Proposed Tech Specs Modifying Inservice Insp Requirements of Section 4.6.E to Allow NRC-approved Alternatives to GL 88-01
ML20205S408
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 04/16/1999
From:
VERMONT YANKEE NUCLEAR POWER CORP.
To:
Shared Package
ML20205S406 List:
References
GL-88-01, GL-88-1, NUDOCS 9904260209
Download: ML20205S408 (4)


Text

I Docket No. 50-271 BVY 99-13 ATTACHMENT 3 Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 213 Generic Letter 88-01 and Use of Code Case N-560 Marked-up Versica of the Current Technical Specification Pages l 9904260209 990416 .

PDR ADOCK 05000271 P PDR  ;

b VYNPS 3 .' 6 LIkITING CONDITIONS FOR 4.6 SURVEILLANCE REQUIREMENTS OPERATION Safety and Relief Valves D. Safety and Relief Valves D.

1. During reactor power 1. Operability testing of operating conditions and Safety and Relief Valves whenever the reactor shall be in accordance coolant pressure is with Specification greater than 120 psig 4.6.E. The lift point and temperature greater of the safety and relief than 350*F, both safety valves shall be set as valves and at least specified in three of the four relief Specification 2.2.B.

valves shall be operable.

2. If Specification 3.6.D.1 is not met, initiate an orderly shutdown and the reactor coolant pressure shall be below 120 psig and 350*F within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Structural Intecrity and E. Structural Intecrity and E. Ooerability Testing Ocerability Testino The structural integrity and 1. Inservice inspection of the operability of the safety-related safety-related systems and components shall be components shall be performed in accordance maintained at the level with Section XI of the required by the original ASME Loiler and Pressure acceptance standards Vessel Code and throughout the life of the applicable Addenda as plant, required by 10 CFR 50, Section 50.55a(g),

except where specific written relief has been granted by the NRC.

pu::::nt 1: 10 CF~ E2, rectinn 5 0. 5 5:(3' 'C' 'i' Inservice inspection of piping, identified in NRC Generic Letter 88-01, shall be performed in accordance with the staff positions on schedule, methods, and personnel and sample expansion included in the Generic Letter faxcej<

wh ere rf wfi wr i o%,

re lief ltas bu*gM"lU y 14s NRc.

120 Ame.ndment No. M, M, 44, 99, Me, 39,444

~

Docket No. 50-271 BVY 99-13 ATTACHMENT 4 Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 213 Generic Letter 88-01 and Use of Code Case N-560 Retyped Technical Specification Pag 9s

h .

VYNPS-I 3.6 LIMhTINGCONDITIONSFOR 4.6 SURVEILLANCE REQUIREMENTS OPERATION D. Safety and Relief Valves D. Safety and Relief Valves

1. During reactor power 1. Operability testing of operating conditions and Safety and Relief Valves whenever the reactor shall be in accordance coolant pressure is with Specification 4.6.E.

l greater than 120 psig and The lift point of the temperature greater than safety and relief valves 350*F, both safety valves shall be set as specified l

and at least three of the in Specification 2.2.B.

four relief valves shall .

I be operable. 1

2. If Specification 3.6.D.1 is not met, initiate an orderly shutdown and the reactor coolant pressure l shall be below 120-psig and 350'F within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

E. Structural Integrity and E. Structural Integrity and Operability Testing Operability Testing i

The structural integrity and 1. Inservice inspection of I the-operability of the safety-related components safety-related systems and shall be performed in components shall be accordance with maintained at the level Section XI of the ASME required by the original Boiler and Pressure f acceptance standards Vessel Code and throughout the life of the applicable Addenda as plant. required by 10 CFR 50, l

Section 50.55a(g), except

' where specific written relief has been granted by the NRC. Inservice inspection of piping, identified in NRC Generic Letter 88-01, shall be performed in accordance with the staff positions on schedule, methods, and personnel and sample expansion included in the Generic Letter, except where specific written I relief has been granted by the NRC.

Amendment No. M, M, M, M, Me, M9,MG 120 l u l l