Text
E
~'}
UNITED 874N8 NUCLEAR AEGUs.ATORY COMMISSION ge,y)i
- CASHINGTSN, D. C. 30646 '
j FEB 5 1990' i
HEMORANDUM FOR:
Chairman Carr Comissioner Roberts i
Comissioner Rogers Comissioner Curtiss Comissioner_ Remick FROM:
James M.' Taylor i
Executive Director for Operations i
l
SUBJECT:
COMPLET10N OF PILGRIM NUCLEAR POWER STATION POWER ASCENSION I
PROGRAM l
l The staff has completed its review of the performance of the Boston Edison 1
Company during operation of the Pilgrim Nuclear Power Station Power Ascension Program, including operation at full power. The results of this review,;along-l with the status of emergency preparedness for the comunities surrounding the facility, are shown in enclosures to the attached draft letter to Boston Edison, Please note that the staff intends to issue!s n or about February 9.- 1990, the o
- attached letter to: (1)acceptthelicensee completion and final assessment i
of the Power Ascension Program and (2) close out Confirmatory Action Letter 86-10. Accordingly, the staff would end its special NRC_ Restart Staff'inspec-i tion program and NRC Restart Assessment Panel oversight of Pilgrim.
- However, NRC attention to Pilgrim will remain' above that typical of ~a single unit ' site.
For example, a staff of three resident inspectors and enhanced technical and management attention will be devoted to the site until the staff has determined that NRC ovb sight can be reduced to that normally devoted to a single Unit site.
In order to keep the Comission apprised of off-site Emergency Preparedness I
(EP)' issues, the staff plans to provide status reports, initially on about a l
quarterly basis. The repor'- format will be similar to the EP status sumary provided herein. As in the past, the information will be gathered in coordination i
with the local communities.
This action has been coordinated with the Office of the General-Counsel, which 4
has no legal objection to this action.
l/f '
\\
~
ne ecutive Di ector for Operations 1
Enclosure:
Draft Letter to Boston Edison Company 1
cc w/ enclosure:
SECY OGC d//
m
DRAFT o
i ATTACHMENT i
Docket No. 50-293 Boston Edison Company ATTH: Mr. Ralph G. Bird
'i Senior Vice President - Nuclear Pilgrim Nuclear Power Station Rocky Hill Road i
Plymouth, Massachusetts 02360 l
i Gentlemen:
a subject: Completion of the Power Ascension Program and Closure of Confirmatory
)1 Action Letter 86-10
References:
(1) Boston Edison Power Ascension Test Program, dated August 31,1988; updated October 27, 1988 (2) Confirmatory Action Letter 86-10, April 12,1986 and-l Supplements dated August 27, 1986 and December 30, 1988-i (3) Pilgrim Nuclear Power Station Final Assessment Report dated December 14, 1989 i
This letter provides NRC acceptance of Bostoh Eatsc Company's (BEco) comple-i tion and self-assessment of the Power Ascension Test Program and satisfaction of NRC Confirmatory Action Letter 86-10 and its supplemer.?s.
This letter also serves to close Confirmatory Action Letter (CAL) 86-10 reterence(2). This-
-letter neither imposes any new requirements nor release,s Boston Edison from any existing requirements contained in the Facility Operating License or Technical Specifications. The staff finds that management performance, plant material condition and operational performance support proceeding with normal operation 3'
of the facility.
The bases for approving the completion of the Power Ascension Program and re-lease from CAL 86-10 consist of: (1) successful completion of the-Power Ascen-i sionProgran;(2)acomprehensiveassessmentofplantandpersonnelperformance by BEco during this phase of plant operation; (3) Final Assessment Report (FAR) submittal by BEco and review of the FAR by the NRC; and (4) HRC staff inspec-tion and review activities which have confirmed the effectiveness of. both the staff and management of BEco during~this phase of plant operation in assuring safe operation of the facility. Enclosure 1 is a surinary of NRC findings which either have been or will be documented in NRC inspection reports.-
However, NRC Staff identified the following three areas in particular from your FAR that are key to long-term improvement and will therefore place special.
i emphasis on these areas in our future review-of your licensed programs: (1) Pro--
i cedure Upgrade Programs, (2) Procedure Adherence, and (3) Management Oversight and Critical Self-Assessment.
With regard to Procedure Upgrade-Programs, at 1
i
'8 Y
.t.
E the January 4,1990 management meeting, the NRC Staff and BECo agreed that the E
stocedure upgrade schedule in Attachment 2 of the Final Assessment Report will i
se schedular commitments to the NRC.
NRC attention to Pilgrim will rem in above that typical of a single unit site.
T For example, a staff of three resident intpectors and enhanced technical and u nagement attention will be devoted to the site until the staff has determined that NRC oversight can be reduced to that normally devoted to a single unit site.
Additionally, the current status of emergency preparedness for the communities surrounding the Filgrim Station Commission, is shown in Enclosur,e 2.as compiled by the staff and reported to the We continue to encourage cooper &tive and expeditious action by Boston Edison, the Commonwealth of hssachusetts and Incal goverr. ment
- to further improve the state of emerge, icy prcparedness for T
the area surrounding the Pilgrim facility. The NRC staff intends to periodic.
ally advise the Commission regarding the status of off-site emergency pre-paredness.
No reply to this letter is required.
Should you have questions, please contact i
the NRC Region 1 office promptly.
Sincerely, I
William T. Russell Regional Administrator
Enclosures:
As stated
ENCLOSURE 1 ASSESSMENT OF LICENSEE'S COMPLETION AND FINAL. ASSES $ MENT 0F THE POWER A$CENS10N PROGRAM AND READINESS FOR CLOSE0UT OF J
CONFIRMATORY ACTION LETTER 86 10
===1.
Background===
NRC Confirmatory Action Letter (CAL) No. 86-10 of April 12, 1986 and the August 27 1986 supplement identifiert specific technical issues to be re-solved prior to facility restart.
In addition, due to other loneterm management, hardware and program issues, Boston Edison Company (BEco) sub-I mitted a formal power ascension program to the NRC. As specified in the licensee's NRC-accepted Power Ascension Test Program, the program included NRC Regional Administrator approval points at St. 255, 501, 76% of full power, as well as requiring a licensee formal assessment and NRC rey!ew i
after completion of the Power Ascension Program, which includes testing at t
full power.
i By letter dated October 6,1989,ized BEco to proceed beyond the fif th\\
strator for NRC Region 1, author approval point and conduct power operations up to full power.
By letter dated December 14 1989 the NRC received the licensee's Final Assessment Report. This enclosure,provides (1) the NRC's assessment of the licen.
see'sperformancesincethelastholdpoint;(2)resultsoftheNRCRestart l
Staff review of the Final Assessment Report; and (3) results of the NRC i
Restart Assessment panel review of the completed Power Ascension Program.
- 11. gronology of Significant _ Plant Events -
October 6, 1989 Licensee received NRC agreement to proceed i
l from fifth NRC approval point.
{
October 7 & 12, 1989 On October 7, 1989 with reactor power at about 895 and subsequently on October 12, 1909 with reactor power at.1005, the "A' recirculation motor generator (M G) set a
tripped when both the motor drive breaker and the generator field breaker opened, in t
both instances, reactor power stabilized at about 601 following each transient. The i
scoop tube on the A" M G set remains locked j
up at this time and the licensee is continu.
ing to troubleshoot the'M-G set.
October 10, 1989 Pilgrim plant reachad 1005 power.
,m----,
.,...-.w,
-g-
.. -. - - ~, - -
- t'.
October 12-13,1989 The licensee conducted a full scale emergency preparedness exercise on October 12-13, 1989. Assessment by the NRC determined that the on-site portion of the drill was success-ful and licensee actions would have pro.
tected the public health and safety.
October 13, 1989 Licensee successfully completed second phase (hotstandbytocoldshutdown)ofShutdown fromOutsidetheControlRoom(SDOCR) test.
October 13 -
Licensee successfully conducted a mini outage 1
November 6, 1989 to perform scheduled maintenance and surveil-lance activit,ies for the plant, a
November 6, 1989 The Pilgrim plant was taken critical at 12:08 p.m.
The plant was limited to 941 gowerduetoinconsistentperformanceofthe A' recirculation motor-generator set speed y
control mechanism.
December 6, 1989 Following a minor modification to the 'A' recirculationmotor-generator-(MG) set speed control circuitry, the M-G set tripped with the reactor power at about 975 when the t
generator field breaker opened due to gene-rator field undervoltage. The reactor stabilized at about $$$ of rated power. power Licensee troubleshooting identified'a failed 1
resistor in the M-G set voltage regulation circuitry and a degraded resistor in the M-G set speed control circuitry which might have caused the M-G set trip. After replacement of the resistors and testing of additional components, the "A" recirculation M G set was returned to service.
December 8, 1989 Automatic reactor scram from about 955 power on a false low reactor water level signal during calibration of a reactor vessel level instrument.
The scram occurred while Instrumenti Con-trols technicians were restoring the level instrument to service. When an isolation:
valve to the instrument rack containing the "A" and "B" reactor. level and pressure transmitters was opened, a pressure spike 'n s
{
s
?
T
. ~,,. ~ _..,
3 the common variable leg caused the lower reactor water level scram signal. There was no actual low water level condition.
December 11, 1989 The plant was returned to service. Power reached about 95% on December 14, 1989, and remained there because the electrical grid load dispatcher requested the plant to defer a power reduction to adjust the control rods to their full power pattern.
December 14, 1989 Test program was completed at the 751 to full power plateau as described in the_ August 31, 1988 Pilgrim Nuclear Power Station Power
. Ascension Program.
One operation originally scheduled for the 100% power plateau (the recirculation pump motor generator scoop tube position deter-mination)hasnotbeencompleted. This operation will be performed at a later date.
The licensee revised the Power Ascension Program to reflect this change in accordance with the process set forth in the second Supplement to CAL 86 10.
December 14,1989 Licensee submittal of Pilgrim Nuclear Power i
Station Final Assessment Report to t!P.C.
This report summarizes the results of the self-assessments and evaluations which Boston Edison has conducted throughout im-plementation of the PNPS Restart Plan and Power Ascension Program.
January 2, 1990 The plant reached full power.
January 4, 1990 The licensee presented results of'the Power Ascension Program, with em)hasis on the 75%
to full,ower plateau to tie MRC Pilgrim Restart Assessment Panel. This sresentation was at a management meeting whic) was open to the public.
111. Staff Evaluation 1.
.The NRC Restart Assessment Panel considered the following in evaluat-ing the conduct of the Pilgrim Power Ascension Test Program and con-sidering approval of normal operation of the facility:
l 1
e 4-4.
Plant status and equipment operability; b.
Management / personnel performance and oversight acC ities:
c.
Power Ascension Test Program adequacy I
d.
Power Ascension Test Program results e.
NRC Inspection program status.
2.
Staff assessment, updated tarough January 15, 1990, of licensee per-formance durin Test Program. g the 75% to full power plateau of the Power Ascension
?
a.
Plant Status and Equipment Operability The licensee has determined and the NRC is satisfied that e ment required for normal full power operations is operable. quip-i When equipment inoperabilities have occurred the licensee has handledtiemconservativelyandwithinTechnIcalSpecification requirements. One equipment problem identified during the Power Ascension Test Program remains unresolved: the tripping of the "A" recirculation sump motor-generator (M G) while in manual-remote mode at hig1 flow conditions. On October 7, 1987 with reactor power at about 895, on October 12,1989 with rea nor at 100f and subsequently on December 6,1989 with reactor at about-t 971, the M-G set tripped when the generator field breaker opened due to generator field undervoltage.
Each time, reactor power stabilized at about 55% to 60% of rated power following the 1
transient. 1.icensee investigation and troubleshooting have failed to identify a conclusive reason for these M-G set triss.
The "A" Recirculation M-G set scoop tube is " locked up" at tiis time.
4 On January 11, 1990, one of the five deep draft salt service water pumps was dropped about one foot to the ground after re-
?
l moval from the system as it was being positioned for mainten-ance.
The drop caused brittle fracture of one of the pump's 1
five eight-foot shaft casing columns. Based on the design mate-l rial properties on the column it should have failed in a duc-i tile manner if at all. The IIcensee is conducting an expedited-evaluation o,f this event and also plans to inspect.the other four pumps once the fifth is~ repaired. The licensee is confi-dent that the stress of the drop was significantly higher than any combination of design stresses for an installed pump and is completing. confirmatory calculations. However the licensee has-indicatedthat,shouldoneofthefourin-servIcepumpsfailand a similar column failure cannot be ruled out as the cause..the o
j t
plant will 'oe promptly shut down (i.e., within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />).
Nor-mally. :, seven day Technical Specification Action Statement wo,Id apply. NRC Region 1 is closely following licensee activi-i
- ties, i
Required non safety-related equipment is in a condition that supports safe plant operation.
Surveillance tests are up to-date with no significant identified discrepancies. -The licen-i see's management review of facility operation up to full power operation is complete.
Operation of the facility was conducted
)
in a safe manner and concerns raised by the NRC and BEco manage-ment regarding facility operations were appropriately addressed.
j in sumary, the NRC Restart Assessment Panel is satisfied that equipment required for continuation of normal full power opera-tion is operable, b.
Msnagement/ personnel Performance and Oversight' Activities I
r The NRC Restart Staff has continued to monitor management and personnel performance since start-up. BEco management has been generally responsive to NRC concerns and has acted in a cautious, deliberate manner.
Licensee peer evaluators were observedandhavebeenprovidinggoodfeedbacktoplantper-sonnel. Operators were general y knowledgeable of their duties and plant conditions and management maintains an active and effective oversight of operations.
Operators responded very well to events that occurred during this phase of the PATP.
These events included three recircula-tion pump motor-generator trips and one reactor scram.
The Restart inspection Staff observed Phase !! of the licensee's i
ShutdownfromOutsidetheControlRoom(SDOCR) test. The licen-see's preparation, comunications, and comand and control were excellent. Test personnel were aware of their re,sponsibilities, skilled in their assil)nments,. and demonstrated excellent plant knowledge, quick thin ting and effective teamworke Frompreparationthroughexecution,thistestwasferformedin a safe and satisfactory manner. Phases'l and 11 o the Shutdown-from Outside Control Room Demonstration were two cases of exem-plary performances by the licensee's operations department dur-ing the PATP.
During the 75% to.100% power plateau, management performed in a-generally cautious deliberate manner. Management was observed maintaining an active oversight of operations and actively l
+
P
-6o involved in decision making.1.icensee evaluation and critique of events continue to be comprehensive and properly focused, demonstrating a safety conscious attitude.
From October 13 through November 6,1989 - the licensee conducted amini-outageinordertoperformschedu!edmaintenanceandsur-veillance activities. The NRC Restart Staff determined that overall the October mint-outage was conducted in an extremely professional,well-organizedandconservativemanner.
Particu-larly noteworthy were the conservative management decisions made at several junctures during the outage. Operations staff cogni-rance of maintenance activities during the outage was superior to that observed during the preceding nine months of the PATP.
During this assessment period, the NRC Restart $taff audited selected tagout documents generated during the October mainten-ante outage. The audit consisted of about fif ty completed tag-outs and five active tegouts.
Review of the tagouts revealed that over 80% of the tagouts contained some error or omission.
Over 30% of the reviewed tagouts had significant errors such as tags hung or cleared by individuals other than those specified on the tagout and, in one case, tags cleared without Nuclear Watch Engineer signature.
In a sampling of approximately ten tagouts involving work which required the lif ting of leads or the installation of jumpers over 50% of the jobs were not entered in the lifted Lead a,nd Jumper Log. Four of the in-stances noted involved the replacement of safety related com-ponents (e.g. Reactor Level Transmitter; Diesel Generator Emer-gencyStartRelay).
The licensee confirmed the NRC findings, identified possible causes and has detailed a corrective action and prevention pro-Included as part of this program is the promulgation of a gram.
new procedure requiring periodic tag audits and a one-time Qual-ity Assurance tagging audit to be completed early in 1990.
It should be noted that no hardware problems were identified (e.g.
tags were hung on the correct valves). Licensee follow up of this issue has been appropriate.
These findings confirm previous NRC assessments that have con-ciuded that, while performance is acceptable and continues to improve, the areas of. procedural adherence and attention-to-detail require continued licensee management attention and NRC monitoring.
The NRC Restart Assessment Panel has concluded that the licensee management and plant staff performance support continued full power operation.
')
1
y_
7 l
c.
Power Ascension Testing Program Adequacy The licensee's Power Ascension Test Program was completed in 4
accordance with the licensee's comitments doce mented in the December 30,ignificant problems or technical issues were out-1988 supplement to Confirmatory Action Letter 86-10. No s i
standing as a result of implementing this program.
One operation originally scheduled for che 100% power plateau, the rectreulation pump motor generator scoop tube position de-termination, has not been completed. This operation will be performed at a later date.- The licensee revised the Power Ascension' Program to reflect this change in accordance with the process set forth in the second Supplement to CAL 86-10. The Staff has reviewed this change during routine inspection and.
found it acceptable.
The licensee successfully completed the second phase of the Shutdown from Outside the Control Room Demonstration on October 13, 1989.
The first phase of-the SDOCR de:nonstretion had been Successfully completed on June 29, 1989.
d, power Ascension Test Program Results The NRC is satisfied that tests and conditions required to be completed by the licensee during performance of the NRC-accepted Power Ascension Program up to full power have been completed.
Satisfactory results were achieved during-the performance of:
)
t Reactor Engineering Testsh Drywell Temperature Profile Measurements; j
ShutdownOutsidetheControlRoomDemonstration(Phase 11).
Also, the NRC evaluated licensee management and plant staff per-formance during planned periods of normal operations at about full power and during the maintenance mini-outage.
During this period licensee management had, as planned, reduced the level of oper,ations oversight.
The NRC panel has concluded that plant operations are being conducted safely and conservatively.
The NRC has reviewed BEco's actions in response to inspection findings which had potential to impact further reactor opera-tions and found no outstanding issues which would preclude-the
, licensee from proceeding with normal full power operations.
h I
--..w
..n-,
-4.,_,---
,.swn, v,
-.,p
-,c..
., y
3 e.
NRC Inspection Program Status With the acceptance of the licensee's completion and final assessment of the Power Ascension Program and close out of Con.
firmatory Action Letter 86-10, the NRC Staff will end.its special NRC Restart Staff inspection program and NRC Restart i
Assessment Panel oversight of Pilgrim. However, NRC attention to Pilgrim will remain above that typical of a single unit site.
A stafd of three resident inspectors and enhanced Region I and NRR technical and management attention will be devoted to the site.
l There are no open allegations at Pilgrim affecting a reconnenda-tion to approve continued normal full power plant operation.-
There are no enforcement actions pending which would preclude continued plant operations.
NRC Re ion ! Inspection Report 50-293/89-12 details one violation LevelIV)concerning i
deviations from the procedural requ rements of.the newly revised tagout )rocedure. However, the Panel has determined that in.
itial slort-term corrective actions for this issue are suffi.
cient. Therefore, the panel concludes that there are no pending enforcement issues whic) would preclude operations up to full power.
3.
ReviewofLicenseeCompletionofPowerAscensionTestProgram(PATP).
Performance of a Final PATP 5 elf-Assessment, and 5atisfaction of Confirmatory Action Letter (CAL) 8610 The Staff also performed a retrospective overall review and evalu-ation to assess whether the licensee has successfully and effectively completed the Power Ascension Test Program,-has performed a meaning-ful and critical self-assessment and is making appropriate short-term and long-term use of lessons learned.
In the course of this review the statf placed special emphasis on assessingt (1) the licensee's,
l plans and measures for transition from the Power Ascension Program to lessonslearnedIn(2)thelicensee'smeasuresforincorporating normal operation topermanentprograms,and(3)thelicensee'splans for continued self evaluation, self-assessment, and self-improvement.
During its deliberations, the Staff evaluated whether-the licensee had fully satisfied CAL 86-10 and whether the CAL should be closed out.
3.1 Background
The Second Supplement to Con'irinatory Action Letter'(CAL) 86-10 was issued December 30,1988 as a letter from William T. Russell:(NRC Region 1) tor.G. Bird (BEco). This supplement indicated that CAL conditions had been satisfied up to the point of carrying out plant restart and power ascension, and that successful implementation of
o )
i the Power Ascension Test Program (PATP) was necessary for final closeout of the CAL. The supplement further indicated that following 4
completion of the PATP and licensee submittal of a report the staff wouldformitsindependentconclusionregardingprogrameffectiveness and would consider final closure of CAL 86-10. The licensee con.
cluded that the PATP was successfully completed and submitted their FinalAssessmentReport(FAR)ofthePATPonDecember 14, 1989.
)
3.2 Review of Final Assessment Report i
As part of its review of PATP completion and program effectiveness the NRC staff reviewed and evaluated the licensee's FAR. Thestaff's 4
review was coordinated through the NRC Pilgrim Restart Assessment i
Panel and included the following:
i r
(
review of the FAR by. Panel me.mbers and other stafft discussions with licensee personnel; i
selected review of FAR back-up material and supporting documents maintained by the licenseen comparison of licensee evaluation and conclusions to NRC inspec.
tion and review findingst and l
a management meeting wi th, the licensee on January 4,- 1990.
in addition, the staff conducted a small number of confirmatory in-spection activities directly related to FAR issues. These will be reported in NRC Inspection Report 50-293/89-13.
The need for these confirmatory inspections af ter NRC receipt of the FAR was. minimal in view of the extraordinary inspection efforts that had been applied throughout the PATP.
The staff concluded that the FAR represents an acce) table self-assessment and indicates successful completion of tie PATP. The con-tent of the FAR is sumary rather than detailed. }iowever, it is well supported by backup documentation maintained by the licensee.
The licensee managers are knowledgeable n,J well-versed in the issues i
involved'-- they were able to provide detailed answers to staff cues-
)
tions during the management meeting and other staff questioning tur-ing the PATP. The licensee FAR provides a slightly more positive view of overall performance than NRC inspection documentst however, L
the difference is not significant. The. licensee's finel assessment agrees closely with the staff's assessment regarding safety signi-ficarit areas to be tar management attention. geted for-further improvement and continued The FAR also identifies needs for streamlining administrative processes for the sake of efficiency; licensee plans for approaching these areas include measures to preclude degradations in the level of safety assurance. This will be evaluated in the 1
course of future routine inspections as the' licensee develops spect-fic changes.
l l
l' l'
i j
)
10 The FAR provides a set of integrated lessons learned and sumarires
' I licensee measures to sustain performance improvements through per-manentandlongtermprograms. The staff concludes that the licensee 1
i has appropriately identi'ied measures for sustaining improvement.
The NRC Staff identified the following three areas En particular that are key to long-term improvement and will therefore place special i
emphasis on these areas in our future reviews' i
Procedure Upgrade Programs;.
Procedure Adherences and Management Oversight aMIritical Self-Assessment.
With regard to Procedure Upgrade Programs,icensee agreed that th at the January 4,1990 management meeting the NRC staff and the l procedure upgrade schedule estimates in Attachment 2 of the FAR are BEco schedular comitments to NRC.
In sumary the staff concludes that the licensee has completed an effectivefinalself-assessmentofthePATPandprovidedanaccept-able report to the NRC.
3.3 Power Ascension __ Test Program Completion Previous NRC assessments have documented satisfactory licensee com-l 4
pletion of the PATP up to the 755 approval point.
Staff inspection and review activities have now concluded that-the licensee.has com-pleted the PATP through full power, including plant power ascension, testing, periods of normal operation ~and a management assessment.
Where the licensee has made changes to the details of the program, they have met the NRC staff stipulations in the CAL 86-10 Second Supplement, dated December 30, 1988.
NRC inspection activities re-lated to the final phase of the PATP, operation to full power, will i
be documented in NRC Inspection Reports 50-293/89-12 and 89-13.
t Based on these reviews and on staff review of the FAR described in I
paragraph 3.2 above the staff concludes'that the licensee has suc-l cessfully completed,the PATP.
3.4 Licensee $atisfaction of CAL 86-10 The CAi. 86-10 Second Supplement indicated that successful completion of the PATP was necessary for final closeout of CAL 86-10. As dis-cussed above, the. licensee has'successfully completed the PATP and submitted an acceptable report. Although performance lapses and weaknesses have occurred, the extensive licensee efforts since origi-nel issuance of CAL 86-10 have resulted in significantly improved safety performance when conpared to historical performance prior to the CAL.
Further, the licent; e has in-place an organization and pro-grams capable of using self-nsessment processes and-lessons learned to sustain and enhance performance.
l
.y, y
- - - - -. ~
w e
ea,-w e
-a,..v--
e
q
, Therefore, the staff concludes that CAL 86-10 may be closed.
The staff intends to maintain above-normal attention at the Pilgrim facility. This includes above normal inspection oversight, provided in part by three resident inspectorst as well as above-normal atten-tion to Pilgrim by NRC line management. This attention will be evaluated and adjusted as necessary in future years based on_the facility's long-term safety performance.
IV. Conclusion l
The NRC Restart Assessment Panel met on January 4, 1990 to review the lic-ensee's completion of the Power Ascension Program and the Final Assessment Report. Boston Edison Company (BEco) had com)1eted the Power Ascension Program and submitted their Final Assessment leport.of the Power Ascension Program on December 14, 1989.
The NRC Staff reviewed the licensee's Final Assessment Report and concluded that the Final Assessment Report repre-sents an acceptable self-assessment and indicates successful completion of the Power Ascension Program.
In addition, Staff inspection and review activities have now concluded that the licensee has completed the Power Ascension Program. The Confirmatory Action Letter 86-10 Second Supplement indicated that successful completion of the Power Ascension Program was necessary for final close out of CAL 86-10. Based on the above, the Staff concludes that CAL 86-10 may be closed.
The NRC also concludes that with the completion of the Power Ascension Program,submittaloftheFInalAssessmentReportandcompletionofthe i
conditions of CAL 86-10, the work of the NRC Restart Staff and NRC Restart Assessment Panel is complete.
However NRC attention to' Pilgrim will re-mainabovethattypicalofasingleunItsite. A staff of three resident t
inspectors and' enhanced technical and management attention will continue to be devoted to the site, t
l' l
\\
l a
R l
1 ENCLOSURE 2 s
Current Status of Emeroenev Preparedness for the Communities Surroundino the Pilarim Station Progress continues to be noted in the state of emergency preparedness for Pilgrim in the successful conduct of the full-participation exercise on October 12-13, 1999, completion of renovations for the Massachusetts Civil Defense Agency (MCDA)
Area !! Emergency Operations Center (EOC) and Wellesley Reception Center, continued resolution of Reception Center issues, and the continued active and visible involvement in the review process by the Federal Emergency Management Agency (FEMA).
The full-participation exercise was conducted or OctobeN12-13, 1989.
Each of the towns, ie., Carver, Duxbury, Kingston, Marshfield, Plymouth, Bridgewater and.Taunton'fu?ly participated.
l Additionally the Commonwealth of Massachusetts Civil Defense-l Agency, Massachusetts State Police, Massachusetts 9epart6ent of l
Public Health, various State Agencies (with repress 9tatives in the EOC), selected National Guard units, and Plymouth Coutsty fully participated.
FEMA observeo c11 activities.
PrelimAnary j
oral results presented by FEMA at a public meeting conducted un October 16, 1989 indicated that no major problem areas were identified.
Subsequent information from FEMA indicates that deficiencies will be issued against Massachusetts regarding the timing end content of Emergency Broadcast System (EBS) messages and command and control of-the Massachusetts EOC.
- currently i
anticipates issuing the deficiency report about January 31, 1990 and will require that Massachusetts demonstrate these areas in a eemediel exercise within about 60 days.
FEMA has given February 28, 1990 as the current schedule to issue the draft exercise report.
In Plymouth, 91 of 92 implementing procedures have been approved in concept by the Domrd of Selectman and all have been forwarded j
to MCDA for review.
Plymouth has requested technical assistance from MCDA regarding the school procedure.
A11= implementing procedures encept for the school procedure have been f orwarded to FEMA for technical review.
FEMA has not' completed its-review.
In Duxbury, all implementing procedures have been forwarded'to MCDA and FEMA for technical review.
FEMA has not completed its review.
In an agreement with MCDA,'Duxbury has taken the lead in
)
identifying and preparing plans'and implementing procedures for host schools et the Wellesley Reception Center.
Preliminary meetings have been conducted with the'Needham School System (loc +ted near the Wellesley Reception Center) to exchange i
information, and additidn~alimeetings are. scheduled.
J 1
j e
In Morohflold, the tcwn 10 cCnoidoring nocing o h00t Cch:31 within thy town bord 3ro, but greater than 5 miles from the Emergency Planning Zone.
MCDA opposes this action.
A meeting is scheduled between Marshfield, MCDA and BECO planners on 1/17/89 I
to discuss this issue.
There are no other major issues identified.
The other towns,'ie., Carver, Kingston, Marshfield, Bridgewater
)
and Taunton, have received a copy of FF.MA technical review comments concerning their emergency plans and implementing procedures.
There are no major issues identified and the towns
?
are in the procens of addressing FEMA comments.
Additional ernurgency plan and implementing procedure revisions are anticipated to address FEMA issues concerning exercise i
performance.
Each town provitled suf ficient staf f to conduct the exercise.
1 Personnel to staff those vacancies that still exist are being ectively pursued.
I Each town completed sufficient training ta adequately prepare and participate in the enercise.
Refresher training will be conducted in 1990.
This training will be similiar to that provided in 1989, but will capture revisions made to resolve areas identified as needing corrective action as a result of the uxercise.
The revisions and resultant lesson plan revisions are dependent upon the issuance of the FEMA exercise report.
Progrens continuou on the reception centers.
In Taunton, the reception renter is fully operational and was fully demonstrated during the exorcise.
Renovations to enhance operations are in t
progrets and are scheduled to be completed by April 1,
1990.
In Bridgewater, all equipment is in the town and available for use at the reception center.
Staffing is complete except for Monitoring and Decontamination Staff.
Bridgewater has officially requettud MCDA at.Listance in this crea es they can not support that function.
MCDA anticipates utilizing a local National Guard unit for this function.
Renovations at the Bridgewater State Collega have commenced, but are presently on hold pending resolution of the Monitoring and Decontamination staffing problem.
Bridgewater conducted a walk-through of the reception center during the cuercise.
In Wellesley, renovations are essenticlly r:omplete for the EOC and decontamination facilities.
All equipment is stored at the facility.
Red Cross has identified mess care facilities and is scheduled to conduct a detailed thulter' survey.
Parting is available onsite as well as at the Sun, Life company and the Massachusetts Bay Community College.
Transportation hou been arranged for shuttle service 1eom the remote parking areas.
All areas are essentially fully ateffed.
The Emergency Plt.n and 20 of 21 Implementing Procedures.
have been drafted.
MCDA has tentatively given June 1, 1990 as the dote t he reception center will be' f ully functional, including 2
complotion of renevotions, picnning, otoffing cnd trotning.
The Public Information Brochure has been published and distribution was completed by September 30, 1989.
BECO is working with MCDA to publish the telephone number for Telephonic Devices for the Deaf (TDDs).
The special needs survey has been completed.
The results indicate that the expected number of individuals needing special essistance is consistent with published federal guidance.
BECO is wori:ing with MCDA to enhance the self-identification of special needs individuals.
The staf f has continued to attend planning meetings with town
' Civil Defense Directors, local elec ted of ficials, Commonweal th and MCDA Area !! officials that discuss the status of off-site emergency preparedness.
FEMA continues to be actively involved with the Commonwealth and local towns, attending many meetings and wori: sessions, as well as the bi-monthly planning meetings.
A Regional Assistance Cornmittee meeting was held on October 3, 1989 at which Commonwec1th and MCDA Area !! emergency plans and implementing procedures were reviewed.
The ettoched emergency preparedness summaries provide the January 5, 1990 status of selected emergency preparedness issues for each town surrounding the Pilgrim Station, the Commonwealth and MCDA Area 11 as compared to that of September 8, 1989.
The staff provided the summaries to the respective town officials through the Civil Def t nse Directors of each area and subsequently contacted occh official to verify the accuracy of the summaries.
3
l e
CARVER EMERGENCY PREPAREDNESS STATUS AS OF 9/8/89 AS OF 1/5/90 EMERGENCY PLAN FEMA comments to Carver's Renovations at the i
AND corrective action Plymouth Airport i
IMPLEMENTING response have been Emergency Worker FROCEDURES incorporated and the Monitoring and r
emergency plan revised as Decontamination Station of June 30, 1989.
Work are complete.
is underway to renovate Recruitment of volunteers the Plymouth Airport for to staff the facility is l
use as an Emergency underway.
There are no g
Worker Monitoring and other changes.
Det:ontamination Station.
This renovation includes showers and changing rooms end identification of staffing is in 1
progress.
TRAINING 7 5'/. o f the training goal Refresher training will has been completed.
One be conducted in 1990.
cession has been This training will be the conducted since July 20, same as offered in 1989 1989.
Prettical training and will capture (Hands-on Training) is revisions made to resolve 1
continuing.
Four areas identified as sessions have been needing corrective conducted and one is
&ction.
The IP revisions scheduled through and resultant lesson plan September 1989.
revisions are dependant upon the issuance of the FEMA cuercise report.
3 l
STAFFING A staffing survey No change.
conducted by Carver identified one additional i
position.
Currently 47 of 48 positions are filled.
Recruiting efforts are continuing for the remaining pot. i t i on.
EQUIPMENT The peger notification Pagers have been system has been delivered distributed.
and installed.
Pagers are currently being distributed.
i 1
4 1
EOC Fully operational.
Fully operational.
)
i i
EXERCISE The Pilgrim Nuclear Power Station full-participation exercise was held on October 12-13, 1989.
Carver fully I
participated in this exercise.
Preliminary findings presented orally by FEMA indicated that no significant problems were identified.
The FEMA exercise report has not been issued to date.
STATUS REVIEWED BY:
Helen Cenello, Deputy Civil Defense Director DATE:
denuary 11. 1990 By teleton with NRC C. Conklin.
No comments.
W r
5 i
6 4
DUXBURY EMERGENCY PREPAREDNESS STATUS AS OF 9/8/89 AS OF 1/5/90 EMERGENCY PLAN On July 28, 1989 the~ town FEMA has not completed AND of Duxbury voted to
.the review of Duxbury's IMPLEMENTING forward the updated Emergency Plan and PROCEDURES drafts of the Emergency implementing Procedures.
Plan and Implementing The Advisory Committee Procedures to MCDA.
They has reviewed 10 of 44 also requested MCDA to procedures.
Duxbury, in forward these drafts to an agreement with MCDA, FEMA for technical review has taken the lead in and ccmment-(and to be identifying host schools used for that purpose for the Wellesley only) and they were Reception Center and subsequently forwarded to developing plans.
l FEMA on August 8, 1989.
Initial meetings-with As of 9/8/89, the Needham School officials Advisory Committee has (the community near reviewed 6 of 44 Wellesley that has been procedures.
tentatively identified) 7 have been held.
)
TRAINING 53'/. o f the training goal Refresher training will has been completed.
be conducted-in 1990.
Practical-training This training will be the (Hends-on Training) is same as offered in 1989 continuing.-
Five and will capture vesulons have been revisions made to.rcsolve completed since.7/20/89 areas identified as and one is, scheduled-needing corrective through September 1989.
action.
The IP revisions and resultant lesson plan revisions are dependant upon the issuance of the r
i FEMA exercise report.
STAFFING 6 of 7 executive Duxbury was essentially-positions, 16 of 18 fully staffed for the operations positions, 11-exercine.
Some-vacancies l
of 12 tummunications still oxist and l
positions and 12 of'12 additional staff needs l
uopport positions are were identified during
~
L filled, for a total of 45 the exercise.
of 4R*.
Recruitment is-l l
continuing.
L I
EQUIPMENT ihe pager notification Radar for the 6
4 system has been installed harbormaster has been and the pagers are identified and scheduled for procurement is underway, distribution the week of School radios have not 9/11/09.
Five additional yet been received.
Some portable radios have been crowding was observed in identified as being the EOC during the needed by.the School exercise.
As a result, Department.
Procurement Duxbury has expanded some is underway.
EOC functions to existing second floor space.
Various equipment, telephones and furniture are required for this space.
i EOC Fully operational.
Fully operational.
j EXERCISE.
The Pilgrim Nuclear Power Station full-participation exercise was held on October iC-13, 1989.
Dunbury fully participated in'this exercise.
Preliminary findings presented orally by FEMA indireted that no significant problems were identified.
The FEMA exercise report has not been issued to date.
Duxbury felt that the exercise was an encellent 1
training session for all I
puroonnel.
Considerable resources, time and training were expended prior to the exercise.
Although all aspects of emergency response were not tested during the enercise, those. areas that were tested worked well and areas were identified where improvements or.
corrective actions are necessary.
j 7
1
.-.. ~ -. -.....-. - --. - - - - - -
.l -
'^
~-------------~-?
q l
q' t,.
e s
u.
STATUS REVIEWED.BY Carl O'Neill, Civil,Defcnoo Directorf
-1 DATES ~Januarv'111 1990- By telecon with'.NRC C.;Conklin.
t
- Comments incorporated.
I 3
1 o
a f '
zd n
1 4
r g
- r p 1
1.. e' f i
t.
l
,yi.
I i
b 5'.-
i e.
l.
F t-i 3
9 i
s 9
8
~
f a
w' l'
s A
1 g
l i
n
I KINGSTON EMER ENCY. PREPAREDNESS STATUS AS OF 9/8/89 AS OF 1/5/90 EMERGENCY PLAN FEMA comments on No Change.
AND Kingston's. corrective IMPLEMENTING action response were FROCEDURES received on June 29, 1989 and are being reviewed for incorporation.
TRAINING 77'/. of the training goal Refresher training will has been completed.
be conducted in 1990.
Three sessions have been This training will be the conducted since 7/00/89.
same as offered in 1989 Practical. Training and will capture (Hands-on Training) is revisions made to resolve continuing.
One session areas identified as has buen conducted since needing corrective 7/20/09 and two are action.
The 1P revisions ocheduled through and resultant lesson plan September, 1989.
revisions are dependant upon the issuance,of the FEMA. exercise report.
TAFFING 44 of 46 operations All vacancies have been positions and 7 of 8 filled and Kingston is administrativo positions fully staffed.
are filled.
EDU1PMENT The pager notification No change.
system is operational.
There are no other identified equipment needu.
EOC Fully operational.
Fully operationa2.
9
r
)
e EXERCISE The Pilgrio Nucloor Pow]r l
Station full-I participation exercise j
was held on October 10-13, 1989.
Kingston fully participated in this exercise.
Preliminary t
findings presented orally by FEMA indicated that no significant problems were identified.
The FEMA exercise _ report has not been issued to date.
STATUS REVIEWED BY Frederick Woodworth, Deputy Civil Defense Director DATE:
Jenuerv 1_0 _199Q By telecon with NRC C. Conklin.
3 Coninierith iric or por a t ed.
i
+
10 t
t_
i e
MARSHFIELD EMERGENCY PREPAREDNESS STATUS AS OF 9/B/89 AS OF 1/5/90
+
EMERGENCY PLAN FEMA comments to The Marshfield School i
AND Marshfield's corrective Nuclear Evacuation i
IMPLEMENTING action response have been Committee (consisting of PROCEDURES incorporated and the school principals and the Emergency Plan revised.
superintendent) are looking at utilizing a host school within Marshfield but 15 miles beyond the EP2.
MCDA opposes this ac tion.
A meeting is scheduled for 1/24/90 with state, town and BECO planners to discuss poscible options.
TRAINING 5 8*/. o f the training goal Refresher. training will has been completed.
Nine be conducted in 1990.
sessions have been This training will be the i
conducted since 7/20/89.
same as offered-in 1989 i
Practical Training and will capture (Hands-on Training) is revisions made to resolve continuing.
Two sessions areas identified as are scheduled through needing corrective September, 1989.
action.
The IP revisions and resultant lesson plan revisions are dependant upon the issuance of the FEMA enercise report.
l STAFFING 33 of 34 operations All l ey positions are positions and 4 of 6 filled.
Recruiting for administrative positions volunteers for remaining i
are filled.
non-key positions is l
ongoing.
t EOU1F MENT The pager notification The pager notification j
system has been-system is not acceptable delivered, but pagers are to the Civil' Defense l
not yet distributed.
Director.
Negotiations are ongoing with BECO regarding an alternate system.
11 t
s,-
e EOC Fully cparoticnol.
Fully cp;rotiono!.
EXERCISE The Pilgrim Nuclear Power Station full-participation exercise was held on October 12-13, 1989.
Marshfield fully participated in this exercise.
Preliminary findings presented orally by FEMA indicated that no significant problems were identified.
The FEMA exercise report has not been issued to date.
STATUS REVIEWED BY:
Maureen Robinson, Civil Defense Administrative Assistant DATEt J etwe rv 16. 1990 By tulocon with NRC C. Conklin.
Conimerits. A ncorporated i
i a
l I
I J
12 l
1
~
PLYMOUTH EMERGENCY PREPAREDNESS STATUS AS OF 9/8/89 AS OF 1/9/90 EMERGENCY PLAN 91 of 92 IPs have No change.
AND received Selectmen REVIEW IMPLEMENTING AND APPROVAL IN CONCEPT.
PROCEDURES 91 IPs have been forwarded to MCDA for review and Plymouth has authorized MCDA to forward all to FEMA, but the School IP, for technical review only.
Plymouth has requested technical assistance from MCDA on the School IP.
Clarifying informetion added by Plymouth.
The School Department IP hou not yet been approved by school committees, but has been given tuthnical review by the State and is in the process of being updated not only from review comments, but f rom correc tive actions found needed because of the drill.
The Saquish/Gurnet egress issue is still not resolved.
A special needs survey has been ctimpleted.
This survey needs to be followed up with a survey that identifies people, not just percentages.
A new issue i
came out of the cxercise for the need for backup locations for Central Firo and Police headquarters in case of evacuation.
TRAINING 5 9 */. o f training is Refresher training will completed.
Five training be conducted in 1990.
sessions are scheduled This training will be the through September 1989.
same as offered in 1989 Prectical training and will capture (Hands-on-Training) is revisions made to resolve continuing.
Nine areas identified as nossions'have been needing corrective.
conducted since July 20, action.
The IP revisions 1989 and three are and resultant lesson plan scheduled through revisions are dependant September, 1989.
upon the issuance of the FEMA enercise report.
STAFFING 21 of 22 first shift Plymouth was essentially operations positions (41 fully staffed'for the of 42 total) and 5 of 10 exercise.
Some vacancies of the administrative still exist and support positions are recruitment is 13
fillcd.
ccntinuing.
FOUIPMENT The pager system-has been Some additional needs delivered and is have.been identified functioning well within because of the October the range of the police exercise that still have repeater.
to be addressed.
EOC Fully operational.
Fully operational.
EXERCISE The Pilgrim Nuclear Power Station full-participation exercise was held on October 12-13, 1989.
Plymouth fully participated in this exercise.'. Preliminary' findings presented orally by FEMA indicated that no significant problems were identified.
The FEMA exercise report has not been issued to date.
STATUS REVIEWED BY:
).__Doualan Hadfield, Director, Office of Emergency Properedness and Gibe Thomuson, Chairman, Board of' i
Scloctmen.
)
DATE:
Owaipf_yJL 1990 By facsimile transmission.to NRC C.
)
Contlin.
I i
j i
l 4
14 i
s:
i
\\
BRIDGEWATER EMERGENCY PREPAREDNESS STATUS AS OF 9/8/89 AS OF 1/5/90 i
EMERGENCY PLAN FEMA comments on No change.
AND Bridgewater's corrective IMPLEMENTING action response has been PROCEDURES received on June 29, 1989 and is being reviewed for incorporation.
i TRAIN!NG 90*/. of-the training goal Refresher training will has been completed.
be conducted in 1990.
Eight sessions have been This training will be the conducted since 7/20/09.
same as offered in 1989 Practical training and will capture (Hands-on Training) is revisions made to resolve continuing.
Three areas identified as sessions have been needing corrective 3
conducted.
action.
The IP revisions and resultant lesson plan revisions are dependant upon the issuance of the FEMA exercise report.
60C STAFFING 39 of 19 first shift Key and support staff are operations positions (58 being re-identified.
of 08 total) and 4 of 4 There are some vacancies first shift and recruitment for administrative positions volunteers is ongoing.
(8 of 8 total) are e
filled.
EDU1PMENT No change regarding the The pager notification pager notification system has been delivered system.
Bridgewater has and installed as well as identified a need for hand held radios and the hand held radios and a CB unit.
An additional 2 base station CB unit.
meter radio need was identified.
EOC Fully operational.
Fully operational.
15
i
ECEPTION The Bridgewater State Renovations have
- NTERS College approved the commenced but are agreement for Reception currently on hold because Center renovations on Bridgewater Fire September 6, 1989.
Department has stated Renovation planning is they cannot support the underway.
Staffing for monitoring and 1
Reception Center decontamination efforts Managers, Reception required.
Bridgewater is Center EOC staff, Traffic in the process of Control staff, and officially requesting Monitoring and assistance from MCDA Decontamination staff has regarding this issue.
been identified and MCDA has been informed of training is in progress, the problem, t
Efforts are underway to staff the rernaining registr ation positions.
Y EXERCISE The Pilgrim Nuclear Power-Station full-participation exercise was held an October 12-
)
13, 1989.
Bridgewater
. fully participated in this exercise.
Preliminary findings presented orally by FEMA i
indicated that no significant problems were identified.
The FEMA exercise report has not been issued to date, STATUS REVIEWED DY:
FrenF Maher, Executive, Secretary and J.
Pin + ult, Asuistant Emergency Management Officer.
DATE:
Jonvery 10. 1989 By telecon with NRC C. Conklin.
No i
comments.
b 16 i.
I i
Q4 k
TAUNTON EMERGENCY FREPAREDNECS STATUS AS OF 9/8/89 AS OF-1/5/90 EMERGENCY PLAN The Emergency Plan and No c hange. -
j AND Procedures have been i
IMPLEMENTING revised to incorporate PROCEDURES FEMA comments and to reflect the change in the Reception Center location.
These revisions have been A
provided to MCDA.
TRAINING B2Y. of the training goal Refresher. training will has been completed.
be conducted-in 1990.
Training is. considered This training will be the essentially complete and same as offered:in'-1989 no further sessions are-an:1 will capture i
g scheduled prior-to the revisions made-to resolve
{
exercise.
Practical areas identified as training (Hands-on needing corrective Training) is continuing.
' action., The IP revisions Sessions have been and resultant. lesson plan conducted for each EOC-revisions are dependant position as well as a upon the issuance of the' l
combined EOC practical.
FEMA enercise report.
i a-EOC STAFFING All operations and No' change, administrative positions i
are filled.
l EQUIPMENT All equipment has been-No change.
delivered and is in place.. There are-no-identified equipment needs.
EOC Fully operational.
Fully operational.
17 i
't D
i RECEPTION
.The Reception.Conter is-Renovations have I
' ENTERS fully operational.._
commenced and are 1
Renovations are scheduled
' scheduled for completion to commence September 18,'
- by 4/1/90.-
l 1989.
t EXERCISE The Pilgrim Nuclear Power Station full-participation exercise-was held on. October 13, 1989.. Taunton fully l
participated in this i'
exercise.
Preliminary findings presented orally i-by FEMAEindicated -that no significant problems were identified.
The FEMA exercise report has not been issued to date.
l STATUS REVIEWED BY Donna Gordon, Assistant Civ11' Defense
(
-Director
~
DATE:
Januarv 10. 1990 By telecon with C. Con k 11'n'.'.. No -
comments.
l.
l l
1 l
s o
i a
l
)
-i
'l 4
18~
n MCDA AREA'11' EMERGENCY PREPAREDNECS STATUS AS OF 9/8/89J AS OF 1/5/90 EMERGENCY PLAN FEMA comments on!the Revision 7 hcs AND emergency plan have-been incorporated FEMA i
IMPLEMENTING incorporated and the comments.
Revision 8 has i
PROCEDURES Emergency Plan revised.
commenced based upon j
MCDA=1s' awaiting comments known exercise L
from FEMA on the observations.
procedures.
1 l
1 TRAINING 58% of the training goal Refresher _ training will 6
has been completed, be conducted in 1990.
Several training sessions This training will be the are scheduleo' prior.to same as offered in 1989
~
Lthe September,20, 1989 and will capture dress rehearsal. exercise, revisions made to resolve l
-areas identified as l
needing corrective action.
The IP revisions and resultant lesson'. plan revisions are. dependant upon the issuance of.the-FEMA exercise. report.
l l
STAFFING National Guard personnel Area ~11 is fully staffed d
have been identified and utilizing MCDA-and training has commenced.
National Guard personne1~.
I A
MCDA. Area II is currently l
wori:ing 'on an agreement to ensure long term continuity and training j
l of the National Guard staff.
i i
i EQUIPMENT Status boards and-maps to See status of.EOC.
I be delivered'by BECo.
Additional communications equipment to bo order ed l
by BECo.
EOC The. agreement for-The renovations are l
renovations has been complete.
Equipment, 1
approved.
Renovations communications and 19 q
-i
+
4 have commenced and are telephones are~1n place.
scheduled for completion There are several areas by! October 1, 1989.
Adentified by MCDA Area-
!I requiring additional-rework and/or equipment
- such as status boards, maps-and selected items as identified in.the' plan, and MCDA-Area'Il and BECO have-agreed upon these areas.--The EOC is very large.-
Tht old operations room is n
dedicated for-communications' support staff.
The'new:
uperations room has amplet space for the Area II staff as-wellias.for-4 representatives-:f rom - the towns.
There are sev'ral e
private offices available for the'townscand MCDA as'.i well as a combination' l
clasuroom/ conference:
i
- room, tXERCISE The^ Pilgrim-Nuclear Power ?!
Station full.
j participation exercise.
,was held:en October 13,'1989. y MCDA Area II i
fully-participated'in' this-exercise.
(
Preliminary findings
]
presented orally by FEMA i
indicated'that no significant problems were identified.. 1The FEMA exercise report ~has not been issued to'dete.
STATUS REVIEWED BY:
Thomas Rodaer, Director MCDA Area II s
4 DATE:
Januarv_iO.1990 By telecon with NRC C. Conklin.-
Comments a
incorporated.
20 i
t
i I
i COMMONWEALTH OF-MASSACHUSETTS: EMERGENCY-PREPAREDNESS STATUS AS OF 9/B/89 AS OF 1/5/90 EMERGENCY PLAN MCDA EOC procedures-were No change.
AND.
submitted to. FEMA for, IMPLEMENTING technical review on FROCEDURES August.io, 1989.-
l TRAINING 32*/. of. the training goal
'The remainder!of initial has been completed.
trainings.as well as Numerous training refresher training, will sessions are' scheduled be_ conducted in-1990, 1
prior.to the 9/20/89-however MCDA has no i
dress rehearsalt exercise.-
formal commitment on i
o retraining from BECO.
The content of the' training program has'nol been agreed upon by MCDA l
and'BECO.-
IPsrevisions should begin11mmediately
~
based upon training"and--
tabletop exercises.
IP l
revisions are not solely'
~
g based-upon the FEMA exercise report.
STAFFING All EOC positions are MCDA has lost-two. full-fully staffed.
time agency' employees who-
.had. operation. assignments:
due to ' budget cuts.
.BECO' has-termina ted,. e f.f ec tive
(
l12/15/89,'the.following staff assigned to~MCDA: a training. administrative
- assistant; a= headquarters word processort and;an AreaLII; word processor.
This'will reduce the support staff available-at the.EOC, as well:as reduce.MCDA's ability to perform-planning changes
' l and. maintain' training, programs.
-i EQUIPMENT There are no outstanding BECO has removed, 4
- equipment needs, al though ef f ec tive 1/12/90,.
EPZ and: Ingustion Pathway facsimile machines-Zone (IPZ) maps need to-be updated.
. locatedc at MCDA' headquarters and' Area-II.
21
- j w
-e
,y w-,w g
n
,4
AJL 8
i
'C Fully operational.
Fully operational.
-j i
-RECEPTION BECo and the Commonwealth Renovations are
- CENTERS.
have reached agreement on essentially completer at'
)
the scope of renovations the Wellesley Reception j
at Wellesley.
BECo-and Center.- A large EOC:has the Commonwealth also been. constructed with agreed to expedite' ample room for._ support.
completion of the staff: including: an -
Emergency Plan and
~ enclosed security-access Procedures for Wellesley, areal a message control areal a Reception' Center
-Managers offices executive: conference rooms large EOC operations-
)
room Operations Officer room Emergency Coordinators offices and a communications office.- Some. furniture and'equipmentLis on-premise and scheduled to be installed by 1/5/90.
Telephones and 1
radios have not yet been installed.
.There are segregated areas 1
for decontaminetion.
Each area has a collection and -change. area,
(
five shower stalls, 10 lavatories ~,.several toilets, and a clean clothing area.
Waste water storage' bladders are stored on 1
premise and will be hooked up to the drains.upon< facility-activation.
Not all plumbing renovations are complete.
The Red-t Cross, MCDA and BECO have-identified 40"f acilities Efor mass care -
use, but errangements for their use are not completed.
TheERed
-Cross will perform a detailed shelter survey'and select i
appr onimately 12 of theseffacilities as priority. mass care facilitien.
The remainder will be available'for overflow as i
required.
Plans for-host-schools are under, development.but not complete.
MCDA is. working with the State, Criminal Justice Training Center which is available. to host ' school' children.
The-Emergency Plan needs revisions dependant upon Implementing-Pr ocedure (IP) revisions.
20 of 21 IPs have been drafted.- The-IP for Disastor Assistance. Team'(human services)-has.been conceptuali:ed but = not yet draf ted.-
Staffing.is essentially complete for both EOC and Reception Center Operations, but.known vacancias ar e state agency; representatives in the EOC,for Education and Social Services.. Annuaitretraining-awaits development of retraining. programs and amended IPs. 'There~is room to park contaminated cars-at'the Wellesley site.
BECO has an agrooment in place with_ Sun Life to park clean cars-and there is additional capacity to park clean cars at the Massachusetts Day Comaeuni.ty College, a state run. facility.:
The Massachusetts 4
Bay Transit Authority can' provide shuttle transportation from the j
remote parking areas.
i TRANSPORTATION 3563 of 6000 hours0.0694 days <br />1.667 hours <br />0.00992 weeks <br />0.00228 months <br /> of The remainder-of initial PROVIDER training complete.
No training,=as well as _
l TRAINING sessions are-currently refresher training, will scheduled.
be-conducted in.1990,'
however MCDA has no j
22 i
L L
-