MONTHYEARML20211A4361999-08-18018 August 1999 Notification of Significant Licensee Meeting 99-47 with Entergy Nuclear,Inc on 990831 to Discuss Results of NRC Plant Performance Review of Pilgrim Nuclear Power Station Issued on 990409 ML20212H7621999-06-22022 June 1999 Notification of 990701 Meeting with NEI & Entergy in Rockville,Md to Discuss Price-Anderson Issues Re Transfer of Pilgrim License from Beco to Entergy ML20205L0301999-04-0909 April 1999 Notification of 990413 Meeting with Boston Edison Co & Entergy Nuclear Generation Co in Rockville,Md to Discuss Sale & Transfer of Pilgrim Station from Boston Edison Co to Entergy Nuclear Generation Co ML20196J5801998-12-0707 December 1998 Notification of 981209 Meeting with Representatives of Beco & Entergy in Rockville,Md to Discuss Sale of Pilgrim Plant ML20196F3461998-12-0202 December 1998 Forwards Info Re Operator Licensing Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids Code IE42 ML20196F5611998-12-0202 December 1998 Forwards Info Re OL Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids A070 ML20154D5091998-10-0202 October 1998 Notification of Meeting W/Beco on 981008 in Rockville,Md to Discuss Core Spray Piping Integrity ML20154G5141998-10-0202 October 1998 Notification of 981008 Meeting W/Beco in Rockville,Md to Discuss Core Spray Piping Integrity.Meeting Has Been Rescheduled to 981015 ML20247G2441998-04-15015 April 1998 Notification of Significant Licensee Meeting 98-34 W/Util on 980427 to Discuss Weaknesses in Licensee Alarm Assessment Program (EA 98-191) ML20203E2781998-02-19019 February 1998 Notification of Significant Licensee Meeting 98-18 W/Util in King of Prussia,Pa on 980310 Re Plant Design Basis Project Discussion ML20199C7581997-10-31031 October 1997 Notification of Significant Licensee Meeting 97-112 W/Util on 971113 to Discuss NRC SALP ML20212D6201997-10-28028 October 1997 Notification of Licensee Meeting on 971121 W/Util in King of Prussia,Pa to Discuss Apparent Violations Identified During NRC Insp 50-293/97-05 ML20140F6151997-06-11011 June 1997 Notification of 970612 Meeting W/Util in Rockville,Md to Discuss Net Positive Suction Head for ECCS Pumps ML20137Q9761997-03-31031 March 1997 Informs That as-found LOCA & Life Testing & Analysis Does Not Provide Acceptable Approach for Demonstrating Qualification at Accident Temp Higher than 340F,per 970110 TAR ML20137B4781997-03-14014 March 1997 Undated Memo Discussing Beco Reorganization ML20141A7361997-03-12012 March 1997 Rcommends That Key RES Staff Attend Subcommittee Meetings to Address Any Questions,Arise in Discussions Among Members & to Answer Any Key Questions Posed in Advance by Subcommittee Chairmen ML20149M3291996-11-12012 November 1996 Forwards Input Re TIA on Plant Licensing Basis & Subsequent Mod Under 10CFR50.59 for Two Safety Significant Problems ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20129D8331996-09-19019 September 1996 Notification of 961003 Predecisional Enforcement Conference 96-98 W/Util to Discuss Containment Penetration Protection. Meeting Closed to Public ML20134J7301996-07-26026 July 1996 Forwards Resolution of Spent Fuel Storage Pool Action Plan Issues Re Response to Two Postulated Event Sequences Involving SFP NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl IR 05000293/19930291993-11-23023 November 1993 Notification of Significant Licensee Meeting 93-156 W/Util on 931202 Re Three Recently Reported Design Issues in Insp Rept 50-293/93-29 ML20058C9711993-11-22022 November 1993 Notification of Significant Licensee Meeting 93-150 W/Util on 931217 Re Hpci/Rcic Reliability & Switchyard Betterment Status ML20059L9721993-11-12012 November 1993 Licensing Board Memorandum & Order Terminating Proceeding .* Informs That Time Provided by NRC Regulation to Review Decision of ASLB Terminating Proceeding in Docket Has Expired.W/Certificate of Svc.Served on 931112 ML20056C4721993-06-17017 June 1993 Discusses Util Assessment of Low Pressure Turbine Analysis. Licensee Retained Structural Integrity Assocs,Inc (SIA) to Evaluate Flaw Indications in 7GA Disk.Sia Anaylsis Reduce Some Obvious Conservatisms Used in GE Analysis ML20128F3911993-02-0303 February 1993 Requests Listed Instructions to Ensure That P Blanch of Northeast Utils & E Hadley of We the People Kept Promptly Informed of NRC Activities on BWR Water Level Indicators & Rosemount Transmitters ML20128E2181993-01-26026 January 1993 Notice of Significant Licensee Meeting 93-11 W/Licensee on 930225 in King of Prussia,Pa to Discuss Util Reorganization ML20059C1171992-11-20020 November 1992 Submits Status Rept on Reactor Water Level Spiking That Occurred on 921024.Related Info Encl ML20125D1161992-10-0707 October 1992 Notification of Significant Licensee Meeting 92-177 W/Util on 921217 to Discuss tie-in of New Security Computer ML20082B1581991-02-20020 February 1991 Summarizes Telcon W/R Murphy Re Mobilization Time for State of Ma Natl Guard Personnel Assigned to Respond to Wellesley, Ma Reception Ctr & State of Ma Civil Defense Agency Area II Headquarters in Event of Emergency at Facility ML20062H5361990-11-23023 November 1990 Forwards Info from Pilgrim Citizens Radiological Monitoring Network,Covering Rept Periods 900910-1017 ML20059P0861990-10-0101 October 1990 Notification of Significant Licensee Meeting 90-118 W/Util on 901016 to Discuss SALP ML20059L1541990-09-0707 September 1990 Notification of Significant Licensee Meeting 90-114 on 900912 at Region I Ofc to Discuss Corrective Actions & Restart Planning Re 900902 Manual Reactor Scram ML20059G4681990-08-0606 August 1990 Forwards Citizens Radiological Monitoring Network Weather Data Rept for Apr-Jul 1990 for Processing Through Nudocs Sys ML20127B4901990-08-0303 August 1990 Responds to 900726 Request for Recommendations for Appropriate Actions in Response to Inspector General Rept 90N-02 ML20127B4961990-08-0101 August 1990 Advises That Staff Did Not Conduct Thorough Review of Offsite Emergency Preparedness Which Resulted in Inaccurate Info Being Provided to Commission ML20058B4501990-06-28028 June 1990 Provides Status Rept Re Progress of off-site Emergency Preparedness Activities at Facility ML20055C2661990-02-0505 February 1990 Forwards Draft Ltr to Util Re Completion of Plant Power Ascension Program.Ltr Will Be Issued on 900209 Which Will Accept Util Completion of Power Ascension Program & Close Out Confirmatory Action Ltr CAL-86-10 ML20248C5841989-09-26026 September 1989 Notification of Significant Licensee Meeting 89-154 W/Util on 891006 in Plymouth,Ma to Discuss SALP Mgt ML20247N0121989-09-12012 September 1989 Forwards Plant Status Rept for 890826-0908.On 890830,reactor Automatically Scrammed Due to Fault on Main Generator Voltage Regulation Circuitry.On 890905,inadvertent Actuation LPCI Loop Select Logic Experienced ML20246N5751989-08-30030 August 1989 Forwards Plant Biweekly Status Rept for 890812-25 ML20245F6401989-08-0101 August 1989 Forwards Facility Biweekly Status Rept for 890715-28.NRC Restart Staff in Place & Onsite Monitoring Licensee Activities on Extended day-shift Basis During Reporting Period ML20247C0631989-07-19019 July 1989 Forwards Biweekly Status Rept for 890701-14.NRC Restart Staff in Place & Onsite & Monitoring Licensee Activities on around-the-clock Basis During Plant Startup & Power Ascension.Part 21 Related ML20247C1611989-07-14014 July 1989 Notification of Significant Licensee Meeting 89-112 W/Util on 890816 in King of Prussia,Pa to Discuss SALP ML20247E4531989-07-10010 July 1989 Forwards Plant Status Rept for 890617-30 Period.Rept Intended to Provide NRC Mgt & Public W/Overview of Plant Activities & NRC Restart Insp Activities ML20246K1141989-07-0303 July 1989 Notification of Significant Licensee Meeting 89-105/suppl Enforcement Conference Re Augmented Insp Team Findings Concerning 890412 Reactor Core Isolation Cooling Sys Overpressurization ML20245E6561989-06-22022 June 1989 Forwards Plant Biweekly Status Rept for 890603-16.On 890616, Reactor Operating at Approx 25% Power w/turbine-generator Synchronized to Grid.On 890612,util Commenced Controlled Reactor Shutdown to Perform Minor Mods,Maint & Testing ML20245F9581989-06-16016 June 1989 Notification of Significant Licensee Meeting 89-096 W/Util on 890619 in King of Prussia,Pa Re 890412 RCIC Sys ML20245A3311989-06-0909 June 1989 Notification of Significant Licensee Meeting 89-90 on 890627 W/Util in King of Prussia,Pa for Mgt Meeting to Discuss Status of Licensee Radiation Control Program ML20244E5081989-06-0707 June 1989 Forwards Biweekly Status Rept for 890520-0602.Rept Provides Overview of Plant Activities & NRC Restart Insp Activities. Part 21 Related 1999-08-18
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211A4361999-08-18018 August 1999 Notification of Significant Licensee Meeting 99-47 with Entergy Nuclear,Inc on 990831 to Discuss Results of NRC Plant Performance Review of Pilgrim Nuclear Power Station Issued on 990409 ML20212H7621999-06-22022 June 1999 Notification of 990701 Meeting with NEI & Entergy in Rockville,Md to Discuss Price-Anderson Issues Re Transfer of Pilgrim License from Beco to Entergy ML20205L0301999-04-0909 April 1999 Notification of 990413 Meeting with Boston Edison Co & Entergy Nuclear Generation Co in Rockville,Md to Discuss Sale & Transfer of Pilgrim Station from Boston Edison Co to Entergy Nuclear Generation Co ML20196J5801998-12-0707 December 1998 Notification of 981209 Meeting with Representatives of Beco & Entergy in Rockville,Md to Discuss Sale of Pilgrim Plant ML20196F3461998-12-0202 December 1998 Forwards Info Re Operator Licensing Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids Code IE42 ML20196F5611998-12-0202 December 1998 Forwards Info Re OL Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids A070 ML20154G5141998-10-0202 October 1998 Notification of 981008 Meeting W/Beco in Rockville,Md to Discuss Core Spray Piping Integrity.Meeting Has Been Rescheduled to 981015 ML20154D5091998-10-0202 October 1998 Notification of Meeting W/Beco on 981008 in Rockville,Md to Discuss Core Spray Piping Integrity ML20247G2441998-04-15015 April 1998 Notification of Significant Licensee Meeting 98-34 W/Util on 980427 to Discuss Weaknesses in Licensee Alarm Assessment Program (EA 98-191) ML20203E2781998-02-19019 February 1998 Notification of Significant Licensee Meeting 98-18 W/Util in King of Prussia,Pa on 980310 Re Plant Design Basis Project Discussion ML20199C7581997-10-31031 October 1997 Notification of Significant Licensee Meeting 97-112 W/Util on 971113 to Discuss NRC SALP ML20212D6201997-10-28028 October 1997 Notification of Licensee Meeting on 971121 W/Util in King of Prussia,Pa to Discuss Apparent Violations Identified During NRC Insp 50-293/97-05 ML20140F6151997-06-11011 June 1997 Notification of 970612 Meeting W/Util in Rockville,Md to Discuss Net Positive Suction Head for ECCS Pumps ML20137Q9761997-03-31031 March 1997 Informs That as-found LOCA & Life Testing & Analysis Does Not Provide Acceptable Approach for Demonstrating Qualification at Accident Temp Higher than 340F,per 970110 TAR ML20137B4781997-03-14014 March 1997 Undated Memo Discussing Beco Reorganization ML20141A7361997-03-12012 March 1997 Rcommends That Key RES Staff Attend Subcommittee Meetings to Address Any Questions,Arise in Discussions Among Members & to Answer Any Key Questions Posed in Advance by Subcommittee Chairmen ML20149M3291996-11-12012 November 1996 Forwards Input Re TIA on Plant Licensing Basis & Subsequent Mod Under 10CFR50.59 for Two Safety Significant Problems ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20129D8331996-09-19019 September 1996 Notification of 961003 Predecisional Enforcement Conference 96-98 W/Util to Discuss Containment Penetration Protection. Meeting Closed to Public ML20134J7301996-07-26026 July 1996 Forwards Resolution of Spent Fuel Storage Pool Action Plan Issues Re Response to Two Postulated Event Sequences Involving SFP NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl IR 05000293/19930291993-11-23023 November 1993 Notification of Significant Licensee Meeting 93-156 W/Util on 931202 Re Three Recently Reported Design Issues in Insp Rept 50-293/93-29 ML20058C9711993-11-22022 November 1993 Notification of Significant Licensee Meeting 93-150 W/Util on 931217 Re Hpci/Rcic Reliability & Switchyard Betterment Status ML20059L9721993-11-12012 November 1993 Licensing Board Memorandum & Order Terminating Proceeding .* Informs That Time Provided by NRC Regulation to Review Decision of ASLB Terminating Proceeding in Docket Has Expired.W/Certificate of Svc.Served on 931112 ML20056C4721993-06-17017 June 1993 Discusses Util Assessment of Low Pressure Turbine Analysis. Licensee Retained Structural Integrity Assocs,Inc (SIA) to Evaluate Flaw Indications in 7GA Disk.Sia Anaylsis Reduce Some Obvious Conservatisms Used in GE Analysis ML20128F3911993-02-0303 February 1993 Requests Listed Instructions to Ensure That P Blanch of Northeast Utils & E Hadley of We the People Kept Promptly Informed of NRC Activities on BWR Water Level Indicators & Rosemount Transmitters ML20128E2181993-01-26026 January 1993 Notice of Significant Licensee Meeting 93-11 W/Licensee on 930225 in King of Prussia,Pa to Discuss Util Reorganization ML20059C1171992-11-20020 November 1992 Submits Status Rept on Reactor Water Level Spiking That Occurred on 921024.Related Info Encl ML20125D1161992-10-0707 October 1992 Notification of Significant Licensee Meeting 92-177 W/Util on 921217 to Discuss tie-in of New Security Computer ML20082B1581991-02-20020 February 1991 Summarizes Telcon W/R Murphy Re Mobilization Time for State of Ma Natl Guard Personnel Assigned to Respond to Wellesley, Ma Reception Ctr & State of Ma Civil Defense Agency Area II Headquarters in Event of Emergency at Facility ML20062H5361990-11-23023 November 1990 Forwards Info from Pilgrim Citizens Radiological Monitoring Network,Covering Rept Periods 900910-1017 ML20059P0861990-10-0101 October 1990 Notification of Significant Licensee Meeting 90-118 W/Util on 901016 to Discuss SALP ML20059L1541990-09-0707 September 1990 Notification of Significant Licensee Meeting 90-114 on 900912 at Region I Ofc to Discuss Corrective Actions & Restart Planning Re 900902 Manual Reactor Scram ML20059G4681990-08-0606 August 1990 Forwards Citizens Radiological Monitoring Network Weather Data Rept for Apr-Jul 1990 for Processing Through Nudocs Sys ML20127B4901990-08-0303 August 1990 Responds to 900726 Request for Recommendations for Appropriate Actions in Response to Inspector General Rept 90N-02 ML20127B4961990-08-0101 August 1990 Advises That Staff Did Not Conduct Thorough Review of Offsite Emergency Preparedness Which Resulted in Inaccurate Info Being Provided to Commission ML20058B4501990-06-28028 June 1990 Provides Status Rept Re Progress of off-site Emergency Preparedness Activities at Facility ML20055C2661990-02-0505 February 1990 Forwards Draft Ltr to Util Re Completion of Plant Power Ascension Program.Ltr Will Be Issued on 900209 Which Will Accept Util Completion of Power Ascension Program & Close Out Confirmatory Action Ltr CAL-86-10 ML20248C5841989-09-26026 September 1989 Notification of Significant Licensee Meeting 89-154 W/Util on 891006 in Plymouth,Ma to Discuss SALP Mgt ML20247N0121989-09-12012 September 1989 Forwards Plant Status Rept for 890826-0908.On 890830,reactor Automatically Scrammed Due to Fault on Main Generator Voltage Regulation Circuitry.On 890905,inadvertent Actuation LPCI Loop Select Logic Experienced ML20246N5751989-08-30030 August 1989 Forwards Plant Biweekly Status Rept for 890812-25 ML20245F6401989-08-0101 August 1989 Forwards Facility Biweekly Status Rept for 890715-28.NRC Restart Staff in Place & Onsite Monitoring Licensee Activities on Extended day-shift Basis During Reporting Period ML20247C0631989-07-19019 July 1989 Forwards Biweekly Status Rept for 890701-14.NRC Restart Staff in Place & Onsite & Monitoring Licensee Activities on around-the-clock Basis During Plant Startup & Power Ascension.Part 21 Related ML20247C1611989-07-14014 July 1989 Notification of Significant Licensee Meeting 89-112 W/Util on 890816 in King of Prussia,Pa to Discuss SALP ML20247E4531989-07-10010 July 1989 Forwards Plant Status Rept for 890617-30 Period.Rept Intended to Provide NRC Mgt & Public W/Overview of Plant Activities & NRC Restart Insp Activities ML20246K1141989-07-0303 July 1989 Notification of Significant Licensee Meeting 89-105/suppl Enforcement Conference Re Augmented Insp Team Findings Concerning 890412 Reactor Core Isolation Cooling Sys Overpressurization ML20245E6561989-06-22022 June 1989 Forwards Plant Biweekly Status Rept for 890603-16.On 890616, Reactor Operating at Approx 25% Power w/turbine-generator Synchronized to Grid.On 890612,util Commenced Controlled Reactor Shutdown to Perform Minor Mods,Maint & Testing ML20245F9581989-06-16016 June 1989 Notification of Significant Licensee Meeting 89-096 W/Util on 890619 in King of Prussia,Pa Re 890412 RCIC Sys ML20245A3311989-06-0909 June 1989 Notification of Significant Licensee Meeting 89-90 on 890627 W/Util in King of Prussia,Pa for Mgt Meeting to Discuss Status of Licensee Radiation Control Program ML20244E5081989-06-0707 June 1989 Forwards Biweekly Status Rept for 890520-0602.Rept Provides Overview of Plant Activities & NRC Restart Insp Activities. Part 21 Related 1999-08-18
[Table view] |
Text
{{#Wiki_filter:_ - _ - -
;( <: ,
SEP 121989.
L Docket No. 50-293 MEMORANDUM FOR: Jon R. Johnson, Chief, Projects Branch No. 3, Division of Reactor Projects FROM: A.. Randy'Blough, Chief, Reactor Projects Section 3A, Division of Reactor Projects
SUBJECT:
PILGRIM STATUS REPORT FOR THE PERIOD AUGUST 26 -
SEPTEMBER 8, 1989 Enclosed-is the Pilgrim bi-weekly status report 'from the NRC Resident Office at. Pilgrim. The NRC Restart Staff is in place and was on-site monitoring licensee activities on an extended day shift basis during this report period.
The Pilgrim bi-weekly status report is intended to provide NRC management and '
the public with an overview of plant activities and NRC restart-inspection activities. Subsequent inspection reports will address many of these topics in more detail.
Original Signed By:
Jon R. Johnson
.A. Randy Blough, Chief Reactor Projects Section 3A Division of Reactor Projects
Enclosure:
As stated f
f00 0FFICIAL RECORD COPY PILGRIM STATUS REPORT - 0001.0.0 11/29/80 8909260117 890912
-{DR ADOCK0500g]3
Fv .; - . ~
. Jon R. Johnson - 2 SEP.121999 cc w/ encl.:
f R. Bird, Senior'Vice. President - Nuclear L. Gustin, Vice President - Corporate Relations K. Highfill, Station Director R.' Anderson, Plant Manager J. Dietrich, Licensing Division Manager-E. Robinson, Nuclear Information Manager R. Swanson, Nuclear Engineering Department Manager
-The. Honorable Edward M. Kennedy
-The Honorable Edward J. Markey The' Honorable Edward P. Kirby
~
The Honorable Peter'V. Forman Chairman, Board of Selectmen, Plymouth Chairman, Board of Selectmen, Carver Chairman, Board of = Selectmen,. Duxbury Chairman, Board of Selectmen, Marshfield Chairman, Board of Selectmen, Kingston
- Chairman, Board of Selectmen, Bridgewater Mayor, City of Taunton Plymouth Civil Defense Director P. Agnes, Assistant Secretary of Public Safety, Commonwealth of Massachusetts M.- Ernst, Committee on Energy, Commonwealth of Massachusetts S. Pollard, Massachusetts Secretary of Energy Resources B.-McIntyre, Chairman, Department of Public Utilities M. Johnson, Chairman, Duxbury Nuclear Committee R. Shimshak, MASSPIRG R. Boulay, Director, Massachusetts Civil Defense Agency and Office of Emergency Preparedness M. Conyngham, Legislative Assistant M.-Jeka, Legislative Assistant K. Anderson, Legislative Assistant Duxbury CURE
'Public Document' Room (PDR)
-Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector Commonwealth of Massachusetts (2) 1 0FFICIAL RECORD COPY PILGRIM STATUS REPORT - 0002.0.0 11/29/80
n .
SEP 121989 Jon R. Johnson 3 bec w/ encl:
Region I Docket Room'(with concurrences)
J. Taylor, EDO J. Dyer, EDO T. Murley, NRR F. Miraglia,'NRR J. Partlow, NRR S. Varga, NRR J. Roe, NRR K. Perkins, NRR D. Crutchfield, NRR C. Rossi, NRR F. Congel, NRR L. Shao, NRR R. Wessman, NRR D. Mcdonald, NRR L. Whitney, NRR -
P. Boehnert, ACRS W. Russell, RI T. Martin, RI W. Kane, RI B. Boger, RI M. Knapp, RI S. Collins, RI J. Johnson, RI R. Blough, RI J. Durr, RI R. Gallo, RI R. Bellamy, RI W. Lazarus, RI L. Kolonauski, RI M. Miller, RI K. Abraham, RI (2)
M. Oprendek, RI (2)
C. Marschall, Acting SRI - Pilgrim T. Kim, RI - Pilgrim C. Carpenter, RI - Pilgrim G. Grant, SRI - Vermont Yankee H. Eichenholz, SRI - Yankee Rowe RI:DRP RI:DRP RI:DRP tvetin d1 efm inPf3 Marschall/meo Blough J nso 9/II/89 4ll2 9 Ib 4//> 0FFICIAL RECORD COPY PILGRIM STATUS REPORT - 0003.0.0 11/29/80 l l
l
___--___________-__---J
m 2 ,
ir . j
-ENCLOSURE' l
PILGRIM STATUS REPORT FOR THE PERIOD AUGUST SEPTEMBER 8, 1989
, 1.0 Plant Status
'As of 8iOO a.m. on September 8, 1989, the reactor was operating at approxi-mately 58% power with the turbine generator synchronized to the grid.
l 2.0. Power Ascension Test Program Status.
At the close of the last report period, the plant was raising power from
-40% following a power reduction to complete backwashing of a condenser waterbox. 'The plant ~ reached 75% power on August 25, 1989.
=0n August 30, 1989, the reactor automatically scrammed.from about 75%
power due to a fault on the main generator's voltage regulation circuit'ry.
- A component failure in the vcitage regulation circuitry caused a turbine runback and the reactor scrammed on reactor vessel high pressure. All systems responded as designed.and the event was of minor safety signific-ance. Detail NRC review of this event will be documented in NRC Inspec-tion Report No. 50-293/89-10.
At 10:16 p.m. on September 6, 1989, the licensee brought the reactor cri-tical following replacement of the failed component and inspection of other plant systems / components. The turbine generator was synchronized to the electrical power distribution grid at 10:14 a.m. on September. 7, 1989. At the close of this report period, the plant was at 58% power.
The licensee ~ continued to conduct routine surveillance along with preven-tive:and corrective maintenance throughout the period.
- 3. I ems of Special Interest NRC Restart Assessment Panel An NRC Restart Assessment Panel teleconference was held on August 28, 1989 at the NRC Region I Office in King of Prussia, Pennsylvania. NRC manage-ment from Region I, the Office of Nuclear Reactor Regulation (NRR), .and the NRC resident staff participated. The Panel was briefed by the licen-see on their plans for the remainder of the 75% plateau and the remainder -
.of the Power Ascension Test program. The Panel meets periodically to co-ordinate planning and execution of NRC inspection and licensing activities related to Pilgrim. The Panel is chaired by Mr. Samuel J. Collins, Deputy Director, Division of Reactor Projects, NRC Region I.
OFFICIAL RECORD COPY PILGRIM STATUS REPORT - 0004.0.0 11/29/80
Enclosure 2 4.0 Emergency Notification System (ENS) Reports Reactor Scram Due to Failed Potential Transformer On August 30, 1989, the licensee notified the NRC via ENS at 8:20 p.m. of the reactor scram detailed in Section 2.0 above.
Inadvertent Actuation of Low Pressure Coolant Injection Loop Select Logic On September 5,1989, the licensee experienced an inadvertent actuation of the Low Pressure Coolant Injection (LPCI) loop select logic and an inadvertent start of the "A" Emergency Diesel Generator during the performance of a surveillance test. However, no reactor vessel injection occurred. Troubleshooting by the licensee revealed that the actuations were apparently due to the placing of a jumper on the wrong relay. The plant was in cold shutdown at the time. The licensee notified the NRC via ENS.
Inoperable High Pressure Coolant Injection System On September 7, 1989, the licensee declared the High Pressure Coolant Injection (HPCI) system inoperable due to minor flow oscillations which caused the HPCI turbine to momentarily trip on overspeed during startup.
The HPCI system is a core standby cooling system that maintains an adequate coolant inventory inside the reactor vessel to prevent fuel clad melt. The licensee notified the NRC via ENS of the HPCI system inoperability.
Inadvertent Opened Secondary Containment Doors On September 7,1989, both the inner and outer secondary containment reactor building access doors were inadvertently opened simultaneously for about three seconds. This occurred due to personnel error. This was reported to the NRC via ENS.
Detailed NRC review of the events described above will be documented in Inspection Report 50-293/89-10.
5.0 Pilgrim Restart Staff Activities The Pilgrim Restart Staff was in extended shift coverage throughout this report period, consistent with reduced testing activities. On August 30, 1989, immediately following the reactor scram, the Senior Resident Inspector was in the control room and observed operator actions in response to the scram.
An NRC-developed inspection plan addressing the 50%-75% power plateau, as well as the primary functional areas of operations, maintenance, surveillance, and startup testing was implemented. The inspectors assessed operator performance, organizational interfaces, adherence to procedures, and Technical Specification compliance.
OFFICIAL RECORD COPY PILGRIM STATUS REPORT.- 0005.0.0 11/29/80
- .y a 7, .. . ,. -
.ct' Enclosure' 3
.The Pilgrim Restart Staff continued to evaluate the performance of licen-r see personnel and the plant to determine whether the licensee should be.
permitted to proceed to the next NRC: approval point, 100% of rated power.
On' September 7, .1989, NRC Region I issued NRC Inspection. Report 50-293/89-07, which details NRC Restart Staff inspections during the period of May 25 - July 10,1989. This report will be available in.the Local.Public Document Room. The inspection report details several violations'of NRC requirements. However,'the Restart Staff. determined that the' licensee's conduct and control of the first phase of the Shutdown from Outside the Control Room test was excellent.
Contact with the press and public continued throughout the period. The NRC Restart Manager'and the Region I Public Affairs Officer have been handling all inquiries.
Pilgrim Restart Staff Composition During Period The. Pilgrim Restart Staff on-site'was comprised of the following personnel during the period.
C; Marschall, Acting Senior Resident Inspector and Restart Manager
-T. Kim, Resident Inspector
'C. Carpenter, Resident Inspector R. Mathew, Reactor Engineer, RI J. Bongarra, Engineering Psychologist J. Bradfute, Project Manager, NRR G.~ Bethke, NRC Contractor On August 31'and September 1,1989, Mr. Jon Jahr. son, Chief, Projects Branch No. 3 was onsite.
OFFICIAL RECORD COPY PILGRIM STATUS REPORT - 0006.0.0 11/29/80