SEP 2 6 Igeg U.S. NUCLEAR REGULATORY COMMISSION No.89-154 REGION I NOTICE OF SIGNIFICANT LICENSEE MEETING Licensee:
Boston Edison Company Facility:
Pilgrim Nuclear Power Station Docket No.:
50-293 Time and Date:
11:00 a.m., Friday, October 6,1989 Location:
Sheraton Inn, Plymouth, Massachusetts
Purpose:
Systematic. Assessment of Licensee Performance (SALP)
Management Meeting NRC Attendees:
W. Russell, Regional Administrator S. Collins, Deputy Director, Division of Reactor Projects-(DRP)
J. Johnson, Chief, Projects Branch No. 3, DRP R. Blough, Chief, Reactor Projects Section 3A, DRP D. Wessman, Director, Project Directorate I-3, NRR D. Mcdonald, Project Manager, PD I-3, NRR C. Marschall, Senior Resident Inspector T. Kim, Resident Inspector C. Carpenter, Resident Inspector Licensee Attendees: S. Sweeney, Chairman and Chief Executive Officer K. Guscott, Director and Chairman, Nuclear Operations Review Committee R. Bird, Senior Vice President, Nuclear K. Highfill, Vice President, Nuclear Operations and Station Director E. Wagner, Vice President, Nuclear Engineering G. Davis, Vice President, Nuclear Administration R. Ledgett, Director, Special Projects R. Anderson, Plant Manager R. Swanson, Regulatory Affairs Department Manager R. Varley, Emergency Preparedness Department Manager F. Famulari, Quality Assurance Department Manager D. Long, Plant Support Department Manager D. Eng, Planning and Outage Manager N. DiMascio, Radiological Protection Section Manager L. Olivier, Operations Section Manager G. Stubbs, Maintenance Section Manager E. Robinson, Nuclear Information Division Manager R. Fairbank, Nuclear Engineering Department Manager P. Antonopoulos, Engineering Analysis Section Manager H. 0heim, Design Section Manager R. Kirven, Power Systems Division Manager 0FFICIAL RECORD COPY LIC MTG NOTICE 89-154 - 0001.0.0 09/25/89 8910030515 890926 PDR ADOCK 05000293 Q
____---_____-___-__-____A
- ~
4 SEp t o W Note: Attendance by NRC personnel at this meeting should be made known by 4:00 p.m., October 2, 1989 via telephone call to A. Randy Blough, Region I, at FTS 8-346-5146 or (215) 337Dhh SIGED BY Prepared by:
A. Randy Blough, Chief, RPS 3A Distribution:
J. M. Taylor, Acting Executive Director for Operations Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations'and Research H. Thompson, Deputy Executive Director for Materials Safety, Safeguards and Operations Support B. Grimes, Director, Division of Reactor Inspection and Safeguards, NRR J. Lieberman, Director, Office of Enforcement T. Murley, Director, Office of Nuclear Reactor Regulation F. Miraglia, Associate Director for Inspection and Technical Assessment, NRR S. Varga, Director, Division of Reactor Projects - I/II, NRR B. Boger, Assistant Director for Region I Reactors, NRR D. Wessman, Director,. Project Directorate I-3, NRR D. Mcdonald, Project Manager, PD I-3, NRR
.J. Dyer, Regional Coordinator, EDO Public Document Room (PDR)
Local Public Document Room (LPDR)
Commonwealth of Massachusetts (2)
NRC Resident Inspector W. Griffin, Plymouth Board of Selectmem Honorable William B. Golden, Massachusetts State Senator 0FFICIAL RECORD COPY LIC MTG NOTICE 89-154 - 0002.0.0 09/25/89
l{'4:: ',,Qj-a d.. 's * - *
- 3 SEP 2 6 fgeg bec
- ,
3 Regional. Administrator-
~ Deputy Regional Administrator Division Directors-Branch. Chiefs Section Chiefs-Public. Affairs Officer (2 copies)
J. McGrath, RI-M. Miller,-RI'
'J..Gutierrez,. RI.
D. Holody, RI.
Region I Receptionist DRMA Files DRP Files.
' Bulletin Board M. J. DiDonato, DRP
.)
t-.
I l
1 l
l i
RI:DRP.
21onauski/meo B1 ugh
.i 9/25/89 9M O FICIAL RECORD COPY LIC MTG NOTICE 89-154-- 0003.0.0 09/25/89 3