Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20211A4361999-08-18018 August 1999 Notification of Significant Licensee Meeting 99-47 with Entergy Nuclear,Inc on 990831 to Discuss Results of NRC Plant Performance Review of Pilgrim Nuclear Power Station Issued on 990409 ML20212H7621999-06-22022 June 1999 Notification of 990701 Meeting with NEI & Entergy in Rockville,Md to Discuss Price-Anderson Issues Re Transfer of Pilgrim License from Beco to Entergy ML20205L0301999-04-0909 April 1999 Notification of 990413 Meeting with Boston Edison Co & Entergy Nuclear Generation Co in Rockville,Md to Discuss Sale & Transfer of Pilgrim Station from Boston Edison Co to Entergy Nuclear Generation Co ML20196J5801998-12-0707 December 1998 Notification of 981209 Meeting with Representatives of Beco & Entergy in Rockville,Md to Discuss Sale of Pilgrim Plant ML20196F3461998-12-0202 December 1998 Forwards Info Re Operator Licensing Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids Code IE42 ML20196F5611998-12-0202 December 1998 Forwards Info Re OL Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids A070 ML20154D5091998-10-0202 October 1998 Notification of Meeting W/Beco on 981008 in Rockville,Md to Discuss Core Spray Piping Integrity ML20154G5141998-10-0202 October 1998 Notification of 981008 Meeting W/Beco in Rockville,Md to Discuss Core Spray Piping Integrity.Meeting Has Been Rescheduled to 981015 ML20247G2441998-04-15015 April 1998 Notification of Significant Licensee Meeting 98-34 W/Util on 980427 to Discuss Weaknesses in Licensee Alarm Assessment Program (EA 98-191) ML20203E2781998-02-19019 February 1998 Notification of Significant Licensee Meeting 98-18 W/Util in King of Prussia,Pa on 980310 Re Plant Design Basis Project Discussion ML20199C7581997-10-31031 October 1997 Notification of Significant Licensee Meeting 97-112 W/Util on 971113 to Discuss NRC SALP ML20212D6201997-10-28028 October 1997 Notification of Licensee Meeting on 971121 W/Util in King of Prussia,Pa to Discuss Apparent Violations Identified During NRC Insp 50-293/97-05 ML20140F6151997-06-11011 June 1997 Notification of 970612 Meeting W/Util in Rockville,Md to Discuss Net Positive Suction Head for ECCS Pumps ML20137Q9761997-03-31031 March 1997 Informs That as-found LOCA & Life Testing & Analysis Does Not Provide Acceptable Approach for Demonstrating Qualification at Accident Temp Higher than 340F,per 970110 TAR ML20137B4781997-03-14014 March 1997 Undated Memo Discussing Beco Reorganization ML20141A7361997-03-12012 March 1997 Rcommends That Key RES Staff Attend Subcommittee Meetings to Address Any Questions,Arise in Discussions Among Members & to Answer Any Key Questions Posed in Advance by Subcommittee Chairmen ML20149M3291996-11-12012 November 1996 Forwards Input Re TIA on Plant Licensing Basis & Subsequent Mod Under 10CFR50.59 for Two Safety Significant Problems ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20129D8331996-09-19019 September 1996 Notification of 961003 Predecisional Enforcement Conference 96-98 W/Util to Discuss Containment Penetration Protection. Meeting Closed to Public ML20134J7301996-07-26026 July 1996 Forwards Resolution of Spent Fuel Storage Pool Action Plan Issues Re Response to Two Postulated Event Sequences Involving SFP NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl IR 05000293/19930291993-11-23023 November 1993 Notification of Significant Licensee Meeting 93-156 W/Util on 931202 Re Three Recently Reported Design Issues in Insp Rept 50-293/93-29 ML20058C9711993-11-22022 November 1993 Notification of Significant Licensee Meeting 93-150 W/Util on 931217 Re Hpci/Rcic Reliability & Switchyard Betterment Status ML20059L9721993-11-12012 November 1993 Licensing Board Memorandum & Order Terminating Proceeding .* Informs That Time Provided by NRC Regulation to Review Decision of ASLB Terminating Proceeding in Docket Has Expired.W/Certificate of Svc.Served on 931112 ML20056C4721993-06-17017 June 1993 Discusses Util Assessment of Low Pressure Turbine Analysis. Licensee Retained Structural Integrity Assocs,Inc (SIA) to Evaluate Flaw Indications in 7GA Disk.Sia Anaylsis Reduce Some Obvious Conservatisms Used in GE Analysis ML20128F3911993-02-0303 February 1993 Requests Listed Instructions to Ensure That P Blanch of Northeast Utils & E Hadley of We the People Kept Promptly Informed of NRC Activities on BWR Water Level Indicators & Rosemount Transmitters ML20128E2181993-01-26026 January 1993 Notice of Significant Licensee Meeting 93-11 W/Licensee on 930225 in King of Prussia,Pa to Discuss Util Reorganization ML20059C1171992-11-20020 November 1992 Submits Status Rept on Reactor Water Level Spiking That Occurred on 921024.Related Info Encl ML20125D1161992-10-0707 October 1992 Notification of Significant Licensee Meeting 92-177 W/Util on 921217 to Discuss tie-in of New Security Computer ML20082B1581991-02-20020 February 1991 Summarizes Telcon W/R Murphy Re Mobilization Time for State of Ma Natl Guard Personnel Assigned to Respond to Wellesley, Ma Reception Ctr & State of Ma Civil Defense Agency Area II Headquarters in Event of Emergency at Facility ML20062H5361990-11-23023 November 1990 Forwards Info from Pilgrim Citizens Radiological Monitoring Network,Covering Rept Periods 900910-1017 ML20059P0861990-10-0101 October 1990 Notification of Significant Licensee Meeting 90-118 W/Util on 901016 to Discuss SALP ML20059L1541990-09-0707 September 1990 Notification of Significant Licensee Meeting 90-114 on 900912 at Region I Ofc to Discuss Corrective Actions & Restart Planning Re 900902 Manual Reactor Scram ML20059G4681990-08-0606 August 1990 Forwards Citizens Radiological Monitoring Network Weather Data Rept for Apr-Jul 1990 for Processing Through Nudocs Sys ML20127B4901990-08-0303 August 1990 Responds to 900726 Request for Recommendations for Appropriate Actions in Response to Inspector General Rept 90N-02 ML20127B4961990-08-0101 August 1990 Advises That Staff Did Not Conduct Thorough Review of Offsite Emergency Preparedness Which Resulted in Inaccurate Info Being Provided to Commission ML20058B4501990-06-28028 June 1990 Provides Status Rept Re Progress of off-site Emergency Preparedness Activities at Facility ML20055C2661990-02-0505 February 1990 Forwards Draft Ltr to Util Re Completion of Plant Power Ascension Program.Ltr Will Be Issued on 900209 Which Will Accept Util Completion of Power Ascension Program & Close Out Confirmatory Action Ltr CAL-86-10 ML20248C5841989-09-26026 September 1989 Notification of Significant Licensee Meeting 89-154 W/Util on 891006 in Plymouth,Ma to Discuss SALP Mgt ML20247N0121989-09-12012 September 1989 Forwards Plant Status Rept for 890826-0908.On 890830,reactor Automatically Scrammed Due to Fault on Main Generator Voltage Regulation Circuitry.On 890905,inadvertent Actuation LPCI Loop Select Logic Experienced ML20246N5751989-08-30030 August 1989 Forwards Plant Biweekly Status Rept for 890812-25 ML20245F6401989-08-0101 August 1989 Forwards Facility Biweekly Status Rept for 890715-28.NRC Restart Staff in Place & Onsite Monitoring Licensee Activities on Extended day-shift Basis During Reporting Period ML20247C0631989-07-19019 July 1989 Forwards Biweekly Status Rept for 890701-14.NRC Restart Staff in Place & Onsite & Monitoring Licensee Activities on around-the-clock Basis During Plant Startup & Power Ascension.Part 21 Related ML20247C1611989-07-14014 July 1989 Notification of Significant Licensee Meeting 89-112 W/Util on 890816 in King of Prussia,Pa to Discuss SALP ML20247E4531989-07-10010 July 1989 Forwards Plant Status Rept for 890617-30 Period.Rept Intended to Provide NRC Mgt & Public W/Overview of Plant Activities & NRC Restart Insp Activities ML20246K1141989-07-0303 July 1989 Notification of Significant Licensee Meeting 89-105/suppl Enforcement Conference Re Augmented Insp Team Findings Concerning 890412 Reactor Core Isolation Cooling Sys Overpressurization ML20245E6561989-06-22022 June 1989 Forwards Plant Biweekly Status Rept for 890603-16.On 890616, Reactor Operating at Approx 25% Power w/turbine-generator Synchronized to Grid.On 890612,util Commenced Controlled Reactor Shutdown to Perform Minor Mods,Maint & Testing ML20245F9581989-06-16016 June 1989 Notification of Significant Licensee Meeting 89-096 W/Util on 890619 in King of Prussia,Pa Re 890412 RCIC Sys ML20245A3311989-06-0909 June 1989 Notification of Significant Licensee Meeting 89-90 on 890627 W/Util in King of Prussia,Pa for Mgt Meeting to Discuss Status of Licensee Radiation Control Program ML20244E5081989-06-0707 June 1989 Forwards Biweekly Status Rept for 890520-0602.Rept Provides Overview of Plant Activities & NRC Restart Insp Activities. Part 21 Related 1999-08-18
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211A4361999-08-18018 August 1999 Notification of Significant Licensee Meeting 99-47 with Entergy Nuclear,Inc on 990831 to Discuss Results of NRC Plant Performance Review of Pilgrim Nuclear Power Station Issued on 990409 ML20212H7621999-06-22022 June 1999 Notification of 990701 Meeting with NEI & Entergy in Rockville,Md to Discuss Price-Anderson Issues Re Transfer of Pilgrim License from Beco to Entergy ML20205L0301999-04-0909 April 1999 Notification of 990413 Meeting with Boston Edison Co & Entergy Nuclear Generation Co in Rockville,Md to Discuss Sale & Transfer of Pilgrim Station from Boston Edison Co to Entergy Nuclear Generation Co ML20196J5801998-12-0707 December 1998 Notification of 981209 Meeting with Representatives of Beco & Entergy in Rockville,Md to Discuss Sale of Pilgrim Plant ML20196F3461998-12-0202 December 1998 Forwards Info Re Operator Licensing Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids Code IE42 ML20196F5611998-12-0202 December 1998 Forwards Info Re OL Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids A070 ML20154G5141998-10-0202 October 1998 Notification of 981008 Meeting W/Beco in Rockville,Md to Discuss Core Spray Piping Integrity.Meeting Has Been Rescheduled to 981015 ML20154D5091998-10-0202 October 1998 Notification of Meeting W/Beco on 981008 in Rockville,Md to Discuss Core Spray Piping Integrity ML20247G2441998-04-15015 April 1998 Notification of Significant Licensee Meeting 98-34 W/Util on 980427 to Discuss Weaknesses in Licensee Alarm Assessment Program (EA 98-191) ML20203E2781998-02-19019 February 1998 Notification of Significant Licensee Meeting 98-18 W/Util in King of Prussia,Pa on 980310 Re Plant Design Basis Project Discussion ML20199C7581997-10-31031 October 1997 Notification of Significant Licensee Meeting 97-112 W/Util on 971113 to Discuss NRC SALP ML20212D6201997-10-28028 October 1997 Notification of Licensee Meeting on 971121 W/Util in King of Prussia,Pa to Discuss Apparent Violations Identified During NRC Insp 50-293/97-05 ML20140F6151997-06-11011 June 1997 Notification of 970612 Meeting W/Util in Rockville,Md to Discuss Net Positive Suction Head for ECCS Pumps ML20137Q9761997-03-31031 March 1997 Informs That as-found LOCA & Life Testing & Analysis Does Not Provide Acceptable Approach for Demonstrating Qualification at Accident Temp Higher than 340F,per 970110 TAR ML20137B4781997-03-14014 March 1997 Undated Memo Discussing Beco Reorganization ML20141A7361997-03-12012 March 1997 Rcommends That Key RES Staff Attend Subcommittee Meetings to Address Any Questions,Arise in Discussions Among Members & to Answer Any Key Questions Posed in Advance by Subcommittee Chairmen ML20149M3291996-11-12012 November 1996 Forwards Input Re TIA on Plant Licensing Basis & Subsequent Mod Under 10CFR50.59 for Two Safety Significant Problems ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20129D8331996-09-19019 September 1996 Notification of 961003 Predecisional Enforcement Conference 96-98 W/Util to Discuss Containment Penetration Protection. Meeting Closed to Public ML20134J7301996-07-26026 July 1996 Forwards Resolution of Spent Fuel Storage Pool Action Plan Issues Re Response to Two Postulated Event Sequences Involving SFP NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl IR 05000293/19930291993-11-23023 November 1993 Notification of Significant Licensee Meeting 93-156 W/Util on 931202 Re Three Recently Reported Design Issues in Insp Rept 50-293/93-29 ML20058C9711993-11-22022 November 1993 Notification of Significant Licensee Meeting 93-150 W/Util on 931217 Re Hpci/Rcic Reliability & Switchyard Betterment Status ML20059L9721993-11-12012 November 1993 Licensing Board Memorandum & Order Terminating Proceeding .* Informs That Time Provided by NRC Regulation to Review Decision of ASLB Terminating Proceeding in Docket Has Expired.W/Certificate of Svc.Served on 931112 ML20056C4721993-06-17017 June 1993 Discusses Util Assessment of Low Pressure Turbine Analysis. Licensee Retained Structural Integrity Assocs,Inc (SIA) to Evaluate Flaw Indications in 7GA Disk.Sia Anaylsis Reduce Some Obvious Conservatisms Used in GE Analysis ML20128F3911993-02-0303 February 1993 Requests Listed Instructions to Ensure That P Blanch of Northeast Utils & E Hadley of We the People Kept Promptly Informed of NRC Activities on BWR Water Level Indicators & Rosemount Transmitters ML20128E2181993-01-26026 January 1993 Notice of Significant Licensee Meeting 93-11 W/Licensee on 930225 in King of Prussia,Pa to Discuss Util Reorganization ML20059C1171992-11-20020 November 1992 Submits Status Rept on Reactor Water Level Spiking That Occurred on 921024.Related Info Encl ML20125D1161992-10-0707 October 1992 Notification of Significant Licensee Meeting 92-177 W/Util on 921217 to Discuss tie-in of New Security Computer ML20082B1581991-02-20020 February 1991 Summarizes Telcon W/R Murphy Re Mobilization Time for State of Ma Natl Guard Personnel Assigned to Respond to Wellesley, Ma Reception Ctr & State of Ma Civil Defense Agency Area II Headquarters in Event of Emergency at Facility ML20062H5361990-11-23023 November 1990 Forwards Info from Pilgrim Citizens Radiological Monitoring Network,Covering Rept Periods 900910-1017 ML20059P0861990-10-0101 October 1990 Notification of Significant Licensee Meeting 90-118 W/Util on 901016 to Discuss SALP ML20059L1541990-09-0707 September 1990 Notification of Significant Licensee Meeting 90-114 on 900912 at Region I Ofc to Discuss Corrective Actions & Restart Planning Re 900902 Manual Reactor Scram ML20059G4681990-08-0606 August 1990 Forwards Citizens Radiological Monitoring Network Weather Data Rept for Apr-Jul 1990 for Processing Through Nudocs Sys ML20127B4901990-08-0303 August 1990 Responds to 900726 Request for Recommendations for Appropriate Actions in Response to Inspector General Rept 90N-02 ML20127B4961990-08-0101 August 1990 Advises That Staff Did Not Conduct Thorough Review of Offsite Emergency Preparedness Which Resulted in Inaccurate Info Being Provided to Commission ML20058B4501990-06-28028 June 1990 Provides Status Rept Re Progress of off-site Emergency Preparedness Activities at Facility ML20055C2661990-02-0505 February 1990 Forwards Draft Ltr to Util Re Completion of Plant Power Ascension Program.Ltr Will Be Issued on 900209 Which Will Accept Util Completion of Power Ascension Program & Close Out Confirmatory Action Ltr CAL-86-10 ML20248C5841989-09-26026 September 1989 Notification of Significant Licensee Meeting 89-154 W/Util on 891006 in Plymouth,Ma to Discuss SALP Mgt ML20247N0121989-09-12012 September 1989 Forwards Plant Status Rept for 890826-0908.On 890830,reactor Automatically Scrammed Due to Fault on Main Generator Voltage Regulation Circuitry.On 890905,inadvertent Actuation LPCI Loop Select Logic Experienced ML20246N5751989-08-30030 August 1989 Forwards Plant Biweekly Status Rept for 890812-25 ML20245F6401989-08-0101 August 1989 Forwards Facility Biweekly Status Rept for 890715-28.NRC Restart Staff in Place & Onsite Monitoring Licensee Activities on Extended day-shift Basis During Reporting Period ML20247C0631989-07-19019 July 1989 Forwards Biweekly Status Rept for 890701-14.NRC Restart Staff in Place & Onsite & Monitoring Licensee Activities on around-the-clock Basis During Plant Startup & Power Ascension.Part 21 Related ML20247C1611989-07-14014 July 1989 Notification of Significant Licensee Meeting 89-112 W/Util on 890816 in King of Prussia,Pa to Discuss SALP ML20247E4531989-07-10010 July 1989 Forwards Plant Status Rept for 890617-30 Period.Rept Intended to Provide NRC Mgt & Public W/Overview of Plant Activities & NRC Restart Insp Activities ML20246K1141989-07-0303 July 1989 Notification of Significant Licensee Meeting 89-105/suppl Enforcement Conference Re Augmented Insp Team Findings Concerning 890412 Reactor Core Isolation Cooling Sys Overpressurization ML20245E6561989-06-22022 June 1989 Forwards Plant Biweekly Status Rept for 890603-16.On 890616, Reactor Operating at Approx 25% Power w/turbine-generator Synchronized to Grid.On 890612,util Commenced Controlled Reactor Shutdown to Perform Minor Mods,Maint & Testing ML20245F9581989-06-16016 June 1989 Notification of Significant Licensee Meeting 89-096 W/Util on 890619 in King of Prussia,Pa Re 890412 RCIC Sys ML20245A3311989-06-0909 June 1989 Notification of Significant Licensee Meeting 89-90 on 890627 W/Util in King of Prussia,Pa for Mgt Meeting to Discuss Status of Licensee Radiation Control Program ML20244E5081989-06-0707 June 1989 Forwards Biweekly Status Rept for 890520-0602.Rept Provides Overview of Plant Activities & NRC Restart Insp Activities. Part 21 Related 1999-08-18
[Table view] |
Text
{{#Wiki_filter:.
*/+tta,4 v UNITED STATES NUCLEAR REGULATORY COMMISSION j #'
f't~j REGION I
/
f 47s ALLENOALE ROAD KING oF PRUSSIA, PENNSYLVANIA 19406 g
AUG 161988 MEMORANDUM FOR: William T. Russell Regional Administrator FROM: Samuel J. Collins, Deputy Director Division of Reactor Projects
SUBJECT:
PILGRIM RESTART ASSESSMENT PANEL MEETING MINUTES On August 11 1988, the Pilgrim Restart Assessment Panel met by teleconference to discuss the status of NRC and licensee activities associated with the pro-posed plant restart. The following personnel were in attendance:
Chairman: Samael J. Collins, Deputy Director, Division of Reactor Projects (ORP)
Members: James T. Wiggins, Chief, Reactor Projects Branch No. 3, ORP Jacque P. Du. r, Chief. Engineering Branch, Division of Reactor Safety (DRS)
William J. Lazarus, Emergency Preparedness Section, Division of Radiation Safety and Safeguards (ORSS)
Others: Clay C. Warren, Senior Resident Inspector The panel discussed the issues from the last meeting, as well as the overall integration of NRC inspection and review activities. As a result of the meet-ing, the below listed actions with responsibility were agreed upon by the Panel.
A panel meeting will be held at the Sheraton in Plymouth, August 25, 1988, at 2:00 p.m. Panci members are encouraged to be present since a phone bridge may not be available for this meeting. All items below will be updated. No separate agenda will be provided for the August 25 meeting.
Task Responsibility Due Date --
- 1. Plant Status Update Resident Inspector Next Panel
- 2. Staffing / Organization Update Resident Inspector Next Panel
- Training Manager
- Maintenance Training
- 3. Site Inspection Activities Resident Inspector Next Panel Update 8812130092 001200 NS6 -190 PDR
AU6151988 Memorandum for William T. Russell 2 Task Responsibility Oue Date Update fire barrier issue Boger/Blough Next panel 4.
status of BEco submittal
- 5. Review and update NRC Restart All Next Panel checklist
- 6. Provide OIL Updates All Next Panel
- 7. ACRS Sub-Committee Preparation Collins Next Panel Status
- 8. Restart Assessment Report -- All Next Panel Begin work IAW assignments -
discuss each panel
- 9. Update Overall Milestone Collins Next Panel Schedule
- 10. Update Subset Milestone All Ongoing Schedules
- Update EP Subset Bellamy Next Panel
- Provide comments to Mcdonald Next Panel 2.206 Subset
- 11. Update Status of Power Durr Next Panel Ascension Program Oeficiencies
- 12. SEP Issues Status Boger Next Panel
- 13. Status of EQ Issues ORS Next Panel
- 14. Oegraded Security Condition - Wiggins Next Panel Enforcement Approach
- 15. Fire Barrier Penetrations - Wiggins Next Panel Enforcement Approach
- 16. Emergency Preparedness Status Bellamy Next Panel t
amue v.
M ns, Deputy Director
! Division of Reactor Projects 1
I i
l
O Memorandum for William T. Russell 3 AllG 151988
Enclosures:
- 1. Pilgrim Overall Milestone Schedule, Revision 10
- 2. Pilgrim Subset Milestone 2.206 Approach, Revision 3
- 3. Pilgrim Subset Milestone Topic Listing, Revision 9 cc w/ enc 15:
T. Murley, NRR F. Miraglia, NRR T. Martin, NRR S. Varga, NRR B. Boger, NRR R. Wessman, NRR
- 0. Mcdonald, NRR F. Akstulewicz, NRR '
J. T!oe, NRR J. Hannon, NRR B. Clayton, E00 J. Allan, RI W. /.ane, RI S. Collins, RI J. Wiggins, RI R. Blough, RI j S. Ebneter, RI J. Curr, RI R. Bellamy, RI L. Doerflein, RI M. Kohl, RI C. Warren, SRI - Pilgrim J. Lyash, RI - Pilgrim T. Kim, RI - Pilgrim i
I 1
I
. i I
~ ' ~ -
CAL 86-10 .pg $ '
Diagnos Uu.~B6- NRC Ltr Mgmt NRC SEP Ltr Restart E78
- 10 AIT RFO-7 Request Re- Meeting SALP 85-9 Team P1t Scr Start Asses)
Assess l
from Plan **E' M"
. _; $.. Idris .__ 86:41__ Rev _(L a_ _ _1
. E_ .. .__ n,, L _
a_- P.da _ BEC1___._ 3 2 = 2E 10/1/84- 2/16/86- 4/12/86 7/86 8/27/86 11/24/86 11/1/85- 7/8/87 7/8/87 7/30/87 MN 5;"
10/31/85 3/7/86 1/31/87 __ 8. ".
BECO Nuc EE e e FEMA SEP Ltr EP Ltr BECo NRR Mtg Pwr Asc Restart Site LOOP Realign-Self to to EP Re- with Prg Plan Work AIT ment Rev. 1 Int Rev 8ECo sponse BECo Submit E.. mStot_p BECo ,
g,Z_.,.,.T_J; Z. , 3 -
~ C . ,Z ua.. ,__.. n_. _ . . ,m_,..,_. .. . a -';
8/5/87 8/21/87 9/17/87 9/17/87 9/24/87 10/15/87 10/26/87 11/8/87 11/12/87 12/87 " R 2.
E$"z NRC All Re- BECo/NRC' ~INRCTublTF BECo seTF ~ o O Public Mtg Start BECo BECo SEP start Plan Resolution Mtg Re: Re- ~
O N grim Assessment Restut ,
on Restart Pre-Self Ltr to NRC Comments to R/S Plan start Plan INP0 Report N an sk Plan Assessment Except DTV BECo Comments Comments Review Submitted $
1/4/88 b_d1/27/88 A _ _. _ T _ . _
2/18/88 2/22/88 11 ,22. . . L 2/22/88 3/18/88
~'A 5/6/88 JI_. m m _ m_. ____. y 5/11/88 5/9-20/88 5/26/88
~~
MRC Rev of BECo/ Staff BEco Decis- ~ bet 5Tel'f-~~ ACR5Tuh-BECo Self- Commission ion on Ltrs gp - - - -
Assess /INP0 l'~ Committee Rpt Results NTI 1 Senior SALP Assessment Mgent Brief/ Re; Readt- 2/1/87-ACRS Prepara- Meeting at Public Mtg IATI Mgt Report ness IATI Brief Presentatior Site t-- _
- t. _ :
_A_. . _a_ . _,/Et 5/JS
_ ~ _. _ A .. - L __
g g
g
_ . 4.,._ g 5/26/88- 6/2/88 6/9/88 6/25/88 8d 7/5/88 7/15/88 7/19-21/88lB/8-24 M E 5f88J 18/26/88I 6/24/88 Rpt 7/26/88 ATI ~
2.206 NRC/ CAL IATI NRC Comp NRC Restart Restart ACRS hRC ffes~ E0P-~ -- Restart NRC 2.206 Power Assessment Report Issues ISS"" Public Public Assessmen full olution Status Issue Ascension Panel ISSU* Meeting Meeting
@omMtg SEP Iss Addressed Status Plan Rev l Report ~
y a .-__p W -, Recom RA
.; 4-_q-_Z. 37} . 4 ,C.~~.'-{ _ - 9/19/88]
a -.
] -> fl gg [9/9/88 j l jl l l j]wfo 9/19/88llw/o l l l10/7/88l l 10/7/88 l
~~
YK RedBm--- ~ T/NRR ED0'ComdisT 'NRC~Uver- y' g Recoer.enda- sion Brief- p g
-~ ---
to sight Plt -
Director / EP tion to ing Public Couva Restart Restart /PWR NRC 6 Mo. o. g NRR Issues EDO Meeting Assent Decision Ascension Release SALP g m --
y
~~ ~
f_]_ l--L_-._ 4-, -. QT.]--- q '",
L_ 'l^. LJ}_ _ J L,~4 _ ,_._,g g ;
J l_ l ._ _ .J L ___] I 1l 1l l #
ioastrr Mts.asToucs iy, .
Rsf*RT 2.2 cgs 4 E.P -'I a
sat.e A c n.s I--
Ens ooAnD _,1 sua cea - - -
go t.c_
' I t- - - can.
i i I
. . e .
l ' .
a 8 r
BCCo e ICStiE S pt.y a n gc.
,_,) AMgWD l- - . gg, sty j R65TMT
.R Gr etT" ,
i A ( l &
*
. g t e 9 m X l . . ; 0 h oEM pers thi- DRAFT '
' 2.Zof, ici u n t. co n g, t 3 t.20 G, -
DIRCH"TDh DECls to e INfVT M'"T
& P00Ltc MTG.
D IRecTDR DECtfaoc i gyg, } {*
, ggyrMitr &
2 ~
~
l - 1 I I I 1 L m
. f// I I </
~
I I / / I I // 1 I ef I [ ff j R (Mac-ige P) 3 g g .
u 3
' 8 . R i e I // 1 1 // I =
n I 1-
. fDul(Ar,oS assTs At. ' DRAFT DRAFT Fa w A z OtR st:nR r IN PuY r gp ie o bt@k - _.
. 2 706 OGctriac ME **T. C>EaSada l
1 I I i [
3
/- / I I // I I / f l '
(ng_iy i g-- - - - - )
t i #80
. I 1 ibP BECo se e ShT15FY '
9 Rc. &
EP Assesnes4L
""h g
=E g srATU.S REPORT ~
l . .
i . .
I .
- . e ENCLOSURE 3 Subset Milestones Topic Listing Area Responsibility A. Overall Milestones S. Collins B. Public and State Involvement R. Blough Meetings with Licensee C. NRR Actions for Restart O. Mcdonald D. Management Transition C. Warren E. Site Inspections / Reviews R. Blough F. EP Status R. Bellamy/F. Congel G. Power Ascension Program J. Ourr H. 2.206 Item Closecut Approach R. Wessman S. Collins Pilgrim Subset Milestones 8/12/88 Rev. 9
.. '.. {W
( ; - . .. . -
~
f#" " %,,, UNITED STATES ,
d i .
e NUCLEAR REGULATORY COMMISSION OFFICE OF GOVERNMENTAL AND PUBLIC AFFAIRS, REGION I 1
l 3[%,(,,~f}
df/
- 475 Allendale Road, King of Prussia, Pa.19408 Tel,215 337 5330 i .....
No. I-88-137 August 23, 1988
Contact:
Karl Abraham NOTE TO EDITORS AND STATION ASSIGNMENT EDITORS A. Randy Blough, Chief of the Reactor Projects Section that inspects Pilgrim has issued a status report summarizing activities of the inspection staff during the period July 30 to August 12, 1988.
The recort is attached.
Occket No. 80-293 August 13, 1983 MEMORANDUM FOR: James T. '4iggins, Chief Reactor Projects Branch No. 3 FROM: A. Randy Blough, Chief Reactor Projects Section No. 3B
SUBJECT:
PILGRIM STATUS REPORT FOR THE PERIOD JULY 30-AUGUST 12, 1938 Enclosed is the Pilgrim bi-weekly status recort from the NRC Resident Office at Pilgrim. Three resident inspectors monitored activities at the plant curing the report period. On August 8, 1988, the NRC began the Integrated Assessment Tecm Insoection (IATI) at tne Pilgrim Station. Onsite inspection will continue through August 19, 1988.
The NRC has tentatively scheduled a management meeting on August 25, 1933, in Plymouth, Massachusetts, to discuss the 1937 Systematic Assessment of Licensee Performance (SALP) report, which was issued on July 27, 1983, and assesses licensee performance for the period February 1,1987 to May IS,1983. Also, on August 26, 1988, NRC Advisory Committe.e en Reactor Safeguards will conduct a publicly held Subcommittee Meeting on Pilgrim Restart at the Plymouth Memorial Hall in Plymouth, Massachusetts.
n p 3 g jg p pg (mere)
, l f
The Pilgrim bi-weekly status report is intended to provide NRC management and !
the public with an overview of plant activities and NRC inspection activities.
Subsequent inspection reports will address many of these topics in more detail. 1 i
(Original signed by D. Haverkamp for) ,
A. Randy Blough, Chief Reactor Projects Section No. 3B
Enclosure:
> As stated l I
i ENCLOSURE PILGRIM STATUS REPORT FOR THE PERIOD JULY 30-AUGUST 12, 1988 ;
- 1. 0 Plant Status
) As of 8:00 a.m., on August 12, 1988, the reactor was in cold shutdown mode I j with moderator temperature about 94 degrees Fahrenheit. l l
2.0 Facility Ocerations Summary l
! The plant has been shutdewn for maintenance and to make program improvements
! since April 12, 1986. The reactor core was completely defueled on February i 13, 1987 to facilitate extensive maintenance and modification of plant equfp- 1
- ment. The licensee completed fuel reload on October 14, 1987. Reinsta11ation of the reactor vessel internal components and the vessel head was followed i by completion of the reactor vessel hydrostatic test. The primary containment j integrated leak rate test was also completed during the week of December 21, 1987. During this period, the licensee performed routine maintenance and surveillance tests.
3.0 Items of Soecial Interest NRC Integrated Assessment Team Inscection (IATI) I I, ;t
! The purpose ;
On August 8, 1988, the NRC began the IATI at the Pilgrim Station.
of this inspection is to perform an in-depth assessment of the licensee's
- readiness for restart. Onsite inspection will continue through August 19, a 1988. Development of an NRC staff recom.mendation to the Commission relative l
to restart will be based in part, on the recent SALP and IATI results.
i The thirteen member team consists of a senior manager, inspection team leader, i
five shift inspectors and several specialist inscectors from both Region I l
and the Offico of Nuclear Reactor Regulation. The senior manager is 4 Mr. Samuel J. Collins, Deputy Director, Oivision of Reactor Projects.
1 Region I, and the Team Leader is Mr. A. Randy Blough, Chief, Reactor Pro-jects Section No. 38, Region I.
]
i
! (more)
3 Two representatives from the Commonwealth of Massachusetts are on the team as observers throughout the inspection.
Scheduled SALP Management Meetino The NRC has scheduled a SALP management meeting for 10:00 a.m. on August 25, 1988, at Sheraton Plymouth at Village Landing in Plymouth, Massachusetts, to discuss the report with licensee senior management. The SALP report for Pilgrim covering the period of February 1,1987 through May 15, 1988 was issued on July 28, 1988. The meeting will be open for public observation. A copy of the Meeting Notice is attached.
Scheduled ACRS Subcommittee Meeting A subcor..mittee of the Nuclear Regula* ry Commission's Advisory Committee on Reactor Safeguards (ACRS) will ho:d a technical meeting on August 26 in Plymouth, Massachusetts, to discuss the proposed restart )f the Pilgrim Nuclear Power Plant in Massachusetts.
The meeting, which is open to the public, will begin at 8 a.m. at the Memorial Hall, 83 Court Street. Representatives of the NRC staff, and of the Boston Edison Cor.pany (BECo). It is also anticipated that members of the public will be permitted to address the Sub-Committee after the NRC staff and BEco sessions conclude, which is currently projected for about 2:30 p.m.
The ACRS is a statutory Committee established to advise the Commission on the safety aspects of proposed and existing nuclear facilities and the adequacy of proposed reactor safety standards, and to perform such other duties as the Commission may request.
4.0 Emercency Notification System (ENS) Reoort On August 2, 1988, a small fire occurred inside the protected area. Repairs to the permanent sodium hypw.orite storage tank located in the intake structure were ongoing. As ldet of these repairs, several bolts were being removed using a torch. At 3:25 p.m., the assigned fire watch observed smoke escaping from beneath fire retardant cloth which had bien installed to support the job. The room was evacuated, the fire brigade assembled, and the fire was extinguished a brief time later. In accordance with the licensee pro-cedures, the Plymouth Fire Department was notified. Two fire trucks arrived cnsite at about 3:50 p.m. af ter the fire had been declared out. The fire occurred in a building outside the radiologicnlly controlled area of the piant.
Consequently, there were no radiation or radioactive contamination ha:neds involved. The licensee notified the NRC via ENS of the incident at 5:30 p.m.
(more)
4 5.0 NRC Staff Status During the Period The inspection staff at Pilgrim during the report period consisted of the following:
Clay Warren ---
Senior Resident Inspe a r Jeffrey Lyash ---
Resident Inspector Tae Kim ---
Resident Inspector In addition, two reactor engineers from Region I and a resident inspector fromYankeeRowefacilitywereonsiteduringtheweekofAugust1,1988, to assist the resident inspectors in reviewing the licensee s corrective actions on previous inspection findings. The results of these inspector activities will be documented in the NRC Inspection Report 50-293/88-27.
e l Document Name:
PA0 I-88-137 Reques s ID:
JANE Author's Name:
Abraham Document Comments:
f I
!}}