ML20247G244

From kanterella
Jump to navigation Jump to search
Notification of Significant Licensee Meeting 98-34 W/Util on 980427 to Discuss Weaknesses in Licensee Alarm Assessment Program (EA 98-191)
ML20247G244
Person / Time
Site: Pilgrim
Issue date: 04/15/1998
From: Cowgill C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
98-34, EA-98-191, NUDOCS 9805200178
Download: ML20247G244 (4)


Text

'

U.S. NUCLEAR REGULATORY COMMISSION No. 98-34 REGION I NOTICE OF SIGNIFICANT LICENSEE MEETING April 15, 1998 Licensee:

Boston Edison Company Facility:

Pilgrim Nuclear Power Station Docket No:

50-293 Time and Date:

9:30 a.m., Monday, April 27,1998 Location:

Public Meeting Room Region i Office King of Prussia, PA

Purpose:

Enforcement Conference to discuss weaknesses in licensee's alarm assessment program (EA 98-191).

NRC Attendees:

J. Wiggins, Director, Division of Reactor Safety C. Cowgill, Chief, Reactor Projects Branch 5 E. King, Physical Security inspector, Emergency Preparedness and Safeguards Branchi DRS P. Frechette, Physical Security inspector, Emergency i

Preparedness and Safeguards Branch, DRS G. Smith, Acting Branch Chief, Emergency Preparedness and Safeguards Branch, DRS Licensee Attendees:

L. Olivier, Vice President - Nuclear Operations V. Oheim, General Manager, Technical W. Riggs, Group Manager, Nuclear Services J. Neal, Manager, Protective Service Dept N. Desmond, Group Manager, Regulatory Relations Note: This meeting is closed to the public. Attendance by additional NRC personnel should be made known by April 22,1998, via telephone call to Curtis Cowgill at (610) 337-5233.

Prepared by:

S Curtis / Cow ' I, hief Projects Bran h 5 Division of Rea rojects

)

[l,-

O 9805200178 900415 PDR ADOCK 05000293 F

PDR

/

L

2 DISTRIBUTION:

Mr. Leon J. Olivier, V.P. - Nuclear Operations Boston Edison Company Commonwealth of Massachusetts 3

i J. Fleming l

PUBLIC Regional Administrator Secretary, R1 Deputy Regional Administrator Secretary, R1

)

DRP Division Secretary, RI

{

DRS Division Secretary, RI DRM Division Secretary, RI DNMS Division Secretary, RI

- Region i Receptionist

J April 15,1998 U.S. NUCLEAR REGULATORY COMMISSION No. 98-34

)

REGION I NOTICE OF SIGNIFICANT LICENSEE MEETING Licensee:

Boston Edison Company

' aility:

Pilgrim Nuclear Power Station Docket No:

50-293

' ne and Date:

9:30 a.m., Monday, April 27,1998 l

l Locatior.

Public Meeting Room

{

Region i Office King of Prussia, PA I

Purpose:

Enforcement Conference to discuss weaknesses in licensee's alarm assessment program (EA 98-191).

1 NRC Attendees:

J. Wiggins, Director, Division of Reactor Safety C. Cowgill, Chief, Reactor Projects Branch 5 E. King, Physical Security inspector, Emergency Preparedness and Safeguards Branch, DRS P. Frechette, Physical Security inspector, Emergency Preparedness and Safeguards Branch, DRS G. Smith, Acting Branch Chief, Emergency Preparedness and Safeguards Branch, DRS Licensee Attendees:

L. Olivier, Vice President - Nuclear Operations V. Oheim, General Manager, Technical W. Riggs, Group Manager, Nuclear Services J. Neal, Manager, Protective Service Dept N. Desmond, Group Manager, Regulatory Relations j

Note: This meeting is closed to the public. Attendance by additional NRC personnel should be made known by April 22,1998, via telephone call to Curtis Cowgill at (610) 337-5233.

Original Signed By:

Prepared by:

Curtis J. Cowgill, Chief i

Projects Branch 5 Division of Reactor Projects

DISTRIBUTION:

Mr. Leon J. Olivier, V.P. - Nuclear Operations Boston Edison Company Commonwealth of Massachusetts J. Fleming PUBLIC Regional Administrator Secretary, RI Deputy Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DRM Division Secretary, RI DNMS Division Secretary, RI Region i Receptionist l

l l

I

Distribution (via E-Maith L. Callan, Executive Director for Operations, OEDO S. Collins, Director, Office of Nuclear Reactor Regulation H. Thompson, Deputy Executive Director for Regulatory Programs, OEDO A. Thadani, Deputy Executive Director for Regulatory Effectiveness, DEDO T. Martin, Deputy Director, Office of Analysis and Evaluation of Operational Data, AEOD J. Roe, Acting Director, Division of Reactor Program Management, NRR D. Matthews, Deputy Director, Division of Reactor Program Management, NRR R. Spessard, Director, Division of Reactor Controls and Human Factors, NRR J. Lieberman, Director, Office of Enforcement B. Boger, Associate Director for Projects, NRR J. Zwolinski, Director, Division of Reactor Projects - 1/11, NRR B. McCabe, Regional Coordinator, OEDO N. Green, Jr., Policy Development & Technical Support Branch PMNS D. Screnci, Public Affairs Officer, RI N. Sheehan, Field Public Affairs Officer, Rl M. Campion, ORA D. Chawaga, ORA D. White, ORA J. Wiggins, DRS L. Nicholson, DRS C. Thomas, Director, PDI-3 A. Wang, PM, NRR R. Laura, SRI - Pilgrim R. Arrighi, RI - Pilgirm DOCUMENT NAME: G:\\ BRANCH 5\\MTGNOTE\\MN98-34.PIL To receive a copy of this document, Indicate in the box: 'C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure

  • N" = No copy l OFFICE Rl/DRS l

Rl/DRS l

Rl/DRP l

l lNAME PFrechette GSmith CCowgill lDATE 04/15/98 04/ /98 04/ /98 04/ /98 04/ /98 OFFICIAL RECORD COPY

- _ _ _ _ _ _ _ _