MONTHYEARML20211A4361999-08-18018 August 1999 Notification of Significant Licensee Meeting 99-47 with Entergy Nuclear,Inc on 990831 to Discuss Results of NRC Plant Performance Review of Pilgrim Nuclear Power Station Issued on 990409 ML20212H7621999-06-22022 June 1999 Notification of 990701 Meeting with NEI & Entergy in Rockville,Md to Discuss Price-Anderson Issues Re Transfer of Pilgrim License from Beco to Entergy ML20205L0301999-04-0909 April 1999 Notification of 990413 Meeting with Boston Edison Co & Entergy Nuclear Generation Co in Rockville,Md to Discuss Sale & Transfer of Pilgrim Station from Boston Edison Co to Entergy Nuclear Generation Co ML20196J5801998-12-0707 December 1998 Notification of 981209 Meeting with Representatives of Beco & Entergy in Rockville,Md to Discuss Sale of Pilgrim Plant ML20196F3461998-12-0202 December 1998 Forwards Info Re Operator Licensing Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids Code IE42 ML20196F5611998-12-0202 December 1998 Forwards Info Re OL Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids A070 ML20154D5091998-10-0202 October 1998 Notification of Meeting W/Beco on 981008 in Rockville,Md to Discuss Core Spray Piping Integrity ML20154G5141998-10-0202 October 1998 Notification of 981008 Meeting W/Beco in Rockville,Md to Discuss Core Spray Piping Integrity.Meeting Has Been Rescheduled to 981015 ML20247G2441998-04-15015 April 1998 Notification of Significant Licensee Meeting 98-34 W/Util on 980427 to Discuss Weaknesses in Licensee Alarm Assessment Program (EA 98-191) ML20203E2781998-02-19019 February 1998 Notification of Significant Licensee Meeting 98-18 W/Util in King of Prussia,Pa on 980310 Re Plant Design Basis Project Discussion ML20199C7581997-10-31031 October 1997 Notification of Significant Licensee Meeting 97-112 W/Util on 971113 to Discuss NRC SALP ML20212D6201997-10-28028 October 1997 Notification of Licensee Meeting on 971121 W/Util in King of Prussia,Pa to Discuss Apparent Violations Identified During NRC Insp 50-293/97-05 ML20140F6151997-06-11011 June 1997 Notification of 970612 Meeting W/Util in Rockville,Md to Discuss Net Positive Suction Head for ECCS Pumps ML20137Q9761997-03-31031 March 1997 Informs That as-found LOCA & Life Testing & Analysis Does Not Provide Acceptable Approach for Demonstrating Qualification at Accident Temp Higher than 340F,per 970110 TAR ML20137B4781997-03-14014 March 1997 Undated Memo Discussing Beco Reorganization ML20141A7361997-03-12012 March 1997 Rcommends That Key RES Staff Attend Subcommittee Meetings to Address Any Questions,Arise in Discussions Among Members & to Answer Any Key Questions Posed in Advance by Subcommittee Chairmen ML20149M3291996-11-12012 November 1996 Forwards Input Re TIA on Plant Licensing Basis & Subsequent Mod Under 10CFR50.59 for Two Safety Significant Problems ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20129D8331996-09-19019 September 1996 Notification of 961003 Predecisional Enforcement Conference 96-98 W/Util to Discuss Containment Penetration Protection. Meeting Closed to Public ML20134J7301996-07-26026 July 1996 Forwards Resolution of Spent Fuel Storage Pool Action Plan Issues Re Response to Two Postulated Event Sequences Involving SFP NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl IR 05000293/19930291993-11-23023 November 1993 Notification of Significant Licensee Meeting 93-156 W/Util on 931202 Re Three Recently Reported Design Issues in Insp Rept 50-293/93-29 ML20058C9711993-11-22022 November 1993 Notification of Significant Licensee Meeting 93-150 W/Util on 931217 Re Hpci/Rcic Reliability & Switchyard Betterment Status ML20059L9721993-11-12012 November 1993 Licensing Board Memorandum & Order Terminating Proceeding .* Informs That Time Provided by NRC Regulation to Review Decision of ASLB Terminating Proceeding in Docket Has Expired.W/Certificate of Svc.Served on 931112 ML20056C4721993-06-17017 June 1993 Discusses Util Assessment of Low Pressure Turbine Analysis. Licensee Retained Structural Integrity Assocs,Inc (SIA) to Evaluate Flaw Indications in 7GA Disk.Sia Anaylsis Reduce Some Obvious Conservatisms Used in GE Analysis ML20128F3911993-02-0303 February 1993 Requests Listed Instructions to Ensure That P Blanch of Northeast Utils & E Hadley of We the People Kept Promptly Informed of NRC Activities on BWR Water Level Indicators & Rosemount Transmitters ML20128E2181993-01-26026 January 1993 Notice of Significant Licensee Meeting 93-11 W/Licensee on 930225 in King of Prussia,Pa to Discuss Util Reorganization ML20059C1171992-11-20020 November 1992 Submits Status Rept on Reactor Water Level Spiking That Occurred on 921024.Related Info Encl ML20125D1161992-10-0707 October 1992 Notification of Significant Licensee Meeting 92-177 W/Util on 921217 to Discuss tie-in of New Security Computer ML20082B1581991-02-20020 February 1991 Summarizes Telcon W/R Murphy Re Mobilization Time for State of Ma Natl Guard Personnel Assigned to Respond to Wellesley, Ma Reception Ctr & State of Ma Civil Defense Agency Area II Headquarters in Event of Emergency at Facility ML20062H5361990-11-23023 November 1990 Forwards Info from Pilgrim Citizens Radiological Monitoring Network,Covering Rept Periods 900910-1017 ML20059P0861990-10-0101 October 1990 Notification of Significant Licensee Meeting 90-118 W/Util on 901016 to Discuss SALP ML20059L1541990-09-0707 September 1990 Notification of Significant Licensee Meeting 90-114 on 900912 at Region I Ofc to Discuss Corrective Actions & Restart Planning Re 900902 Manual Reactor Scram ML20059G4681990-08-0606 August 1990 Forwards Citizens Radiological Monitoring Network Weather Data Rept for Apr-Jul 1990 for Processing Through Nudocs Sys ML20127B4901990-08-0303 August 1990 Responds to 900726 Request for Recommendations for Appropriate Actions in Response to Inspector General Rept 90N-02 ML20127B4961990-08-0101 August 1990 Advises That Staff Did Not Conduct Thorough Review of Offsite Emergency Preparedness Which Resulted in Inaccurate Info Being Provided to Commission ML20058B4501990-06-28028 June 1990 Provides Status Rept Re Progress of off-site Emergency Preparedness Activities at Facility ML20055C2661990-02-0505 February 1990 Forwards Draft Ltr to Util Re Completion of Plant Power Ascension Program.Ltr Will Be Issued on 900209 Which Will Accept Util Completion of Power Ascension Program & Close Out Confirmatory Action Ltr CAL-86-10 ML20248C5841989-09-26026 September 1989 Notification of Significant Licensee Meeting 89-154 W/Util on 891006 in Plymouth,Ma to Discuss SALP Mgt ML20247N0121989-09-12012 September 1989 Forwards Plant Status Rept for 890826-0908.On 890830,reactor Automatically Scrammed Due to Fault on Main Generator Voltage Regulation Circuitry.On 890905,inadvertent Actuation LPCI Loop Select Logic Experienced ML20246N5751989-08-30030 August 1989 Forwards Plant Biweekly Status Rept for 890812-25 ML20245F6401989-08-0101 August 1989 Forwards Facility Biweekly Status Rept for 890715-28.NRC Restart Staff in Place & Onsite Monitoring Licensee Activities on Extended day-shift Basis During Reporting Period ML20247C0631989-07-19019 July 1989 Forwards Biweekly Status Rept for 890701-14.NRC Restart Staff in Place & Onsite & Monitoring Licensee Activities on around-the-clock Basis During Plant Startup & Power Ascension.Part 21 Related ML20247C1611989-07-14014 July 1989 Notification of Significant Licensee Meeting 89-112 W/Util on 890816 in King of Prussia,Pa to Discuss SALP ML20247E4531989-07-10010 July 1989 Forwards Plant Status Rept for 890617-30 Period.Rept Intended to Provide NRC Mgt & Public W/Overview of Plant Activities & NRC Restart Insp Activities ML20246K1141989-07-0303 July 1989 Notification of Significant Licensee Meeting 89-105/suppl Enforcement Conference Re Augmented Insp Team Findings Concerning 890412 Reactor Core Isolation Cooling Sys Overpressurization ML20245E6561989-06-22022 June 1989 Forwards Plant Biweekly Status Rept for 890603-16.On 890616, Reactor Operating at Approx 25% Power w/turbine-generator Synchronized to Grid.On 890612,util Commenced Controlled Reactor Shutdown to Perform Minor Mods,Maint & Testing ML20245F9581989-06-16016 June 1989 Notification of Significant Licensee Meeting 89-096 W/Util on 890619 in King of Prussia,Pa Re 890412 RCIC Sys ML20245A3311989-06-0909 June 1989 Notification of Significant Licensee Meeting 89-90 on 890627 W/Util in King of Prussia,Pa for Mgt Meeting to Discuss Status of Licensee Radiation Control Program ML20244E5081989-06-0707 June 1989 Forwards Biweekly Status Rept for 890520-0602.Rept Provides Overview of Plant Activities & NRC Restart Insp Activities. Part 21 Related 1999-08-18
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211A4361999-08-18018 August 1999 Notification of Significant Licensee Meeting 99-47 with Entergy Nuclear,Inc on 990831 to Discuss Results of NRC Plant Performance Review of Pilgrim Nuclear Power Station Issued on 990409 ML20212H7621999-06-22022 June 1999 Notification of 990701 Meeting with NEI & Entergy in Rockville,Md to Discuss Price-Anderson Issues Re Transfer of Pilgrim License from Beco to Entergy ML20205L0301999-04-0909 April 1999 Notification of 990413 Meeting with Boston Edison Co & Entergy Nuclear Generation Co in Rockville,Md to Discuss Sale & Transfer of Pilgrim Station from Boston Edison Co to Entergy Nuclear Generation Co ML20196J5801998-12-0707 December 1998 Notification of 981209 Meeting with Representatives of Beco & Entergy in Rockville,Md to Discuss Sale of Pilgrim Plant ML20196F3461998-12-0202 December 1998 Forwards Info Re Operator Licensing Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids Code IE42 ML20196F5611998-12-0202 December 1998 Forwards Info Re OL Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids A070 ML20154G5141998-10-0202 October 1998 Notification of 981008 Meeting W/Beco in Rockville,Md to Discuss Core Spray Piping Integrity.Meeting Has Been Rescheduled to 981015 ML20154D5091998-10-0202 October 1998 Notification of Meeting W/Beco on 981008 in Rockville,Md to Discuss Core Spray Piping Integrity ML20247G2441998-04-15015 April 1998 Notification of Significant Licensee Meeting 98-34 W/Util on 980427 to Discuss Weaknesses in Licensee Alarm Assessment Program (EA 98-191) ML20203E2781998-02-19019 February 1998 Notification of Significant Licensee Meeting 98-18 W/Util in King of Prussia,Pa on 980310 Re Plant Design Basis Project Discussion ML20199C7581997-10-31031 October 1997 Notification of Significant Licensee Meeting 97-112 W/Util on 971113 to Discuss NRC SALP ML20212D6201997-10-28028 October 1997 Notification of Licensee Meeting on 971121 W/Util in King of Prussia,Pa to Discuss Apparent Violations Identified During NRC Insp 50-293/97-05 ML20140F6151997-06-11011 June 1997 Notification of 970612 Meeting W/Util in Rockville,Md to Discuss Net Positive Suction Head for ECCS Pumps ML20137Q9761997-03-31031 March 1997 Informs That as-found LOCA & Life Testing & Analysis Does Not Provide Acceptable Approach for Demonstrating Qualification at Accident Temp Higher than 340F,per 970110 TAR ML20137B4781997-03-14014 March 1997 Undated Memo Discussing Beco Reorganization ML20141A7361997-03-12012 March 1997 Rcommends That Key RES Staff Attend Subcommittee Meetings to Address Any Questions,Arise in Discussions Among Members & to Answer Any Key Questions Posed in Advance by Subcommittee Chairmen ML20149M3291996-11-12012 November 1996 Forwards Input Re TIA on Plant Licensing Basis & Subsequent Mod Under 10CFR50.59 for Two Safety Significant Problems ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20129D8331996-09-19019 September 1996 Notification of 961003 Predecisional Enforcement Conference 96-98 W/Util to Discuss Containment Penetration Protection. Meeting Closed to Public ML20134J7301996-07-26026 July 1996 Forwards Resolution of Spent Fuel Storage Pool Action Plan Issues Re Response to Two Postulated Event Sequences Involving SFP NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl IR 05000293/19930291993-11-23023 November 1993 Notification of Significant Licensee Meeting 93-156 W/Util on 931202 Re Three Recently Reported Design Issues in Insp Rept 50-293/93-29 ML20058C9711993-11-22022 November 1993 Notification of Significant Licensee Meeting 93-150 W/Util on 931217 Re Hpci/Rcic Reliability & Switchyard Betterment Status ML20059L9721993-11-12012 November 1993 Licensing Board Memorandum & Order Terminating Proceeding .* Informs That Time Provided by NRC Regulation to Review Decision of ASLB Terminating Proceeding in Docket Has Expired.W/Certificate of Svc.Served on 931112 ML20056C4721993-06-17017 June 1993 Discusses Util Assessment of Low Pressure Turbine Analysis. Licensee Retained Structural Integrity Assocs,Inc (SIA) to Evaluate Flaw Indications in 7GA Disk.Sia Anaylsis Reduce Some Obvious Conservatisms Used in GE Analysis ML20128F3911993-02-0303 February 1993 Requests Listed Instructions to Ensure That P Blanch of Northeast Utils & E Hadley of We the People Kept Promptly Informed of NRC Activities on BWR Water Level Indicators & Rosemount Transmitters ML20128E2181993-01-26026 January 1993 Notice of Significant Licensee Meeting 93-11 W/Licensee on 930225 in King of Prussia,Pa to Discuss Util Reorganization ML20059C1171992-11-20020 November 1992 Submits Status Rept on Reactor Water Level Spiking That Occurred on 921024.Related Info Encl ML20125D1161992-10-0707 October 1992 Notification of Significant Licensee Meeting 92-177 W/Util on 921217 to Discuss tie-in of New Security Computer ML20082B1581991-02-20020 February 1991 Summarizes Telcon W/R Murphy Re Mobilization Time for State of Ma Natl Guard Personnel Assigned to Respond to Wellesley, Ma Reception Ctr & State of Ma Civil Defense Agency Area II Headquarters in Event of Emergency at Facility ML20062H5361990-11-23023 November 1990 Forwards Info from Pilgrim Citizens Radiological Monitoring Network,Covering Rept Periods 900910-1017 ML20059P0861990-10-0101 October 1990 Notification of Significant Licensee Meeting 90-118 W/Util on 901016 to Discuss SALP ML20059L1541990-09-0707 September 1990 Notification of Significant Licensee Meeting 90-114 on 900912 at Region I Ofc to Discuss Corrective Actions & Restart Planning Re 900902 Manual Reactor Scram ML20059G4681990-08-0606 August 1990 Forwards Citizens Radiological Monitoring Network Weather Data Rept for Apr-Jul 1990 for Processing Through Nudocs Sys ML20127B4901990-08-0303 August 1990 Responds to 900726 Request for Recommendations for Appropriate Actions in Response to Inspector General Rept 90N-02 ML20127B4961990-08-0101 August 1990 Advises That Staff Did Not Conduct Thorough Review of Offsite Emergency Preparedness Which Resulted in Inaccurate Info Being Provided to Commission ML20058B4501990-06-28028 June 1990 Provides Status Rept Re Progress of off-site Emergency Preparedness Activities at Facility ML20055C2661990-02-0505 February 1990 Forwards Draft Ltr to Util Re Completion of Plant Power Ascension Program.Ltr Will Be Issued on 900209 Which Will Accept Util Completion of Power Ascension Program & Close Out Confirmatory Action Ltr CAL-86-10 ML20248C5841989-09-26026 September 1989 Notification of Significant Licensee Meeting 89-154 W/Util on 891006 in Plymouth,Ma to Discuss SALP Mgt ML20247N0121989-09-12012 September 1989 Forwards Plant Status Rept for 890826-0908.On 890830,reactor Automatically Scrammed Due to Fault on Main Generator Voltage Regulation Circuitry.On 890905,inadvertent Actuation LPCI Loop Select Logic Experienced ML20246N5751989-08-30030 August 1989 Forwards Plant Biweekly Status Rept for 890812-25 ML20245F6401989-08-0101 August 1989 Forwards Facility Biweekly Status Rept for 890715-28.NRC Restart Staff in Place & Onsite Monitoring Licensee Activities on Extended day-shift Basis During Reporting Period ML20247C0631989-07-19019 July 1989 Forwards Biweekly Status Rept for 890701-14.NRC Restart Staff in Place & Onsite & Monitoring Licensee Activities on around-the-clock Basis During Plant Startup & Power Ascension.Part 21 Related ML20247C1611989-07-14014 July 1989 Notification of Significant Licensee Meeting 89-112 W/Util on 890816 in King of Prussia,Pa to Discuss SALP ML20247E4531989-07-10010 July 1989 Forwards Plant Status Rept for 890617-30 Period.Rept Intended to Provide NRC Mgt & Public W/Overview of Plant Activities & NRC Restart Insp Activities ML20246K1141989-07-0303 July 1989 Notification of Significant Licensee Meeting 89-105/suppl Enforcement Conference Re Augmented Insp Team Findings Concerning 890412 Reactor Core Isolation Cooling Sys Overpressurization ML20245E6561989-06-22022 June 1989 Forwards Plant Biweekly Status Rept for 890603-16.On 890616, Reactor Operating at Approx 25% Power w/turbine-generator Synchronized to Grid.On 890612,util Commenced Controlled Reactor Shutdown to Perform Minor Mods,Maint & Testing ML20245F9581989-06-16016 June 1989 Notification of Significant Licensee Meeting 89-096 W/Util on 890619 in King of Prussia,Pa Re 890412 RCIC Sys ML20245A3311989-06-0909 June 1989 Notification of Significant Licensee Meeting 89-90 on 890627 W/Util in King of Prussia,Pa for Mgt Meeting to Discuss Status of Licensee Radiation Control Program ML20244E5081989-06-0707 June 1989 Forwards Biweekly Status Rept for 890520-0602.Rept Provides Overview of Plant Activities & NRC Restart Insp Activities. Part 21 Related 1999-08-18
[Table view] |
Text
r ,
9
%g "
Y Q
c JUL101989 ,
. Docket ' No.' ; 50-293 : '
I
- MEMORANDUM FOR: Jon R. Johnson,: Chief
,3 '
Reactor Projects Brantn'No'. 3 '
Division of Reactor. Pr'o jects FROM:- A. Randy.Blough, Chief-Reactor. Projects.Section No. 3A Division.of Reactor Projects
SUBJECT:
PILGRIM STATUS REPORT.FOR THE PERIOD JUNE 17-30,,1989 4
Enclosed -is" the Pilgrim bi weekly status report from the NRC Resident- Office
.at Pilgrim.
The NRC . Restart Staff is in place and was on site monitoring
. ascension licensee activities on an around-the clock basis duririg plant.startup ar;d power period. ana ' on' .an extended shift basis' at other times ' during this report-On June 26,1989, Mr. William T. Russell, hagion I Administrator, approved the NRC Restart Assessment Panel's recommendation to release the licensee from..1 H.Tthird NRC approval ' point (25% of rated power) in the licensee's Power Ascension est Program.'
On June 29,'1989, the' licensee successfully completed the first phase (reactor scram to hot.' standby) of 'the shutdo'wn from outside the ' control room test.
The Pilgrim bi-weekly status report is intended to provide NR0 management and
- the public .with an overview of plant activities ano NRC restart inspection activities. Subsequent inspection reports will address many of these topics :
- in more detail.
p . Randy Blough, Chief v Reactor Projects Section IG. 3A Division of Reactor Projects
Enclosure:
,As stated ,
OFFICIAL ~ RECORD COPY PILGRIM STATUS 6/17-30/89 - 0001.0.0 -
07/10/89 '
f '
890726c172 690710 ,
ADOCK 05000293 PDR .
g PNU 4 q
l*u ". .
Memora'ndum for_Jon R. Jchnson l
2 M10 m cc w/ encl:
R. Bird, Senior Vice President - Nuclear L. Gustin, Vice President - Corporate Relations i K. Highfill, Station Director R. Anderson, Plant Manager J. Dietrich, Licensing Division Manager E. Robinson, Nuclear Information Manager R. Swanson, Nuclear Engineering Department Manager The Honorable Edward M. Kennedy The Honorable Edward J. Markey The Honorable Edward P. Kirby The Honorable Peter V. Forman Chairman, Board of Selectmen, Plymoutr.
Chairman, Board of Selectmen, Carver Chairman, Board of Selectmen, Duxbury Chairman, Board of Selectmen, Marshfield Chairman, Board of Selectmen, Kingston Chairman, Board of Selectmen, Bridgewater Mayor, City of Taunton Plymouth Civil Defense Director P. Agnes, Assistant Secretary of Public Safety, Commonwealth of Massachusetts M. Ernst, Committee on Energy, Commonwealth of Massachusetts S. Pollard, Massachusetts Secretary of Energy Resources B. McIntyre, Chairman, Department of Public Utilities N. Johnson, Chairman, Duxbury Nuclear Committee R. Shimshak, fMSSPIRG R. Boulay, Director, Massachusetts Civil Defense Agency and Office cf Emergency Preparedness M. Conyngham, Legislative Assistant M. Jeka, Legislative Assistant K. Anderson, Legislative Assistant Duxbury CURE Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector Commonwealth of Massachusetts (2) 0FFICIAL RECORD COPY PILGRIM STATUS 6/17-30/89 - 0002.0.0 07/10/89 l
vg ~
3-- - --
- -- ~ - - - -
!(s;;q
&; y> '
- 4 Memorandums for Jon' R. -Johnson 3 1
]g gg i
' bec w/ enc 1:
Region I Docket Room (with concurrences)
L' W J. Taylor, ED0- .
JT Dyer, ED0' t
. T.'Murley, NRR F- Miraglia, NRR' J. Partlow, NRR-
- S, Varga, .NRR f' .J. Roe, NRR K; Perkins,'NRR ^
D. Crutchfield,.NRR C. Rossi, NRR F. Congel, NRR'
'L'. Shao, NRR H ' R. Wessman, NRR D.' Mcdonald, NRR-L.. Whitney, NRR.
P.' Boehnert,:ACRS-W. Russell, RI
,T. Martin, RI' W.1Kane,.RI' B..Boger, RI '
4 M. Knapp,.RI-
' J. Durr, RI 1R. Gallo, RI
. R. Bellamy, RI W Lazarus,'RI.
P; Eapen, RI.
R. Blough,:RI.
J. Lyash, RIL M. Kohl, RI M. J. DiDonato, RI (2)-_
K. Abraham,-RI (2)
, - M. Miller;.RI
' C Warren, SRI - Pilgrim T.' Kim' RI:- Pilgrim-C. Carpenter,'.RI Pilgrim ,
l RI:DR RI:DRP i
CW j k:DRP R h JJohnson
=
789 //o /8 7/10/89 0FFICIAL RECORD COPY PILGRIM STATUS 6/17-30/89 - 0003.0.0 07/10/89 M
ww_____.-_.__.----.._.-__a- n_.-__. __- _._ - - . _ _ e
t ENCLOSURE '
pilgrim Status Report for the Period June 17-30, 1989 1.0 Plant Status As of 8:00 a.m. on June 30, 1989, the reactor was in hot standby with reactor pressure at 340 psig and moderator temperature at 425 degrees F.
2.0 Power Ascension Test Program Status The plant was this report operating at approx ~imately 25% power at the beginning of period.
On June 26, 1989, Mr. William T. Russell, Regional Administrator for Region I, approved the NRC Restart Assessment Panel's recommendation to release the licensee from the third NRC approval point (25% of rated power) in the licensee's Power Ascension Test Program. The program includes NRC approval points at 5%, 25%, 50% and 75% of full power and both a licensee written report and NRC review after completion of testing at full power.
The NRC Restart Assessment Panel recommends to the Regional Administrator when the plant is ready to be released from each approval point.
At 9:45 p.m. on June 26, 1989, after NRC release from the approval point, the licensee raised reactor power to 35% in order to continue with their Power Ascension Test Program.
The licensee successfully completed the first phase (reactor scram to hot standby)
June of the shutdown from outside the control room (SDOCR) test on 29, 1989. The purpose of the test was to: 1) demonstrate that the reactor cm be safely shutdown from outside the main contr,1 room;
- 2) demonstrate that the procedures used in performing the SDOCR were suf-ficiently clear and comprehensive; and 3) demonstrate that a sufficient number of personnel were available to perform the many actions required by the procedure in a timely, coordinated manner. The hot standby demonstra-tion involved shutdown of the reactor from approximately 25% power and subsequent maintenance of the hot standby condition. Detailed flRC review of this test and licensee actions will be documented in NRC Inspection Report 50-293/89-07.
The plant was maintained in hot standby for the remainder of this report period.
Control rod scram time testing and reactor engineering tests are also scheduled during this phase.
OFFICIf.L RECORD COPY PILGRIM STATUS 6/17-30/89 - 0004.0.0 07/10/89 w _ _ - - - - - -~ - - - ---- - - - - . - . - - - - - _ - - - - -
e Enclosure 2 3.0 Items of Special Interest Enforcement Conference An Enforcement Conference to discuss the Augmented Inspection Team's (AIT) findings regarding the April 12, 1989, Reactor Core Isolation Cooling j
-(RCIC) system piping pressurization event was held on June 19, 1989, in the NRC. Region I Office in King of Prussia, Pennsylvania. The NRC Staff had previously verified the licensee's implementation of corrective actions in response to the findings prior to plant startup on i
April 28, 1989. NRC Region I issued the AIT's evaluation of the RCIC event in NRC Inspection Report 50-293/89-80 dated May 8, 1989.
Licensee Meeting with NRC Region I On Jnne 27, 1989, the licensee met with the NRC in the Region I Office in King, of Prussia, Pennsylvania to discuss licensee Health Physics Program improvements. This meeting was open for publi: observation.
L_icersee Personnel Change The licensee announced that the Radiological Section Manager, Mr. Jeff Jens, will leave Boston Edison Company on June 30, 1989.
Mr. Nick DiMascio, formerly the Radiological Controls Manager at the Shoreham Nuclear Power Station has assumed the responsibilities of Radio-logical Section Manager.
4.0 Emergency Notification System (ENS) Reports On June 19, 1989, an individual scaled the outer perimeter fence around the plant, and chained himself to the outside of the protected area fence.
The individual did not enter the plant protected area. Plymouth police responded and the individual was arrested for trespassing. Licensee secur-ity response was prompt. The licensee notified the NRC via ENS. Detailed NRC review of this event will be documented in NRC Inspection Report 50-293/89-07.
5.0 Pilgrim Restart Staff Activities The Pilgrim Restart Staf f was in extended shift coverage at the beginning '
of this report period, consistent with reduced testing activity. The Restart Staff began Jnd-the clock shift coverage at 7:00 a.m. on June 26, 1989. Additional personnel from NRC Region I, NRR and an NRC contractor wer9 onsite during the report period to augment the resident l inspection staff.
OFFICIAL RECORD COPY PILGRIM STATUS 6/17-30/89 - 0005.0.0 -
07/10/89 _
r 1', 'l
. Enclosure 3
An NRC-develop'ed inspection plan addressing the 5-25% and the 25-50%
plateaus, as well as the primary functional areas of operations, mainten- i ance, surveillance, and startup testing continued to be implemented. The inspectors assessed operator performance, herence to procedures and Technical Specification compliance. organizational in The Pilgrim Restart Staff continued to evaluate the performance of licen-see personnel and the plant to determine whether the licensee should be permitted to proceed to the next NRC approval point, 75% of rated power.
. Contact wi+,h the press and public continued throughout the period. The NRC handling Restart Manager and the Region I Public Af fairs Officer have inquiries. been Pilgrim Restart Staff Composition During Period The Pilgrim during Restart Staff onsite was comprised of the following personnel the period:
C. Kim, T. Warren, Senior Resident Resident Inspector and Restart Manager Inspector C. Carpenter, Residtint Inspector J. Golla, Reactor Engineer, Region I (RI)
S. Pullani, Senior Operations Engineer, RI R. Hernan, Senior Project Manager, NRRD. Mcdonald, Project Ma J. Hayes, Project Manager, NRR G. Bethke, NRC Contractor G. Bryan, NRC Contractor During the week of June 19, 1989, one regional-based inspector was onsite to review the licensee's onsite emergency preparedness program. The j results of this inspection will be documented in Inspection Report 50-293/89-09.
OFFICIAL RECORD COPY PILGRIM STATUS 6/17-30/89 - 0006 07/10/89
_ _ _ _ _ _ _ _ _ _ _ _ - _ - - -