ML20245F958

From kanterella
Jump to navigation Jump to search
Notification of Significant Licensee Meeting 89-096 W/Util on 890619 in King of Prussia,Pa Re 890412 RCIC Sys
ML20245F958
Person / Time
Site: Pilgrim
Issue date: 06/16/1989
From: Blough A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
EA-89-095, EA-89-95, NUDOCS 8906280303
Download: ML20245F958 (2)


Text

- _ -

M 16 M U.S. NUCLEAR REGULATORY COMMISSION No.89-096 REGION I NOTICE OF SIGNIFICANT LICENSEE MEETING Licensee: Boston Edison Company Facility.: Pilgrim Nuclear Power Station Docket No.: 50-293 Time and Date: 1:00 p.m. , June 19, 1989 Location: NRC Region I, DRP Conference Room, King of Prussia, PA

Purpose:

Enforcement Conference Concerning AIT Findings Regarding the April 12, 1989 Reactor Core Isolation Cooling system Overpressurization (EA 39-95)

NRC Attendees: W. Russell, Regional Administrator S. Collins, Deputy Director, Division of Reactor Projects (DRP)

J. Durr, Chief, Engineering Branch, Division of Reactor Safety (DRS)

J. Wiggins, Chief, Projects Branch No. 3, DRP R. Blough, Chief, Reactor Projects Section 3B, DRP J. Gutierrez, Regional Counsel D. Holody, Enforcement Specialist W. Troskoski, Senior Enforcement Specialist, Office of Enforcement D. Mcdonald, Project Manager, PD I-3, NRR T. Kim, Resident Inspector Licensee Attendees: R. Bird, Senior Vice President - Nuclear R. Anderson, Plant Manager V. 0heim, Acting Regulatory Affairs et.al.

Note: Enforcement Conferences are not open for public observation. Attendance by NRC personnel at this meeting should be made known by 10 00 a.m.,

June 19, 1989 via telephone call to A. Randy Blough, Region I, at FTS 8-346-5146 or (215) 337-5146.

ORIGINAL SIGNED BY Prepared by:

A. Randy Blough, Chief Reactor Projects Section No. 3B 0FFICIAL RECORD COPY LIC MTG NOTICE 89-096 - 0001.0.0 06/16/89 '\

lER9ESE0 SESS$! E'~F5

g.+34.

,, ,. JUN 161915 2

Distribution:

, V. Stello, Jr., Executive Director for Operations J. Taylor, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research H. -Thompson,; Deputy Executive Director for Materials Safety, Safeguards and Operations Support B. Grimes, Director, Division of Reactor Inspection and Safeguards, NRR J. Lieberman, Director, Office of Enforcement

' Chandler, Assistant General Counsel for Enforcement 1 vriey, Director, Office of Nuclear Reactor Regulation F. Miraglia, Associate Director for Inspection and. Technical Assessment, NRR S. Varga, Director, Division of Reactor Projects - I/II, NRR B. Boger, Assistant Director for Region I Reactors, NRR D. Wessman, Director, Project Directorate I-3, NRR D. Mcdonald, Project Manager, PD I-3, NRR B. Clayton, Regional Coordinator, EDO Public Document Room (PDR)

Local Public Document Room (LPDR)

Commonwealth of Massachusetts (2)

NRC Resident Inspector W. Griffin, Plymouth Board of Selectmem Honorable William B. Golden, Massachusetts State Senator Honorable Edward P. Kirby Honorable Peter V. Foreman bec:

Regional Administrator Deputy Regional Administrator Division Directors Branch Chiefs Section Chiefs Public Affairs Officer J. McGrath, RI M. Miller, RI J. Gutierrez, RI D. Holody, RI Region I Receptionist DRMA Files DRP Files Bulletin Board M. J. DiDonato, DRP

?

I:DRP RI:DRP RI:DRP JLyash/mjd RBlough Q'3Wiggin.

L 6/16/89 bI

([/(

0FFICIAL RECORD COPY LIC MTG NOTICE 89-096 - 0002.0.0 06/16/89

- _ _ - _ - _ - - - _ _ _