Summarizes Minutes of Util Restart Assessment Panel 870921 Meeting Re Status of NRC & Licensee Activities Associated W/ Proposed Plant Restart.Outstanding Actions as of End of 870903 Panel Meeting Discussed
ML20196F336
Person / Time
Site: Pilgrim
Issue date: 10/07/1987
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Russell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20150E198 List:
References
FOIA-88-198 NUDOCS 8812120268
Download: ML20196F336 (3)


Text

. _ _

Nt I

Q

/

s 10ci w su f.

t MEMORANDUM FOR: William T. Russell Regional Administrator FROM:

Samuel J. Collins, Deputy Director Division of Reactor Projects

SUBJECT:

PILGRIM RESTART ASSESSMENT PANEL MEETING MINUTES L

t On September 21, 1937, the Ptigrim Restart Assessment Panel met to discuss the status of NRC and licensee activities associated with the proposed plant restart.

The following personnel were in attendance:

Chairman:

Samuel J. Collins, Deputy Director, ORP Members:

Jacque P. Curr, Acting Deputy Director, ORS Ronald R. Bellamy, Chief. Emergency Preparedness and Radiological Protection Branch. ORSS A. Randy Blough, Chief, Reactor Projects Section 38, ORP Others:

James T. Wiggins, Chief, Reactor Projects Branch No. 3, ORP Bruce Boger, Assistant Director for RI Reactors, NRR Richard H. Wessman, Project Manager, NRR Brent Clayton, EDO Representative Victor Nerses, Acting Director, Project Directorate I-3, NRR Lawrence T. Doerflein, Project Engineer, RPS 3B, ORP Marie T. Miller, Regional State Liaison Officer Tae K. Kim, Resident Inspector, Pilgrim i

Roy L. Fuhrmeister, Reactor Engineer, RPS 3B, ORP l

c The panel discussed the issues listed in the Agenda shown in Enclosure 1.

In addition, the panel discussed the actions which remained outstanding as of the end of the September 3, 1987 Panel meeting.

As a result of the meeting, the following actions with responsibility were agreed upon by the Panel:

Task Responsibility 1.

Respono to BECo Exemption Request for Congel (NRR) l December 9 Full Participation Exercise i

2.

Respond to BECo Letter on FEMA Issues Bellamy(DRSS) i 3.

Review Description of Decenber 9 Exercise Bellamy (0RSS)

Objective f

I i

1 1

I I

t

'l l

w w on>2aa yyjg '

I JOHNSONOO-190 PDR

Memorandum for William T. Russell 2

9F OCri 1987 Task Responsibility 4.

Review EEco Training of Operations Durr(ORS)

Personnel on Plant Modifications and Normal Operation f.CoQltr,s,Deput/ Director llt9%

.amue Divition of Reactor Projects

Enclosure:

I As stattd cc w/etel:

T. Murley, NRR F. Miraglia, NRR R. Starostecki, NRR S. Varga, NRR B. Boger, NRR R. Wessman, NRR J. Roe, NRR J. Hannon, NRR W. Recan. NRR O'h i

B. Rayton, E00 4

J. Allan, RI W. Kane, RI L. Bettenhausen, RI J. Wiggins, RI l

T. Martin, RI J. Ourr, RI.

R. Bellamy, RI L. Doerflein, RI i

R. Fuhrmeister, RI J. Lyash, RI - Pilgrie.

T. Kim, RI - Pilgrim i

l C. Warren, SRI - Shoreham j

4 I

I I

i 4

l

_~w-9 ENCLOSURE Agenda for the September 21, 1987 Pilgrim Restart panel Meeting 1.

Preparations for the September 24 SECo-NRC Meeting (NRR) 2.

Emergency Preparedness Issues Exception Request Response to Varga 8/18 Letter 3.

Refueling Activities EP Position Paper (NRR)

Open Item Closure Refueling Inspection Plan 4.

Current Outage Schedule Restart plan Submittal (2-3 We'eks) 5.

NRC Timetables Inspection Schedule /Recent Results Response to 2.206 Public Meeting 6.

Allegation Status 7.

Security Meeting (BEco Request) on 9/30 Discuss Response to Enforcement Conference I

i k