Text
-
t e
21 OCT 1987 MEMORANDUM FOR: William T. Russell Regional Administrator FROM:
Samuel J. Collins, Deputy Director Division of Reactor Projects
SUBJECT:
PILGRIM RESTART ASSESSMENT PANEL MEETING MINUTES i
On October 8,1987, the Pilgrim Restart Assessment Panel met to discuss the status of NRC and licensee activities associated with the proposed plant I
restart.
The following personn'1 were in attendance:
Chairman:
Samuel J. Collins, Deputy Director, ORP Members:
Jacque P. Durr, Acting Deputy Director, DRS A. Randy Blough, Chief, Reactor Projects Section 3B, DRP James T. Wiggins, Chief, Reactor Projects Branch No. 3, DRP
(
Bruce Boger, Assistant Ofrector for RI Reactors, NRR l
Others:
Richard H. Wessman, Project Manager, NRR Robert Gallo, Chief, Operations Branch ORS f
Mohamed Shanbaky, Chief, Facilities Radiation Protection i
Section, ORSS Jeff Lyash, Resident Inspector, Pilgrim Clay Warren, Senior Resident Inspector, Shoreham l
Michele Evans, Operations Engineer, DRS Lawrence T. Ocerflein, Project Engineer, RPS 3B, DRP l
]
The panel discussed the issues listed in the Agenda shewn in Enclosure 1.
In 4
addition, the panel discussed the actions which remained outstanding as of the end of the September 21, 1937 Panel meeting.
j I
i As a result of the treeting, the following actions with responsibility were agreed upon by the Panel:
L j
Task Responsibility 1.
Determine if there are any MCIAP items which Ourr (DRS) need to be reclassified as restart issues l
E.
Develop scope and schedule outline for the Boger(NRR) li 20P review
(
L 3.
Initiate Task Interface Agreement for the Gallo(ORS) l E0P review r
I f
l i
i 8812120269 881208 '
- / s POR FOIA
/ //
l JOHNSON 88-190 PDR l
s Memoraadum for William T. Russell 2
Task Responsibility 4.
Call R. Ledgett and obtain firm dates for Wiggins (DRP) submission of restart plan appendices and power ascension program 5.
Provide presentation, at the next panel Shanbaky (DRSS) meeting, of the status (including issues and heading) of BEco's Health Physics Program 6.
Develop organizational structure for the Blough (DRP)
Integrated Assessment Inspection Team 7.
Provide NRR the agenda for the October 29 B)sugh (DRP) public meeting the Ouxbury Selectmen 8.
Update the NRC Restart concerns list Wiggins(DRP)
Durr (DRS)
Bellamy (ORSS)
Pending BECo's submittal of the Restart Plan, the Panel tentat scheduled the next i
U Okbd samuelJ. Collins,DeputyDirecte.-
Division of Reactor Projects
Enclosure:
As stated
.I l
l i
~ '
Memorandum for Williao T. Russell 3
cc w/ enc 1:
T. Murley, NRR F. Miraglia, NRR R. Starostecki, NRR S. Varga, NRR B. Boger, NRR R. Wessman, NRR r
J. Roe, NRR J. Hannon, NRR W. Regan, NRR T
' 1,'. Cangela'
- 15. LlayEo,
J. Allan, RI i
W. Kane, RI i
J. Wiggins, RI T. Martin, RI i
J. Durr, RI R. Bellamy, RI l
A. Blough, DRP L. Doerflein, RI R. Fuhrmeister, RI l
J. Lyash, RI - Pilgrim
(
T. Kim, RI - Pilgrim p
C. Warren, SRI - Shoreham i
I i
i e
l 1
}
)
1 1
~.
., 4 i
ENCLOSURE i
Agenda for the October 8, 1987 Pilgrim Restart Panel Meeting 1.
Review BECo's conduct of the refueling i
2.
Review and update Restart concerns list with respect to: (ORP/0RSS/NRR) l Recent inspection results WISHLIST schedule i
3.
Discuss how BECo's Restart Assessment Plan will be reviewed within the NRC t
4 Discuss the structure and scheduling of the Restart Integrated Assessment l
Team Inspection l
l 5.
Oebrief of Commissioner Bernthal's Visit (SJC) ii j
6.
Discuss results/ impressions of 10/8 meeting with the State 1
7.
Discuss the sch.Juling/ conduct of future public meetings.
1 5
}