_

BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION in the Matter of )

POWER AUTHORITY OF THE STATE OF NEW YORK ) Docket No. 50-333 James A. FitzPatrick Nuclear Power Plant )

APPLICATION FQR AMENDMENT TO THE OPERATING LICENSE Pursuant to Section 50.90 of the regulations of the Nuclear Regulatory Commission, the Power ,

Authority of the State of New York, as holder of Facility Operating License No. DPR-59, hereby l cpplies for an amendment to the Technical Specifications contained in Appendices A and B of this license.

This application for amendment to the FitzPatrick Technical Specifications proposes to revise .ne cpplication to convert the FitzPatrick current Technical Specifications (CTS) to be consistent with the improved Standard Technical Specifications (ISTS) in NUREG-1433, Revision 1, dated April 1995. The proposed revision to the application reflects withdrawal of a proposed license cmendment which was not contained in the original proposal for conversion to ITS, reflect issuance of license amendments 249,250,251 and 252, and reflect submittal of proposed changes to the current Technical Specifications regarding Local Power Range Monitor (LPRM) calibration and Administrative Controls.

The Proposed license amendment request to revise the application to convert the FitzPatrick CTS to the FitzPatrick Improved Technical Specification (ITS) is enclosed with this application.

POWER AUTHOjtlTY OF THE STATE OF NEW YORK 2 r <

J. nubel en!or Vice President and Chief Nuclear Officer STATE OF NEW YORK 9906030158 990601 PDR COUNTY OF ADOCK 05000333 Subscribed and Syyorn to before me REM E.O'CONNOR this /W day of (/zw _ ,1999.

YMd""M ~T

  • MA%% ui_ ,6b"'

otary Pubf

Attachment 1 JPN-99-018 l

PENDING LICENSE AMENDMENT REQUESTS (JPTSs)

AS OF MAY 17,1999 l NYPA JPN TAC Number NYPA JPTS JPTS Title -

Number And Date Number M99751 JPN-97-032 JPTS-97-004 Distribution ofinoperable Control Rods 10/08/97 mal 136 JPN-98-007 JPTS-97-007 Revision to SGT Charcoal Efficiency and 02/26/98 Change forincreasing Allowable Containment Leakage (L.)

M94611 JPN-96-004 JPTS-95-007 Emergency Diesel Generator Allowable 01/25/ % Out-of-service Time JPN-96-018 Response to written Request for Additional 04/26/96 Information dated 4/18/96 )

JPN-96-038 Response to verbal Request for Additional 09/12/96 Information dated 6/17/96 JPN-97-012 Response to written Request for Additional 03/17/97 Information dated 2/4/97 JPN-97-027 Response to verbal Request for Additional 09/09/97 Infonnation dared 9/3/97 M99824 JPN-97-033 JPTS-96-012 Design Features 10/14/97 JPN-98-033 Response to written Request for Additional 07/23/98 Information dated 6/1/98 l

JPN-98 385 Revision to proposed change regarding 12/03/98 Design Features JPN-99-005 Response to written Request for Additional 02/25/99 information darted 1/26/99 JPN-99-127 AfTidavit to support proposed change 04/08/99 regarding Design Features MA4591 JPN-99-002 JPTS-99-001 LPRM Calibration i 01/15/99 i JPN-99-011 JPTS-99-002 Administrative Controls 04/05/99

Attachm:nt 2 JPN-99-018 "Beyond" CTS and "Beyond" lSTS The following JAF ITS Specifications are those which are not in the CTS and are not a direct result of conversion to the ISTS. If an ITS l specification is also in the CTS or, if a change proposed as part of the conversion is consistent with NUREG 1433 or is audressed in a TSTF, it is not considered as "beyond-beyond" and is not listed below.

l 3.0.3, JFD X2 - Be in MODE 2 was changed to allow a 9 hour1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br /> completion time. This was approved for Duane Arnold which also uses thermal-hydraulic stability solution Option 1-D. (Since CTS 3.0.C does not include an intermediate action and time for being in MODE 2, the MODE 2 requirement was added as M1 with the completion time of 9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br /> to be in MODE 2. The M1 discussion noted that the M1 change was consistent with 1433 except for the 9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br />, which is due to thermal hydraulic I stability solution Option I-D.)

3.3.1.1, Reactor Protection System (RPS) Instrumentation Function 5, DOC L9 - reactor scram on MSIV closure. CTS is less than or equal to 10% and ITS is less than or equal to 14%.

3.3.1.1, CLB11 - Extended Required Action F.1 Completion Time from 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> consistent with CLB and the change to 3.0.3 which allows 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to be in MODE 2 after initiation of Action (See 3.0.3, JFD X2).

3.3.5.1, DOC L1 and L5 - ADS initiation timer and the CS and LPCI pump start timer values were changed and tolerances relaxed to allow the extension of CAllBRATION Frequency to 24 months. j 1

3.3.5.1, DOC L5 - Core spray, LPCI and ADS Logic System Functional Test (LSFT) Frequency extended to 24 months.

3.4.9, DOC L2 - RCS P/T Limits were changed to add a new alternate criteria to allow idle recirc pump (loop) start if the operating loop is >40%

flow or if the idle loop is <40% flow for less than or equal to 30 minutes.

3.5.1, DOC L7 - ECCS-Operating, reduced HPCI and LPCI pump flow rates to SAFER /GESTR-LOCA flow rates.

3.5.2, DOC L5 - ECCS-Shutdown, reduced RHR (LPCI) pump flow rates to SAFER /GESTR-LOCA flow rates as in ITS 3.5.1 for RHR (LPCI) pumps.

l 1

{ Attachm:nt 2 JPN-99-018 3.6.1.9, DOC L5 - Residual Heat Removal (RHR) Containment Spray was changed to allow 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to restore one subsystem when both subsystems are inoperable. The Completion Time of 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> is consistent l with:

l

  • ITS 3.6.2.3, RHR Suppression Pool Cooling, Condition B Completion Time (see ITS 3.6.2.3, DOC L4) and,

3.6.2.3, DOC L4 - Residual Heat Removal (RHR) Suppression Pool Cooling was changed to allow 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to restore one subsystem when both subsystems are inoperable. The Completion Time of 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> is consistent with:

l

I e [,'UREG-1434, LCO 3.6.1.7, RHR Containment Spray, Condition B Completion Time,

3.8.1, DOC M5 & JFD CLB6 - AC Sources - Operating, Condition D for I two reserve circuits inoperable was changed to add new interim power reduction to less than or equal to 45% with a 36 hour4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Completion Time.

CTS allow 7 days to shutdown and ISTS a!Iow 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to begin shutdown

- both with no interim power reduction. (Since CTS allows 7 days with no interim power reduction the changes are rnore restrictive rather than less restrictive. JFD CLB6 notes that the NUREG-1433, LCO 3.8.1 Condition C 24 hout Completion Time has been extended to 7 days l consistent with C' 3 3.9.B.2 and an additional requirement (Required i Action D.2) has Imen added to require THERMAL POWER be reduced to

<45% RTP within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.)

3.8.4, DOC M2 & L4 - DC Sources - Operating was changed to allow 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to restore one inoperable source. CTS allow 7 days and ISTS allow 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. This change makes ITS 3.8.4 consistent with NUREG 3.8.9 (ITS 3.8.7) Distribution Systems-Operating, Condition A Completion Time for one AC power distribution subsystem inoperable.

5.5, DOC L2 - VFTP (ITS 5.5.8) changed Standby Gas Treatment (SGT) and Control Room Emergency Ventilation Air Supply (CREVAS) system filter testing frorn 6 months (or 12 months) to 24 months consistent with Regulatory Guide 1.52, Revision 2 or the fuel cycle length.

2 l

Attachment 3 JPN-99-018 l

REVISION B TO ITS CONVERSION PACKAGES l

i l

1 i

I l

l I

i New York Power Authority James A. FitzPatrick Nuclear Power Plant i Docket 50 333 DPR 59  ;

i l

l-l l

l l

PAGE CHANGE INSTRUCTIONS 1

i The page replacement instructions attached are provided as an aid for those individuals using or reviewing the ITS conversion submittal that need to update the original 4 (Revision A) JAFNPP ITS submittal to Revision B.

1 Each replacement (or new) page is marked " Revision B" in the lower right corner ,

(except for JAFNPP typed ITS and Bases pages). l J

l 2

l t-

1 l

j 1

Volume 2 (ITS Specifications)  ;

l a

Tab Section Remove Pane Insert Pane 3.5 3.5.1 3.5-6 3.5-6 i

l Volume 5 (CTS markup pages in CTS order)

Remove Insert l

l (CTS page / Specification / Markup page) (CTS page / Specification / Markup page) 7 / Spec 3.3.1.1/1 of 15 7 / Spec 3.3.1.1/1 of 16 8 / Spec 33.1.1/ 2 of 15 8 / Spec 33.1.1/ 2 of 16 9 / Spec 33.1.1/ 3 of 15 9 / Spec 33.1.1/ 3 of 16 11/ Spec 33.1.1/ 4 of 15 11/ Spec 33.1.1/ 4 of 16 II / Spec 33.6.1/ 22 of 25 I1/ Spec 3.3.6.1/ 22 cf 26 27 / Spec 33.1.1/ 5 of 15 - 27 / Spec 33.1.1/ 5 of 16 28 / Spec 33.6.1/1 of 25 28 / Spec 33.6.1/ I of 26 30b / Chapter 3.0 / 5 of 5 30b / Chapter 3.0 / 5 of 5 30i / Spec 33.1.1/ 6 of 15 30i / Spec 33.1.1/ 6 of 16 40 / Spec 33.1.1/ 7 of 15 40 / Spec 33.1.1/ 7 of 16 41/ Spec 33.1.1/ 8 of 15 41/ Spec 33.1.1/ 8 of 16 j

- 42 / Spec 33.1.1/ 9 of 15 42 / Spec 33.1.1/ 9 of 16 l

43 / Spec 3.3.1.1/10 of 15 43 / Spec 3.3.1.1/10 of 16  !

43a / Spec 3.3.1.1/1I of 15 43a / Spec 33.1.1/11 of 16 l

44 / Spec 33.1.1/12 of 15 44 / Spec 33.1.1/12 of 16 44 / Spec 33.6.1/11 of 25 44 / Spec 33.6.1/11 of 26 i 44 / Spec 33.6.2 / 8 of 15 44 / Spec 33.6.2 / 8 of 16  ;

l 45 / Spec 33.1.1/13 of 15 45 / Spec 33.1.1/13 of 16 45 / Spec 3.3.6.1/12 of 25 45 / Spec 33.6.1/12 of 26 45 / Spec 33.6.2 / 9 of 15 45 / Spec 33.6.2 / 9 of 16 l

i 3

J

n Volume 5 (CTS markup pages in CTS order)- Continued Remove Insert (CTS page / Specification / Markup page) (CTS page / Specification / Markup page) 46 / Spec 33.1.1/14 of 25 46 / Spec 33.1.1/14 of 16 None 46 / Spec 33.1.1/16 of 16 46 / Spec 33.6.1/13 of 25 46 / Spec 3.3.6.1/13 of 26 None 46 / Spec 33.6.1/ 26 of 26 46 / Spec 33.6.2 /10 of 15 46 / Spec 33.6.2 /10 of 16 None 46 / Spec 33.6.2 /16 of 16 47 / Spec 33.1.1/15 of 15 47 / Spec 3.3.1.1/15 of 16 47 / Spec 33.6.1/14 of 25 47 / Spec 33.6.1/14 of 26 47 / Spec 33.6.2 /11 of 15 47 / Spec 33.6.2 /1I of 16 49 / Spec 3.3.6.1/ 2 of 25 49 / Spec 33.6.1/ 2 of 26 49 / Spec 33.6.2 /1 of 15 49 / Spec 33.6.2 / I of 16 l

62 / Spec 33.6.1/ 3 of 25 62 / Spec 33.6.1/ 3 of 26 62 / Spec 33.6.2 / 2 of 15 62 / Spec 33.6.2 / 2 of 16 63 / Spec 33.6.1/ 4 of 25 63 / Spec 33.6.1/ 4 of 26 )

64 / Spec 33.6.1/ 5 of 25 64 / Spec 33.6.1/ 5 of 26 64 / Spec 33.6.2 / 3 of 15 64 / Spec 3.3.6.2 / 3 of 16 65 / Spec 33.6.1/ 6 of 25 65 / Spec 33.6.1/ 6 of 26 65 / Spec 3.3.6.2 / 4 of 15 65 / Spec 33.6.2 / 4 of 16  ;

65a / Spec 33.6.1/ 7 of 25 65a / Spec 33.6.1/ 7 of 26 65a / Spec 33.6.2 / 5 of 15 65a / Spec 33.6.2 / 5 of 16 i 66 / Spec 33.5.1/ 2 of 15 66 / Spec 33.5.1/ 2 of 15 l 66 / Spec 33.5.2 / 2 of 10 66 / Spec 33.5.2 / 2 of 10 I 67 / Spec 33.5.1/ 3 of 15 67 / Spec 33.5.1/ 3 of 15 67 / Spec 33.6.1/18 of 25 67 / Spec 33.6.1/18 of 26 68 / Spec 3.3.5.1/ 4 of 15 68 / Spec 33.5.1/ 4 of 15 68 / Spec 33.5.2 / 3 of 10 68 / Spec 33.5.2 / 3 of 10 69 / Spec 33.5.1/ 5 of 15 69 / Spec 33.5.1/ 5 of 15 -

69 / Spec 33.8.1/2 of4 69 / Spec 33.8.1/ 2 of 4 70 / Spec 33.5.1/ 6 of 15 70 / Spec 33.5.1/ 6 of 15 '

70 / Spec 3.3.5.2 / 4 of 10 70 / Spec 33.5.2 / 4 of 10 70 / Spec 3.3.6.1/19 of 25 70 / Spec 33.6.1/19 of 26 4

i i

c Volume 5 (CTS markun pages in CTS order)- Continued l Femove - . insert (CTS page / Specification / Markup page) (CTS page / Specification / Markup page) 71/ Spec 33.5.1/ 7 of 15 71/ Spec 33.5.1/ 7 of 15 71/ Spec 33.5.2 / 5 of 10 71/ Spec 33.5.2 / 5 of 10 71a / Spec 33.5.1/ 8 of 15 71a / Spec 33.5.1/ 8 of 15 71a / Spec 33.5.2 / 6 of 10 71a / Spec 3.3.5.2 / 6 of 10

' 71b / Spec 33.5.1/ 9 of 15 71b / Spec 33.5.1/ 9 of 15 71b / Spec 33.5.2 / 7 of 10 71b / Spec 33.5.2 / 7 of 10 71b / Spec 33.6.1/ 20 of 25. 71b / Spec 33.6.1/ 20 of 26 71b / Spec 33.8.1/ 3 of 4 71b / Spec 33.8.1/ 3 of 4 77a / Spec 33.6.1/15 of 25 77a / Spec 33.6.1/15 of 26 77d / Spec 3.3.6.1/16 of 25 ' 77d / Spec 33.6.1/16 of 26 78 / Spec 33.6.1/ 8 of 25 78 / Spec 3.3.6.1/ 8 of 26 79 / Spec 3.3.6.1/ 9 of 25 79 / Spec 33.6.1/ 9 of 26 79 / Spec 33.6.2 /12 of 15 79 / Spec 33.6.2 /12 of 16 80 / Spec 33.5.1/10 of 15 80 / Spec 33.5.1/10 of 15

- 80 / Spec 33.5.2 / 8 of 10 80 / Spec 33.5.2 / 8 of 10 80 / Spec 33.6.1/ 21 of 25 80 / Spec 33.6.1/ 21 of 26 80 / Spec 3.3.8.1/ 4 of 4 80 / Spec 33.8.1/ 4 of 4 -

84 / Spec 33.61/10 of 25 84 / Spec 33.6.1/10 of 26 84 / Spec 33.6.2 /13 of 15 84 / Spec 33.6.2 /13 of 16 86 / Spec 33.6.1/17 of 25 86 / Spec 3.3.6.1/17 of 26 247 / Section 5.1/1 of 3 ~ 247 / Section 5.1/1 of 5 None 247 / Section 5.1/ 4 of 5 247 / Section 5.2 / I of 6 247 / Section 5.2 /1 of 8 None 247 / Section 5.2 / 7 of 8 247a / Section 5.2 / 4 of 6 247a / Section 5.2 / 4 cf 8 248 / Section 5.2 / 5 of 6 248 / Section 5.2 / 5 of 8 249 / CTS Chapter 6.0 / 3 of 22 249 / CTS Chapter 6.0 / 3 of 22 252 / CTS Chapter 6.0 / 7 of 22 252 / CTS Chapter 6.0 / 7 of 22 252a / CTS Chapter 6.0 / 8 of 22 252a / CTS Chapter 6.0 / 8 of 22 252b / CTS Chapter 6.0 / 9 of 22 252b / CTS Chapter 6.0 / 9 of 22 5

e Volume 5 (CTS markup nages in CTS orderb Continued Remove lpngs (CTS page / Specification / Markup page) (CTS page / Specification / Markup page) 253 /.Section 5.4 /1 of 3 253 / Section 5.4 /1 of 4 254a / Section 5.4 / 2 of 3 254a / Section 5.4 / 2 of 4 254a / Section 5.6 /1 of 9 254a / Section 5.6 /1 of 10 254b / Section 5.6 / 2 of 9 254b / Section 5.6 / 2 of 10 254c / Section 5.6 / 7 of 9 254c / Section 5.6 / 7 of 10 254d / Section 5.6 / 8 of 9 254d / Section 5.6 / 8 of 10

' 254g / Section 5.6 / 9 of 9 254g / Section 5.6 / 9 of 10 258 / CTS Chapter 6.0 /13 of 22 258 / CTS Chapter 6.0 /13 of 22 258 / CTS Chapter 6.0 /14 of 22 None 260a / Section 5.2 / 3 of 6 260a / Section 5.2 / 3 of 8 (CTS RETS page / Specification / Markup page) (CTS RETS page / Specification / Markup page) 29 / Spec 3.7.5 / 2 of 6 29 / Spec 3.7.5 / 2 of 6 l 34 / Spec 3.3.6.2 / 6 of 15 34 / Spec 3.3.6.2 / 6 of 16 37 / Spec 3.3.6.1/ 23 of 25 37 / Spec 3.3.6.1/ 23 of 26 37 / Spec 3.3.6.2 / 7 of I5 37 / Spec 3.3.6.2 / 7 of 16 1 37 / Spec 3.3.7.1/ 4 of 7 - 37 / Spec 3.3.7.1/ 4 of 7 l

37 / Spec 3.3.7.2 / 2 of 10 37 / Spec 3.3.7.2 / 2 of 10 37 / Spec 3.7.5 / 3 of 6 37 / Spec 3.7.5 / 3 of 6 37 / CTS RETS 3.1/ 3 of 6 .37 / CTS RETS 3.1/ 3 of 6 37a / Spec 3.3.7.1/ 5 of 7 37a / Spec 3.3.7.1/ 5 of 7 37a / Spec 3.3.7.2 / 3 of 10 37a / Spec 3.3.7.2 / 3 of 10 37a / Spec 3.7.5 / 4 of 6 .

37a / Spec 3.7.5 / 4 of 6 37a / CTS RETS 3.1/4 of 6 37a / CTS RETS 3.1/ 4 of 6 38 / Spec 3.3.6.1/ 24 of 25 38 / Spec 3.3.6.1/ 24 of 26 l 38 / Spec 3.3.6.2 /14 of 15 38 / Spec 3.3.6.2 /14 of 16 39 / Spec 3.3.6.1/ 25 of 25 ' 39 / Spec 3.3.6.1/ 25 of 26 39 / Spec 3.3.6.2 /15 of15 39 / Spec 3.3.6.2 /15 of 16 66 / Section 5.1/ 3 of 3 66 / Section 5.2 / 3 of 5 None .. 66 / Section 5.2 / 5 of 5 i

66 / Section 5.2 / 6 of 6 66 / Section 5.2 / 6 of 8 6

Volume 5 (CTS markup pages in CTS order)- Continued Remove Insert (CTS RETS page / Specification / Markup page) (CTS RETS page / Specification / Markup page)

None' 66 / Section 5.2 / 8 of 8 66 / Section 5.4 / 3 of 3 66 / Section 5.4 / 3 of 4 None 66 / Section 5.4 / 4 of 4 66 / Section 5.6 / 5 of 9 66 / Section 5.6 / 5 of 10 None 66 / Section 5.6 /10 of 10 67 / Section 5.6 / 6 of 9 67 / Section 5.6 / 6 of 10 68 / Section 5.6 / 4 of 9 68 / Section 5.6 / 4 of 10 Volume 6 (ITS 1.0. 2.0. and 3.0 Conversion Packages) lah Section Remove nace Insert nace 3.0 CTS Markup 5 of 5 5 of 5 3.0 Specifications None 3.0-1 thru 3.0-5 Volume 8 (ITS 3.3.1 thru 3.3.4 Conversion Packanes)

Tah Section Remove nace Insert nage 3.3.1.1 CTS Markup 1of15 Iof16 thru thru 15 of15 16 of16 3.3.1.1 DOCS 4 of 21 4 of 21 Volume 9 (ITS 3.3.5 thru 3.3.6.1 Conversion Packages)

Ich Section Remove Pace Insert Pace 3.3.5.1 CTS Markup 2 of 15 2 of15 thru thru /

10 0f l5 10 0f l5 l

l 7

r l

l Volume 9 (ITS 3.3.5 thru 3.3.6.1 Conversion Packages)- Continued Tah Section Remove Pace Insert Pace 3.3.5.1 DOCS 7 of 14 7 of14 8 of14 8 of14 11 of14 11 of 14 13 of 14 13 of 14 3.3.5.1 NSHCs Iof12 1of12 2 0fl2 2 of l2 Ilofl2 llofl2 12 of12 12 of 12 3.3.5.1 NUREG Markup 3.3-42 3.3-42 3.3-43 3.3-43 3.3.5.2 CTS Markup 2 of 10 2 of10 thru thru 8 of10 8 of10 3.3.6.1 CTS Markup 1of25 1of26 thru thru 25 of 25 26 of 26 3.3.6.1 NUREG Markup 3.3 55 3.3-55 3.3.6.1 NUREG JFDs 2 of 5 2 of 5 5of5 5of5 Volume 10 (ITS 3.3.6.2 thru 3.3.8 Conversion Packages)

Tgh Section Remove Pact insert Pace 3.3.6.2 CTS Markup 1of15 1of16 thru thru 15 of 15 16 of 16 3.3.6.2 NUREG Markup 3.3-65 3.3-65 3.3.6.2 NUREG JFDs 1of2 1of2 20f2 20f2 l l

3.3.7.1 CTS Markup 4 of 7 4 of 7 )

S of 7 S of 7 3.3.7.2 CTS Markup 2 of10 2 of10 3 of10 3 of10 l

l 3.3.8.1 CTS Markup 2 of 4 2 of 4 l thru thru 4 of 4 4 of 4 l

8

1 l

Volume 12 (ITS 3.5 Conversion Packaees) i Tah Section Remove nace Insert pace 3.5.1 NUREG Markup 3.5-5 3.5-5  !

3.5.1 NUREG JFDs Iof4 Iof4 3 of 4 3 of 4 3.5.1 Specifications 3.5-6 3.5-6 3.5.2 NUREG Markup 3.5-10 3.5-10

{

l i

i Volume 15 UTS 3.7 thru 3.8.2 Conversion Packages) lah Section Remove nace Insert pace 3.7.5 CTS Markup Page 2 of 6 Page 2 of 6 thru thru Page 4 of 6 Page 4 of 6 I 1

Volume 19 OTS 5.0 Conversion Packaee. CTS 6.0. CTS RETS. and '

Generic NSHC)

Iah Section Remove nace Insert pace 5.1 CTS Markup 1of3 I of 5 thru thru 3 of 3 5 of 5 Iof3 5.1 DOC 6 1of2 thru thru 3 of 3 2 of 2 5.2 CTS Markup 1 of 6 1of8 thru thru 6 of 6 8 of 8 1 5.4 CTS Markup 1of3 1of4 thru thru 3 of 3 4 of 4 5.6 CTS Markup 1of9 1of10 thru thru 90f9 10 0f l0 l 6.0 CTS Markup 3 of 22 3 of 22 9

l Volume 19 (ITS 5.0 Conversion Packane. CTS 6.0. CTS RETS. and l Generic NSHC)- Continued Igh Section Remove page Insert ogge l 6.0 CTS Markup 7 of 22 7 of 22 thru thru 9 of 22 9 of 22 6.0 CTS Markup 13 of 22 13 of 22 14 of 22 14 of 22 l

CTS RETS 3.1 CTS Markup 3 of 6 3 of 6 4 of 6 4 of 6 1

l l

4 l

~

)

1 l

l 10- j

Volume 2 Specifications s l

This page )rovided as a ) lace holder and to assist personnel updating tw original JAMPP ITS Conversion Packages to l Revision B.