Discusses Minutes of Util Restart Assessment Panel 871208 Meeting Re Status of NRC & Licensee Activities Associated W/ Proposed Plant Restart
ML20196F412
Person / Time
Site: Pilgrim
Issue date: 12/29/1987
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Russell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20150E198 List:
References
FOIA-88-198 NUDOCS 8812130067
Download: ML20196F412 (5)


Text

. _ - - _ - _ _ _ _ _ _ _ _ _ _

(-

s

~

7 DEC 291987 4,

^

V 1

MEMORANDUM FOR: William T. Russell Regional Administrator FROM:

Samuel J. Collins, Deputy Director Division of Reactor Projects

SUBJECT:

PILGRIM RESTART ASSESSMENT PANEL MEETING MINUTES On December 8, 1987, the Pilgrim Restart Assessment Panel met to discuss the status of NRC and licensee activities associated with the prooosed plant Restart.

The following personnel were in attendance:

Chairman:

Samuel J. Collins, Deputy Director, DRP Members:

A. Randy Blough, Chief, Reactor Projects Section No. 38, DRP Ronald R.

Bellamy, Chief, Radiological Protection and Emergency Preparedness Branch, DRSS Bruce Boger, Assistant Director for RI Reactor',, NRR Others:

William T. Russell, Regional Acministrator i

Richard H. Wessman, Froject Manager, NRR Clay C. Warren, Senior Resident Inspector, Pilgrim j

Jeff Lyash, Resident Inspector, Pilgrim i

T. J. Kim, Resident Inspector, Pilgrim i

I j

The panel discussed t5e issues listed in the Agenda shown in Enclosure 1. Also, Mr. Ralph Bird, Senior Vice President - Nuclear (Boston Edison Company) briefed i

l the Panel on phnt status and schedules.

As a result of the meeting, the j

following act hns with responsibility were agreed upon by the Panel.

j Task Responsibility Due Date l

1.

Evaluate need for additional All Next Meeting j

inspections to evaluate effectiveness of organizational i

transition i

2.

Distribute Restart Plan Review Blough 12/11/87 1

Instructions (Complete 12/14/87) l

)

3.

Review Restart Plan All IAW Schedule (IAW Assignments)

First Milestone is

(

1/8/88 for Initial

}

Review /RAI l

f I

i I

i i

i l

8812130067 001200 PDR FOIA J0MSDN88-190 PDR 3$

l j

,e g gg g Memorandum for William T. Russell 2

o t

2 Task Responsibility Due Date l

t 4.

Request Massachusetts (Agnes)

Miller /Blough ASAP to expedite response to NRC's 11/12/87 request for assistance in arranging public meetings; after response, arrange meetings.

5.

Get Appendix 7 of Restart Plan Blough Distribute ASAP i

and distribute (prerequisites to after receipt from public meetings).

BEco l

6.

Resolve questions on pre-Boger 12/10/87 requisites to NRC to begin (Complete 12/10/S7) l review of E0P subtaittal, t

7.

Resolve issue of timing of Boger Next Meeting I

Technical Specification submittal for organizational j

changes.

l 8.

Get help on inspection of Blough ASAP f

overtime controls if needed.

j 9.' Develop outline / format for Blough Next Meeting i

NRC Reactness Report.

10.

Determire which AIT items are Durr ASAP Restart issues.

i f

i

'At NM4d amuel

!1rns, Deputy Director Division of Reactor Projects l

Enclosure:

t As stated i

i

[

s

Memorandum for William T. Russell 3

DEC 291987 cc w/ enc 1:

T. Hurley, NRR F. Miraglia, NRR

5. Varga, NRR B. Boger, NRR R. Wessman, NRR J. Roe, NRR J. Hannon, NRR J. Allan, RI W. Kane, RI J. Wiggins, R1 T. Martin, RI J. Durr, RI R. Bellamy, RI L. Deerflein, RI R. Funrmeister, R!

C. Warren, SRI - Pilgrim J. Lyash, RI - Pilgrim T. Kim, RI - Pilgrim F

l J

l i

)

t l

r 4

i l

l l

1 I

I i

l

ENCLOSURE Restart Panel Items Discussed December 8. 1937 1.

SEco Organization Changes 2.

AIT Results/ Station Blackout Mods 3.

Restart Plan Review 4

Public Meeting Schedule 5.

Provisions for State / Local Comments on Restart Plan 6.

Status of Security Issues 7.

E0P Review Status S.

SALP Schedule i-9.

Allegation Status l

l 1

F i

?

I i

I t

r a

- -, - ~ ~ -,,,

Ult I l~ll2DA

arriott, s

.,h @

  • qlv b(*

4<i

\\ Q

.~1 (301) 897 9400 s

r -

g

  • 1!e= 7 1 'i l p p N h

i 1

\\.

..L

(

.s

/

D by 7 5 (s.T v i,, ( :

L

.i

/

e,. \\ :..

\\:

t.'

tr2 6 ((

,,, ('

I h

E, N

yS.

4

/

\\h Q, G&

Q)

ILr t r '.' ) l l4,(c.

b r FL

%.m s

~ ~T C P. (l ~c

/i, '

,hs,.+4 Erdoy llungry llour Mon. Fri. 5:00 l'.M.

3 (M) I'.M.

fklTilf Il[I 0111130

)

l l

4 T/21

.