Text
.....g h i %
MEMORANDUM FOR: Thomas A. Rehm, Assistant for Operations Office of Executive Director for Operations FROM: Thomas E. Murley, Director Office of Nuclear Reactor Regulation
SUBJECT:
KENNEDY QUESTIONS - 1/7/88 HEARING ON PROPOSED RESTART OF PILGRIM (EDO #003369)
Enclosed are NRR's responses to the questions Senator Kennedy has raised.
Question 3 was answered by OGC. Where appropriate, answers wera reviewed !
by the Region. If you have any further questions, please contact Suzie Black of my staff on (X21255).
Or181 val sign,d by Zh93E.3 E. Marley Thomas E. Murley, Director Office of Nu;1 ear Reactor Regulation
Enclosures:
Kennedy Responses Distribution Central File H. Thompson E. Beckjord PDTSS Rdg EDO #003569/M. Bridgers SECY EDO #003569/D. Mossburg S. Black w/o Enclosures l EDO Rdg PHAS Rdg w/o Enclosures l C. Mohrvinkel l E. Doolittle
! T. Murley J. Snierek F. Miraglia i OGC GPA/C4(3)
V. Stello J. Taylor T. Rehm W. Russell J. Murray ,
S j $l/88 3 5 /88 3 3 /88 )/jf/88 J
l l
/t#R iT4URLEY l
VI /88 1
i Og21pga00120B JOHNSONOB-190 PDR y//p
/ u
n i QUESTION 1. There remains a great deal of uncertainty as to how the NRC .
will evaluate whether the Pilgrim reactor is ready to restart.
As you know, I fully support the adjudicatory hearing process and hope that the NRC will agree that an adjudicatory hearing is the proper way to proceed. I am aware that there has been one public meeting in Plymouth and that another meeting is contemplated. Would you provide me with a schedule of planned or proposed future meetings, including the location of the meetings, who will attend from the NRC, and what public involvement there will be at the meetings. I am also interested in learning if a final decision has been made on Governor Dukakis' and Attorney General Shannon's petition for an adjudicatory hearing. If a decision has not yet been made, when will it be made?
ANSWER.
i
\
The NRC staff and local officials in Massachusetts have engaged in a continuing l dialogue on the Pilgrim situation. This dialogue has included public meetings 1
with the Plyinouth Board of Selectmen and Chamber of Comerce, the Duxbury Board of Selectmen, the Massachusetts Joint Comittee on Energy, the Massachusetts Legislative Committee on the Investigation and Study of the Pilgrim Station, the Town of Plymouth Advisory Comittee on Nuclear Matters, and others. The NRC staff a?io participated in a public forum on the Pilgrim situation at the Kennedy /NRR 9 #4 A #00
QUESTION 10 (Continued) 2 i i Duxbury High School on October 29, 1987. This meeting was sponsored by the Duxbury Board of Selectmen. Representatives from some of these groups also have participated in NRC Region I management meetings dealing with the Pilgrim facility, including the Systematic Assessment of Licensee Performance (SALP) reeting held on May 7, 1987. On October 8, 1987, the NRC met with representa-tives of the Connonwealth of Massachusetts in our Region I office. This meeting, which was oper, to the public, was held to discuss agenda iteins proposed by the Comonwealth, including emergency preparedness issues, the status of various NRC technical reviews, and inspection activities expected in the next few months.
Subsequently, other meetings have been held with representatives of the Comonwealth discussing the same topics.
The most recent meeting, which was coordinated with the Connonwealth and invited participation by interested members of the pub 11c, was held in Plymouth on February 18, 1988 to receive connents on the Pilgrim Nuclear Station Restart Plan.
l The following is the projected schedule, location and expected participation I for future meetings which are currently planned. The schedules are tentative and subject to change depending on several of the integrated activities being conducted by both the licensee and NRC staff.
1
- 1. Public meeting (s) will be held in the Plyinouth area, currently projected l for late April or early May to discuss the disposition of coments and concerns raised in the February 18, 1988 public meeting. Themeeting(s) 1 will be chaired by HRC senior staff members and members of the public will participate.
l l
l Kennedy /NRR 9 fin 100
QUESTION 1_. (Continued) 3 t
1 1
- 2. A Comission meeting, currently projected for late May or ea-ly June, to brief the Comission on the status of Pilgrim activities relating to plant
. restart and the NRC staff's plans and schedule for completing their readiness review. This will be a public meeting held in the Washington, D.C. area.
The extent of public participation will be detailed in the Federal Register Notice of the pending meeting.
- 3. A public meeting will be held in the Plymouth area to discuss the results of NRC's team inspection of the readiness of the plant and licensee management support the restart and safe operation of the plant. This meeting is tentatively scheduled for July or August.
- 4. A public meeting, currently projected for July or August, will be held between NRC senior staff and State Senator William Golden and the other petitioners who submitted the July, 1986, 10 CFR 2.206 Petition, if the petitioners desire a meeting. This meeting will discuss emergency preparedness, r.anagement and plant readiness issues. NRC will also answer questions of the petitioners. It will be held in the Plymouth area. The petitioners and members of the public will participate. This meeting may be coordinated with the meeting addressed in number 3 above.
- 5. The Cocinission will hold an additional public meet'ing at NE#Iea t quart'ers prior to making any decisions regarding the readiness of Pilgrim to resume operations. The staff will provide a full accounting of its recomendations and supporting bases in relation to the restart of the [
Pilgris station during this meeting. This meeting is not currently scheduled. The extent of public participation will bc detailed in the Federal Register Notice of the pendfag meeting.
Xennedy/NRR 3/30/AR
(Continued) 4 QUESTION 1.
t 3 i Other public reetings, including those with Boston Edison, will be held as circumstances warrant. These meetings will be announced pursuant to NRC staff' policy on open meetings (43 FR 28058 which is enclosed).
A final decision has not been made on Governor Dukakis' and Attorney General Shannon's petition for an adjudicatory hearing. The petitioners were notified in our letter dated November 13, 1987 that the Petition would be treated as a request for action according to 10 CFR 2.206 of the Commission's regulations.
The staff is nearing completion of their evaluation of the information related to the petition and we expect to render a decision under 10 CFR 2.206 in the near future.
Enclosure:
43 FR 280e8 l
l t
i l
\
l l Kennedy /NRR
( 3/30/88 i
" C ' 5 " t UNITED STATES NUCLEAR REOULATORY COMMIS$10N R'J ES and REGULATIONS D"" " I
' ' tif ts ta. cH Artin i. coot ct ripanAt aloutArca;s-gitraov COMMISSION NOTICES POUCY STATEMENTS Conduct of Proceedings es pa ro*Se ov'imary of the unclasalfled 6M pen. retaam$mese elthe eagte regulenary Pwedeh.e 4/tt'7s pesprietary portforu os such meetings structure. Aher TMI. fat over a year and fors Ltd the summary to interest. a lall, the Coasmesmo'e att.suse soanittic ucInrta AreuC.Ahoset ed persona unable to attend se that rueerte were facteed se PEme se
- P** ss m e e liew ed beeC la 8I , g',redMt *
'd'T P e teMance s11J not te Itmited solels be-et ver O* F'f*" U** N ** *'*"" b
- The Nuclear RegN! ster / Ceestels. cause preltminary optnlona. recom- ePecded ebaagee as:nes arp lit asen s (NRC si re#suona in le crn eneMauer.a. et sduce sin w effered u s remila of tho ucidssa.
3.303 pennit appikanu te corder in- en the mertu of the appikaucas Nepush staf nview of formuis wius the NAC ter.haka3 etati during the meeting. Regner a Usatlew wse deh sview rettees of demeaue tuerue et when a party at petitlener for leste 61s pe etsgas which km applicaucra These meetiras to tnunene reevnta. teuenable of. so gyrg,.p.nigge g, i, ws;g
,e ser ed u sa esaenual means fee forts sul w made by the NRC staff t* 6e subf9td pluth The e is m the eschange of tecMksJ informauce infans the party et peutioner of gune ,g neew g ge msne aM vtews nec^aary for the lethrut*3 forthcoming meeunes coMett.ed br d revkw of apptusueca For seversJ **d ** M trd years other sarues et potenud pertes the prtateNRC artsetechnks) aments staffforse atteManc that appre,. heaitage m scscin!ed La nest 2*.
se domestk ucerutrJ prxe+dtn85. M tan be ms4e. It nr. teecrutsed that la meeths.b4aar of these veu u members of tne senertJ pubue, some esses the need let a preespt concois a ppucatleris fac e ung have, upon requeet, been permitted te me,ttng may snde it trepossible er in. L asps if theos are est st1*M apptkant NRC tachakal staff prseucable to neuff all parues aM pe- scaduded prier to .e I, lies of UUoners The polk 7 duertbed 6beve
(.
uneeungs u eteerveis llowpet. the ceassirgee. &e cost zif A deley cons =uws retutauons da not ** alae cannet prseccably be septied l* c Md rush bCtens W Utts The autre that others he pertafsted '* thance encounurs wtenn NRC tech" Conaksees wtD seek pe(derrednes
- tend such infereat meeunes b* nicaJ ttalf personnel SM *WF parties sed dCa whugn rwu we tween spelkant v.4 ttatt. 6M me er peuuonm but such annes encoun- suasWe et de se 6e sener*3 pr*ctk* betta foueted in this tais sul not be permitted to serve u o stal commulameng restre h44 never ben tonnal!; uuna- acurce of mformance for me coMeet "" ""'i*a s lated. This staurnent is intended t* WucmaN neess. w a fait and thetos bearug praesee, pe,vtde ruch uueutsuen it is else T).anfen the -r m.raalea k taeving noted that thta matter la related to the th poucy states se de aeed f.ar es i provtalon for incieued pubue putac8- e4 7aasE23 baluced ud eat coa &ct d 65 i Ntuson
.ce Nmo . d.uNs n oenton tu R,pe seuld,u rot on PS***8 EM h",, he n
sa. m l As a senersJ maatter.the Conwntasjon tieument W Poacy cel Caedset
&& 5es fue by te boude le nM etaff try se ineofw eoneerned cet). sood,cttad costessoes and sens In tar Commi.s3co actJvity in %% ons n lagt. Py sad which eeF have eaprtsaed na intervet L 58dgreged han rferene 11de An meeunes eeMvcted 67 the NRC g' g g g g' gg docueeef is tended to de wie tecMJesJ etaff u tart of its rettew of problems ne primaidy M the boards' U a dodet W the Ateous Sah ad a, par pn.oe s .a . ,ews au, sa liewswr,
,,2e the boenis,ew'R.
i, ,,,oma, u a - d s,o.4 o e< P .e m s were,s e on ,uevlas ut, w en.e e,e e
do,,eees.tk,
.t t .tu M- = c.etue.,et ev.ne.t .a.o wa,d puum, -
a . nee ar ,ae ,u ,uenm,n.,.iu.in . a.
i.
Indite M en i an s,eitses or peuveners se. rhe I.w leeve.**.
e meeu . s,usass.a64os Coeun,ts ,has e,,saadasd .~*
- e ie .a.s int.
oe ve.,e me i,,u,. .e4 b, me NRe i-w.=
etaff to feestate sa enhange of taler.
n.
, , i. ,
i i. u , .e, e metho d e.edtwacet t sedy consensed Part Iel
, ,,9, gigg, 3, ,, g,,, g, 64 Ce helee's Rale, sad s,.uon between the 6ep!k*nt BM the aguer se it ende are le ant tw A egalg.
t_w.o It i.stue,spected
.M = th.n.t.the NR.C w M-am-
- warw .a Re e., ,! me .The.C.omebska e,. . t. i. .,+. wta.bes.to a, e sc cipou in the muuns. , the .e h -
T,,w uf ie,e- n.eM h , 6.n,.d to es, th beerd,ahmad eawe .mei
,.n ounir.paru.ueM,s wt m.he. ~un 6, eb m n-n.w.mm ae<* ,e ,. a. . ,,, m e u. ae.e. ,,
e w ,,,
i, fat,,,a,
,d, , , ,,
En,e.,,e.n,, e"
,eik., ~ of
-* e,e.6.,.ee.," *ie uRc y + 6 '" "*C.%'."a".a"*4'A"' **
.n ,e e be. e nn om,e n.-
,e w*e - *=
- w*-
ve- a. -
.- a
. .ht.um mt.o. p. .o
,ew
- ,e eb ee,,o e oi,-t., e,.ew .t u,e ,.he v e .ar
.6 . e, -.-=< .a,u,t. ,,,.eL,,a.,,v
, , ee,
,,s e.
,e n , e.am ,te.te-.ueM p u. ,ee w. =* .en e, ae,.d,,
,,f ma.,.e,,. n.uued .
oaena-oe et- . ,,.a, a Co,,ea, esi,,,
.,on. .no. = fwn.o, ,apmar.o.fe. e,ed. T i. ,, ,, e .,o e,,,,e d.,
.,e .e t e.,ue.e en ,,ti .e Moo . . , a e w.o b wo.4 g t *J g t, ~ a ,,5; ",e n = meww-d.-me** * * . L""L,,e,e.
,u e. . .e .e. is 6.
. . . . . . . . . . . . n e e ... . .-
QUESTION 2. During your testimony, you mentioned that the NRC had asked Boston Edison a series of questions relating to direct torus venting. Specifically, Edison was asked when and under what conditions they would utilire & direct torus vent. At the time of the hearing, Boston Edison hcd not yet responded to the NRCis questions. You indicated that a response would be necessary before the NRC could proceed with considering whether the installation of s direct torus vent was warranted at Pilgrim. Has Edison responded to the NRC's questions? If so, has the NRC made a decision on whether it will permit the licensee to make the direct torus vent improvement?
ANSWER.
The Boston Edison Company (BICo) has not yet responded to our questions cf August 21, 1987 relating to their submittal of a design for a direct torus ,
vent (OTY). As stated in the testimony, the questions must be resolved before the systen is placed into service. The vent line, which would be capaDie of providing a hardened (high pressure) path from the containnent torus structure to the plant stack, has physically been installed with blind flanges to isolate the DTY from the existing low pressure vent path through the plant Standby Gas Treatrent System to the plant stack. The installation of the piping, supports, and blind flange were installed by BEco pursuant to provisions of 10 CFA 50.59.
Kennedy /NRR 3/30/88
QUESTION 2. (Continued) 2 9 f 10 CFR 50.59 allows licensees to make changes to their facility as described in the safety analysis report without prior Comission approval, if the proposed change does not involve a change in the technical specifications incorporated in the license or an unreviewed safety question.
An inspection team was sent to the Pilgrim site during the first week of March to review the non-operational physical plant modification. The objective of the inspection was to verify the adequacy of the plant modification and associated licensee safety evaluations. The vent line is not operational as installed, however, we chose to confirm that the plant modification (including the in-stallation of the piping, supports and blind flange) does not adversely affect the function of the other plant systems, structures or the plant response undei-accident conditions. The inspection team concluded that the plant modification was adequately evaluated by the licensee and the design change had been made with no adverse impact on plant safety. The conclusion was based on a system ,
walkdown, inspection of the supporting documentation and interviews with utility personnel. At this tire the NRC has not made a decision on allowing the installation or operation of a direct torus vent system.
Kennedy /NRR 3/30/88
1 QUESTION 3. During the hearing, I asked you how many times the NRC has been formally requested to hold adjudicatory hearings in relation to restarting or licensing a nuclear reactor. I would be interested in learning who made the requests (i.e., whether they came from the licensee, from a State government, or elsewhere), and whether the NRC acted favorably or unfavorably on the requests (and/or petitions)?
ANSWER.
There have been contested operating licensing proceedings for most operating r.uclear power plants. Our log shows some 80 proceedings. There have also been some 70 proceedings involving amendments to power plants' operating licenses. Many amendment proceedings could affect continued reactor oper: tion.
We have identified 6 proceedings directly involvirg power plant restarts:
Browns Ferry 1975; Changes involving startup after fire; Intervenor B. Garner. Connission authorized operation.
i Humboldt Bay - 1977; Xequest to delete seismic upgrade requirements allowing startup of the facility; Intervenor Sierra Club, Friends of the Earth.
Proceedings teminated after licensee notified NRC of intent to decomission the facility, f
l Kennedy /NRR I 4 sin #00
QUESTION 30 (Continued) 2 Trojan - 1978; Proceedings on Comission Order requiring modifications to Control Building; Interrenors D. McCoy, C. Parson, N. Bell, E.Roso11e, S.Willingham, Coalition for Safe Power, Columbia Environrental Council, Bonneville Power Authority, State of Oregon. Comission authorized operation, i
Rancho Seco - 1979; Proceedir to permit operation af ter post JDil shutdown i Order; Licensee requested , earing; Intervenor California Eridrgy Comission et.al. Comission aut';:' d operation.
Three Mile Island 1 - 1979; R oceedings to permit operation after post-TMI shutdown Order; Intervenors Comonwealth of Pennsylvania, UCS, TM1 Alert, Mr.& Mrs. Aamodt. Comission authorized operation.
San Onofre Unit 1 - 1984; Seismic shutdown Order recission; Hearing requested by Sierra Club et.al. Comission denied request for hearing and authorized operation.
We also looked at 81 published Director's Decisions issued since February,1979 that relate to power reactors. In 30 of those cases petitioners made requests under 10 CFR i 2.206 that could fairly be construed as requests for adjudicatory heari s. (Petitionersrarelyusedtheword"adjudicatory'.)
. . -w a .
A brief explanation of the process associated with petitions filed under 10 CFR I 2.206 is called for. Under 10 CFR 2.206, a_ny n person may file a request j withanNRCdirector"...toinstituteaproceedingpursuanttoi2.202(orders toshowcause)tomodify,suspendorrevokealicense,orforsuchotheraction I
Kennedy /NRR 1lin/AR t
QUESTION 3. (Continued) 3 j i
as may be proper." There is no requirement for the petitioner to deconstrate a legal interest in the matters raised in the petition.
' Only H the NRC institutes a proceeding in response to the 2.206 petition, will members of the public be given an opportunity to request a hearing and demonstrate the requisite legal interest in the proceeding so as to be allowed to intervene. Thedemonstrationofrequisiteinterestisnojaffectedbythe fact that the petitioner to intervene had filed a 2.206 petition; it is an independent requirenent.
Thus, granting an adjudicatory hearing directly in response to a 2.206 retition would be legally inappropriate. The reason is that a 2.206 petitioner has no right to a hearing. Illinoisv.NRC,591F.2d12,14(7thCir.1979), for this reason, the NRC has never granted an adjudicatory hearing in direct response to the request of a 2.206 petitioner.
Nevertheless, in two instances, requests by petitioners did indirectly result in adjudicatory hearings. In one case, an Order to Show Cause issued in ,
response to a petition, see Dairyland Power Cooperative (Lacrosse Boiling Water Reactor), 0080-9,11NRC392(1980), resulted in a proceeding. In a second case the Cocaission decided to hold a discretionary adjudication to resolve safety issues raised by a petition and Director's Decision responding to the petition. See Consolidated Edison Co. of New York Inc. (Indian Point Unit No.3),DD-80-55,11NRC351(1980). See also Consolidated Edison Co. of New York Inc. (Indian Point Unit No. 3). CL1-81-1,13 NRC 1 (1981).
l l
Kennedy /NRR 1 tin /00 t
QUESTION 4 You may be aware that the Massachusetts State Legislature is ,
considering a bill which would expand the Emergency Planning Zone around nuclear power plants in Massachusetts to 50 miles.
Would the NRC support this initiative?
i
~
ANSWER.
We assume that the proposal for expanding the Emergency Planning Zone (EPZ) referred to in your question relates to the current 10-mile plume exposure pathway EPZ, as there 1.5 currently a 50-mile EPZ for the ingestion exposure pathway. It is the NRC view that the current detailed planning requirements for the 10-mile plume exposure pathway EPZ and 50-mile ingestion exposure pathway EPZ are adequate to assure that prompt and effective actions can be taken to protect the public in the event of an accident. Thus we do not believe there is a need from a public health and safety standpoint to expand the 10-mile plume exposure pathway EPZ around nuclear power plants to 50 miles.
However, this does not at all preclude a State and utfifty from working together to develop supplemental planning for the plume exposure pathway for areas beyond 10 miles if they so desire.
l l
l l
l l
l Kennedy /NRR
i l
l QUESTION 5. In your prepared statement you said, "The NRC will not permit the facility (Pilgrim) to resume operation until corrective actions satisfactory to the NRC have been taken to address the Emergency Planning deficiencies identified by FEMA". Have those corrective actions been taken? You also indicated th'at the NRC would allow the plant to restart without the ruolution of all Emergency Planning deficiencies. What deficiencies would the NRC allow to be left unresolved at restarti ANSWER.
Progress has been r,ade to date toward improving the offsite emergency prepared-ness programs at Pilgrim and correcting the emergency planning deficiencies identified by FEMA. Drafts of the local emergency plans have been completed and six of these plans have b:en forwarded by the Connonwealth to FEMA for informal technical review. The draft Massachusetts Civil Defense Agency Area II plan has essentially been completed and is being reviewed by the Connonwealth. The draf t of the Coc1monwealth plan for Pilgrim is nearing completion.
1 l
As indicated in the testfrony, the NRC may authorize re; tart with some planning i issues not fully resolved. In reaching this decision, the NRC will examine each planning deficiency and weigh the significance of the deficiency, the nature of any compensatory actior.s, and the progress being made by the Comaon-wealth, local governments and the licensee toward correction of the deficiency.
Emergency planning is a dynamic process at operating nuclear plant sites in the i
Kennedy /NRR 3/31/88
l QUESTION 5. (Continued) )
i United States. In practice, we expect that emergency response plans will be revised and improved on a continual basis. Deficiencies identified during the ongoing review process and in biennial exercises at each of these sites are assessed for significance and plants may be allowed to operate while the defi-ciencies are being corrected. Given the progress to date at' Pilgrim, it is premature at this tinie to attempt to determine which, if any, deficiencies will remain when restart decisions are to be rade. However, the NRC will give special attention to the corrective actions involving the emergency response plans for schools and day care centers as well as the emergency response plans for special-needs and transport-dependent populations in the plume exposure pathway emergency planning zone.
I l
I dy Kenne,an/NRR i
l QUESTION 6. You said in your testimony that a detailed team inspection will be performed at Pilgrim prior to a restart decision.
Has that inspection conrenced? When will it conclude? How long will the public have to review the hRC's findings relative to the inspection and prior to a restart decision?
ANSWER.
Prior to consideration of Pilgrim plant restart, the NR; will conduct an Integrated Assessment Team Inspection (IATI) at Pilgrim to review and evaluate the effectiveness of licensee corrective action programs in order to determine the readiness of the plant and licensee personnel to support the restart and safe operation of Pilgrim. The inspection will encompass a three wet > period and is tentatively scheduled for June 1988 based on a projection of licensee activities. It is expected that the report, documenting the findings of the team, will be issued approximately one month prior to the planned public Commission meeting to consider a restart decision.
. . -n a1*
Kennedy /NRR l 3/30/88
o .
QUESTION 7. A great deal of public concern has focused on a release of .
radioactive resin which occurred at Pilgrim in the summer of 1982. It is my understanding that radioactive resin was found on the rooftops of buildings owned by Boston Edison. Would you please provide all the data the NRC has on file (including onsite and offsite readings, dosimeter readings and stack readings) indicating what the level of radioactivity had been in the period of time when the resin was released.
ANSWER.
In response to your request, we have made a comprehensive search of our files regarding inforr.ation on the radioactive resin release at the Pilgrim Station.
Enclosed are all the documents which were found as a result of this search.
Enclosures 1 and 3 provide the most detail concerning the event itself. Figure 1 of Enclosure 1 indicates the extent of the contamination by the resin found on June 11, 1982. All contamination found was within the site boundary. Figure 1 of Enclosure 1 provides a detailed map, but basically contamination was found as follows:
l l
Kennedy /NRR 1/16#00
QUESTION 7 (Continued) 2 Location Activity in disintegrations per minute (DPM)*
Adminstration Building Roof 100,000 - 200,000 DPM Turbine Building 100,000 DPM i
A0G Building 200,000 DPM Retube Building 200,000 DPM Main Transformer Area 1,000 - 25,000 DPM Pavement curb near Retube Building 20,000 - 80,000 DPM Pavement curb near Administration 100,000 - 200,000 DPM Building
\
i
Enclosures:
- 1. Inspection Report No. S0-293/82-20, dated August 5, 1982.
- 2. Letter from R. W. Starostecki, NRC, to W. D. Harrington, BEco, dated ,
June 16, 1982.
- 3. Letter from J. E. Howard, 8Eco, to R. W. Starostecki, NRC, dated July 15,1982.
- 4. NUREG-0837, "NRC TLD Direct Radiation Monitoring Network," Progress Reports l for January through Septester 1982, Yol. 2 Mos.1, 2, and 3.
- 5. Memorandum from R. J. Mattson, NRC, to H. R. Denton, NRC, "Generic I glica-tions of the Release of Spent Domineralizer Resins from Pilgrim, Unit No.1," dated July 8,1982.
l l
l
'In descrete small piles of resin of several grams.
l l
l Kennedy /NRR s isn io n ;
QUESTION 7 (Continued) 3
- 6. Memorandum from J. L. Pellet, NRC, to X. V. Seyfrit, NRC, "Technical Review Report on Pilgrim 1 Resin Migration,' dated April 19, 1983. .
- 7. Event Evaluation Sheet, "Spent Resin Release," dated June 14, 1982.
- 8. IE Information Notice No. 82-43, "Deficiencies in LWR Air Filtration / Ventilation Systems," dated November 16, 1982.
- 9. Pilgrim Nuclear Power Station, "Radioactive Effluent and Waste Disposal Report Including Radiological Impact on Humans,' January1 through June 30, 1982, dated September 1,1982. ,
- 10. Pilgrim Nuclear Power Station, "Radioactive Effluent and Waste Disposal Report including Radiological Impact on Humans,' July 1 through December 30, 1982, dated March 1, 1983.
L l
l Kennedy /NRR 1/.tn /AA
QUESTION 8. In recent years, Boston Edison has had unsatisfactory ratings ,
in the area of fire protection. I would like to know if Pilgrim is now in full compliance with fire protection requirements? Are all barriers, fire doors and penetration seals repaired and capable of passing required testing? Are fire watches still required in certain areas of the plant? (
How many fire watches are still needed? Will the NRC require Edison to co'nplete the upgrading of the entire fire protection system prior to allowing restart? How r.any maintenance requests are still outstanding in the area of fire protection?
Please also connent on the condition of the Halon system in the computer room at the plant and the smoke detectors over the spent fuel pool.
ANSWER.
I j Pilgrim is either in compliance or will be in compliance with its fire l
protection requirements prior to restart.
I !,
! One activity of the additional licensee fire protection personnel described above.was a reevaluation of plant fire protection features, comparing those features against NRC requirements and guidance, in an effort to determine (a) the level of actual coepliance, and (b) the adequacy of the features t provided to prevent unacceptable fire damage.
e l 0
yutu tun so nonunveo/ r During the course of this reevaluation the licensee found several cases where they did not literally comply with the NRC requirements or specific corrnitinents they had made earlier. The licensee, however, provided justification to demonstrate adequate protection against unacceptable fire damage. On that basis, the licensee asked for exemptions from those requirements. In most cases the staff granted the exemptions. In those cases where the staff did not agree with the justification provided, the licensee made modifications so as to be in compliance.
Because of the rore or less constant activity at operating plants, temporary changes, repairs, modifications, etc., may result in a particular condition that is not in compliance. These situations are conterplated and provisions are in place to assist in identifying the situation beforehand, providing interim protectionmeasures(suchasfirewatches)andmaintainingadministrativecontrol of the situation to assure tha+ the out-of-compliance condition is corrected.
Before answering each of the specific sub questions about fire protection at the Pilgrim Station, it is useful to address the overall progracratic status.
l During the last one and one-half to two years Boston Edison Coepany has made significant improvements in their entire fire protection program. Additional personnel with extensive experience in nuclear power plant fire protection l
l Kennedy /NRR 3/30/88 1
yutsinun 00 toonunueo/ J have been hired. Realignment of responsibilities and authority among these licensee personnel have strengthened the entire fire protection program and provided a higher level of accountability and continuity of effort that has resulted in substantial improvement in the program. This is evidenced by the methodology and thoroughness exhibited in identifying and correcting deficiencies.
The Itcensee has indicated that all modiNcations and work associated with upgrading required fire barr',rs, fire doors and penetratioa seals has been completed. The licensee has comitted to having all of the necessary docuv. it-ation concerning the above work completed prior to plant startup.
Fire watches continue to be used in some areas at Filgrim as well as most ,
operating plants. At the beginning of the present outage approximately 18 months ago, eight persons per shift were assigned full time responsibility for fire watches covering approximately 180 individual postings. As of March 17, 1988, no continuous fire watches are required. Two persons per shift are assigned as fire watches covering 41 separate postings throughout the plant.
Of those 41 postings, 25 are related to fire barrier deficient.ies,15 are related to maintenance activities and one is related specifically to activities pertaining to the outage.
. . - n.V . .
Kennedy /NRR 1/30/88
QUESTION 8. (Continued) 4 One hundred and sixty-one maintenance requests were still outstanding in the area of fire protection on March 17, 1988. However, this number by itself does not give an accurate picture of the Pilgrim fire protection maintenance program. On January F,1987 there were 260 open maintenance requests related to fire protection.
Since January 1,1987, approximately 1,480 new fire protection-related maintenance requests have been generated and approximately 1,580 have been closed.
A computer located in a small room adjacent to the Cable Spreading Room is being phased out. The room is protected by an operable automatic Halon fire suppression system. A new plant computer has been installed next to the Technical Support Center and the primary fire protection is provided by a sprinkler system with secondary protection provided by an automatic Halon fire suppression system. Both of these systems are operable.
i Six smoke detectors are located over the Spent Fuel Pool in the ven'tilation system exhaust ducts. Four of the six detectors have already been tested during this current plant outage. The other two are scheduled for testing prior to plant startup.
l
.I l
r Kennedy /NRR 3/30/AA
QUESTION 9. How many automat? and manual scrams have occurred at Pilgrim since the plant became operational? What is the annual industry-wide average?
ANSWER.
Table 1 provides data on unplanned automatic and manual scrams during critical operation for Pilgrim from 1984 through 1987 compiled from licensee event reports per 10 CFR 50.72 and to CFR 50.73. The comparable industry l average rates are also provided in Table 1.
Prior to 1984, reactor scrams were not directly reportable to the NRC (Pilgrim entered commercial service December 1,1972). As a result, that information is not readily available in our files, and in order to neet the timely response you requested only data from 1984 is listed.
Enclosure:
Table of Unplanned Scrans ,
When Critical for Pilgrim and Industry i
t I
Kennedf/NRR l 3/30/88 '
}
- -]
Enclosure to Question 9 iable 1 Unplanned Scrams When Critical for Pilgrim and Industry 1984 - 1987 1C 4 :', , 1985 1986 1987 "
Pilgrim Automatic 0 4 4 0 Manual 0 0 0 0 Industry Average Automatic 5.4 5.0 4.0 3.2 Manual 0.6 0.5 0.5 0.6
- Pilgrim critical hours for 1984 = 170.
- Pilgrim critical hours for 1987 = 0.
Kennedy /NRR 3/30/AA
QUESTION 10. How a ny "Unusus) Events" and how a ny "Alerts' have been declared at Pilgrim since 19727 Please describe and give the date of each report. How does this compare to the industry-wide average?
ANSWER.
One of the mjor lessons from the TN!-2 accident in 1979 was the need to upgrade emergency planning at nuclear plant sites. As a result, the NRC published the definition and guidance for emergency categories of ' Unusual Event' and
' Alert" in January 1980 in NUREG 0654/ FEMA-REP-1, codified them in Appendix E to Part 10 CFR 50 in August 1980, and erbodied them in reporting requirement 10 CFR 50.72 in August 1983. The NRC staff has compiled a coeputerized data 1 base, consisten* with the definitions of emergency categories and the reporting requirements, from i,.just 1982 to present. For coeparison purposes', the computer
- data base information available dating from August 1983, the first coeplete year of collecting data, is provided. The computer records of notifications to the Operations Center show that Pilgrim has declared 12 Unusual Events and no Alerts since 1983. Of the 12 Unusual Events, 2 were caused by fires in nonsafety related equipment and I was due to a potentially contaminated individual being transferred offsite for M dical treatment. The reminder were attributed to :;afety system inoperability which necessitated shutdown of the plant in accordance with the l<
plant's Technical Specifications. A table of all Unusual Events for Pilgrim is l
enclosed which describes the events and dates of each.
Enclosure Table of Unusual Events at f
Ptigria Nuclear Station Kennedy /NRR 3/30/84
-y--ww QUESTION 100 (Continued) 2 A comparison of Pilgrim Unusual Events versus the industry average follows:
Industry Unusual Licensed Industry Pilgrim Unusual Year Events Units Average Events
- 1982 - . ,, .
1983 205 85 2.4 0 1984 224 91 2.0 1 1985 312 98 3.2 5 1986 209 104 1.0 '
5 1987 231 109 2.1 0
- 1988 . . . .
l
- Pilgrim reported an Unusuc1 Event on August 18, 1982 relating to a fire in a face mask fitting machine and an Unusual Event an February 11, 1988 relating to a fire in the machine shop. These and other licensee Unusual Events which i may have occurre i in this time frame are n;; included in the table because the information is not included in the computer data base for the entire year.
l Pilgris also had one Alert on June 3, 1982 relating to a withdrawn incore .
detector resulting in abnormal radiation levels. This event lasted approxi-l mately 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. P11gris had no other Alerts from 1983 to 1987, however Alerts have been r6 ported from other licensed facilities.
l l
l
! Kennedy /NRR l 3/10/92 j
' ~ ~~
QUEST 16N100 (Continued) 3 Enclosure to Question 10 Unusual Events at Pilgrim Nuclear Station August 1983 to Present -
4 Event Description -
4/26/84 Potentially contaminated man taken to hospital. !
5/16/85 2 safety system trains inoperable.
05/23/85 2 sa..ty system trains inope. 3ble.
09/20/85 2 safety system trains inopecable.
, 10/15/85.. 2 safety systes trains inoperable.
, 11/04/05 Residual Heat Renoval safety train A inoperable.
- 01/W/36 2 of 8 Main Steam ! solation Yalves fail closure 1 :
time test.
) 01/09/86 Fire in line to hydrogen storage tanks.
l 02/11/86 Low pressure coolant injection inoperable.
02/14/86 2 safety system trains inoperable.
04/11/86 Loss of containment integrity.
) 02/11/88 Fire in mary ao shop.
l l
l Kennet ,'NRR 3 / 30. '*;<
QUESTION 12. There have been a number of allegations concerning the illegal dumping of radioactive waste on Boston Edison property.
Concerns have also been raised over Edison's use of the town dump for disposal of radioactive saterial. Would you please describe what monitoring the NRC conducts or requires on d
materials and waste leaving the Pilgrim site. Has the NRC or the licensee performed tests on Edison property and at the town dump to ensure that there are no elevated levels of radiation at areas suspected of containing radioactive waste?
Where and when were tests conducted? What were the results?
I ANSWER.
I ine NRC staff does not itself monitor materials and wastes leaving the Pilgris I
site. The licensee is required to monitor all items containing or contaminated with radioactivity that are leaving the site. There are several facility l 1 t
l procedures that provide specific guidance and instructions to plant health physics workers regardir.g this activity. All radioactive wastes that are sent ,
I to sites specifically intended for burial sust meet feferal regulations for i radiation dose rate and contamination Itvels as well as special requirements of !
the burial sites. NRC performs routine inspections of the radioactive trans- l portation area to ensure that licensees are conforming to these'regulttory l l
requirements. further, onsite materials not thought to be contaminar at l
are being shipped offsite that have the potential of being contamin 4 ,i surveyed prior to being allowed off the site. The licensee is not allcwed to !
dispose of contaminated ob,1ects in non-radwaste fact 11 ties without a special i
i Kennedy /NRR ,
3/30/88
QUESTION 120 (Continued) 2 varianceprovidedforin10CFR20.302(a). BECo has not appifed for these variances. To our knowledge, no contaminated objects have been disposed of in' the town dump or in other public facilities not specifically intended for contaminated objects.
Some cut shrubs with slight contamination were disposed of on BEco property in 1987. The contamination was not detected with standard survey meters, but was so low that it was only detected on clippings using sensitive laboratory equipment. The clippings had been taken after these shrubs had been taken from the site. Notwithstanding, the contamination levels were lower than typical soil backgroun- eyels and they posed no health hazard (see enclosed Inspection
- 1eport 50-293 57, dated March 11,1988,p.!!). MRC hss not performed surveys for contamination of the town dump or at other BEco properties. MRC does not routinely perform contamination surveys of this type. As stated in I the Inspection Report, the inspectors reviewed the licensee's program for l release of material from the site and concluded that it was adequate.
Enclosure:
Inspection Report dtd 3/11/88 Kennedy /NRR 1 mnion j
--- _l
QUESTION 13. Has Pilgrim ever violated established radiation emission levels i.e., have there been any releases from the plant which exceeded standards set by the NRC?
ANSWER.
The permissible levels of radiation in unrestricted areas and of radioactivity in effluents to unrestricted areas are estabitshed in MRC regulations embodied in 10 CFR 20, Standards for Protection Against Radiation. These regulations j specify limits on levels of radiation and limits on concentrations of radio-nuclides in the facility's effluent releases to the air and water (above natural background) under which the reactor rust operate. Further, the rt,alations require
! that there be no unmonitored release paths from the plant. The regulations i
are structured to provide reasonable assurance that no see6er of the general public in unrestricted areas will receive a radiation dose, as a result of facility operation, of more than 0.5 rem in 1 calendar year. These radiation dose i linits are established to pmtect the health and safety of the public.
l l
l In addition to tha Radiation Protection Standards of 10 CFR 20,10 CFR 50 Ve establishes Itcense requirements in the form of Itcense Technical Specifica-tions on effluents free nuc? ear power reactors. The purpose of the Technical Specifications on effluents is to keep releases of radioactive nterials to unrestrictsJ areas during nera l operations, including expected operational S 4
QUESTION 130 (Continued) 2
,c. .
occurrences, as low as is reasonably achievable (ALARA). Another regulation (Appendix!of10CFR50)providesnumericalguidanceondese-designobjectives for light water reactors to meet this ALARA requirement. The dose-design objectives are low, about 1% of the Radiation Protection Standards of 10 CFR
- 20. Thus, it is possible for a licensee to exceed the dose-design objectives, but still be within the Radiation Protection Standards.
The NRC staff has reviewed the agency records on radioactivity releases from the Pilgrim nuclear power plant. Although there were situations w Hn the radioactivity releases exceeded Pilgrim's Technical Specifications, these releas's did not exceed the Radiation Protection Standards of 10 CFR 20.
We have also reviewed the agency records on the amounts of radioactivity measured in the environment around the Pilgrim nuclear power plant. The licensee has reported elevated levels above norm:1 background of some radionuclides in some environrental samples over the time period 1978 through 1981. However, it should be noted that Pilgrim's previous guidelines for reporting elevated levels
- of radioactivity in environmental samples were conservative. Under Pilgrim's current Technical Specifications, many (if not all) of the previously reported elevated levels would no longer be considered rerortable. The previously reported elevated leve1s of radiogegtytty in environmental samples would lead to doses less than specified in the Radiation Protection Standards and thus would be i
below NRC regulatory limits. ;
i in surr.ary, radioactive emissions from the Pilgris nuclear power plant have occasionally exceeded the plant's Technical Specifications: however, they have l
not exceeded the NRC's Radiation Prot (4 tion Standards, f'.""'.dy/NRR
/
,_,.+ / ,
Ah
., / . -
. /""%, UNITED STATES
! NUCLEAR REGULATORY COMMISSION 5 9 OFFICE OF GOVERNMENTAL AND PUBLIC AFFAIRS, REGION I 475 Allendale Road, King of Pru sia, Pa.19406
- \ *... /s Tel. 215 337 5330 No. I-88-37 April 6, 1988
Contact:
Karl Abraham NOTE TO EDITORS AND STATION ASSIGNMENT EDITORS A. Randy Blough, Chief of the Reactor Projects Section that inspects Pilgrim, has issued a status report summarizing activities of the inspection staff during the period March 12-25, 1988.
The report _i s __a_t_tached.
M March 30, 1988 Docket No. 50-293 MEMORANDUM FOR: James T. Wiggins, Chief Reactor Projects Branch No. 3 l FROM: A. Randy Blough, Chief l Reactor Projects Section No. 38 l
SUBJECT:
PILGRIM STATUS REPORT FOR THE PERIOD MARCH 12-25, 1988 Enclosed is the Pilgrim bi-weekly status report from the NRC Resident Office at Pilgrim. Three resident inspectors monitored activities at the plant during l the report period. In addition, a four member NRC inspection team visited the Pilgrim Station and the licensee's Chiltonville training f acility to evaluate the licensee's revised Emergency Operating Procedures, i
l The status reports are intended to provide NRC management and the public with l
an overview of plant activities and NRC inspection activities. Subsequent l inspection reports will address many of these topics in more detail.
l (Original signed by)
' A. Randy Blough, Chief l Reactor Projects Section No. 3B
Enclosure:
As stated l (more) em:um g, h
2 ENCLOSURE PILGRIM STATUS REPORT FOR THE PERIOD MARCH 12-25. 1988 1.0 Plant Status As of 8:00 a.m. on M' u h, D&',, the reactor was in cold shutdown mode with moderator tempt.' s h sbcut ? degrees Fahrenheit. >
2.0 Facility Operations Yv-ry The plant has been '> ,en f<
- intenance and te make program improve-ments since April 12. .W. % reactor core was completely defueled on February 13, 1987 to
- ilitets :xtensive maintenance and modification of plant equipment. The ). ?nses completed fuel reload on October 14, 1987.
Reinstallation of the reactor vessel internal components and the vessel head was followed by completion of the reactor vessel hydrostatic test.
The primary containment integrated leak rato test was also completed dur-ing the week of December 21, 1987, Ouring this report period, the licensee continued with the post modifica-tion / maintenance testing of p? ant equipment.
3.0 Items of Special Interest NRC Evaluation of the Emercene.y Operating Procedures l The Emergency Operating Procedures (EOPs) are used by the control room operators in case of abnormal conditions in the plant. The licensee has revised the existing E0Ps to meet the updated industry guidelines for operating boiling-water reactors and to incorporate the recent plant modifications. The new E0Ps and the related Procedure Generation Package were submitted to the NRC for review on December 1A, 1987. ;
I As part of the NRC evaluation of the new E0Ps at the Pilgrim Station, a i four-member NRC inspection team visited the Pilgrim St. tion and the i licensee's Chiltonville training facilities during the week of March 14, 1988. The evaluation included observation of control room e operators' execution of the E0Ps utilizing the control room simulator.
review of onsite documents relating to the E0P development, and review of ;
operator training. The results of the evaluation will be documented in l the inspection report 50-293/88-11. '
I (more)
t I
3 '
Reactor Operator Licensina Examination Results l
! On March 25, 1988, NRC Region I issued the examination report 50-293/87-56
- documenting the results of the NRC administered examinations on December 7-11, 1987 to Boston Edison Company's candidates for optrating licenses. Written examinations and operating tests were administered to
- two senior reactor operator and six reactor operator candidates. All candidates passed these examinations.
Personnel who directly operate a nuclear power reactor are required to be licensed by the NRC. Each candidate for an operating license must meet certain educational aN experience standards. These individuals partici-pate in a complete and extensive licensee training program. Upon comple-tion of this training program, the NRC administers comprehensive written 3
and oral examinations, including a plant walkthrough.
Recent NRC Inspection Results On March 4,1968, NRC Region I issued the inspection report 50-293/88-01 documenting the results of a routine inspection of the Pilgrim Station radiation safety program conducted on January 25-29, 1988 by a region ,
. based specialist inspector. Areas reviewed included followup on previous inspector findings, organization ar.d staffing of the licensee's Radiation '
Protection Section, control of locked high radiation areas, coi. trol of hot particles and disposition of exavated dirt. No violations were identified.
' The inspection report 50-293/88-03 was issued on March 7, 1988 documenting the results of a routine inspection conducted on January 25-29, 1988 by
, two region based specialist inspectors. Areas inspected it.cluded followup t on previous inspection findings in the area of materials / component integ- l rity and plant modifications and test procedures. In addition, the Pcwer
' i
- Ascension Test Program and the licensee's plans for oversight and assess-
) ment of Power Ascension activities were reviewed. No violations were j identified. The Power Ascension Test Program was determined to be in the l
developmental stages and not fully ready for inspection. A future inspec-I tion will be conducted to assess the licensee Power Ascension Program when
! finalized.
I i On March 4,1988, NRC Region I issued the inspection report 50-293/88-05 documenting the results of a routine inspection conducted on January 25-28, 1988 by two region basea spacialist inspectors. Areas inspected
- included changes to the emergency preparedness program, organization and l management control, training, protective action decision making and i emergency action levels. No violations were identified.
l l
l (more)
(
i l ._
1 1
- 4 t
I a
The inspection report 50-293/88-06 was issued on March 4, 1988 documenting the results of a routine inspection conducted on January 25 28, 1988 by two region based specialist inspectors. Areas inspected included the site security program upgrades, security organization, protected area physical ,
barriers, access control of personnel and packages, and adequacy of alarm !
l stations and compensatory measures. No violations wore identified.
On March 17, 1988, NRC Region I issued the inspection report 50-293/88-09 documenting the results of a special inspection conducted on February 24-25, 1988 by a region based specialist inspector. The inspec-tion focused on conditions surrounding the classification and reporting of a Notification of Unusual Event identified on February 11, 1988. One ;
weakness was noted regarding offsite notifications. The licensee failed '
to follow the requirements of Emergency Procedure 5.7.2.8, "Control Room Emergency Communicaticos", which requires, in part, the notification of the Plymouth Policy Department of conditions surrounding an emergency classification of an Unusual Event or above. The licensee had identified this problem and was working on corrective actions. This weakness has .
been classified as a licensee identified violation, l i
4.0 Emergency Notific,ation & stem (ENS) Report During this period, the licensee made the following report to the NRC !
pursuant to 10 CFR 50.72:
f On March 12, 1388, the 'icensee experienced an automatic closure of thu !
. inboard prirrary containment isolation valve on the reactor water cleanup !
! (RWCU) system suction line. Investigation by the licensee indicateo that the technicians performing a surveillance on the electrical portie.:, of the system inadvertently grounded a wire which had been lifted ouring tha ,
i surveillance test. Grounding the wire resulted in a blow , logic power '
- fuse, and doeaergitation of this portion of the logic causyd the valve to l automatically close. The fuse was replaced and the test subsequently ;
) completed. l 1
4 5.0 NRC Staff Status During the Period
- r l The inspection staff at Pilgrim during the report period consisted of the following
Clay Warren ---
Senior Resident Inspector
- Jeffrey Lyash ---
Resident Inspector !
! Tae Ki,a ---
Resident Inspector l
In addition, a four member inspection team was onsite during the week of
! March 14, 1988 to evaluate the licensee's revised E0P's. '
l a
% rtWe m ,
/""%,, UNITED STATES I
! NUCLEAR REGULATORY COMMISSION 3 f OFFICE OF GOVERNMENTAL AND PUBLIC AFFAIRS, REGION I 475 Allendale Road, King of Prussia, Pa. Ib406
%,.....,/ Tel. 215-337 53%
No. I-88-46 Aoril 21, 1988
Contact:
Karl % raham NOTE TO EDITORS AND STATION ASSIGNMENT EDITORS A. Randy Blough, Chief of the Reactor Projects Section that inspects Pilgrim has issued a status report summarizing activities of the inspection staff during the period March 26 - April 8, 1988.
The report is attached.
April 19, 1988 Docket No. 50-293 MEMORANnVM FOR: James T. Wiggins, Chief Reactor Projects Branch No. 3 FROM: A. Randy Blough, Chief Reactor Projects Section No. 38
SUBJECT:
PILGRIM STATUS REPORT FOR THE PERIOD MARCH 26 - APRIL 8, 198a Enclosed is the Pilgrim bi-weekly statu!, report from the NRC Resident Office at Pilgrim. Three resident inspectors monitored activities at the plant during the report period. In addition, a region-based specialist inspector was onsite during the week of April 4,1988, to review the licensee's radioactive waste processing systems and ef fluent monitoring. On May 11, 1988, NRC sill be con-ducting a public meeting at the Plymouth Memorial Hall, in Plymouth, Massachusetts to respond to the public comments and concerns on the Boston Edison Company's Pilgrim Restart Plan raised during the February 18, 1988 public meeting. NRC Region I will issue a news release to inform the public of the scheduled meeting.
Section 3 of the enclosed report provides an overview of NRC activities and plans for assessing licensee's readiness for restart. Subsequent inspection reparts will address many of these topics in more detail.
(Original Signed By)
A. Randy Blough, Chi _ef Reactor Projects Section No. 3B
Enclosure:
As stated (more) 9t&;O MM 'ljy
g ENCLOSURE PILGRIM STATUS REPORT FOR THE PERIOD MARCH 26 - APRIL 8, 1988
- 1. 0 Plant Status As of 8:00 a.m. on April 8,1988, the reactor was in cold shutdown mode with moderator temperature about 95 degrees Fahrenheit.
2.0 Facility Operations Summary The plant has been shutdown for maintenance and to make program improve-ments since April 12, 1986. The reactor core was completely defueled on February 13, 1987 to facilitate extensive maintenance and modi'ication of plant equipment. The licensee completed fuel reload on October 14, 1987.
Reinstallation of the reactor vessel internal components and
- he vessel head was followed by successful completion of the reactor vessel hydro-static test. The primary containment integrated leak rate test was also successfully completed during the week of December 21, 1987, 3.0 Items of Soecial Interest Overview of NRC Activities Regarding Pilgrim In April 1986, an Augmented Inspection Team (AIT) was dispatched from NRC Region I to Pilgrim in response to several operational problems. At that time the licensee agreed, in a Confirmatory Action Letter, to obtain Regional Administrator approval prior to a plant r e s ta r*. . Most of the related technical issues were resolved. However, NRC oncerns raised during the 1985 Systematic Assessment of Licensee Performance (SALP) and during a subsequent regional diagnostic team inspection remained. On July 25, 1986, Boston Edison Company announced that the outage would be extended to in:lude refueling and completion of plant modifications. The requirement to obtain NRC approval prior to restart was extended in August, 1987 to cover the other hardware and SALP related performance issues. On August 27, 1986, the Regional Administrator, NRC-Region I, requested in a letter to the licensee that they perform a formal assessment of their readiness for plant restart, and provide the assessment results for NRC review. By letters dated July 30, 1987, October 26, 1987 and January 4,1988, the licensee submitted the Pilgrim Nuclear Power Station Restart Plan. A special NRC Task Force was formed to review and evaluate the Restart Plan. This Task Force completed its inittai review and, on March 18, 1988, forwarded a request for additional information to the licensee.
l l
i j -
(more) l
[
L .
l 4
NRC is continuing to devote considerable inspection resources to Pilgrim. ,
The resident staff has been maintained at three inspectors. Since the l plant was shut down on April 12, 1986, the NRC has conducted 84 spec.lal !
and routine inspections in various functional areas at Pilgrim expending i 11,977 direct inspection hours. Senior NRC management involvement also [
remains substantial. A series of management meetings to discuss the !
licensee's progress and proposed programs have been held. Frequent site
- tours by Commissioners, the Director of Office of Nuclear Reactor ,
Regulation (NRR) and the Regional Administrator have been conducted. A t Pilgrim Restart Assessment Panel was formed which consists of senior '
management from NRR and Region I. This Panel coordinates the planning and i execution of NRC activities, and assesses the results of these activities to provide an independent judgement of the plant's readiness for opera-tion. The Panel meets approximately bi-weekly, with alternating meetings held onsite. Development of the staff's restart recommendatior, will be coordinated by the Panel, t I
! The licensee's management self-assessment to determine restart readiness is underway. Once a conclusion has been reached by the licensee a formal
- restart request will be submitted. The NRC staff currently plans to per-form an Integrated Assessment Team Inspection (IATI) and a SALP, prior to finalizing a NRC staff recommendation on restart. A Readiness Report addressing the SALP and IATI results will be prepared to support the NRC staff recommendation. Current plans include a status briefing for the Commission, a full Commission meeting to review the staff's recommenda-tion, and a Commission vote regarding restart. Some Commissioners have j indicated that they will visit the site personally prior to the Commission meeting. l l In order to accommodate broad public participation into the NRC assessment i process, a public meeting was conducted by the NRC in Plymouth, 3
Massachusetts on February 18, 1988. Public comments on the licensee's j
! Restart Plan were received orally and in writing. Prior to the meeting, ;
{
copies of the Restart Plan were made available to the local town libraries for public review. The NRC Task Force is reviewing the meeting l
transcription to identify and disposition relevant comments and concerns.
j A second public meeting is scheduled to be held in the Plymouth area on ,
j May 11., 1988, to respond to the comments and concerns raised during the i i
first meeting. Before a position on restart of the plant is developed in l 1 final form, a public meeting will be held between NRC senior staff and j State Senator William Golden and other petitioners who submitted the July i 198610 CFR 2.206 petition if the petitioners desire such a meeting. This
) meeting will discuss NRC's actions regarding the Pilgrim plant and answer
{ questions of the petitioners.
t t
l (more)
4 ,
i NRC Public Meeting to Respond to Comments on BEco's Pilgrim Restart /lan !
On May 11, 1988, NRC will be conducting a public meeting at the Plymouth Memorial Hall, in Plymouth, Massachusetts to res, pond to the public com-ments and concerns on the Boston Edison Company s Pilgrim Restart Plan raised during the February 18, 1988 public meeting. The meeting is scheduled for 7:00 p.m. to 9:00 p.m. NRC Region I will issue a news release to inform the public of the scheduled meeting.
Management Meeting for Power Ascension Test Program i l
On April 8,1988, a publicly-noticed management meeting was held between NRC and Boston Edison Company (BECo) officials at the NRC offices in Kine-Pennsylvania. BECo management presented an overview of the ;
of Prussia,ineering ongoing eng analysis to support the basis of their Power Ascension Test Program. The licensee previously had submitted a Power Ascension i Test Program and a Management Self-Assessment Program describing the i methods which will be employed to assess and confirm the readiness of :
plant hardware and staff for extended power operation. NRC staff review !
of these items is ongoing. !
4.0 Emergency Notification System (ENS) Recort During this period, the licensee made the following report to the NRC -
pursuant to 10 CFR 50.72: ;
On March 31, 1988, at 12:42 p.m., an inadvertent reactor building isola-tion and an automatic start of both standby gas treatment trains occurred.
A licensed operator performing a daily surveillance test of the refueling floor high radiation monitors failed to properly reset the monitors. When ,
the operator proceeded to test the redundant monitors, ccmbined trip !
functions resulted in the observed engineered safety systems actuations.
The trip signals were reset and the systems returned to normal operation a short time later.
5.0 NRC Staff Status During the Period The inspection staff at Pilgrim during the report period consisted of the i following: '
Clay Warren ---
Senior Resident Inspector Jeffrey Lyash ---
Resident Inspector Tae Kim ---
Resident Inspector In addition, a region-based specialist inspector was onsite during the r week of April 4,1988 to review the licensee s effluent monitoring program ;
including radioactive waste processing systems. ;