ML20196F469

From kanterella
Jump to navigation Jump to search
Discusses Minutes of Util Restart Assessment Panel 880811 Telcon Re Status of NRC & Licensee Activities Associated W/ Proposed Plant Restart
ML20196F469
Person / Time
Site: Pilgrim
Issue date: 08/15/1988
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Russell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20150E198 List:
References
FOIA-88-198 NUDOCS 8812130092
Download: ML20196F469 (6)


Text

{{#Wiki_filter:.

          */+tta,4  v UNITED STATES NUCLEAR REGULATORY COMMISSION j      #'

f't~j REGION I

                         /

f 47s ALLENOALE ROAD KING oF PRUSSIA, PENNSYLVANIA 19406 g AUG 161988 MEMORANDUM FOR: William T. Russell Regional Administrator FROM: Samuel J. Collins, Deputy Director Division of Reactor Projects

SUBJECT:

PILGRIM RESTART ASSESSMENT PANEL MEETING MINUTES On August 11 1988, the Pilgrim Restart Assessment Panel met by teleconference to discuss the status of NRC and licensee activities associated with the pro-posed plant restart. The following personnel were in attendance: Chairman: Samael J. Collins, Deputy Director, Division of Reactor Projects (ORP) Members: James T. Wiggins, Chief, Reactor Projects Branch No. 3, ORP Jacque P. Du. r, Chief. Engineering Branch, Division of Reactor Safety (DRS) William J. Lazarus, Emergency Preparedness Section, Division of Radiation Safety and Safeguards (ORSS) Others: Clay C. Warren, Senior Resident Inspector The panel discussed the issues from the last meeting, as well as the overall integration of NRC inspection and review activities. As a result of the meet-ing, the below listed actions with responsibility were agreed upon by the Panel. A panel meeting will be held at the Sheraton in Plymouth, August 25, 1988, at 2:00 p.m. Panci members are encouraged to be present since a phone bridge may not be available for this meeting. All items below will be updated. No separate agenda will be provided for the August 25 meeting. Task Responsibility Due Date --

1. Plant Status Update Resident Inspector Next Panel
2. Staffing / Organization Update Resident Inspector Next Panel
  • Training Manager
  • Maintenance Training
3. Site Inspection Activities Resident Inspector Next Panel Update 8812130092 001200 NS6 -190 PDR

AU6151988 Memorandum for William T. Russell 2 Task Responsibility Oue Date Update fire barrier issue Boger/Blough Next panel 4. status of BEco submittal

5. Review and update NRC Restart All Next Panel checklist
6. Provide OIL Updates All Next Panel
7. ACRS Sub-Committee Preparation Collins Next Panel Status
8. Restart Assessment Report -- All Next Panel Begin work IAW assignments -

discuss each panel

9. Update Overall Milestone Collins Next Panel Schedule
10. Update Subset Milestone All Ongoing Schedules
  • Update EP Subset Bellamy Next Panel
  • Provide comments to Mcdonald Next Panel 2.206 Subset
11. Update Status of Power Durr Next Panel Ascension Program Oeficiencies
12. SEP Issues Status Boger Next Panel
13. Status of EQ Issues ORS Next Panel
14. Oegraded Security Condition - Wiggins Next Panel Enforcement Approach
15. Fire Barrier Penetrations - Wiggins Next Panel Enforcement Approach
16. Emergency Preparedness Status Bellamy Next Panel t

amue v. M ns, Deputy Director ! Division of Reactor Projects 1 I i l

O Memorandum for William T. Russell 3 AllG 151988

Enclosures:

1. Pilgrim Overall Milestone Schedule, Revision 10
2. Pilgrim Subset Milestone 2.206 Approach, Revision 3
3. Pilgrim Subset Milestone Topic Listing, Revision 9 cc w/ enc 15:

T. Murley, NRR F. Miraglia, NRR T. Martin, NRR S. Varga, NRR B. Boger, NRR R. Wessman, NRR

0. Mcdonald, NRR F. Akstulewicz, NRR '

J. T!oe, NRR J. Hannon, NRR B. Clayton, E00 J. Allan, RI W. /.ane, RI S. Collins, RI J. Wiggins, RI R. Blough, RI j S. Ebneter, RI J. Curr, RI R. Bellamy, RI L. Doerflein, RI M. Kohl, RI C. Warren, SRI - Pilgrim J. Lyash, RI - Pilgrim T. Kim, RI - Pilgrim i I 1 I . i I

                ~                '                     ~    -

CAL 86-10 .pg $ ' Diagnos Uu.~B6- NRC Ltr Mgmt NRC SEP Ltr Restart E78

  • 10 AIT RFO-7 Request Re- Meeting SALP 85-9 Team P1t Scr Start Asses)

Assess l from Plan **E' M"

              . _; $.. Idris .__                                                              86:41__                                                            Rev _(L a_        _ _1
                                                                . E_ ..   .__      n,,              L            _

a_- P.da _ BEC1___._ 3 2 = 2E 10/1/84- 2/16/86- 4/12/86 7/86 8/27/86 11/24/86 11/1/85- 7/8/87 7/8/87 7/30/87 MN 5;" 10/31/85 3/7/86 1/31/87 __ 8. ". BECO Nuc EE e e FEMA SEP Ltr EP Ltr BECo NRR Mtg Pwr Asc Restart Site LOOP Realign-Self to to EP Re- with Prg Plan Work AIT ment Rev. 1 Int Rev 8ECo sponse BECo Submit E.. mStot_p BECo , g,Z_.,.,.T_J; Z. , 3 -

                                                              ~ C . ,Z ua.. ,__.. n_. _                  .                                  .  ,m_,..,_. .. . a                                             -';

8/5/87 8/21/87 9/17/87 9/17/87 9/24/87 10/15/87 10/26/87 11/8/87 11/12/87 12/87 " R 2. E$"z NRC All Re- BECo/NRC' ~INRCTublTF BECo seTF ~ o O Public Mtg Start BECo BECo SEP start Plan Resolution Mtg Re: Re- ~ O N grim Assessment Restut , on Restart Pre-Self Ltr to NRC Comments to R/S Plan start Plan INP0 Report N an sk Plan Assessment Except DTV BECo Comments Comments Review Submitted $ 1/4/88 b_d1/27/88 A _ _. _ T _ . _ 2/18/88 2/22/88 11 ,22. . . L 2/22/88 3/18/88

                                                                                                                          ~'A 5/6/88 JI_. m m _ m_. ____. y 5/11/88            5/9-20/88 5/26/88
                                                                   ~~

MRC Rev of BECo/ Staff BEco Decis- ~ bet 5Tel'f-~~ ACR5Tuh-BECo Self- Commission ion on Ltrs gp - - - - Assess /INP0 l'~ Committee Rpt Results NTI 1 Senior SALP Assessment Mgent Brief/ Re; Readt- 2/1/87-ACRS Prepara- Meeting at Public Mtg IATI Mgt Report ness IATI Brief Presentatior Site t-- _

t. _  :

_A_. . _a_ . _,/Et 5/JS _ ~ _. _ A .. - L __ g g g _ . 4.,._ g 5/26/88- 6/2/88 6/9/88 6/25/88 8d 7/5/88 7/15/88 7/19-21/88lB/8-24 M E 5f88J 18/26/88I 6/24/88 Rpt 7/26/88 ATI ~ 2.206 NRC/ CAL IATI NRC Comp NRC Restart Restart ACRS hRC ffes~ E0P-~ -- Restart NRC 2.206 Power Assessment Report Issues ISS"" Public Public Assessmen full olution Status Issue Ascension Panel ISSU* Meeting Meeting

            @omMtg                                    SEP Iss        Addressed                     Status                                                     Plan Rev         l Report ~

y a .-__p W -, Recom RA

                                                  .; 4-_q-_Z.                   37} . 4 ,C.~~.'-{                                    _ - 9/19/88]

a -.

                                                                                                                                                                                       ] ->            fl gg                     [9/9/88 j        l         jl                l                     l               j]wfo 9/19/88llw/o                         l           l     l10/7/88l    l 10/7/88 l
                          ~~

YK RedBm--- ~ T/NRR ED0'ComdisT 'NRC~Uver- y' g Recoer.enda- sion Brief- p g

                                                                                                 -~      ---

to sight Plt - Director / EP tion to ing Public Couva Restart Restart /PWR NRC 6 Mo. o. g NRR Issues EDO Meeting Assent Decision Ascension Release SALP g m -- y

                                                                                                             ~~                            ~

f_]_ l--L_-._ 4-, -. QT.]--- q '", L_ 'l^. LJ}_ _ J L,~4 _ ,_._,g g  ; J l_ l ._ _ .J L ___] I 1l 1l l #

ioastrr Mts.asToucs iy, . Rsf*RT 2.2 cgs 4 E.P -'I a sat.e A c n.s I-- Ens ooAnD _,1 sua cea - - - go t.c_

       '                                                               I t- - -      can.

i i I

 .             .                                                       e             .

l ' . a 8 r BCCo e ICStiE S pt.y a n gc.

  • MtCND a
                                             ,_,)     AMgWD            l- - . gg, sty           j           R65TMT
  • ORG. M O R6.Ch6 AW-j
                                                                                                           .R Gr etT"                               ,

i A ( l &

                                                           *
  • X g "
  .                                                        g                         t e                            9                          m      X l                         .                            .                          ;      0 h oEM                    pers thi-              DRAFT    '
                                                                               ' 2.Zof,                     ici u n t.             co n g,   t      3 t.20 G,     -

DIRCH"TDh DECls to e INfVT M'"T

                                                                           &     P00Ltc MTG.

D IRecTDR DECtfaoc i gyg, } {*

  ,                                                                                                                                ggyrMitr  &

2 ~

       ~

l - 1 I I I 1 L m

  . f//         I       I       </
                                     ~

I I / / I I // 1 I ef I [ ff j R (Mac-ige P) 3 g g . u 3

   '                                                       8                                             .                                           R i                                                        e                 I      //      1            1      //       I                            =

n I 1-

  . fDul(Ar,oS               assTs At.            ' DRAFT                    DRAFT                       Fa w A z OtR st:nR            r      IN PuY             r      gp ie                 o    bt@k          - _.
  .        2 706                OGctriac               ME **T.                                              C>EaSada l

1 I I i [ 3

             /- /  I        I      //      I       I     / f      l                  '

(ng_iy i g-- - - - - ) t i #80

                                                    .                                I    1                                                    ibP BECo se                  e ShT15FY '

9 Rc. & EP Assesnes4L

                                                                                                                                               ""h g
                                                                                                                                               =E g srATU.S                                             REPORT                                      ~

l . . i . . I .

  • . e ENCLOSURE 3 Subset Milestones Topic Listing Area Responsibility A. Overall Milestones S. Collins B. Public and State Involvement R. Blough Meetings with Licensee C. NRR Actions for Restart O. Mcdonald D. Management Transition C. Warren E. Site Inspections / Reviews R. Blough F. EP Status R. Bellamy/F. Congel G. Power Ascension Program J. Ourr H. 2.206 Item Closecut Approach R. Wessman S. Collins Pilgrim Subset Milestones 8/12/88 Rev. 9
 ..     '..                                                                       {W

(  ; - . .. . -

      ~

f#" " %,,, UNITED STATES , d i . e NUCLEAR REGULATORY COMMISSION OFFICE OF GOVERNMENTAL AND PUBLIC AFFAIRS, REGION I 1 l 3[%,(,,~f} df/

  • 475 Allendale Road, King of Prussia, Pa.19408 Tel,215 337 5330 i .....

No. I-88-137 August 23, 1988

Contact:

Karl Abraham NOTE TO EDITORS AND STATION ASSIGNMENT EDITORS A. Randy Blough, Chief of the Reactor Projects Section that inspects Pilgrim has issued a status report summarizing activities of the inspection staff during the period July 30 to August 12, 1988. The recort is attached. Occket No. 80-293 August 13, 1983 MEMORANDUM FOR: James T. '4iggins, Chief Reactor Projects Branch No. 3 FROM: A. Randy Blough, Chief Reactor Projects Section No. 3B

SUBJECT:

PILGRIM STATUS REPORT FOR THE PERIOD JULY 30-AUGUST 12, 1938 Enclosed is the Pilgrim bi-weekly status recort from the NRC Resident Office at Pilgrim. Three resident inspectors monitored activities at the plant curing the report period. On August 8, 1988, the NRC began the Integrated Assessment Tecm Insoection (IATI) at tne Pilgrim Station. Onsite inspection will continue through August 19, 1988. The NRC has tentatively scheduled a management meeting on August 25, 1933, in Plymouth, Massachusetts, to discuss the 1937 Systematic Assessment of Licensee Performance (SALP) report, which was issued on July 27, 1983, and assesses licensee performance for the period February 1,1987 to May IS,1983. Also, on August 26, 1988, NRC Advisory Committe.e en Reactor Safeguards will conduct a publicly held Subcommittee Meeting on Pilgrim Restart at the Plymouth Memorial Hall in Plymouth, Massachusetts. n p 3 g jg p pg (mere)

                        ,                                                                                                             l f

The Pilgrim bi-weekly status report is intended to provide NRC management and  ! the public with an overview of plant activities and NRC inspection activities. Subsequent inspection reports will address many of these topics in more detail. 1 i (Original signed by D. Haverkamp for) , A. Randy Blough, Chief Reactor Projects Section No. 3B

Enclosure:

> As stated l I i ENCLOSURE PILGRIM STATUS REPORT FOR THE PERIOD JULY 30-AUGUST 12, 1988  ;

1. 0 Plant Status

) As of 8:00 a.m., on August 12, 1988, the reactor was in cold shutdown mode I j with moderator temperature about 94 degrees Fahrenheit. l l 2.0 Facility Ocerations Summary l ! The plant has been shutdewn for maintenance and to make program improvements ! since April 12, 1986. The reactor core was completely defueled on February i 13, 1987 to facilitate extensive maintenance and modification of plant equfp- 1

ment. The licensee completed fuel reload on October 14, 1987. Reinsta11ation of the reactor vessel internal components and the vessel head was followed i by completion of the reactor vessel hydrostatic test. The primary containment j integrated leak rate test was also completed during the week of December 21, 1987. During this period, the licensee performed routine maintenance and surveillance tests.

3.0 Items of Soecial Interest NRC Integrated Assessment Team Inscection (IATI) I I, ;t ! The purpose  ; On August 8, 1988, the NRC began the IATI at the Pilgrim Station. of this inspection is to perform an in-depth assessment of the licensee's

readiness for restart. Onsite inspection will continue through August 19, a 1988. Development of an NRC staff recom.mendation to the Commission relative l

to restart will be based in part, on the recent SALP and IATI results. i The thirteen member team consists of a senior manager, inspection team leader, i five shift inspectors and several specialist inscectors from both Region I l and the Offico of Nuclear Reactor Regulation. The senior manager is 4 Mr. Samuel J. Collins, Deputy Director, Oivision of Reactor Projects. 1 Region I, and the Team Leader is Mr. A. Randy Blough, Chief, Reactor Pro-jects Section No. 38, Region I. ] i ! (more)

3 Two representatives from the Commonwealth of Massachusetts are on the team as observers throughout the inspection. Scheduled SALP Management Meetino The NRC has scheduled a SALP management meeting for 10:00 a.m. on August 25, 1988, at Sheraton Plymouth at Village Landing in Plymouth, Massachusetts, to discuss the report with licensee senior management. The SALP report for Pilgrim covering the period of February 1,1987 through May 15, 1988 was issued on July 28, 1988. The meeting will be open for public observation. A copy of the Meeting Notice is attached. Scheduled ACRS Subcommittee Meeting A subcor..mittee of the Nuclear Regula* ry Commission's Advisory Committee on Reactor Safeguards (ACRS) will ho:d a technical meeting on August 26 in Plymouth, Massachusetts, to discuss the proposed restart )f the Pilgrim Nuclear Power Plant in Massachusetts. The meeting, which is open to the public, will begin at 8 a.m. at the Memorial Hall, 83 Court Street. Representatives of the NRC staff, and of the Boston Edison Cor.pany (BECo). It is also anticipated that members of the public will be permitted to address the Sub-Committee after the NRC staff and BEco sessions conclude, which is currently projected for about 2:30 p.m. The ACRS is a statutory Committee established to advise the Commission on the safety aspects of proposed and existing nuclear facilities and the adequacy of proposed reactor safety standards, and to perform such other duties as the Commission may request. 4.0 Emercency Notification System (ENS) Reoort On August 2, 1988, a small fire occurred inside the protected area. Repairs to the permanent sodium hypw.orite storage tank located in the intake structure were ongoing. As ldet of these repairs, several bolts were being removed using a torch. At 3:25 p.m., the assigned fire watch observed smoke escaping from beneath fire retardant cloth which had bien installed to support the job. The room was evacuated, the fire brigade assembled, and the fire was extinguished a brief time later. In accordance with the licensee pro-cedures, the Plymouth Fire Department was notified. Two fire trucks arrived cnsite at about 3:50 p.m. af ter the fire had been declared out. The fire occurred in a building outside the radiologicnlly controlled area of the piant. Consequently, there were no radiation or radioactive contamination ha:neds involved. The licensee notified the NRC via ENS of the incident at 5:30 p.m. (more)

4 5.0 NRC Staff Status During the Period The inspection staff at Pilgrim during the report period consisted of the following: Clay Warren --- Senior Resident Inspe a r Jeffrey Lyash --- Resident Inspector Tae Kim --- Resident Inspector In addition, two reactor engineers from Region I and a resident inspector fromYankeeRowefacilitywereonsiteduringtheweekofAugust1,1988, to assist the resident inspectors in reviewing the licensee s corrective actions on previous inspection findings. The results of these inspector activities will be documented in the NRC Inspection Report 50-293/88-27.

e l Document Name: PA0 I-88-137 Reques s ID: JANE Author's Name: Abraham Document Comments: f I !}}