Discusses Minutes of Util Restart Assessment Panel 880426 Meeting Re Status of NRC & Licensee Activities Associated W/ Proposed Plant Restart
ML20196F443
Person / Time
Site: Pilgrim
Issue date: 05/09/1988
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Russell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20150E198 List:
References
FOIA-88-198 NUDOCS 8812130086
Download: ML20196F443 (6)


Text

_ _ _ - _ _ _ _ _ - .

UNITED 8T0748 k NUCLEAR REGULATORY COMMISSION /) [

t REGION I 479 ALf.sNOALE RoAO p'

KINO oF PRUS$lA, PENNSYLVANIA 1940e #

w o9 weg /s ll in1 d s rator ,/ p FROM: Samuel J. Collins, Deputy Director s Division of Reactor Projects

SUBJECT:

PILGRIM RESTART ASSESSMENT PANEL MEETING MINUTES On April 2fi,1988, the Ptigrim Restart Assessment Panel met onsite to discuss the status of NRC and licensee activities associated with the proposed plant Restart. The following personnel were in attendance:

! Chairman: Samuel J. Collins, Deputy Director, ORP (By Teleconference) j Members: James T. Wiggins, Chief, Reactor Projects Branch No. 3, DRP A. Randy Blough, Chief, Reactor Projects Section No. 3B, ORP Bruce A. Boger, Assistant Director for Region I Reactors, NRR (By Teleconferencel

]

Richard H. Vessmta, Project Directorate I-1, NRR (By Teleconference)

Ronald R. Bellany, Chief. Facilities Radiological Safety 1 and Safeguards Branch, ORSS Others: Daniel G. Mcdonald, Project Manager, NRR (By Teleconference)

Lawrence T. Doerflein, Project Engineer, RPS 3B, ORP Clay C. Warren, Senior Resident Inspector, Pilgrim Jeffrey J. Lyash, Resident Inspector, Pilgrim Tae K. Kim, Resident Inspector, Pilgrim Robert M. Gallo, Chief, Operations Branch, ORS Michael M. Kohl, Reactor Engineer, RPS 3B, DRP l The panel discussed the issues from the last meeting, as well as the overall I integration of NRC inspection and review activities. As a result of the meet-l ing, the below listed actions with responsibility were agreed upon by the

, Panel.

The next panel meeting will be held onsite at 8:30 a.m., May 12,1988 (Bridge No. 492-4037). All items below will be updated. No separate agenda will be provided for the May 12 meeting.

Task Responsibility Due Date

1. Plant Status Update Resident I.tspector Next Panel
2. Staffing / Organization Update Resident Inspector Next Panel I

4 l ..

1 l 8812130006 001200 NS 8 190 PDP [ [

i Memorandum for William T. Russell 2 MAY 09 M I

Task Re sponsit'111 ty Due Date

3. $tte Inspection Activities Resident Inspector Next Panel i Update  ;

i 4 the Mcdonald Next Panel I NRR statustoof ask onceBECo Licensing (OOC) per cycle '

surveillances

~

5. NRR to find out how OOC Wessman Next Panel surveillances were handled at other long term shutdown  !

plants '

6. Develop itst of problems / Warren Next Panel i

concerns with old MSTP  !

7. Infore BEco of the need for Collins Next Panel r a briefing (5/23) and a r letter documenting INPO I review results
8. Develop list of Appendix R Warren Next Panel f itemsfor5/16(Notley)  ;

inspection

9. Pre-Assessment Report and Warren Next Panel  !

Self-Assessment Status

10. Review and update NRC Restart All May 10  !'

checklist, identify items (either currently open or closed) for  ;

recheck during !ATI

11. Provide OIL Updates ORS April 29
12. Resttrt Assessment Report '
  • Provide Comments on All Next Panel -

Format (

  • Assign responsibilities Blough April 29 l for sections  ;
13. Independent Assessment Team Doerflein April 29 I i

Inspection Plan r I

i.

l I

I i

Memorandum for William T. Russell 3 0 9 1986 4

Task Responsibility Due Date I

14 IATI Organization Chart / Team Blough May 4 Members

15. Update Overall Milestone All Next Panel Schedule
16. E0P Open Item Status NRR/0RS Next Panel
17. Update Subset Milestone All Next Panel Schedules
18. Review Status of Power Ourr/Blough Next Panel
Ascension Program Deficiencies
19. Presentations for Public Collins /Gutierrez May 6 Meeting (Update Status) Bellamy/Ocerflein (W/0 5/9) Boger i

' 20. Update Status on Administrative Blough May 6 Arrangements for Public Meeting

,__ ;r 21. Expedite concurrence and issuance Wessman Next Panel

, of Commonwealth 2.206 Petition I response j 22. Of rect Torus Vent Update Boger Next Panel i

) Deputy Director Division of Reactor Projects

Enclosures:

1. Ptigria Overall Milestone Schedule, Revision 2
2. Ptigrim Subset Milestone Topic Listing Revision 1 i

i 1

1 i

U

Memorandum for W1111aa T. Russell 4 MY 09 588 cc w/encis:

T. Murley, NRR F. Miragita, NRR T. Martin, NRR S. Varga, NRR B. Boger, NRR R. Wessman, NRR

0. Mcdonald, NRR F. Akstulewicz, NRR J. Roe, NRR J. Hannon, NRR W. Re

. .ayton, E00 J. Allan, RI W. Kane, RI J. Wiggins, RI R. Blough, RI F. Congel, RI J. Ourr, RI R. Bellamy, RI L. Doerflein, RI M. Kohl, RI C. Warren, SRI - Pilgrim J. Lyash, RI - Pilgrim T. Kim, RI - Pilgrim l

I l

i l

l t

i

C8Fiu- Pithwni extl)LLISIONAL HliLSIONth ,

Diagnos CAL 86- Rf0-7 NRC Ltr Rqs".

SALP ,

Mgmt SALP NRC SEP Ltr Restart 85-99 Team 10 AIT Start Restart Assess From Plan A55'55 MeetinS 86-99 Inso. PLT Scr 86-41 Plan BECo Rev. 0 -

a u u u

5  ; _
a _ u _ u _ u _ u 10/1/84- 2/16/86- 4/1f/86 7/66 '8/27/66 11/24/86 ' 11/1/85- ~ 7/8/87 7/8/87 7/30/87 10/31/85 3/7/86 1/31/87 9 P

S FEMA 1 rSEP Ltr EP Ltr SECo E

^*C ** *

  • Self Int to to EP Re- Prg P1an Work LOOP Nuc. Re- -

Rev i BECo BECo sponse Sutwnt t Rev. 1 Stop AIT align

5  : 5  :  !  :  !  ;-  !  :  !  :  !  ; a  ; a 8/5/87 8/21/87 9/17/87 9/17/87 9/2e/87 10/15/87 10/26/87 11/8/87 11f12/87 12/87 BECo SelY Assess- NRC Public Mtg Start BECo BECo SEP NRC All Re- ment 'BECo/NRC fubHc Restart Pilgrim on Restart Pre-Self Ltr to NRC start Plan Comp Resolution of g Re Plan Task Plan Assessment Except DTV Comunents to VS an NO Ano 7 R/S Plan Review Force BECo rn-rmnts

!  : 3 -

l  : '  :

1/4/08 1/27/88 2/18/88 2/22/83 2/22/88 3/18/88 S/2/88 S/6/88 b/11/88 S/9-20/88 BECo Dects NRC Camp BECo Self- NRC Resolu- IATI Prep =

BECo on IATI Pwr Ascens Assess /INPO tion of SEP & Comen. 'EOP SU DTV/SEP Readiness Plan Rev Rpt Results Issues Briefin) Issues IATI be

( EEE Status Presentation Addressed 5

I Fina}SARtt -

i . . .

u

, o.x, I  ! Is/is/881 I I Is/23/84 I I I Sf24-27y881 1 I gi,m_, o_,1 le/28/881 1 I a:ra R * *.O NRC Restart NRC CAL / Restart 5 S IATI Z.ZOb IATI NRC Z.ZC6 Assessment Restart Assessment Issue StatusPanel Recom g EP Iss'e Rpt Issue

  • u RA D/NRR Public Public Report 5 Recom t)

Issue Status Mtg Mtg to RA Status J Reconen n/nne l to EDO E =

l = " =

l = " = "

= " -

1 17/1/e.a 1 I I Iw/o 7/11 Iw/o 7/11 17/22/88 I I I 17/25/88 I I I I I I I EDO Brief Conan Publit Restart NRC Over- I k-Meeting Comun Assent Decisico sight Pit SALP NRC 6 Mo. L

  • N.

Restaryo/PWR Ascens n Mtg Release SALP "E E n / u u u r u g u g

u w

i n .

_ r Iw/o8/11 Iw/08/11 I I I I I I I I I I I I I I I I onen Comply with Staff

l

. t ENCLOSURE 2 Sbset Milestones Topic Listing

~

Area Responsibility l r

A. Overall Milestones S. Collins }

f B. Pubite and State Involvement R. Blough  !

Meetings with Licensee l

C. NRR Actions for Restart D. Mcdonald

{

D. Management Transition C. Warren i E. Site Inspections / Reviews R. Blough I F. Assessment Panel Activities S. Collins f G. SALP C. Warren l

H. EP Status R. Bellamy

!. Restart Assessment Report (RAR) L. Deerflein J. Integrated Assessment Team Inspection (IATI) R. Blough K. Power Ascension Program J. Ourr S. Collins Pilgrim Subset Milestones 5/7/88 Rev. 2