MONTHYEARML20211A4361999-08-18018 August 1999 Notification of Significant Licensee Meeting 99-47 with Entergy Nuclear,Inc on 990831 to Discuss Results of NRC Plant Performance Review of Pilgrim Nuclear Power Station Issued on 990409 ML20212H7621999-06-22022 June 1999 Notification of 990701 Meeting with NEI & Entergy in Rockville,Md to Discuss Price-Anderson Issues Re Transfer of Pilgrim License from Beco to Entergy ML20205L0301999-04-0909 April 1999 Notification of 990413 Meeting with Boston Edison Co & Entergy Nuclear Generation Co in Rockville,Md to Discuss Sale & Transfer of Pilgrim Station from Boston Edison Co to Entergy Nuclear Generation Co ML20196J5801998-12-0707 December 1998 Notification of 981209 Meeting with Representatives of Beco & Entergy in Rockville,Md to Discuss Sale of Pilgrim Plant ML20196F3461998-12-0202 December 1998 Forwards Info Re Operator Licensing Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids Code IE42 ML20196F5611998-12-0202 December 1998 Forwards Info Re OL Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids A070 ML20154D5091998-10-0202 October 1998 Notification of Meeting W/Beco on 981008 in Rockville,Md to Discuss Core Spray Piping Integrity ML20154G5141998-10-0202 October 1998 Notification of 981008 Meeting W/Beco in Rockville,Md to Discuss Core Spray Piping Integrity.Meeting Has Been Rescheduled to 981015 ML20247G2441998-04-15015 April 1998 Notification of Significant Licensee Meeting 98-34 W/Util on 980427 to Discuss Weaknesses in Licensee Alarm Assessment Program (EA 98-191) ML20203E2781998-02-19019 February 1998 Notification of Significant Licensee Meeting 98-18 W/Util in King of Prussia,Pa on 980310 Re Plant Design Basis Project Discussion ML20199C7581997-10-31031 October 1997 Notification of Significant Licensee Meeting 97-112 W/Util on 971113 to Discuss NRC SALP ML20212D6201997-10-28028 October 1997 Notification of Licensee Meeting on 971121 W/Util in King of Prussia,Pa to Discuss Apparent Violations Identified During NRC Insp 50-293/97-05 ML20140F6151997-06-11011 June 1997 Notification of 970612 Meeting W/Util in Rockville,Md to Discuss Net Positive Suction Head for ECCS Pumps ML20137Q9761997-03-31031 March 1997 Informs That as-found LOCA & Life Testing & Analysis Does Not Provide Acceptable Approach for Demonstrating Qualification at Accident Temp Higher than 340F,per 970110 TAR ML20137B4781997-03-14014 March 1997 Undated Memo Discussing Beco Reorganization ML20141A7361997-03-12012 March 1997 Rcommends That Key RES Staff Attend Subcommittee Meetings to Address Any Questions,Arise in Discussions Among Members & to Answer Any Key Questions Posed in Advance by Subcommittee Chairmen ML20149M3291996-11-12012 November 1996 Forwards Input Re TIA on Plant Licensing Basis & Subsequent Mod Under 10CFR50.59 for Two Safety Significant Problems ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20129D8331996-09-19019 September 1996 Notification of 961003 Predecisional Enforcement Conference 96-98 W/Util to Discuss Containment Penetration Protection. Meeting Closed to Public ML20134J7301996-07-26026 July 1996 Forwards Resolution of Spent Fuel Storage Pool Action Plan Issues Re Response to Two Postulated Event Sequences Involving SFP NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl IR 05000293/19930291993-11-23023 November 1993 Notification of Significant Licensee Meeting 93-156 W/Util on 931202 Re Three Recently Reported Design Issues in Insp Rept 50-293/93-29 ML20058C9711993-11-22022 November 1993 Notification of Significant Licensee Meeting 93-150 W/Util on 931217 Re Hpci/Rcic Reliability & Switchyard Betterment Status ML20059L9721993-11-12012 November 1993 Licensing Board Memorandum & Order Terminating Proceeding .* Informs That Time Provided by NRC Regulation to Review Decision of ASLB Terminating Proceeding in Docket Has Expired.W/Certificate of Svc.Served on 931112 ML20056C4721993-06-17017 June 1993 Discusses Util Assessment of Low Pressure Turbine Analysis. Licensee Retained Structural Integrity Assocs,Inc (SIA) to Evaluate Flaw Indications in 7GA Disk.Sia Anaylsis Reduce Some Obvious Conservatisms Used in GE Analysis ML20128F3911993-02-0303 February 1993 Requests Listed Instructions to Ensure That P Blanch of Northeast Utils & E Hadley of We the People Kept Promptly Informed of NRC Activities on BWR Water Level Indicators & Rosemount Transmitters ML20128E2181993-01-26026 January 1993 Notice of Significant Licensee Meeting 93-11 W/Licensee on 930225 in King of Prussia,Pa to Discuss Util Reorganization ML20059C1171992-11-20020 November 1992 Submits Status Rept on Reactor Water Level Spiking That Occurred on 921024.Related Info Encl ML20125D1161992-10-0707 October 1992 Notification of Significant Licensee Meeting 92-177 W/Util on 921217 to Discuss tie-in of New Security Computer ML20082B1581991-02-20020 February 1991 Summarizes Telcon W/R Murphy Re Mobilization Time for State of Ma Natl Guard Personnel Assigned to Respond to Wellesley, Ma Reception Ctr & State of Ma Civil Defense Agency Area II Headquarters in Event of Emergency at Facility ML20062H5361990-11-23023 November 1990 Forwards Info from Pilgrim Citizens Radiological Monitoring Network,Covering Rept Periods 900910-1017 ML20059P0861990-10-0101 October 1990 Notification of Significant Licensee Meeting 90-118 W/Util on 901016 to Discuss SALP ML20059L1541990-09-0707 September 1990 Notification of Significant Licensee Meeting 90-114 on 900912 at Region I Ofc to Discuss Corrective Actions & Restart Planning Re 900902 Manual Reactor Scram ML20059G4681990-08-0606 August 1990 Forwards Citizens Radiological Monitoring Network Weather Data Rept for Apr-Jul 1990 for Processing Through Nudocs Sys ML20127B4901990-08-0303 August 1990 Responds to 900726 Request for Recommendations for Appropriate Actions in Response to Inspector General Rept 90N-02 ML20127B4961990-08-0101 August 1990 Advises That Staff Did Not Conduct Thorough Review of Offsite Emergency Preparedness Which Resulted in Inaccurate Info Being Provided to Commission ML20058B4501990-06-28028 June 1990 Provides Status Rept Re Progress of off-site Emergency Preparedness Activities at Facility ML20055C2661990-02-0505 February 1990 Forwards Draft Ltr to Util Re Completion of Plant Power Ascension Program.Ltr Will Be Issued on 900209 Which Will Accept Util Completion of Power Ascension Program & Close Out Confirmatory Action Ltr CAL-86-10 ML20248C5841989-09-26026 September 1989 Notification of Significant Licensee Meeting 89-154 W/Util on 891006 in Plymouth,Ma to Discuss SALP Mgt ML20247N0121989-09-12012 September 1989 Forwards Plant Status Rept for 890826-0908.On 890830,reactor Automatically Scrammed Due to Fault on Main Generator Voltage Regulation Circuitry.On 890905,inadvertent Actuation LPCI Loop Select Logic Experienced ML20246N5751989-08-30030 August 1989 Forwards Plant Biweekly Status Rept for 890812-25 ML20245F6401989-08-0101 August 1989 Forwards Facility Biweekly Status Rept for 890715-28.NRC Restart Staff in Place & Onsite Monitoring Licensee Activities on Extended day-shift Basis During Reporting Period ML20247C0631989-07-19019 July 1989 Forwards Biweekly Status Rept for 890701-14.NRC Restart Staff in Place & Onsite & Monitoring Licensee Activities on around-the-clock Basis During Plant Startup & Power Ascension.Part 21 Related ML20247C1611989-07-14014 July 1989 Notification of Significant Licensee Meeting 89-112 W/Util on 890816 in King of Prussia,Pa to Discuss SALP ML20247E4531989-07-10010 July 1989 Forwards Plant Status Rept for 890617-30 Period.Rept Intended to Provide NRC Mgt & Public W/Overview of Plant Activities & NRC Restart Insp Activities ML20246K1141989-07-0303 July 1989 Notification of Significant Licensee Meeting 89-105/suppl Enforcement Conference Re Augmented Insp Team Findings Concerning 890412 Reactor Core Isolation Cooling Sys Overpressurization ML20245E6561989-06-22022 June 1989 Forwards Plant Biweekly Status Rept for 890603-16.On 890616, Reactor Operating at Approx 25% Power w/turbine-generator Synchronized to Grid.On 890612,util Commenced Controlled Reactor Shutdown to Perform Minor Mods,Maint & Testing ML20245F9581989-06-16016 June 1989 Notification of Significant Licensee Meeting 89-096 W/Util on 890619 in King of Prussia,Pa Re 890412 RCIC Sys ML20245A3311989-06-0909 June 1989 Notification of Significant Licensee Meeting 89-90 on 890627 W/Util in King of Prussia,Pa for Mgt Meeting to Discuss Status of Licensee Radiation Control Program ML20244E5081989-06-0707 June 1989 Forwards Biweekly Status Rept for 890520-0602.Rept Provides Overview of Plant Activities & NRC Restart Insp Activities. Part 21 Related 1999-08-18
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211A4361999-08-18018 August 1999 Notification of Significant Licensee Meeting 99-47 with Entergy Nuclear,Inc on 990831 to Discuss Results of NRC Plant Performance Review of Pilgrim Nuclear Power Station Issued on 990409 ML20212H7621999-06-22022 June 1999 Notification of 990701 Meeting with NEI & Entergy in Rockville,Md to Discuss Price-Anderson Issues Re Transfer of Pilgrim License from Beco to Entergy ML20205L0301999-04-0909 April 1999 Notification of 990413 Meeting with Boston Edison Co & Entergy Nuclear Generation Co in Rockville,Md to Discuss Sale & Transfer of Pilgrim Station from Boston Edison Co to Entergy Nuclear Generation Co ML20196J5801998-12-0707 December 1998 Notification of 981209 Meeting with Representatives of Beco & Entergy in Rockville,Md to Discuss Sale of Pilgrim Plant ML20196F3461998-12-0202 December 1998 Forwards Info Re Operator Licensing Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids Code IE42 ML20196F5611998-12-0202 December 1998 Forwards Info Re OL Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids A070 ML20154G5141998-10-0202 October 1998 Notification of 981008 Meeting W/Beco in Rockville,Md to Discuss Core Spray Piping Integrity.Meeting Has Been Rescheduled to 981015 ML20154D5091998-10-0202 October 1998 Notification of Meeting W/Beco on 981008 in Rockville,Md to Discuss Core Spray Piping Integrity ML20247G2441998-04-15015 April 1998 Notification of Significant Licensee Meeting 98-34 W/Util on 980427 to Discuss Weaknesses in Licensee Alarm Assessment Program (EA 98-191) ML20203E2781998-02-19019 February 1998 Notification of Significant Licensee Meeting 98-18 W/Util in King of Prussia,Pa on 980310 Re Plant Design Basis Project Discussion ML20199C7581997-10-31031 October 1997 Notification of Significant Licensee Meeting 97-112 W/Util on 971113 to Discuss NRC SALP ML20212D6201997-10-28028 October 1997 Notification of Licensee Meeting on 971121 W/Util in King of Prussia,Pa to Discuss Apparent Violations Identified During NRC Insp 50-293/97-05 ML20140F6151997-06-11011 June 1997 Notification of 970612 Meeting W/Util in Rockville,Md to Discuss Net Positive Suction Head for ECCS Pumps ML20137Q9761997-03-31031 March 1997 Informs That as-found LOCA & Life Testing & Analysis Does Not Provide Acceptable Approach for Demonstrating Qualification at Accident Temp Higher than 340F,per 970110 TAR ML20137B4781997-03-14014 March 1997 Undated Memo Discussing Beco Reorganization ML20141A7361997-03-12012 March 1997 Rcommends That Key RES Staff Attend Subcommittee Meetings to Address Any Questions,Arise in Discussions Among Members & to Answer Any Key Questions Posed in Advance by Subcommittee Chairmen ML20149M3291996-11-12012 November 1996 Forwards Input Re TIA on Plant Licensing Basis & Subsequent Mod Under 10CFR50.59 for Two Safety Significant Problems ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20129D8331996-09-19019 September 1996 Notification of 961003 Predecisional Enforcement Conference 96-98 W/Util to Discuss Containment Penetration Protection. Meeting Closed to Public ML20134J7301996-07-26026 July 1996 Forwards Resolution of Spent Fuel Storage Pool Action Plan Issues Re Response to Two Postulated Event Sequences Involving SFP NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl IR 05000293/19930291993-11-23023 November 1993 Notification of Significant Licensee Meeting 93-156 W/Util on 931202 Re Three Recently Reported Design Issues in Insp Rept 50-293/93-29 ML20058C9711993-11-22022 November 1993 Notification of Significant Licensee Meeting 93-150 W/Util on 931217 Re Hpci/Rcic Reliability & Switchyard Betterment Status ML20059L9721993-11-12012 November 1993 Licensing Board Memorandum & Order Terminating Proceeding .* Informs That Time Provided by NRC Regulation to Review Decision of ASLB Terminating Proceeding in Docket Has Expired.W/Certificate of Svc.Served on 931112 ML20056C4721993-06-17017 June 1993 Discusses Util Assessment of Low Pressure Turbine Analysis. Licensee Retained Structural Integrity Assocs,Inc (SIA) to Evaluate Flaw Indications in 7GA Disk.Sia Anaylsis Reduce Some Obvious Conservatisms Used in GE Analysis ML20128F3911993-02-0303 February 1993 Requests Listed Instructions to Ensure That P Blanch of Northeast Utils & E Hadley of We the People Kept Promptly Informed of NRC Activities on BWR Water Level Indicators & Rosemount Transmitters ML20128E2181993-01-26026 January 1993 Notice of Significant Licensee Meeting 93-11 W/Licensee on 930225 in King of Prussia,Pa to Discuss Util Reorganization ML20059C1171992-11-20020 November 1992 Submits Status Rept on Reactor Water Level Spiking That Occurred on 921024.Related Info Encl ML20125D1161992-10-0707 October 1992 Notification of Significant Licensee Meeting 92-177 W/Util on 921217 to Discuss tie-in of New Security Computer ML20082B1581991-02-20020 February 1991 Summarizes Telcon W/R Murphy Re Mobilization Time for State of Ma Natl Guard Personnel Assigned to Respond to Wellesley, Ma Reception Ctr & State of Ma Civil Defense Agency Area II Headquarters in Event of Emergency at Facility ML20062H5361990-11-23023 November 1990 Forwards Info from Pilgrim Citizens Radiological Monitoring Network,Covering Rept Periods 900910-1017 ML20059P0861990-10-0101 October 1990 Notification of Significant Licensee Meeting 90-118 W/Util on 901016 to Discuss SALP ML20059L1541990-09-0707 September 1990 Notification of Significant Licensee Meeting 90-114 on 900912 at Region I Ofc to Discuss Corrective Actions & Restart Planning Re 900902 Manual Reactor Scram ML20059G4681990-08-0606 August 1990 Forwards Citizens Radiological Monitoring Network Weather Data Rept for Apr-Jul 1990 for Processing Through Nudocs Sys ML20127B4901990-08-0303 August 1990 Responds to 900726 Request for Recommendations for Appropriate Actions in Response to Inspector General Rept 90N-02 ML20127B4961990-08-0101 August 1990 Advises That Staff Did Not Conduct Thorough Review of Offsite Emergency Preparedness Which Resulted in Inaccurate Info Being Provided to Commission ML20058B4501990-06-28028 June 1990 Provides Status Rept Re Progress of off-site Emergency Preparedness Activities at Facility ML20055C2661990-02-0505 February 1990 Forwards Draft Ltr to Util Re Completion of Plant Power Ascension Program.Ltr Will Be Issued on 900209 Which Will Accept Util Completion of Power Ascension Program & Close Out Confirmatory Action Ltr CAL-86-10 ML20248C5841989-09-26026 September 1989 Notification of Significant Licensee Meeting 89-154 W/Util on 891006 in Plymouth,Ma to Discuss SALP Mgt ML20247N0121989-09-12012 September 1989 Forwards Plant Status Rept for 890826-0908.On 890830,reactor Automatically Scrammed Due to Fault on Main Generator Voltage Regulation Circuitry.On 890905,inadvertent Actuation LPCI Loop Select Logic Experienced ML20246N5751989-08-30030 August 1989 Forwards Plant Biweekly Status Rept for 890812-25 ML20245F6401989-08-0101 August 1989 Forwards Facility Biweekly Status Rept for 890715-28.NRC Restart Staff in Place & Onsite Monitoring Licensee Activities on Extended day-shift Basis During Reporting Period ML20247C0631989-07-19019 July 1989 Forwards Biweekly Status Rept for 890701-14.NRC Restart Staff in Place & Onsite & Monitoring Licensee Activities on around-the-clock Basis During Plant Startup & Power Ascension.Part 21 Related ML20247C1611989-07-14014 July 1989 Notification of Significant Licensee Meeting 89-112 W/Util on 890816 in King of Prussia,Pa to Discuss SALP ML20247E4531989-07-10010 July 1989 Forwards Plant Status Rept for 890617-30 Period.Rept Intended to Provide NRC Mgt & Public W/Overview of Plant Activities & NRC Restart Insp Activities ML20246K1141989-07-0303 July 1989 Notification of Significant Licensee Meeting 89-105/suppl Enforcement Conference Re Augmented Insp Team Findings Concerning 890412 Reactor Core Isolation Cooling Sys Overpressurization ML20245E6561989-06-22022 June 1989 Forwards Plant Biweekly Status Rept for 890603-16.On 890616, Reactor Operating at Approx 25% Power w/turbine-generator Synchronized to Grid.On 890612,util Commenced Controlled Reactor Shutdown to Perform Minor Mods,Maint & Testing ML20245F9581989-06-16016 June 1989 Notification of Significant Licensee Meeting 89-096 W/Util on 890619 in King of Prussia,Pa Re 890412 RCIC Sys ML20245A3311989-06-0909 June 1989 Notification of Significant Licensee Meeting 89-90 on 890627 W/Util in King of Prussia,Pa for Mgt Meeting to Discuss Status of Licensee Radiation Control Program ML20244E5081989-06-0707 June 1989 Forwards Biweekly Status Rept for 890520-0602.Rept Provides Overview of Plant Activities & NRC Restart Insp Activities. Part 21 Related 1999-08-18
[Table view] |
Text
.----
.~ $8 '00 UNITED STATES 4
i-NUCLEAR REGULATORY COMMISSION
' 3- f': I. REGION I c5 ALLENoALE ROAD y
% KING OF PRUSSIA, PENNSYLVANIA 19408 JUL 121988 MEMORANDUM FOR: William T. Russell Regional Administrator FROM: Samuel J. Collins, Deputy Director Division of Reactor Projects
SUBJECT:
PILGRIM RESTART ASSESSMENT PANEL MEETING MINUTES On June 30 1988, the Pilgrim Restart Assessment Panel met onsite to discuss the status of NRC and licensee activities associated with the proposed plant Restart. The following personnel were in attendance:
Chairman: Samuel J. Collins, Deputy Director, Division of Reactor Projects (ORP)
Members: A. Randy Blough, Chief, Reactor Projects Section No. 38, ORP (By Teleconference)
Richard H. Wessman, Director, Project Directorate I-3, Office of Nuclear Reactor Regulation (NRR) (By Teleconference)
James T. Wiggins, Chief, Reactor Projects Branch No. 3, ORP Ronald R. Bellamy, Chief, Facilities Radiological Safety and Safeguards Branch, Division of Radiation Safety and Safeguards (DRSS) (Part-Time)
Daniel G. Mcdonald, Project Manager, NRR Others: Lawrence T. Doerflein, Project Engineer, RPS 38, ORP (By Teleconference)
Frank M. Akstulewicz, PO I-3, NRR (By Teleconference)
Cynthia A. Carpenter, Resident Inspector - Yankee Frank J. Congel, Acting Director, ORSS William O. Travers, Chief, Emergenecy Preparedness Branch, NRR (Part-Time)
Clay C. Warren, Senior Resident Inspector Jeffrey J. Lyash, Resident inspector Tae K. Kim, Resident Inspec ;r The panel discussed the issues from the last meeting, as well as the overall integration of NRC inspection and review activities. As a result of the meet-ing, the below listed actions with responsibility were agreed upon by the Panel.
A panel meeting will be held at Headquarters (NRR), July 15, 19CS, at 10:00 a.m. (Bridge No. 492-9894). All items below will be u pd a *.e d . No separate agenda will be provided for the July 15 meeting.
8912130090 081208 J NS Oh-190 PDR ,
, Memorandum for William T. Russell 2 dO[ l2 [30$ ,
Task Responsibility Due Date
- 1. Plant Status Update Resident Inspector Next Panel
- 2. Staffing / Organization Update Resident fai, vector Next Panel
- Obtain Experience Matrix Blough July 18 frem BECo as part of IATI Preparation
- 3. Site Inspection Activities Resident Inspector Next Panel Update
- 4. Update fire barrier issue Roger /Blough Next Panel status of BECo submittal
- 5. Review and update NRC Restart All Next Panel checklist
- 6. Provice OIL Updates All Next Panel
- 7. Indapendent Assessment Team Inspection Plan
- Provide final comments All Next Panel e Assemble team briefing Blough Next Panel 4
packages
- Update IATI Organization Blough Next Panel Chart / Team Members
- 8. NRR to continue liaison w/ACRS Boger Next Panel staff to reach agreement on involvement and scheduling
- 9. Restart Assessment Report -- All Next Pinel Begin work IAW assignments-discuss each panel ,
- 10. Update Overall Milestone Collins Next Panel Schedule
- 11. Update Subset Milestone All Ongoing Schedules
+ Update EP Subset Bellamy Next Panel
- Provide comments to Mcdonald Next Panel 2.206 Subset
f
- Memorandum for William T.. Russell 3 Task Responsibility Due Date
- 12. Update Status of Power Ourr Next Panel Ascension Program Deficiencies
- 13. SEP issues Status Beger Next Panel
- 14. Self-Assessment Report Review Doerflein Next Panel
- 15. IATI Request Letter Review Blough Next Panel (BEco Ltr.88-099,6/25/88)
- 16. Maintenance Inspection Response ORS /Blough Next Panel Review (BECo 88-098,6/25/88) ue , o ins, eputy Director Division of Reac'.or Projects
Enclosures:
- 1. Pilgrim Overall Milestone Schedule, Revision 7
- 2. Pilgrim Subset Milestone 2.206 Approach, Revistan.1
- 3. Pilgrim Subset Milestone Topic Listing, Revis'on 7 l
Memorandum for William T. Russell 4 M j g ]ggg cc w/encis:
T. Murley, NRR F. Miraglia, NRR T. Martin, NRR S. Varga, NRR B. Boger, NRR R. Wessman, NRR
- 0. Mcdonald, NRR F. Akstulewicz, NRR J. Roe, NRR J. Hannon, NRR W. Re an o
, t., ayton, E00 J. Allan, RI W. Kane, RI J. Wiggins, RI R. Blough, RI G. Sjoblom, RI J. Ourr, RI R. Bellamy, RI L. Doerflein, RI M. Kohl, RI C. Warren, SRI - Pilgrim J. Lyash, RI - Pilgrim T. Kim, RI - Ptigrim
CAL 36-10 -
HRC Ltr rggnt t4Rc 5LP Ltr' Restcrt Diagnos. CAL 86-10 AIT RFO-7 Request Re- ticeting SALP Asscss from Plan SALP Team Insp. Plt Scr Start start Assest 85-41 36-99 Plan BECo Rev. 0 ,
- 3D J - 4 ; I - I :
E U - II I :
E 4 . H E
10/1/84- 2/16/86- 4/12/86 7/86 C/27/05 11/24/86 11/1/85- 7/C/87 7/8/87 ' 7/30/87 10/31/85 3/7/C6 1/31/87 ]
2 e
BECo i:uc "
5 EPLtrl BECO flRR Mtg Pwr Asc Restart Site Realign-FEMA SEP Ltr LOOP with Prg Plan . Work ment Self to to EP ^
int onu BEco BECo Resnonse RFCo -Submit Rev. 1 l Stoo A I E E E E E E I I 7
8/21/S7 9/17/87 9/17/37 9/24/87 10/15/87 10/26/87 11/C/37 11/12/87 12/37 8/5/87 "
P liRCAllRe-)BLCo/ilRC NRC Public btCo Self- S Public Mtg Start BECo BECo SEP start Plan Resolution Mtg Re: Re- Assessment 7, Restart Pilgrim I:lPO Report m on Restart Pre-Self Ltr to !{RC Coments to R/S Plan sttrt Plan Assessment Except DTV btCo Cements Review Submitted ~
7 hree Plan , Comments 8 8 8 ' ' ' 8 n ;
' : : : : : : : 3 1/27/88 2/18/88 2/22/88 2/22/88 3/ 111/ 8 8 5/6/88 S/11/88 S/9-20/88 S/26/88 1/4/83 BECo Selt-
~--
fiRC Rev of BECo/ Staff BECo Decis-BEco Self- Senior Ccmission ton on Ltrs SALP ALRS Assess /INPO lATI lATI iiRC Resolu-Assessment Management Brief/ Re: Readi- 2/1/87- Briefin'! 2pt Results Prepara- IATI Rpt tion of R: port Visit PuM ic Mtg ness IAll S/15/88 Presentation tions issue SEP Issues
" " " " Z " 8
[ : : : : 5 l '
S/26/88- 6/2/58 6/9/08 6/25/83 Bd 7/5/88 l7/15/88j pi9-21/83 8/8-19/88 C. D $
Rpt 7/26/88 (Tentat) t 8gR 6/24/88 wwx NRC Restart Restart R a; E NRC CAL / NRC Comp NRC 2.206 ACRS Sub-E0P 2.200 Restart Power IAll comittee Asses, ment Assessment SALP = *3 Issues Public Public Report Panel Recom Mgt My ;;f Addressed Issue Issue Ascension Heeting liceting at Status Status Plan Rev fleetin9 Site to RA Meeting 8 ",
l ;
5 8 :
l :
~l :
n
- g @@
5 m
l I I I I il l II l l l ! l l ;NR3 cw .
RA Recom D/tiRR ACRS Full EDO Comis- NRC Over- Ri to .EP Recoctaenda-Comittee sion Brief- Comm Restart sight Pit 1!RC 6 Ho I D ector/ Issues tion t Meeting ing Public Assent . Decision gRestart/PWR Release SALP 3 Meeting j l [ Ascension __.
I + "
=
" = ; -
l :
a g :g =
3 3 l-_ l I I I _J l I i 1 1 I I J I .
1 I _j I i g
Sossa- Mitestoues iar '
RcroRT
-'I 2.2.O fos ( E.P g I
Sh t.P A c rt.s 3-
<Acqs
- ! SoARD __1 500 coH ----
Futt j , g r -- CoH.
, . I g i
, a e
! I t I g
- i BECo frStfE s at.e i n ac_
l McMD Anspb l- - - ggy.str -J ResinRT ORG.Cws. ___) o ns.ois. 3 955-i Raesar . .
m
- I
= t I g i ! ,
8 e r
E
. I t t }
e i ~
g s
. n
}
,2 -
Goc D EM IM n't ht- DRhFT
' 2.Zoco FinnL con n. & 3 9 z.2cG, F DIREcma. & IMPff 6 Poet.tc
t HT6. 'l E E DEOslos M6Mt MTG. DErlfioc gmgy y S $
a ~ n m
I _ l l l l l t ;,
I / / I I <r
~
l l f f I l ff g l ff g g ff g g =
, (MK-tgEP) I g I
. Q 2
' s 1 // I l' // l S i i 1-Du i<AK.05 'Im m A L DRhFT DRgF F3 W ht-2 dd/e' z otitsenR 3 tro pot- r gpg m a btWk.
D6ctriou MENT. DE<tston I i i I [
l / / I I // l l f f l t (ng_9 t __ _ __ _ _ )
! a'R BECo ShTISFY EP hk
- EP z N RC. & A5545MEWiL &8 STATO.S RGPoRT [
. I . I I l- / / I I // I I /f I
ENCLOSURE 3 4
Subset Milestones Topic Listing ,
Area Responsibility i A. Overall Milestones S. Collins l B. Public and State Involvement R. 81ough Meetings with Licensee C. NRR Actions for Restart D. Mcdonald O. Management Transition C. Warren E. Site Inspections / Reviews R. Blough F. EP Status R. Bellamy/F. Congel G. Power Ascension Program J. Ourr H. 2.206 Item Closecut Approach R. Wessman i
i l
l ,
l l
l i
l I
S. Collins i
Pilgrim Subset Milestones 6/30/88 Rev. 7 f
l 1
/"%g UNITED STATES
! n NUCLEAR REGULATORY COMMISSION
, f OFFICE OF GOVERNMENTAL AND PUBLIC AFFAIRS, REGION I 475 Allendate Road, King of Prussia, Pa.19406
...../ Tel. 215 337 5330 No. I-88-120 July 28, 1988
Contact:
Karl Abraham NOTE TO EDITORS AND STATION ASSIGNMENT EDITORS A. Randy Blough, Chief of the Reactor Projects Section that inspects Pilgrim has issued a status report summarizing activities of the inspection staff during the period July 2 to 15, 1988.
The report is attached.
July 25, 1988 Docket No. 50-293 HEMORANDUM FOR: James T. Wiggins, Chief Reactor Projects Branch No. 3 FROM: A. Randy Blough, Chief Reactor Projects Section 3B
SUBJECT:
PILGRIM STATUS REPORT FOR THE PERIOD JULY 2 - 15, 1988 Enclosed is the Pilgrim bi-weekly status report from the NRC Resident Office at Pilgrim. Three resident inspectors monitored activities at the plant during the report period. During the week of July 4, 1988, a Systematic Assessment of Licensee Performance (SALP) board meeting was held for Pilgrim at the NRC Regional office in King of Prussia, Penrisylvania. The SALP assessment covered the period of February 1, 1987 through May 15, 1988. The SALP report will be issued upon completion of NRC management review. By a letter dated July 11, 1988, the NRC notified the licensee management that the NRC has completed its review of the licensee's Self-Assessment Report and the associated action schedules for restart. The NRC has tentatively scheduled a comprehensive Integrated Assessment Team Inspection (IATI) to begin on August i 8, 1988. Onsite preparation for the IATI will be conducted during July 19 -
l 21, 1988.
l f (more) l 2n+Hmtyy sy W36
G s V 2
The Pilgrim bi-weekly status report is intended to provide NRC management and r the public with an overview of plant activities and NRC inspection activities.
Subsequent inspection reports will address many of these topics in more detail.
(Original signed b F. I. Young, for) y i A. Randy Blough, Chief Reactor Projects Section 3B
Enclosure:
I As Stated l L
ENCLOSURE l
- PILGRIM STATUS REPORT FOR THE PERIOD JULY 2 - 15,19% ,
1.0 Plant Status As of 8:00 a.m., on July 15, 1988, the reactor was in cold shutdown mode l with moderator temperature about 96 digrees Fahrenheit. l 3 2.0 Facility Ooerations Summary The plant has been shutdown for maintenance and to make program ;
improvements since April 12, 1986. The rector core was completely i defueled on February 13, 1987 to facilitate extensive maintenance and l modification of plant equipment. The licensee completed fuel reload on '
October 14, 1987. Reinstallation of the reactor vessel internal components and the vessel head was followed by completion of the reactor vessel hydrostatic test. The primary containment integrated leak rate test was also completed during the week of December 21, 1987. During l
f this period, the licensee performed routine maintenance and surveillance i tests. Some of the ongoing projects include: degrade voltage protection modification, DC electrical breaker testing, and RHR low pressure coolant injection valve repair work.
) 3.0 Items of Special Interest
! Pilgrim Systemmatic Assessment of Licensee Performance (SALP) Board -
l l Meeting !
l l The SALP process is supplemental to the normal regulatory processes used l
, to ensure compliance to NRC rules and regulations. It is intended to be '
sufficiently diagnostic to provide a rational basis for allocating NRC [
resources and to provide meaningful guidance to licensee management in !
! order to improve the quality and safety of plant operations. !
i l (more) !
l i
0 3
On July 5-6, 1988, a SALP board meeting was held for Pilgrim at the NRC !
- Regional Office in King of Prussia, Pennsylvania. The SALP assessment i covered the period of February 1, 1987 through May 15, 1988. The SALP board, composed of members from NRC management in Region I and NRR, reviewed the collection of performance observations and inspection results by the resident inspectors and regional inspectors in order to assess the licensee's performance at the Pilgrim station. The SALP report will be issued upon completion of NRC management review. During ,
the SALP period, the NRC expended a total of 9698 direct inspection hours at Pilgrim which is substantially above the typical level of inspection effort, NRC Assessment Panel Meeting A NRC Assessment Panel meeting for Pilgrim was held on July 15, 1988 at the NRC headquarters offices in Rockville, Maryland. NRC management from Region I and the NRC resident staf f participated via tele-conference.
NRC Assessment Panel meets periodically tu coordinate preplanning and execution of NRC inspection and licensing activities related to Pilgrim.
The Panel is chaired by Mr. Samuel J. Collins, Deputy Director, Division of Reactor Projects, NRC Region I.
Scheduled NRC Integrated Assessment Team Inspection (IATI) j By a letter dated July 11, 1988, the NRC notified the licensee management a
that the NRC has completed its review of the licensee's Self-Assessment Report and the associated schedules for resolution of remaining items prior to restart. The NRC has tentatively scheduled a comprehensive IATI to begin ,n August 8,1988. Onsite preparation for the IATI will be conducted during July 19 - 21, 1988. The IATI will independently review the licensee's readiness for restart. Development of an NRC staff recommendation to the Commission relative to restart will be based on the SALP and IATI results.
The team will consist of a senior manager, inspection team leader, four shift inspectors, and several specialist inspectors from both Region I and the Office of Nuclear Reactor Regulation. The senior manager is Mr.
Samuel J. Collins, Deputy Director, Division of Reactor Projects, Region I, and the team leader is Mr. A. Randy Blough, Section Chief, Reactor Projects Section 38, Region I.
Arrangements have been made for a representative from the Conmonwealth of Massachusetts to be on the team as an observer throughout the IATI.
- 4.0 Emergency Notification System (ENS) Report During this period, the licensee made the following reports to the NRC i
pursuant to 10 CFR 50.72:
1 (more)
4 On July 5, 1988, an inadvertent reactor scram occurred during electrical maintenance on the intermediate range power monitor (IRM) system. The actuation resulted from spurious spiking of "A" and "B" intermediate range power monitor channels when a third IRM was returned to service. The licensee's preliminary investigation indicated a procedural error contributed to the observed actuation. .
On July 8,1988, the licensee experienced an unexpected reactor scram during performance of a post-modification test on the Anticipated Transient Without Scram (ATWS) system. The ATWS system is designed to provide independent means of introducing negative reactivity to the reactor by tripping the reactor recirculation pumps and initiating the alternate control rod insertion system in i the unlikely event of a reactor protection system failure. The !
licensee's preliminary investigation determined that all equipment performed as designed and that the cause of the actuation was due to a procedural inadequacy. The test procedure did not identify a potential reactor scram due to high water level in the scram discharge instrument volume.
l On July 12, 1988, an inadvertent start of the "B" emergency diesel generator (EDG) occurred during implementation of clactrical l equipment isolations on associated safety-related 4160 VAC bus. The isolations were being conducted in accordance with an approved work ng sheet. The effect of the isolations on the start plan logic and taggi,B" of the ' EDG, had not been identified.
The NRC inspector's review of these events will be further discussed in Inspection Report 50-293/88-25.
5.0 NRC Staff Status During the Period j The inspection staff at Pilgrim during the report period consisted of the
- followir.g
Clay Warren ---
Senior Resident Inspector Jeffrey Lyash ---
Resident Inspector Tae Kim ---
Resident Inspector !
In addition, a reactor engineer from the regional office was onsite during the week of July 11, 1988 to assist the resident inspectors in reviewing the licensee's corrective actions on previous inspection findings. The results of these inspector activities will be documented I
- in the NRC inspection report 50-293/88-25.