Notification of Significant Licensee Meeting 89-105/suppl Enforcement Conference Re Augmented Insp Team Findings Concerning 890412 Reactor Core Isolation Cooling Sys Overpressurization
ML20246K114
Person / Time
Site: Pilgrim
Issue date: 07/03/1989
From: Blough A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
EA-89-095, EA-89-95, NUDOCS 8907180060
Download: ML20246K114 (2)


Text

,,

9,)

?,

e.

I J

e, g

'JUL,O'8 M -

U.S. NUCLEAR REGULATORY COMMISSION No.89-105 REGION I-NOTICE'0F SIGNIFICANT LICENSEE MEETING

^

Licensee:

Boston Edison Company Facility:

Pilgrim Nuclear Power Station

. Docket No.:

50-293 Time and Date:

12:30 p.m., July'19, 1989.

Location:

NRC Region I, DRP Conference Room, King of Prussia, PA f'

Purpose:

Supplemental Enforcement Conference Concerning AIT Findings Regarding the. April. 12, 1989 Reactor Core Isolation Cooling system LNerpressurization (EA 89-95)-

NRC Attendees:

W. Russell, Regional Administr. tor S. Collins, Deputy Director,. Division of Reactor Project (DRP).

J. Durr, Chief,. Engineering Branch,-Division of Reactor Safety (DRS)

J. Wiggins, Chief, Projects Branch No. 3, DRP.

R. Blough, Chief, Reactor Projects Section 3B, DRP-J. Gutierrez, Regional Coun 91 D. Holody. Enforcement Specialist W. Troskoski, Senior Enforcement Specialist, Office of Enforcement D. Mcdonald, Project Manager,-PD I-3, NRR T. Kim, Resident Inspector Licensee Attendees: R. Bird, Senior Vice - Nuclear R. Anderson, Plant Manager V. 0heim, Acting Regulatory Affairs Note: Enforcement Conferences are not c en for public observation. Attendance r

by NRC personnel at this meeting should be made known by 10:00 a.m.,

July 18,1989, via telephone call to A.

p1 Blou h, Region I, at FTS 8-346-5146 or (215) 337-5146.

mu, S By Prepared by:

A. Randy Clough, Chief Reactor Projects Section No. 3B hh3 g

DOC

$E'@

PD I

t 1

0FFICIAL RECORD COPY BLOUGH 536 6/29/89 - 0001.0.0 06/29/89 C m m t.c.t o

  • ?

o' y.

JUL 0 31989 Distribution:

V. Stello, Jr., Executive Director for Operations J. Taylor, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research H. Thompson, Deputy Executive Director for Materials Safety, Safeguards and Operations Support B. Grimes, Director, Division of Reactor Inspection and Safeguards, NRR J. Lieberman, Director, Office of Enforcement J. Goldberg, Deputy Assistant General Counsel for Enforcement T. Murley, Director, Office of Nuclear Reactor Regulation F. Miraglia, Associate Director for Inspection and Technical Assessment, NRR S. Varga, Director, Division of Reactor Projects - I/II, NRR B. Boger, Assistant Director for Region I Reactors, NRR D. Wessman, Director, Project Directorate I-3, NRR D. Mcdonald, Project Manager, PD I-3, NRR J. Dyer, Regional Coordinator, ED0 Public Document Room (PDR)

Local Public Document Room (LPDR)

Commonwealth of Massachusetts (2)

NRC Resident Inspector W. Griffin, Plyr.outh Board of Selectmem Honorable William B. Golden, Massachusetts State Senator bec:

Regional Administrator Deputy Regional Administrator Division Directors Branch Chiefs Section Chiefs Public Affairs Officer (2 copies)

J. McGrath, RI M. Miller, RI J. Gutierrez, RI D. Holody, RI Region I Receptionist DRMA Files DRP Files Bulletin Board M. J. DiDonato, DRP JLyash/s/jdRI:DRP/< RI:DRP RBlough gf 4:'//89

(./t}/89 0FFICIAL RECORD COPY BLOUGH 536 6/29/89 - 0002.0.0 06/29/89

,