MONTHYEARJAFP-99-0278, Application for Amend to License DPR-59,providing Rev C to Proposed TS Change Converting Current TSs to Improved Standard Tss.Withdrawal of JPTS-95-004,proposed TS Changes Re Inservice Leak & Hydrostatic Testing Operation,Reflected1999-10-14014 October 1999 Application for Amend to License DPR-59,providing Rev C to Proposed TS Change Converting Current TSs to Improved Standard Tss.Withdrawal of JPTS-95-004,proposed TS Changes Re Inservice Leak & Hydrostatic Testing Operation,Reflected JAFP-99-0279, Correction to 980226 Application for Amend to License DPR-59,revising Ref 19 to Assume 90% SBGT Sys Charcoal Efficiency,Instead of 99%.Ref 19 on TS Page 285 Needs to Be Changed from Rev 0 to Rev 1,based on Revised Calculation1999-10-14014 October 1999 Correction to 980226 Application for Amend to License DPR-59,revising Ref 19 to Assume 90% SBGT Sys Charcoal Efficiency,Instead of 99%.Ref 19 on TS Page 285 Needs to Be Changed from Rev 0 to Rev 1,based on Revised Calculation ML20216J8321999-09-29029 September 1999 Application for Amend to License DPR-59,proposing Change to TS 3.5.B.3 & Associated Bases.Change Extends LCO for RHRSW Sys from 7 Days to 11 Days with Special Conditions to Allow for Installation of Mod to Division a RHRSW Strainer ML20196F5931999-06-22022 June 1999 Application for Amend to License DPR-59,changing to Pressure Temp limits.Pressure-temp Curves & Associated LCO & Bases Changes Included in Proposed Amend ML20195B8741999-06-0101 June 1999 Revised Application for Amend to License DPR-59,converting Plant CTS to Be Consistent with Improved Std TS in NUREG-1433,Rev 1,dtd Apr 1995 ML20206U1351999-05-19019 May 1999 Application for Amend to License DPR-59,requesting 14 Day AOT for EDG Sys ML20205K1041999-04-0505 April 1999 Application for Amend to License DPR-59,removing Position Title of General Manager from Sections & Will State That If Site Executive Officer Is Unavailable,Responsibilities Will Be Delegated to Another Staff Member,In Writing ML20205D8271999-03-26026 March 1999 Application for Amend to License DPR-59,converting CTS to Be Consistent with Improved Std TS in NUREG-1433,Rev 1 ML20199H3511999-01-15015 January 1999 Application for Amend to License DPR-59,removing Local Power Range Monitor (LPRM) Signal Calibr Method from TS Table 4.1-2 JAFP-98-0385, Revised Application for Amend to License DPR-59,revising Design Features.Rev 7 to non-proprietary & Proprietary Versions of HI-971661, Licensing Rept for Reracking of Ja FitzPatrick SFP, Encl.Proprietary Info Withheld1998-12-0303 December 1998 Revised Application for Amend to License DPR-59,revising Design Features.Rev 7 to non-proprietary & Proprietary Versions of HI-971661, Licensing Rept for Reracking of Ja FitzPatrick SFP, Encl.Proprietary Info Withheld ML20236X7811998-08-0303 August 1998 Application for Amend to License DPR-59,proposing Rev to Note Which Will Allow TS Section 1.1.A Re SLMCPR to Be Applicable During Cycle 14 ML20236M6151998-07-10010 July 1998 Application for Amend to License DPR-59 to Relocate Portions of TS 3/4.6.C, RCS - Coolant Chemistry, from TS to UFSAR & Applicable Plant Procedures Controlled by 10CFR50.59 Process ML20236L2741998-07-0606 July 1998 Application for Amend to License DPR-59,amending Tech Specs Section 3.5.b.1 Re Main Condenser Steam Jet Air Ejector & Table 3.10-1 Re Radiation Monitoring Sys That Initiates &/Or Isolates Sys ML20249B1551998-06-16016 June 1998 Application for Amend to License DPR-59,relocating Safety Review Committee Review,Audit & Related Record Keeping Requirements from Tech Specs to Chapter 17 of Fsar,Per Administrative Ltr 95-06 ML20217K0361998-03-30030 March 1998 Application for Amend to License DPR-59,changing Interval of Selected LSFT from Semiannually to Once Per 24 Months & Revising Definition of LSFT to Be Consistent w/NUREG-1433 ML20247F7791998-02-26026 February 1998 Application for Amend to License DPR-59,changing Allowable Containment Leakage Rate to 1.5 Percent Per Day & Assumed Value of Filter Efficiency for SBGT Used in Calculations to Determine Dose Effects to Onsite ML20202G8551998-02-0606 February 1998 Revised Application for Amend to License DPR-59,to Revise TS Tables 3.2-2 & 4.4-2,revising Allowed Outage Times for 4kV Emergency Bus Undervoltage Trip Functions & Replace Generic Actions for Inoperable Instrument Channels ML20202D5391998-02-0606 February 1998 Application for Amend to License DPR-59,allowing RCS Pressure Tests to Be Performed in Cold Shutdown Mode ML20202D3881998-02-0606 February 1998 Application for Amend to License DPR-59,revising RPS Normal Supply Electrical Protection Assembly Undervoltage Trip Setpoint as Result of Reanalysis Based on Most Limiting Min Voltage Requirements of Applied Loads ML20203J6671997-12-12012 December 1997 Application for Amend to License DPR-59,revising TS Section 6.2.2.6 Re Administrative Controls for Normal Working Hours of Plant Staff Who Perform Safety Related Functions ML20217H9801997-10-14014 October 1997 Application for Amend to License DPR-59,proposing Revision to TS Re Design Features Section,Including Revised Limits for Fuel Storage.Changes Correct Maximum Exposure Dependent, Infinite Lattice Multiplication Factor for Fuel Bundles ML20217G2991997-10-0808 October 1997 Application for Amend to License DPR-59,reflecting Change in LCO ML20140D8011997-04-14014 April 1997 Application for Amend to License DPR-59,deleting Plant Staff Performance Audit Requirement from Section 6.5.2.9.b & Incorporating Plant Staff Performance Review Requirement in Section 6.5.2.8 ML20135B1871996-11-26026 November 1996 Application for Amend to License DPR-59,requesting That Snubber Operability,Surveillance & Records Requirements in TS Be Relocated to Plant Controlled Documents ML20115G0581996-07-12012 July 1996 Application for Amend to License DPR-59,revising Min Critical Power Ratio Safety Limit ML20113B6261996-06-20020 June 1996 Application for Amend to License DPR-59,supporting Adoption of Primary Containment Leakage Rate Testing Requirements of Option B 10CFR50,App J at Plant ML20112D5661996-05-30030 May 1996 Application for Amend to License DPR-59,eliminating Selected Response Time Testing Requirements ML20112D1501996-05-30030 May 1996 Application for Amend to License DPR-59,revising Minimum Critical Power Ratio Safety Limit & Associated Basis ML20112D2671996-05-30030 May 1996 Application for Amend to License DPR-59,revising ATWS Recirculation Pump Trip Reactor Pressure ML20112B6411996-05-16016 May 1996 Application for Amend to License DPR-59,deleting Requirement for PORC to Review Fire Protection Program & Implementing Procedures.Addl Deletion of Insp & Audit Requirements of Specs 6.14.A & 6.14.B ML20108D1151996-04-24024 April 1996 Application for Amend to License DPR-59,supporting Adoption of Primary Containment Lrt Requirements of Option B to 10CFR50,App J & Clarifying Numerical Value of Allowable Containment Leakage Rate as 1.5% Per Day ML20107M4461996-04-24024 April 1996 Application for Amend to License DPR-59,relocating TS 3.11.B/4.11.B Crescent Area Ventilation & Associated Bases from TS to Controlled Procedure ML20101H6671996-03-27027 March 1996 Application for Amend to License DPR-59,adopting Primary Containment Lrt Requirements of Option B to 10CFR50,App J at Plant & Clarifies Numerical Value of Allowable Containment Lrt as 1.5% Per Day ML20101F8311996-03-22022 March 1996 Application for Amend to License DPR-59,revising TS to Implement BWROG Option I-D long-term Solution for Thermal Hydraulic Stability ML20101H3671996-03-22022 March 1996 Application for Amend to License DPR-59,changing TS Table 3.2-2, Core & Containment Cooling Sys Initiation & Control Instrumentation Operability Requirements ML20097A1921996-02-0101 February 1996 Application for Amend to License DPR-59,allowing RCS Pressure Tests to Be Performed While Remaining in Cold Shutdown Mode ML20100C2911996-01-25025 January 1996 Application for Amend to License DPR-59,revising Allowed out-of-service Times for Single Inoperable EDGs to Accommodate on-line Maint of EDGs ML20097J6661996-01-25025 January 1996 Application for Amend to License DPR-59,revising TS to Extend Instrumentation & Miscellaneous Surveillance Test Intervals to Support 24-month Operating Cycle ML20095F7051995-12-14014 December 1995 Application for Amend to License DPR-59,revising TSs to Incorporate IST Requirements of Section XI of ASME Boiler & Pressure Vessel Code JPN-95-051, Application for Amend to License DPR-59,proposing to Extend Surveillance Test Intervals for SLC Sys to Support 24 Month Operating Cycles1995-11-30030 November 1995 Application for Amend to License DPR-59,proposing to Extend Surveillance Test Intervals for SLC Sys to Support 24 Month Operating Cycles ML20094B6471995-10-25025 October 1995 Application for Amend to License DPR-59,revising TS Re Extensionof Containment Sys Surveillance Test Intervals to Accommodate 24 Month Operating Cycles ML20092H5341995-09-15015 September 1995 Application for Amend to License DPR-59,proposing TS by Extending Surveillance Test Intervals for Auxiliary Electrical Sys to Support 24 Month Operating Cycles ML20086P6421995-07-21021 July 1995 Application for Amend to License DPR-59.Amend Would Replace title-specific List of Members on PORC W/More General Statement of Membership Requirements ML20085G3561995-06-15015 June 1995 Application for Amend to License DPR-59,proposing Changes to Ts,By Extending Surveillance Test Intervals for Control Rod Sys to Support 24 Month Operating Cycles ML20083M8081995-05-12012 May 1995 Application for Amend to License DPR-59,extending Surveillance Test Intervals for Esws to Support 24 Month Operating Cycles,Per GL 91-04 JPN-95-022, Application for Amend to License DPR-59.Amend Would Extend Surveillance Test Intervals for Nuclear Steam Supply Sys to Support 24 Month Operating Cycles1995-04-12012 April 1995 Application for Amend to License DPR-59.Amend Would Extend Surveillance Test Intervals for Nuclear Steam Supply Sys to Support 24 Month Operating Cycles JPN-95-011, Application for Amend to License DPR-59,to Extend Surveillance Test Intervals for Snubber Systems to Support 24 Month Operating Cycles1995-03-0202 March 1995 Application for Amend to License DPR-59,to Extend Surveillance Test Intervals for Snubber Systems to Support 24 Month Operating Cycles JPN-95-007, Application for Amend to License DPR-59,to Impose Operability & Surveillance Requirements for Rv Overfill Protection Instrumentation1995-02-22022 February 1995 Application for Amend to License DPR-59,to Impose Operability & Surveillance Requirements for Rv Overfill Protection Instrumentation JPN-94-065, Application for Amend to License DPR-59,revising TSs Re PORC Membership & Review Responsibilities1994-12-0202 December 1994 Application for Amend to License DPR-59,revising TSs Re PORC Membership & Review Responsibilities ML20076F4631994-10-0707 October 1994 Application for Amend to License DPR-59,changing TS Re Safety/Relief Valve Testing Requirements 1999-09-29
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARJAFP-99-0279, Correction to 980226 Application for Amend to License DPR-59,revising Ref 19 to Assume 90% SBGT Sys Charcoal Efficiency,Instead of 99%.Ref 19 on TS Page 285 Needs to Be Changed from Rev 0 to Rev 1,based on Revised Calculation1999-10-14014 October 1999 Correction to 980226 Application for Amend to License DPR-59,revising Ref 19 to Assume 90% SBGT Sys Charcoal Efficiency,Instead of 99%.Ref 19 on TS Page 285 Needs to Be Changed from Rev 0 to Rev 1,based on Revised Calculation JAFP-99-0278, Application for Amend to License DPR-59,providing Rev C to Proposed TS Change Converting Current TSs to Improved Standard Tss.Withdrawal of JPTS-95-004,proposed TS Changes Re Inservice Leak & Hydrostatic Testing Operation,Reflected1999-10-14014 October 1999 Application for Amend to License DPR-59,providing Rev C to Proposed TS Change Converting Current TSs to Improved Standard Tss.Withdrawal of JPTS-95-004,proposed TS Changes Re Inservice Leak & Hydrostatic Testing Operation,Reflected ML20216J8321999-09-29029 September 1999 Application for Amend to License DPR-59,proposing Change to TS 3.5.B.3 & Associated Bases.Change Extends LCO for RHRSW Sys from 7 Days to 11 Days with Special Conditions to Allow for Installation of Mod to Division a RHRSW Strainer ML20196F5931999-06-22022 June 1999 Application for Amend to License DPR-59,changing to Pressure Temp limits.Pressure-temp Curves & Associated LCO & Bases Changes Included in Proposed Amend ML20195B8741999-06-0101 June 1999 Revised Application for Amend to License DPR-59,converting Plant CTS to Be Consistent with Improved Std TS in NUREG-1433,Rev 1,dtd Apr 1995 ML20206U1351999-05-19019 May 1999 Application for Amend to License DPR-59,requesting 14 Day AOT for EDG Sys ML20205K1041999-04-0505 April 1999 Application for Amend to License DPR-59,removing Position Title of General Manager from Sections & Will State That If Site Executive Officer Is Unavailable,Responsibilities Will Be Delegated to Another Staff Member,In Writing ML20205D8271999-03-26026 March 1999 Application for Amend to License DPR-59,converting CTS to Be Consistent with Improved Std TS in NUREG-1433,Rev 1 ML20199H3511999-01-15015 January 1999 Application for Amend to License DPR-59,removing Local Power Range Monitor (LPRM) Signal Calibr Method from TS Table 4.1-2 JAFP-98-0385, Revised Application for Amend to License DPR-59,revising Design Features.Rev 7 to non-proprietary & Proprietary Versions of HI-971661, Licensing Rept for Reracking of Ja FitzPatrick SFP, Encl.Proprietary Info Withheld1998-12-0303 December 1998 Revised Application for Amend to License DPR-59,revising Design Features.Rev 7 to non-proprietary & Proprietary Versions of HI-971661, Licensing Rept for Reracking of Ja FitzPatrick SFP, Encl.Proprietary Info Withheld ML20236X7811998-08-0303 August 1998 Application for Amend to License DPR-59,proposing Rev to Note Which Will Allow TS Section 1.1.A Re SLMCPR to Be Applicable During Cycle 14 ML20236X5831998-07-29029 July 1998 Amend 245 to License DPR-59,consisting of Changes to TS in Response to Application Transmitted by ,Requesting Rev of Reactor Protection Sys Normally Supply Electrical Protection Assembly Undervoltage Trip Setpoint ML20236M6151998-07-10010 July 1998 Application for Amend to License DPR-59 to Relocate Portions of TS 3/4.6.C, RCS - Coolant Chemistry, from TS to UFSAR & Applicable Plant Procedures Controlled by 10CFR50.59 Process ML20236L2741998-07-0606 July 1998 Application for Amend to License DPR-59,amending Tech Specs Section 3.5.b.1 Re Main Condenser Steam Jet Air Ejector & Table 3.10-1 Re Radiation Monitoring Sys That Initiates &/Or Isolates Sys ML20249B1551998-06-16016 June 1998 Application for Amend to License DPR-59,relocating Safety Review Committee Review,Audit & Related Record Keeping Requirements from Tech Specs to Chapter 17 of Fsar,Per Administrative Ltr 95-06 ML20217K0361998-03-30030 March 1998 Application for Amend to License DPR-59,changing Interval of Selected LSFT from Semiannually to Once Per 24 Months & Revising Definition of LSFT to Be Consistent w/NUREG-1433 ML20247F7791998-02-26026 February 1998 Application for Amend to License DPR-59,changing Allowable Containment Leakage Rate to 1.5 Percent Per Day & Assumed Value of Filter Efficiency for SBGT Used in Calculations to Determine Dose Effects to Onsite ML20202G8551998-02-0606 February 1998 Revised Application for Amend to License DPR-59,to Revise TS Tables 3.2-2 & 4.4-2,revising Allowed Outage Times for 4kV Emergency Bus Undervoltage Trip Functions & Replace Generic Actions for Inoperable Instrument Channels ML20202D3881998-02-0606 February 1998 Application for Amend to License DPR-59,revising RPS Normal Supply Electrical Protection Assembly Undervoltage Trip Setpoint as Result of Reanalysis Based on Most Limiting Min Voltage Requirements of Applied Loads ML20202D5391998-02-0606 February 1998 Application for Amend to License DPR-59,allowing RCS Pressure Tests to Be Performed in Cold Shutdown Mode ML20203J6671997-12-12012 December 1997 Application for Amend to License DPR-59,revising TS Section 6.2.2.6 Re Administrative Controls for Normal Working Hours of Plant Staff Who Perform Safety Related Functions ML20217H9801997-10-14014 October 1997 Application for Amend to License DPR-59,proposing Revision to TS Re Design Features Section,Including Revised Limits for Fuel Storage.Changes Correct Maximum Exposure Dependent, Infinite Lattice Multiplication Factor for Fuel Bundles ML20217G2991997-10-0808 October 1997 Application for Amend to License DPR-59,reflecting Change in LCO ML20140D8011997-04-14014 April 1997 Application for Amend to License DPR-59,deleting Plant Staff Performance Audit Requirement from Section 6.5.2.9.b & Incorporating Plant Staff Performance Review Requirement in Section 6.5.2.8 ML20135B1871996-11-26026 November 1996 Application for Amend to License DPR-59,requesting That Snubber Operability,Surveillance & Records Requirements in TS Be Relocated to Plant Controlled Documents ML20115G0581996-07-12012 July 1996 Application for Amend to License DPR-59,revising Min Critical Power Ratio Safety Limit ML20113B6261996-06-20020 June 1996 Application for Amend to License DPR-59,supporting Adoption of Primary Containment Leakage Rate Testing Requirements of Option B 10CFR50,App J at Plant ML20112D2671996-05-30030 May 1996 Application for Amend to License DPR-59,revising ATWS Recirculation Pump Trip Reactor Pressure ML20112D1501996-05-30030 May 1996 Application for Amend to License DPR-59,revising Minimum Critical Power Ratio Safety Limit & Associated Basis ML20112D5661996-05-30030 May 1996 Application for Amend to License DPR-59,eliminating Selected Response Time Testing Requirements ML20112B6411996-05-16016 May 1996 Application for Amend to License DPR-59,deleting Requirement for PORC to Review Fire Protection Program & Implementing Procedures.Addl Deletion of Insp & Audit Requirements of Specs 6.14.A & 6.14.B ML20107M4461996-04-24024 April 1996 Application for Amend to License DPR-59,relocating TS 3.11.B/4.11.B Crescent Area Ventilation & Associated Bases from TS to Controlled Procedure ML20108D1151996-04-24024 April 1996 Application for Amend to License DPR-59,supporting Adoption of Primary Containment Lrt Requirements of Option B to 10CFR50,App J & Clarifying Numerical Value of Allowable Containment Leakage Rate as 1.5% Per Day ML20101H6671996-03-27027 March 1996 Application for Amend to License DPR-59,adopting Primary Containment Lrt Requirements of Option B to 10CFR50,App J at Plant & Clarifies Numerical Value of Allowable Containment Lrt as 1.5% Per Day ML20101F8311996-03-22022 March 1996 Application for Amend to License DPR-59,revising TS to Implement BWROG Option I-D long-term Solution for Thermal Hydraulic Stability ML20101H3671996-03-22022 March 1996 Application for Amend to License DPR-59,changing TS Table 3.2-2, Core & Containment Cooling Sys Initiation & Control Instrumentation Operability Requirements ML20097A1921996-02-0101 February 1996 Application for Amend to License DPR-59,allowing RCS Pressure Tests to Be Performed While Remaining in Cold Shutdown Mode ML20100C2911996-01-25025 January 1996 Application for Amend to License DPR-59,revising Allowed out-of-service Times for Single Inoperable EDGs to Accommodate on-line Maint of EDGs ML20097J6661996-01-25025 January 1996 Application for Amend to License DPR-59,revising TS to Extend Instrumentation & Miscellaneous Surveillance Test Intervals to Support 24-month Operating Cycle ML20095F7051995-12-14014 December 1995 Application for Amend to License DPR-59,revising TSs to Incorporate IST Requirements of Section XI of ASME Boiler & Pressure Vessel Code JPN-95-051, Application for Amend to License DPR-59,proposing to Extend Surveillance Test Intervals for SLC Sys to Support 24 Month Operating Cycles1995-11-30030 November 1995 Application for Amend to License DPR-59,proposing to Extend Surveillance Test Intervals for SLC Sys to Support 24 Month Operating Cycles ML20094B6471995-10-25025 October 1995 Application for Amend to License DPR-59,revising TS Re Extensionof Containment Sys Surveillance Test Intervals to Accommodate 24 Month Operating Cycles ML20092H5341995-09-15015 September 1995 Application for Amend to License DPR-59,proposing TS by Extending Surveillance Test Intervals for Auxiliary Electrical Sys to Support 24 Month Operating Cycles ML20086P6421995-07-21021 July 1995 Application for Amend to License DPR-59.Amend Would Replace title-specific List of Members on PORC W/More General Statement of Membership Requirements ML20085G3561995-06-15015 June 1995 Application for Amend to License DPR-59,proposing Changes to Ts,By Extending Surveillance Test Intervals for Control Rod Sys to Support 24 Month Operating Cycles ML20083M8081995-05-12012 May 1995 Application for Amend to License DPR-59,extending Surveillance Test Intervals for Esws to Support 24 Month Operating Cycles,Per GL 91-04 JPN-95-022, Application for Amend to License DPR-59.Amend Would Extend Surveillance Test Intervals for Nuclear Steam Supply Sys to Support 24 Month Operating Cycles1995-04-12012 April 1995 Application for Amend to License DPR-59.Amend Would Extend Surveillance Test Intervals for Nuclear Steam Supply Sys to Support 24 Month Operating Cycles JPN-95-011, Application for Amend to License DPR-59,to Extend Surveillance Test Intervals for Snubber Systems to Support 24 Month Operating Cycles1995-03-0202 March 1995 Application for Amend to License DPR-59,to Extend Surveillance Test Intervals for Snubber Systems to Support 24 Month Operating Cycles JPN-95-007, Application for Amend to License DPR-59,to Impose Operability & Surveillance Requirements for Rv Overfill Protection Instrumentation1995-02-22022 February 1995 Application for Amend to License DPR-59,to Impose Operability & Surveillance Requirements for Rv Overfill Protection Instrumentation JPN-94-065, Application for Amend to License DPR-59,revising TSs Re PORC Membership & Review Responsibilities1994-12-0202 December 1994 Application for Amend to License DPR-59,revising TSs Re PORC Membership & Review Responsibilities 1999-09-29
[Table view] |
Text
_
BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION in the Matter of )
POWER AUTHORITY OF THE STATE OF NEW YORK ) Docket No. 50-333 James A. FitzPatrick Nuclear Power Plant )
APPLICATION FQR AMENDMENT TO THE OPERATING LICENSE Pursuant to Section 50.90 of the regulations of the Nuclear Regulatory Commission, the Power ,
Authority of the State of New York, as holder of Facility Operating License No. DPR-59, hereby l cpplies for an amendment to the Technical Specifications contained in Appendices A and B of this license.
This application for amendment to the FitzPatrick Technical Specifications proposes to revise .ne cpplication to convert the FitzPatrick current Technical Specifications (CTS) to be consistent with the improved Standard Technical Specifications (ISTS) in NUREG-1433, Revision 1, dated April 1995. The proposed revision to the application reflects withdrawal of a proposed license cmendment which was not contained in the original proposal for conversion to ITS, reflect issuance of license amendments 249,250,251 and 252, and reflect submittal of proposed changes to the current Technical Specifications regarding Local Power Range Monitor (LPRM) calibration and Administrative Controls.
The Proposed license amendment request to revise the application to convert the FitzPatrick CTS to the FitzPatrick Improved Technical Specification (ITS) is enclosed with this application.
POWER AUTHOjtlTY OF THE STATE OF NEW YORK 2 r <
J. nubel en!or Vice President and Chief Nuclear Officer STATE OF NEW YORK 9906030158 990601 PDR COUNTY OF ADOCK 05000333 Subscribed and Syyorn to before me REM E.O'CONNOR this /W day of (/zw _ ,1999.
YMd""M ~T
otary Pubf
Attachment 1 JPN-99-018 l
PENDING LICENSE AMENDMENT REQUESTS (JPTSs)
AS OF MAY 17,1999 l NYPA JPN TAC Number NYPA JPTS JPTS Title -
Number And Date Number M99751 JPN-97-032 JPTS-97-004 Distribution ofinoperable Control Rods 10/08/97 mal 136 JPN-98-007 JPTS-97-007 Revision to SGT Charcoal Efficiency and 02/26/98 Change forincreasing Allowable Containment Leakage (L.)
M94611 JPN-96-004 JPTS-95-007 Emergency Diesel Generator Allowable 01/25/ % Out-of-service Time JPN-96-018 Response to written Request for Additional 04/26/96 Information dated 4/18/96 )
JPN-96-038 Response to verbal Request for Additional 09/12/96 Information dated 6/17/96 JPN-97-012 Response to written Request for Additional 03/17/97 Information dated 2/4/97 JPN-97-027 Response to verbal Request for Additional 09/09/97 Infonnation dared 9/3/97 M99824 JPN-97-033 JPTS-96-012 Design Features 10/14/97 JPN-98-033 Response to written Request for Additional 07/23/98 Information dated 6/1/98 l
JPN-98 385 Revision to proposed change regarding 12/03/98 Design Features JPN-99-005 Response to written Request for Additional 02/25/99 information darted 1/26/99 JPN-99-127 AfTidavit to support proposed change 04/08/99 regarding Design Features MA4591 JPN-99-002 JPTS-99-001 LPRM Calibration i 01/15/99 i JPN-99-011 JPTS-99-002 Administrative Controls 04/05/99
Attachm:nt 2 JPN-99-018 "Beyond" CTS and "Beyond" lSTS The following JAF ITS Specifications are those which are not in the CTS and are not a direct result of conversion to the ISTS. If an ITS l specification is also in the CTS or, if a change proposed as part of the conversion is consistent with NUREG 1433 or is audressed in a TSTF, it is not considered as "beyond-beyond" and is not listed below.
l 3.0.3, JFD X2 - Be in MODE 2 was changed to allow a 9 hour1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br /> completion time. This was approved for Duane Arnold which also uses thermal-hydraulic stability solution Option 1-D. (Since CTS 3.0.C does not include an intermediate action and time for being in MODE 2, the MODE 2 requirement was added as M1 with the completion time of 9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br /> to be in MODE 2. The M1 discussion noted that the M1 change was consistent with 1433 except for the 9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br />, which is due to thermal hydraulic I stability solution Option I-D.)
3.3.1.1, Reactor Protection System (RPS) Instrumentation Function 5, DOC L9 - reactor scram on MSIV closure. CTS is less than or equal to 10% and ITS is less than or equal to 14%.
3.3.1.1, CLB11 - Extended Required Action F.1 Completion Time from 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> consistent with CLB and the change to 3.0.3 which allows 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to be in MODE 2 after initiation of Action (See 3.0.3, JFD X2).
3.3.5.1, DOC L1 and L5 - ADS initiation timer and the CS and LPCI pump start timer values were changed and tolerances relaxed to allow the extension of CAllBRATION Frequency to 24 months. j 1
3.3.5.1, DOC L5 - Core spray, LPCI and ADS Logic System Functional Test (LSFT) Frequency extended to 24 months.
3.4.9, DOC L2 - RCS P/T Limits were changed to add a new alternate criteria to allow idle recirc pump (loop) start if the operating loop is >40%
flow or if the idle loop is <40% flow for less than or equal to 30 minutes.
3.5.1, DOC L7 - ECCS-Operating, reduced HPCI and LPCI pump flow rates to SAFER /GESTR-LOCA flow rates.
3.5.2, DOC L5 - ECCS-Shutdown, reduced RHR (LPCI) pump flow rates to SAFER /GESTR-LOCA flow rates as in ITS 3.5.1 for RHR (LPCI) pumps.
l 1
{ Attachm:nt 2 JPN-99-018 3.6.1.9, DOC L5 - Residual Heat Removal (RHR) Containment Spray was changed to allow 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to restore one subsystem when both subsystems are inoperable. The Completion Time of 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> is consistent l with:
l
- ITS 3.6.2.3, RHR Suppression Pool Cooling, Condition B Completion Time (see ITS 3.6.2.3, DOC L4) and,
3.6.2.3, DOC L4 - Residual Heat Removal (RHR) Suppression Pool Cooling was changed to allow 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to restore one subsystem when both subsystems are inoperable. The Completion Time of 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> is consistent with:
l
I e [,'UREG-1434, LCO 3.6.1.7, RHR Containment Spray, Condition B Completion Time,
3.8.1, DOC M5 & JFD CLB6 - AC Sources - Operating, Condition D for I two reserve circuits inoperable was changed to add new interim power reduction to less than or equal to 45% with a 36 hour4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Completion Time.
CTS allow 7 days to shutdown and ISTS a!Iow 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to begin shutdown
- both with no interim power reduction. (Since CTS allows 7 days with no interim power reduction the changes are rnore restrictive rather than less restrictive. JFD CLB6 notes that the NUREG-1433, LCO 3.8.1 Condition C 24 hout Completion Time has been extended to 7 days l consistent with C' 3 3.9.B.2 and an additional requirement (Required i Action D.2) has Imen added to require THERMAL POWER be reduced to
<45% RTP within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.)
3.8.4, DOC M2 & L4 - DC Sources - Operating was changed to allow 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to restore one inoperable source. CTS allow 7 days and ISTS allow 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. This change makes ITS 3.8.4 consistent with NUREG 3.8.9 (ITS 3.8.7) Distribution Systems-Operating, Condition A Completion Time for one AC power distribution subsystem inoperable.
5.5, DOC L2 - VFTP (ITS 5.5.8) changed Standby Gas Treatment (SGT) and Control Room Emergency Ventilation Air Supply (CREVAS) system filter testing frorn 6 months (or 12 months) to 24 months consistent with Regulatory Guide 1.52, Revision 2 or the fuel cycle length.
2 l
Attachment 3 JPN-99-018 l
REVISION B TO ITS CONVERSION PACKAGES l
i l
1 i
I l
l I
i New York Power Authority James A. FitzPatrick Nuclear Power Plant i Docket 50 333 DPR 59 ;
i l
l-l l
l l
PAGE CHANGE INSTRUCTIONS 1
i The page replacement instructions attached are provided as an aid for those individuals using or reviewing the ITS conversion submittal that need to update the original 4 (Revision A) JAFNPP ITS submittal to Revision B.
1 Each replacement (or new) page is marked " Revision B" in the lower right corner ,
(except for JAFNPP typed ITS and Bases pages). l J
l 2
l t-
1 l
j 1
Volume 2 (ITS Specifications) ;
l a
Tab Section Remove Pane Insert Pane 3.5 3.5.1 3.5-6 3.5-6 i
l Volume 5 (CTS markup pages in CTS order)
Remove Insert l
l (CTS page / Specification / Markup page) (CTS page / Specification / Markup page) 7 / Spec 3.3.1.1/1 of 15 7 / Spec 3.3.1.1/1 of 16 8 / Spec 33.1.1/ 2 of 15 8 / Spec 33.1.1/ 2 of 16 9 / Spec 33.1.1/ 3 of 15 9 / Spec 33.1.1/ 3 of 16 11/ Spec 33.1.1/ 4 of 15 11/ Spec 33.1.1/ 4 of 16 II / Spec 33.6.1/ 22 of 25 I1/ Spec 3.3.6.1/ 22 cf 26 27 / Spec 33.1.1/ 5 of 15 - 27 / Spec 33.1.1/ 5 of 16 28 / Spec 33.6.1/1 of 25 28 / Spec 33.6.1/ I of 26 30b / Chapter 3.0 / 5 of 5 30b / Chapter 3.0 / 5 of 5 30i / Spec 33.1.1/ 6 of 15 30i / Spec 33.1.1/ 6 of 16 40 / Spec 33.1.1/ 7 of 15 40 / Spec 33.1.1/ 7 of 16 41/ Spec 33.1.1/ 8 of 15 41/ Spec 33.1.1/ 8 of 16 j
- 42 / Spec 33.1.1/ 9 of 15 42 / Spec 33.1.1/ 9 of 16 l
43 / Spec 3.3.1.1/10 of 15 43 / Spec 3.3.1.1/10 of 16 !
43a / Spec 3.3.1.1/1I of 15 43a / Spec 33.1.1/11 of 16 l
44 / Spec 33.1.1/12 of 15 44 / Spec 33.1.1/12 of 16 44 / Spec 33.6.1/11 of 25 44 / Spec 33.6.1/11 of 26 i 44 / Spec 33.6.2 / 8 of 15 44 / Spec 33.6.2 / 8 of 16 ;
l 45 / Spec 33.1.1/13 of 15 45 / Spec 33.1.1/13 of 16 45 / Spec 3.3.6.1/12 of 25 45 / Spec 33.6.1/12 of 26 45 / Spec 33.6.2 / 9 of 15 45 / Spec 33.6.2 / 9 of 16 l
i 3
J
n Volume 5 (CTS markup pages in CTS order)- Continued Remove Insert (CTS page / Specification / Markup page) (CTS page / Specification / Markup page) 46 / Spec 33.1.1/14 of 25 46 / Spec 33.1.1/14 of 16 None 46 / Spec 33.1.1/16 of 16 46 / Spec 33.6.1/13 of 25 46 / Spec 3.3.6.1/13 of 26 None 46 / Spec 33.6.1/ 26 of 26 46 / Spec 33.6.2 /10 of 15 46 / Spec 33.6.2 /10 of 16 None 46 / Spec 33.6.2 /16 of 16 47 / Spec 33.1.1/15 of 15 47 / Spec 3.3.1.1/15 of 16 47 / Spec 33.6.1/14 of 25 47 / Spec 33.6.1/14 of 26 47 / Spec 33.6.2 /11 of 15 47 / Spec 33.6.2 /1I of 16 49 / Spec 3.3.6.1/ 2 of 25 49 / Spec 33.6.1/ 2 of 26 49 / Spec 33.6.2 /1 of 15 49 / Spec 33.6.2 / I of 16 l
62 / Spec 33.6.1/ 3 of 25 62 / Spec 33.6.1/ 3 of 26 62 / Spec 33.6.2 / 2 of 15 62 / Spec 33.6.2 / 2 of 16 63 / Spec 33.6.1/ 4 of 25 63 / Spec 33.6.1/ 4 of 26 )
64 / Spec 33.6.1/ 5 of 25 64 / Spec 33.6.1/ 5 of 26 64 / Spec 33.6.2 / 3 of 15 64 / Spec 3.3.6.2 / 3 of 16 65 / Spec 33.6.1/ 6 of 25 65 / Spec 33.6.1/ 6 of 26 65 / Spec 3.3.6.2 / 4 of 15 65 / Spec 33.6.2 / 4 of 16 ;
65a / Spec 33.6.1/ 7 of 25 65a / Spec 33.6.1/ 7 of 26 65a / Spec 33.6.2 / 5 of 15 65a / Spec 33.6.2 / 5 of 16 i 66 / Spec 33.5.1/ 2 of 15 66 / Spec 33.5.1/ 2 of 15 l 66 / Spec 33.5.2 / 2 of 10 66 / Spec 33.5.2 / 2 of 10 I 67 / Spec 33.5.1/ 3 of 15 67 / Spec 33.5.1/ 3 of 15 67 / Spec 33.6.1/18 of 25 67 / Spec 33.6.1/18 of 26 68 / Spec 3.3.5.1/ 4 of 15 68 / Spec 33.5.1/ 4 of 15 68 / Spec 33.5.2 / 3 of 10 68 / Spec 33.5.2 / 3 of 10 69 / Spec 33.5.1/ 5 of 15 69 / Spec 33.5.1/ 5 of 15 -
69 / Spec 33.8.1/2 of4 69 / Spec 33.8.1/ 2 of 4 70 / Spec 33.5.1/ 6 of 15 70 / Spec 33.5.1/ 6 of 15 '
70 / Spec 3.3.5.2 / 4 of 10 70 / Spec 33.5.2 / 4 of 10 70 / Spec 3.3.6.1/19 of 25 70 / Spec 33.6.1/19 of 26 4
i i
c Volume 5 (CTS markun pages in CTS order)- Continued l Femove - . insert (CTS page / Specification / Markup page) (CTS page / Specification / Markup page) 71/ Spec 33.5.1/ 7 of 15 71/ Spec 33.5.1/ 7 of 15 71/ Spec 33.5.2 / 5 of 10 71/ Spec 33.5.2 / 5 of 10 71a / Spec 33.5.1/ 8 of 15 71a / Spec 33.5.1/ 8 of 15 71a / Spec 33.5.2 / 6 of 10 71a / Spec 3.3.5.2 / 6 of 10
' 71b / Spec 33.5.1/ 9 of 15 71b / Spec 33.5.1/ 9 of 15 71b / Spec 33.5.2 / 7 of 10 71b / Spec 33.5.2 / 7 of 10 71b / Spec 33.6.1/ 20 of 25. 71b / Spec 33.6.1/ 20 of 26 71b / Spec 33.8.1/ 3 of 4 71b / Spec 33.8.1/ 3 of 4 77a / Spec 33.6.1/15 of 25 77a / Spec 33.6.1/15 of 26 77d / Spec 3.3.6.1/16 of 25 ' 77d / Spec 33.6.1/16 of 26 78 / Spec 33.6.1/ 8 of 25 78 / Spec 3.3.6.1/ 8 of 26 79 / Spec 3.3.6.1/ 9 of 25 79 / Spec 33.6.1/ 9 of 26 79 / Spec 33.6.2 /12 of 15 79 / Spec 33.6.2 /12 of 16 80 / Spec 33.5.1/10 of 15 80 / Spec 33.5.1/10 of 15
- 80 / Spec 33.5.2 / 8 of 10 80 / Spec 33.5.2 / 8 of 10 80 / Spec 33.6.1/ 21 of 25 80 / Spec 33.6.1/ 21 of 26 80 / Spec 3.3.8.1/ 4 of 4 80 / Spec 33.8.1/ 4 of 4 -
84 / Spec 33.61/10 of 25 84 / Spec 33.6.1/10 of 26 84 / Spec 33.6.2 /13 of 15 84 / Spec 33.6.2 /13 of 16 86 / Spec 33.6.1/17 of 25 86 / Spec 3.3.6.1/17 of 26 247 / Section 5.1/1 of 3 ~ 247 / Section 5.1/1 of 5 None 247 / Section 5.1/ 4 of 5 247 / Section 5.2 / I of 6 247 / Section 5.2 /1 of 8 None 247 / Section 5.2 / 7 of 8 247a / Section 5.2 / 4 of 6 247a / Section 5.2 / 4 cf 8 248 / Section 5.2 / 5 of 6 248 / Section 5.2 / 5 of 8 249 / CTS Chapter 6.0 / 3 of 22 249 / CTS Chapter 6.0 / 3 of 22 252 / CTS Chapter 6.0 / 7 of 22 252 / CTS Chapter 6.0 / 7 of 22 252a / CTS Chapter 6.0 / 8 of 22 252a / CTS Chapter 6.0 / 8 of 22 252b / CTS Chapter 6.0 / 9 of 22 252b / CTS Chapter 6.0 / 9 of 22 5
e Volume 5 (CTS markup nages in CTS orderb Continued Remove lpngs (CTS page / Specification / Markup page) (CTS page / Specification / Markup page) 253 /.Section 5.4 /1 of 3 253 / Section 5.4 /1 of 4 254a / Section 5.4 / 2 of 3 254a / Section 5.4 / 2 of 4 254a / Section 5.6 /1 of 9 254a / Section 5.6 /1 of 10 254b / Section 5.6 / 2 of 9 254b / Section 5.6 / 2 of 10 254c / Section 5.6 / 7 of 9 254c / Section 5.6 / 7 of 10 254d / Section 5.6 / 8 of 9 254d / Section 5.6 / 8 of 10
' 254g / Section 5.6 / 9 of 9 254g / Section 5.6 / 9 of 10 258 / CTS Chapter 6.0 /13 of 22 258 / CTS Chapter 6.0 /13 of 22 258 / CTS Chapter 6.0 /14 of 22 None 260a / Section 5.2 / 3 of 6 260a / Section 5.2 / 3 of 8 (CTS RETS page / Specification / Markup page) (CTS RETS page / Specification / Markup page) 29 / Spec 3.7.5 / 2 of 6 29 / Spec 3.7.5 / 2 of 6 l 34 / Spec 3.3.6.2 / 6 of 15 34 / Spec 3.3.6.2 / 6 of 16 37 / Spec 3.3.6.1/ 23 of 25 37 / Spec 3.3.6.1/ 23 of 26 37 / Spec 3.3.6.2 / 7 of I5 37 / Spec 3.3.6.2 / 7 of 16 1 37 / Spec 3.3.7.1/ 4 of 7 - 37 / Spec 3.3.7.1/ 4 of 7 l
37 / Spec 3.3.7.2 / 2 of 10 37 / Spec 3.3.7.2 / 2 of 10 37 / Spec 3.7.5 / 3 of 6 37 / Spec 3.7.5 / 3 of 6 37 / CTS RETS 3.1/ 3 of 6 .37 / CTS RETS 3.1/ 3 of 6 37a / Spec 3.3.7.1/ 5 of 7 37a / Spec 3.3.7.1/ 5 of 7 37a / Spec 3.3.7.2 / 3 of 10 37a / Spec 3.3.7.2 / 3 of 10 37a / Spec 3.7.5 / 4 of 6 .
37a / Spec 3.7.5 / 4 of 6 37a / CTS RETS 3.1/4 of 6 37a / CTS RETS 3.1/ 4 of 6 38 / Spec 3.3.6.1/ 24 of 25 38 / Spec 3.3.6.1/ 24 of 26 l 38 / Spec 3.3.6.2 /14 of 15 38 / Spec 3.3.6.2 /14 of 16 39 / Spec 3.3.6.1/ 25 of 25 ' 39 / Spec 3.3.6.1/ 25 of 26 39 / Spec 3.3.6.2 /15 of15 39 / Spec 3.3.6.2 /15 of 16 66 / Section 5.1/ 3 of 3 66 / Section 5.2 / 3 of 5 None .. 66 / Section 5.2 / 5 of 5 i
66 / Section 5.2 / 6 of 6 66 / Section 5.2 / 6 of 8 6
Volume 5 (CTS markup pages in CTS order)- Continued Remove Insert (CTS RETS page / Specification / Markup page) (CTS RETS page / Specification / Markup page)
None' 66 / Section 5.2 / 8 of 8 66 / Section 5.4 / 3 of 3 66 / Section 5.4 / 3 of 4 None 66 / Section 5.4 / 4 of 4 66 / Section 5.6 / 5 of 9 66 / Section 5.6 / 5 of 10 None 66 / Section 5.6 /10 of 10 67 / Section 5.6 / 6 of 9 67 / Section 5.6 / 6 of 10 68 / Section 5.6 / 4 of 9 68 / Section 5.6 / 4 of 10 Volume 6 (ITS 1.0. 2.0. and 3.0 Conversion Packages) lah Section Remove nace Insert nace 3.0 CTS Markup 5 of 5 5 of 5 3.0 Specifications None 3.0-1 thru 3.0-5 Volume 8 (ITS 3.3.1 thru 3.3.4 Conversion Packanes)
Tah Section Remove nace Insert nage 3.3.1.1 CTS Markup 1of15 Iof16 thru thru 15 of15 16 of16 3.3.1.1 DOCS 4 of 21 4 of 21 Volume 9 (ITS 3.3.5 thru 3.3.6.1 Conversion Packages)
Ich Section Remove Pace Insert Pace 3.3.5.1 CTS Markup 2 of 15 2 of15 thru thru /
10 0f l5 10 0f l5 l
l 7
r l
l Volume 9 (ITS 3.3.5 thru 3.3.6.1 Conversion Packages)- Continued Tah Section Remove Pace Insert Pace 3.3.5.1 DOCS 7 of 14 7 of14 8 of14 8 of14 11 of14 11 of 14 13 of 14 13 of 14 3.3.5.1 NSHCs Iof12 1of12 2 0fl2 2 of l2 Ilofl2 llofl2 12 of12 12 of 12 3.3.5.1 NUREG Markup 3.3-42 3.3-42 3.3-43 3.3-43 3.3.5.2 CTS Markup 2 of 10 2 of10 thru thru 8 of10 8 of10 3.3.6.1 CTS Markup 1of25 1of26 thru thru 25 of 25 26 of 26 3.3.6.1 NUREG Markup 3.3 55 3.3-55 3.3.6.1 NUREG JFDs 2 of 5 2 of 5 5of5 5of5 Volume 10 (ITS 3.3.6.2 thru 3.3.8 Conversion Packages)
Tgh Section Remove Pact insert Pace 3.3.6.2 CTS Markup 1of15 1of16 thru thru 15 of 15 16 of 16 3.3.6.2 NUREG Markup 3.3-65 3.3-65 3.3.6.2 NUREG JFDs 1of2 1of2 20f2 20f2 l l
3.3.7.1 CTS Markup 4 of 7 4 of 7 )
S of 7 S of 7 3.3.7.2 CTS Markup 2 of10 2 of10 3 of10 3 of10 l
l 3.3.8.1 CTS Markup 2 of 4 2 of 4 l thru thru 4 of 4 4 of 4 l
8
1 l
Volume 12 (ITS 3.5 Conversion Packaees) i Tah Section Remove nace Insert pace 3.5.1 NUREG Markup 3.5-5 3.5-5 !
3.5.1 NUREG JFDs Iof4 Iof4 3 of 4 3 of 4 3.5.1 Specifications 3.5-6 3.5-6 3.5.2 NUREG Markup 3.5-10 3.5-10
{
l i
i Volume 15 UTS 3.7 thru 3.8.2 Conversion Packages) lah Section Remove nace Insert pace 3.7.5 CTS Markup Page 2 of 6 Page 2 of 6 thru thru Page 4 of 6 Page 4 of 6 I 1
Volume 19 OTS 5.0 Conversion Packaee. CTS 6.0. CTS RETS. and '
Generic NSHC)
Iah Section Remove nace Insert pace 5.1 CTS Markup 1of3 I of 5 thru thru 3 of 3 5 of 5 Iof3 5.1 DOC 6 1of2 thru thru 3 of 3 2 of 2 5.2 CTS Markup 1 of 6 1of8 thru thru 6 of 6 8 of 8 1 5.4 CTS Markup 1of3 1of4 thru thru 3 of 3 4 of 4 5.6 CTS Markup 1of9 1of10 thru thru 90f9 10 0f l0 l 6.0 CTS Markup 3 of 22 3 of 22 9
l Volume 19 (ITS 5.0 Conversion Packane. CTS 6.0. CTS RETS. and l Generic NSHC)- Continued Igh Section Remove page Insert ogge l 6.0 CTS Markup 7 of 22 7 of 22 thru thru 9 of 22 9 of 22 6.0 CTS Markup 13 of 22 13 of 22 14 of 22 14 of 22 l
CTS RETS 3.1 CTS Markup 3 of 6 3 of 6 4 of 6 4 of 6 1
l l
4 l
~
)
1 l
l 10- j
Volume 2 Specifications s l
This page )rovided as a ) lace holder and to assist personnel updating tw original JAMPP ITS Conversion Packages to l Revision B.
l Discard this page along with pages removed in accordance with the page replacement instructions.
l l
i I
l l
1 l
l