Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20211H444 | 27 August 1999 | Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues | |
ML20211E149 | 23 August 1999 | Notification of Licensee Meeting with Util on 990830 to Discuss Recent Refueling Maint Outage | |
ML20209G242 | 14 July 1999 | Notification of 990722 Meeting with License in Rockville, MD to Discuss Changes in EOI Licensing Organization Including Division of Responsibilities within New EOI Corporate Licensing Group | |
ML20209F611 | 12 July 1999 | Revised Notification of 990805 Meeting with Util to Discuss Radiation Protection Issues Identified in NRC Insps Repts 50-458/98-10 & 50-458/99-04 | |
ML20209D827 | 7 July 1999 | Notification of 990719 Licensee Meeting in Arlington,Tx to Discuss Failed Fuel Recovery Project | |
ML20196G032 | 24 June 1999 | Notification of 990726 Meeting with Util to Discuss Radiation Protection Issues | |
ML20195F881 | 10 June 1999 | Notification of 990622 Meeting with Util in Rockville,Md to Discuss Related Issues Associated with Fuel Integrity Problems Experienced During Recent Cycle 8 Operation | |
ML20207E923 | 2 June 1999 | Notification of 990611 Meeting with EOI in Rockville, Maryland to Be Briefed by EOI & to Discuss Related Issues Associated with Fuel Integrity Problems Experienced During Recent Cycle 8 Operation | |
ML20207G376 | 2 June 1999 | Revised Notification of 990611 Meeting with EOI in Rockville,Maryland to Discuss Issues Associated with Fuel Integrity Problems Experienced During Recent Cycle 8 Operation.Meeting Cancelled | |
ML20205R887 | 20 April 1999 | Notification of 990504 Meeting with Util in Rockville,Md to Discuss Proposal to Submit Consolidated Security Plan for Util Sites | |
DD-99-05, Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action | 20 April 1999 | Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action | |
ML20196K947 | 6 April 1999 | Notification of Significant Licensee Meeting with Util on 990420 to Discuss Results of Most Recent NRC Plant Performance Review | |
ML20205C448 | 29 March 1999 | Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990222-0303 | Safe Shutdown Shutdown Margin High Radiation Area Half scram Grab sample Offsite Dose Calculation Manual Time to boil Met Tower Job Performance Measure Scram Discharge Volume |
IR 05000458/1999301 | 29 March 1999 | Forwards NRC Operator Licensing Exam Rept 50-458/99-301 (Including Completed & Graded Tests) for Tests Administered on 990222-0303 | Shutdown Margin High Radiation Area Half scram Grab sample Offsite Dose Calculation Manual Time to boil Met Tower Job Performance Measure Scram Discharge Volume |
ML20207K916 | 11 March 1999 | Notification of Significant Licensee Meeting with Util on 990325 to Discuss River Bend Station Engineering Program & Performance with Project,Maintenance & Engineering Branch Personnel | |
ML20199L051 | 21 January 1999 | Notification of 990222 Meeting with Util in Rockville,Md for Ucs to Present Addl Info & Clarify Issues Raised in Two 10CFR2.206 Petitions Re River Bend Station & Perry Nuclear Power Plant | |
ML20195G112 | 17 November 1998 | Notification of 981201-02 Meeting with Entergy Operations in Taft,Louisianna to Conduct Joint Workshop for Licensing Personnel from Entergy & Nrc,Project Directorate IV-1 | |
ML20195F169 | 12 November 1998 | Notification of 981123 Meeting with Entergy Operations,Inc in Arlington,Tx to Discuss Apparent Inoperability of Divs I & II Emergency DGs | |
ML20153H667 | 8 September 1998 | Revised Notification of 981007 Meeting with Util to Discuss Level of Instructions & Details for Transferring QA Plan Details from Current Program Plans at Four Sites to Std Program Plan at All Sites.Originally Scheduled for 980929 | |
ML20151U797 | 8 September 1998 | Notifies of 980929 Meeting with Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring Quality Assurance Plan Details from Current Program Plans at Four Sites to Std Quality Assurance Program Plan | |
ML20151T614 | 3 September 1998 | Notification of Licensee Meeting W/Util on 980910 in Arlington,Tx to Discuss Plant Performance W/Regional Administrator & Division Directors | |
ML20238F586 | 28 August 1998 | Notification of 980909 Meeting w/BWR/6S:EOI & Listed Utils in Rockville,Md to Discuss W/Nrc Planned Applications by Licensees to Reduce Operability Requirements During Refueling Outages | |
ML20237A281 | 12 August 1998 | Notification of 980827 Meeting W/Nrc & Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring QA Plan Details from Current Program Plans at Four Sites | |
ML20236Q937 | 13 July 1998 | Notification of Licensee Meeting W/Entergy Operations,Inc on 980729 in Arlington,Tx to Discuss Results of Plant Fire Protection Functional Insp | |
ML20249A210 | 11 June 1998 | Notification of 980702 Meeting W/Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring Quality Assurance Plan Details from Current Program Plans at Four Sites to Std Quality Assurance Program Plan for Site | |
ML20248M196 | 8 June 1998 | Notification of Significant Licensee Meeting W/Util on 980626 in Arlington,Tx Re Predecisional EC to Discuss Apparent Violation of 10CFR50.9 | |
ML20216D635 | 13 April 1998 | Notification of 980416 Meeting W/Util in Rockville,Md to Discuss Entergy Operations,Inc Initial Proposal to Standardize Security Plans for Listed Plants | |
ML20217E847 | 26 March 1998 | Notification of Significant Licensee Meeting W/Util on 980402 to Discuss Entergy Operations,Inc Annual Performance Assessment | |
ML20216B139 | 10 March 1998 | Notification of Significant Licensee Meeting W/Util on 980324 to Consider Licensee Assessment of Performance Since Feb 1997 & to Discuss Design Basis of Standby Gas Treatment Sys & Effect on Operator Access to Reactor Bldg | |
ML20197B872 | 5 March 1998 | Notification of 980401 Meeting W/Util in Jackson,Ms to Discuss Licensing Issues & Regulatory Performance Efficiencies W/Licensing Staff for Plants.Meeting Agenda Encl | |
ML20203B413 | 5 February 1998 | Notification of 980319 Meeting W/Entergy Operations,Inc,In Rockville,Md to Discuss Level of Instructions & Details of Transferring QA Plan Details from Current Program Plans at Four Sites to Standard QA Program Plan for Use at All Sites | |
ML20198M835 | 12 January 1998 | Notification of 980122 Meeting W/Util in Rockville,Md to Discuss Site Licensing Status for Listed Plants & to Explore Ways to Standardize Licensing Submittals & Issuances | |
ML20202G156 | 3 December 1997 | Forwards Facility Submitted Outline,Initial Exam Submittal & as Given Operating Exam,Administered on 970728-0801 at Plant,Unit 1 | |
ML20202G168 | 3 December 1997 | Forwards SRO Exam Rept Key for Exams Administered on 970728-0801 at Plant | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Loop seal Half scram Hydrostatic Squib Abnormal operational transient Scram Discharge Volume Fuel cladding Fire Watch |
ML20199E685 | 18 November 1997 | Notification of Licensee Meeting W/Util on 971202 to Discuss Circumstances Surrounding Two Incidents on 970913 & 971004 | |
ML20198K079 | 15 October 1997 | Notification of 971022 Meeting W/Entergy Operations,Inc in Rockville,Md Re Standard Quality Assurance Manual for Entergy Sites | |
ML20141H811 | 31 July 1997 | Notification of 970819 Meeting W/Entergy Operations,Inc in Rockville,Md to Discuss Open Issues from Fire Protection Functional Insp Conducted at River Bend Station During July 1997.Meeting Agenda Attached | Safe Shutdown |
ML20141H232 | 20 May 1997 | Revised Notification of 970717 Licensee Meeting W/Util in Arlington,Tx to Discuss Long Term Performance Improvement Plan.Date Changed from 970522 | |
ML20141A719 | 12 May 1997 | Notification of 970520 Meeting W/Util in Rockville,Md to Discuss Proposed Removal of Leakage Control Sys on Main Steam Lines & Other Penetrations & to Increase Allowable Leak Rate for MSIVs | |
ML20141B937 | 8 May 1997 | Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 970127-0214 | Safe Shutdown Reactor Vessel Water Level Half scram Grab sample Squib Emergency Lighting Job Performance Measure Scram Discharge Volume Operability Determination Overtravel Fire Watch Grace period Unidentified leakage Siren |
ML20138K082 | 8 May 1997 | Notification of Licensee Meeting W/Util on 970522 in Arlington,Tx to Discuss Long Term Performance Improvement Plan | |
ML20203C092 | 23 April 1997 | Discusses Initiation of OI Rept 4-97-003 Re Falsification of Fire Watch logs.EA-97-184 Assigned to Track Case.Viewgraphs from 970602 Predecisional Enforcement Conference Encl | Reactor Vessel Water Level High Radiation Area Grab sample Foreign Material Exclusion Scram Discharge Volume Liquid penetrant Pressure Boundary Leakage Fire Protection Program Fire Watch Hourly Fire Watch |
ML20137W684 | 15 April 1997 | Notification of 970502 Meeting W/Listed Attendees in Jackson,Mi.Meeting Agenda Encl | |
ML20203C087 | 15 April 1997 | Requests Review of OI Rept 4-97-003 Issued 970411.OI Has Concluded That Deliberate Violation of Requirements Occurred | |
ML20137K523 | 1 April 1997 | Notification of 970414 Meeting W/Util in Arlington,Tx to Introduce Entergy Mgt | |
ML20147H413 | 31 March 1997 | Forwards SE Accepting Proposed P-T Limits for Heatup, Cooldown,Inservice Leak & Hydrostatic Testing & Core Criticality Acceptable to 12 Efpy.Salp Input Also Encl | Hydrostatic |
ML20137C920 | 20 March 1997 | Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement | Unanalyzed Condition |
ML20136D553 | 10 March 1997 | Notification of 970313 Meeting W/Util in Rockville,Md to Discuss Proposed Program & Design for ECCS Strainers for Plant,In Response to NRC Bulletin 96-003, Potential Plugging of ECCS Strainers by Debris in Bwrs | |
ML20134P223 | 20 February 1997 | Discusses Ti 2515/122 Evaluation or Rosemount Pressure Transmitter Performance & Licensee Enhanced Surveillance Programs multi-plant Action B-122 | |
ML20134P175 | 14 February 1997 | Notification of Licensee Meeting W/Licensee on 970318 in St Francisville,La to Present Results of SALP Rept | Systematic Assessment of Licensee Performance |