1 of 3, with attached.
Reason for Change: To reflect change in paging system company for YNSD.
SPS/cjm Reviewed =--- M l. proved 8 @-so y PORC Sect ry ' Plank Manager 1
A.P. 0832, Figure 1 3 Rev. 7 j
O
0.P. 3501 APPENDIX II L. .- 2 OE D -/ /-
AI.ERT - SECURITY SHIFT SUPERVISOR ,
Time Initials ,
i I==ediate Actions:
- 1. Upon hearing the announce=ent of the Alert, notify the plant personnel listed below using the auto-matic telephone paging system. Dial one of the following numbers; Scace name and location, request the initiation of a group page for VY pagers, and give the following message, "All personnel please call the plant ;
i= mediately."
(In the event this system is out of order, notification I must be nade by manual dialing of the appropriate numbers '
in the plant phone list.)
V.Y. President V.Y. Manager of Operations Plant Manager Asst. Plant Manager Operations Support Manager Operations Superintendent Technical Services Superintendent Director of Communications Engineering Support Supervisor Reactor and Computer Supervisor Chem. and H.P. Supervisor '
I&C Supervisor "aintenance Supervisor Operations Supervisor \
Asst. Operations Supervisor l Training Supervisor
- 2. _Notifv Yankee Nuclear Services Division Security (Mic. _.
ey .) and give the following message:
"This is 1er=ent Yankee. We have an Alert.
Standby for Yankee Staff calls." (Repeat this message and request acknowledgement)
- 3. Notify Yankee Nuclear Services Division personnel:
- a. Dial the following number:
k
? age 1 of 3 w
t, MEMORANDUM To _ Plant Procedure Manual Holders Vernon May 24, 1982 '
FR. OM G. D. Weyman Vernon FILE 6.1.5 Sus;ECT Channe to Plant Procedure Manual Chem & HP DEPARTMENT INSTRUCTION 82-17 Concurring Individual: Il , .
1 Date: T/.* a / .
SRO Concurring: _ r o / Date: [ fl Second SRO Concur n: Data: > (/'
U '
Chemistry and Health Physics Su ervisor or Plant Health Physicist:
/ Date: TfM,
_9 This instruction becemes effective on the date that a Second. Senior Licensed Operator signs above, unless a Health Physics procedure is involved, in which case this instruction becomes effective on the date that a Senior Licensed Operator and the Chemistry and Health Physics Supervisor or the Plant Health Physicist signs above.
Instruction Cancelled: Rev. 15 of OP 3502 Scope of Instruction: Replace Appendix II, page 1 of 3, with attached.
Reason for Change: To reflect change in paging system company for YNSD.
\
SPS/cjm .
Reviewed PORC Secr :
_ - -E/__ Approved /Nm4 l
_ P14nt Manapr {
I A.P. 0832, Figure 1 Rev. 7 I
. . i
~
,. 0.? 3502 APPE!iDIX II 2cc . i-c) T % 3 - / ,/ '
SITE AREA - SECURITY SHIFT SUPERVISOR Time Initials
- nmediate Actions l
- 1. Upon hearing the announce=ent of the Site Area Emergency, notify the plant personnel listed below using the automatic telephone paging system. Dial one of rha following numbers: ,
State name and location, request the taitiation of a group page for VY pagers, and give the following
. message, "All personnel please call the plant i= mediately."
(In the event this sytem is out of order, notifica-tion must be made by manual dialing of the appropriate numbers in the plant phone list.)
7.Y. President V.Y. Manager of Operations Plant Manager Asst. Plant Manager Operations Support Manager Operations Superintendent
{
Technical Seriices Superintendent Director of Communications Engineering Support Supervisor Reactor and Computer Supervisor Chemistry & Health Physics Supertisor I 5.C Supervisor Maintenance Superi1sor Operations Superiisor Asst. Operations Supervisor Training Supervisor !
- 2. Nce4** vankne Nuclear Services Division Security
('.. .. - _ .
exte ) and give the following message:
"This is Vermont Yankee. We have a Site Area Emergency. Standby for Yankee Staff calls."
(Repeat this message and request acknowledgement)
- 3. Notify Yankee Nuclear Services Division eersonnel:
J'- a. Dial tne following nusce
- b. The Z!?-CALL operator will answer.
- c. Ask for pag' .ctivated.
- d. Repeat Steps a, b, and e approximately 15 minutes af ter the initial call to assure that all YNSD personnel have been reached.
Page 1 of 3
.o .
MEMORANDUM To Plant Procedure Manual Holders Vernon May 24, 1982 m .v
'FROM G. D. Weyman Vernon FILE 6.1.5 .
SUBJECT Change to Plant Procedure Manual Chem & HP DEPARTMENT INSTRUCTION 82-18 Concurring Individual: Vld .
~
. aljd Date: N24, /7L - ,
SRO Concurring: MM fN/ Date: A [J 4 [f A Second SRO Concurring: / ,
Date: ( [2 -
y- -
f,- i Chemistry and Health Phfics Supervisor or Plant Health Physicist:
Date: [ /N.1 This instruction becomes effective on the date that a Second Senior Licensed Operator signs above, unless a Health. Physics procedure is involved, in which case this instruction becomes effective on the date that a Senior Licensed Operator and the Chemistry and Health Physics Supervisor or the Plant Health Physicist signs above.
Instruction Cancelled: Rev. 16 of OP 3503 Scope of Instruction: Replace Appendix II, page 1 of 3, with attached.
Reason for Change: To reflect change in paging system company for YNSD.
SPS/cjm Reviewed /( M Approved b#.
PORC Secr ry P16nt Ma gQ A.P. 0832, Figure 1
. Rev. 7
d
. . .~ . .
,711Z '.
~
0.P. 3503 APPENDIX II jg GCTERAL EMERGENCT - SECURITY SHIFT SUPERVISOR Time Initials I= mediate Actions
- 1. Upon hearing the announcement of a General Emergency,
- notify the plant personnel listed below using the automatic telephone paging system. Dial one of the following number
. State name and location, request the initiation of a group page for VY pagers, and give the following message, "All personnel please call the plant immediately."
(In the event this system is out of order, notification must be made by manual dialing of the appropriate nu=bers in the plant phone list.)
V.Y. President 7.Y. Manager of Operations Plant Manager Asst. Plant Manager Operations Support Manager Operations Superintendent Technical Services Superintendent Director of Communications Engineering Support Supervisor Reactor and Computer Supervisor Chem. and H.P. Supervisor I&C Supervisor Maintenance Supervisor Operations Supervisor \
Asst. Operations Supervisor Training Supervisor
- 2. Notify Yankee. Nuclear Services Division Security e ) and give the following message:
"This is Ver=ot.t Yankee. We have a General Emergency.
Standby for Yankee Staff calls." (Repeat this message and request acknowledgement)
- 3. Motify Yankee Nuclear Services Division personnel:
p a. Dial the following number: '
- b. The !!P-CALL operator will answer.
? sue 1 of 3
_ . . '.?
"--"*C' MEMORANDUM To Plant Procedure Manual Holders Vernon May 24. 1982 m.
FROM c n umn Vernon pu,g 6.1.5 Sus)ECT Chance to Plant Procedure Manual Chem & HP DEPARTMENT INSTRUCTION 82-19 Concurring Individual: // / , ,
wul'LL Date: T[7.6/f2-SRO Concurring: // ) Date: s />
Second SRO Concu i g:
y -
Date:
dli Chemistry and Health Physics Supervisor or Plant Health Physicist:
n-Y ,
Date: M This instruction becomes effective on the date that a Second Senior Licensed Operator signs above, unless a Health Physics procedure is involved, in which case this instruction becomes effective on the date that a Senior Licensed. Operator and the Chemistry and Health Physics Supervisor or the Plant Health Physicist signs above.
Instruction Cancelled: Rev. 15 of OP 3504 Scope of Instruction: Replace page 9 of procedure with attached.
Reason for Change: To reflect change in paging system company for YNSD.
i SPS/cjm -
Reviewed J_ Approved [Neu _
fPORCSece ary Plant Managef f A.P. 0832, Figure 1 Rev. 7
%, 4- 5 0.P. 3504
- -- .e ., .._
~
m.
-%gp
= - OL 72-17
.t.
~
- 5. All replies are brief1v written in the Reply section by the perhon assigned to make the reply and are returned to the center coordinator for his infor=ation and con-currence. J
- 6. The center coordinator retains Part 3 (pink copy) for logging and/or future reference, and returns Part 1 (original) to the communications assistant for dispatch- l
1
- 7. Upon completion, the communications assistant retains '
the Original (white copy) as the Communications Log copy and discards the related Part 2 (yellow) " tickler" copy.
1 I. Dedicated GAI-Tronics
- 1. During an Unusual Event, Alert, Site Area, or General Emergency, Channel 4 of GAI-Tronics is reserved for use by three parties: Control Room, Emergency Operations Facility, and the Technical Support Center.
J. Personnel Paging Systa=s
- 1. Vermonc Yankee Personnel
- a. Dial one of the following nu=bers:
- b. To initiate a group page:
- 1) State name and location
- 2) Request the initiation of a group page for VT pagers
- 3) Give the message that should be passed to the paged individuals
- c. To initiate a single person page:
- 1) State name and location
- 2) State individual (s) name (Table 1) and,
- 3) Give message that should be passed to the paged individual
- 2. YNSD Personnel
- a. Dial the following number: .
- b. The ZIP-CALL operator will answer
- c. Ask for page :o be activated.
_ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _