ML20059P086

From kanterella
Jump to navigation Jump to search
Notification of Significant Licensee Meeting 90-118 W/Util on 901016 to Discuss SALP
ML20059P086
Person / Time
Site: Pilgrim
Issue date: 10/01/1990
From: Rogge J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 9010250205
Download: ML20059P086 (2)


Text

~

l s;

N OCT 011990 t

U.S. NUCLEAR REGULATORY COMMISSION No.90-118 REGION I NOTICE OF SIGNIFICANT LICENSEE MEETING Licensee:

Boston Edison Company Facility:

Pilgrim Nuclear Power Station Docket No.:

50-293 Time and Date:

1:00 p.m., Tuesday, October 16, 1990 Location:

Chiltonv111e Training Center, Plimoth Plantation Highway, Plymouth, Massachusetts

Purpose:

Systematic Assessment of Licensee Performance ($' ALP)

Management Meeting (50-293/89-99)

NRC Attendees:

D. Wessman, Director, Project Directorate I-3, Office of Nuclear Reactor Regulation (NRR)

W. Hodges, Director, Division of Reactor Safety (DRS)

R. Cooper, Deputy Director, Division of Radiation Safety and Safeguards (DRSS)

J. Johnson, Chief, Projects Branch No. 3, Division of Reactor Projects (DRP)

J. Rogge, Chief, Reactor Projects Section 3A, DRP R. Eaton, Project Manager, PD I-3, NRR J. Macdona~1d, Senior Resident Inspector W. Olsen, Resident Inspector Licensee Attendees: R. Bird, Executive Vice President G. Davis, Senior Vice President - Nuclear R. Anderson, Vice President - Nuclear Operations R. Ledgett, Director, Special Projects R. Swanson, Regulatory Affairs Department Manager R. Varley, Emergency Preparedness Department Manager F. Famulari, Quality Assurance Department Manager N. DiMascio, Radiological Protection Section Manager L Olivier, Operations Section Manager R, Stubbs, Maintenance Section Manager R. Fairbanks, Nuclear Engineering Department Manager Note: This meeting is open to the public. Attendance by NRC personnel at this meeting should be made known by 4:00 p.m., Friday, October 12, 1990 via telephone call to J. Rogge, Region I, at FTS 8-346-5146 or Commercial (215) 337-5146.

i SIGNE l

l Prepared by: _

_mo g,chn F. Rogge, Chif, [J S 3A l

JC SO 0FFICIAL RECORD COPY LIC MTG NOTICE 90-118 - 0001.0.0

[

09/?S/90 291 MP9E9# ?91991_

' ~ '

P PNU m

s

, q;

. x

",, -./

2 0CT 011990 7

m Distribution:

J. M. Taylor, Executive Director for Operations J.-Sniezek, Deputy Executive Director for Nuclear Reactor Regulation, Regional

" Operations and Research (DEDR)

H. Thompson, Deputy Executive Director for Nuclear Material Safety, Safeguards q'

. and Operations Support (DEDS)

B. K. Grimes, Director, Division of Reactor Inspection and Safeguards, NRR J. Lieberman, Director, Office of. Enforcement T. E. Murley, Director, Office of Nuclear Reactor Regulation W. T. Russell, Associate Director for Inspection and Technical Assessment, NRR S. Varga, Director, Division of Reactor Projects

-I/II', NRR B. Boger, Assistant Director for Region I Reactors, NRR D.' Wessman, Director, Project Directorate 1-3, NRR R. Eaton, Project Manager, PD I-3, NRR W. Bateman, NRR -

J.- Caldwell, Regional Coordinator, EDO N. Green' Jr., Policy Development & Technical Support Branch Public Document Room (PDR) local Public Document Room (LPDR)

Commonwealth'of Massachusetts (2)

NRC Resident ~ Inspector W. Griffin, Plymouth Board of Selectmem Honorable William B. Golden, Massachusetts State Senator q'-

bCC:

Regional Administrator Deputy Regional Administrator

[

Division Directors 1

Branch Chiefs

.Section Chiefs Public Affairs Officer (2 copies)

TJ.,McGrath,.RI M.: Miller, RI j

.K.; Smith, RI D. Holody,=RI

' Region I Receptionist DRMA-Files-1 DRP Files e

Bulletin Board

-M. J' DIDonato,:DRP I

k i

s

/B fTey/meo Rog e Jo ngon s

9/25/90

/ %

hl 0FFICIAL RECORD COPY-LIC MTG NOTICE 90-118

.0002.0.0-

-09/U5/90

!I'

_a g

'