Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARJAFP-99-0278, Application for Amend to License DPR-59,providing Rev C to Proposed TS Change Converting Current TSs to Improved Standard Tss.Withdrawal of JPTS-95-004,proposed TS Changes Re Inservice Leak & Hydrostatic Testing Operation,Reflected1999-10-14014 October 1999 Application for Amend to License DPR-59,providing Rev C to Proposed TS Change Converting Current TSs to Improved Standard Tss.Withdrawal of JPTS-95-004,proposed TS Changes Re Inservice Leak & Hydrostatic Testing Operation,Reflected JAFP-99-0279, Correction to 980226 Application for Amend to License DPR-59,revising Ref 19 to Assume 90% SBGT Sys Charcoal Efficiency,Instead of 99%.Ref 19 on TS Page 285 Needs to Be Changed from Rev 0 to Rev 1,based on Revised Calculation1999-10-14014 October 1999 Correction to 980226 Application for Amend to License DPR-59,revising Ref 19 to Assume 90% SBGT Sys Charcoal Efficiency,Instead of 99%.Ref 19 on TS Page 285 Needs to Be Changed from Rev 0 to Rev 1,based on Revised Calculation ML20216J8321999-09-29029 September 1999 Application for Amend to License DPR-59,proposing Change to TS 3.5.B.3 & Associated Bases.Change Extends LCO for RHRSW Sys from 7 Days to 11 Days with Special Conditions to Allow for Installation of Mod to Division a RHRSW Strainer ML20196F5931999-06-22022 June 1999 Application for Amend to License DPR-59,changing to Pressure Temp limits.Pressure-temp Curves & Associated LCO & Bases Changes Included in Proposed Amend ML20195B8741999-06-0101 June 1999 Revised Application for Amend to License DPR-59,converting Plant CTS to Be Consistent with Improved Std TS in NUREG-1433,Rev 1,dtd Apr 1995 ML20206U1351999-05-19019 May 1999 Application for Amend to License DPR-59,requesting 14 Day AOT for EDG Sys ML20205K1041999-04-0505 April 1999 Application for Amend to License DPR-59,removing Position Title of General Manager from Sections & Will State That If Site Executive Officer Is Unavailable,Responsibilities Will Be Delegated to Another Staff Member,In Writing ML20205D8271999-03-26026 March 1999 Application for Amend to License DPR-59,converting CTS to Be Consistent with Improved Std TS in NUREG-1433,Rev 1 ML20199H3511999-01-15015 January 1999 Application for Amend to License DPR-59,removing Local Power Range Monitor (LPRM) Signal Calibr Method from TS Table 4.1-2 JAFP-98-0385, Revised Application for Amend to License DPR-59,revising Design Features.Rev 7 to non-proprietary & Proprietary Versions of HI-971661, Licensing Rept for Reracking of Ja FitzPatrick SFP, Encl.Proprietary Info Withheld1998-12-0303 December 1998 Revised Application for Amend to License DPR-59,revising Design Features.Rev 7 to non-proprietary & Proprietary Versions of HI-971661, Licensing Rept for Reracking of Ja FitzPatrick SFP, Encl.Proprietary Info Withheld ML20236X7811998-08-0303 August 1998 Application for Amend to License DPR-59,proposing Rev to Note Which Will Allow TS Section 1.1.A Re SLMCPR to Be Applicable During Cycle 14 ML20236M6151998-07-10010 July 1998 Application for Amend to License DPR-59 to Relocate Portions of TS 3/4.6.C, RCS - Coolant Chemistry, from TS to UFSAR & Applicable Plant Procedures Controlled by 10CFR50.59 Process ML20236L2741998-07-0606 July 1998 Application for Amend to License DPR-59,amending Tech Specs Section 3.5.b.1 Re Main Condenser Steam Jet Air Ejector & Table 3.10-1 Re Radiation Monitoring Sys That Initiates &/Or Isolates Sys ML20249B1551998-06-16016 June 1998 Application for Amend to License DPR-59,relocating Safety Review Committee Review,Audit & Related Record Keeping Requirements from Tech Specs to Chapter 17 of Fsar,Per Administrative Ltr 95-06 ML20217K0361998-03-30030 March 1998 Application for Amend to License DPR-59,changing Interval of Selected LSFT from Semiannually to Once Per 24 Months & Revising Definition of LSFT to Be Consistent w/NUREG-1433 ML20247F7791998-02-26026 February 1998 Application for Amend to License DPR-59,changing Allowable Containment Leakage Rate to 1.5 Percent Per Day & Assumed Value of Filter Efficiency for SBGT Used in Calculations to Determine Dose Effects to Onsite ML20202G8551998-02-0606 February 1998 Revised Application for Amend to License DPR-59,to Revise TS Tables 3.2-2 & 4.4-2,revising Allowed Outage Times for 4kV Emergency Bus Undervoltage Trip Functions & Replace Generic Actions for Inoperable Instrument Channels ML20202D5391998-02-0606 February 1998 Application for Amend to License DPR-59,allowing RCS Pressure Tests to Be Performed in Cold Shutdown Mode ML20202D3881998-02-0606 February 1998 Application for Amend to License DPR-59,revising RPS Normal Supply Electrical Protection Assembly Undervoltage Trip Setpoint as Result of Reanalysis Based on Most Limiting Min Voltage Requirements of Applied Loads ML20203J6671997-12-12012 December 1997 Application for Amend to License DPR-59,revising TS Section 6.2.2.6 Re Administrative Controls for Normal Working Hours of Plant Staff Who Perform Safety Related Functions ML20217H9801997-10-14014 October 1997 Application for Amend to License DPR-59,proposing Revision to TS Re Design Features Section,Including Revised Limits for Fuel Storage.Changes Correct Maximum Exposure Dependent, Infinite Lattice Multiplication Factor for Fuel Bundles ML20217G2991997-10-0808 October 1997 Application for Amend to License DPR-59,reflecting Change in LCO ML20140D8011997-04-14014 April 1997 Application for Amend to License DPR-59,deleting Plant Staff Performance Audit Requirement from Section 6.5.2.9.b & Incorporating Plant Staff Performance Review Requirement in Section 6.5.2.8 ML20135B1871996-11-26026 November 1996 Application for Amend to License DPR-59,requesting That Snubber Operability,Surveillance & Records Requirements in TS Be Relocated to Plant Controlled Documents ML20115G0581996-07-12012 July 1996 Application for Amend to License DPR-59,revising Min Critical Power Ratio Safety Limit ML20113B6261996-06-20020 June 1996 Application for Amend to License DPR-59,supporting Adoption of Primary Containment Leakage Rate Testing Requirements of Option B 10CFR50,App J at Plant ML20112D5661996-05-30030 May 1996 Application for Amend to License DPR-59,eliminating Selected Response Time Testing Requirements ML20112D1501996-05-30030 May 1996 Application for Amend to License DPR-59,revising Minimum Critical Power Ratio Safety Limit & Associated Basis ML20112D2671996-05-30030 May 1996 Application for Amend to License DPR-59,revising ATWS Recirculation Pump Trip Reactor Pressure ML20112B6411996-05-16016 May 1996 Application for Amend to License DPR-59,deleting Requirement for PORC to Review Fire Protection Program & Implementing Procedures.Addl Deletion of Insp & Audit Requirements of Specs 6.14.A & 6.14.B ML20108D1151996-04-24024 April 1996 Application for Amend to License DPR-59,supporting Adoption of Primary Containment Lrt Requirements of Option B to 10CFR50,App J & Clarifying Numerical Value of Allowable Containment Leakage Rate as 1.5% Per Day ML20107M4461996-04-24024 April 1996 Application for Amend to License DPR-59,relocating TS 3.11.B/4.11.B Crescent Area Ventilation & Associated Bases from TS to Controlled Procedure ML20101H6671996-03-27027 March 1996 Application for Amend to License DPR-59,adopting Primary Containment Lrt Requirements of Option B to 10CFR50,App J at Plant & Clarifies Numerical Value of Allowable Containment Lrt as 1.5% Per Day ML20101F8311996-03-22022 March 1996 Application for Amend to License DPR-59,revising TS to Implement BWROG Option I-D long-term Solution for Thermal Hydraulic Stability ML20101H3671996-03-22022 March 1996 Application for Amend to License DPR-59,changing TS Table 3.2-2, Core & Containment Cooling Sys Initiation & Control Instrumentation Operability Requirements ML20097A1921996-02-0101 February 1996 Application for Amend to License DPR-59,allowing RCS Pressure Tests to Be Performed While Remaining in Cold Shutdown Mode ML20100C2911996-01-25025 January 1996 Application for Amend to License DPR-59,revising Allowed out-of-service Times for Single Inoperable EDGs to Accommodate on-line Maint of EDGs ML20097J6661996-01-25025 January 1996 Application for Amend to License DPR-59,revising TS to Extend Instrumentation & Miscellaneous Surveillance Test Intervals to Support 24-month Operating Cycle ML20095F7051995-12-14014 December 1995 Application for Amend to License DPR-59,revising TSs to Incorporate IST Requirements of Section XI of ASME Boiler & Pressure Vessel Code JPN-95-051, Application for Amend to License DPR-59,proposing to Extend Surveillance Test Intervals for SLC Sys to Support 24 Month Operating Cycles1995-11-30030 November 1995 Application for Amend to License DPR-59,proposing to Extend Surveillance Test Intervals for SLC Sys to Support 24 Month Operating Cycles ML20094B6471995-10-25025 October 1995 Application for Amend to License DPR-59,revising TS Re Extensionof Containment Sys Surveillance Test Intervals to Accommodate 24 Month Operating Cycles ML20092H5341995-09-15015 September 1995 Application for Amend to License DPR-59,proposing TS by Extending Surveillance Test Intervals for Auxiliary Electrical Sys to Support 24 Month Operating Cycles ML20086P6421995-07-21021 July 1995 Application for Amend to License DPR-59.Amend Would Replace title-specific List of Members on PORC W/More General Statement of Membership Requirements ML20085G3561995-06-15015 June 1995 Application for Amend to License DPR-59,proposing Changes to Ts,By Extending Surveillance Test Intervals for Control Rod Sys to Support 24 Month Operating Cycles ML20083M8081995-05-12012 May 1995 Application for Amend to License DPR-59,extending Surveillance Test Intervals for Esws to Support 24 Month Operating Cycles,Per GL 91-04 JPN-95-022, Application for Amend to License DPR-59.Amend Would Extend Surveillance Test Intervals for Nuclear Steam Supply Sys to Support 24 Month Operating Cycles1995-04-12012 April 1995 Application for Amend to License DPR-59.Amend Would Extend Surveillance Test Intervals for Nuclear Steam Supply Sys to Support 24 Month Operating Cycles JPN-95-011, Application for Amend to License DPR-59,to Extend Surveillance Test Intervals for Snubber Systems to Support 24 Month Operating Cycles1995-03-0202 March 1995 Application for Amend to License DPR-59,to Extend Surveillance Test Intervals for Snubber Systems to Support 24 Month Operating Cycles JPN-95-007, Application for Amend to License DPR-59,to Impose Operability & Surveillance Requirements for Rv Overfill Protection Instrumentation1995-02-22022 February 1995 Application for Amend to License DPR-59,to Impose Operability & Surveillance Requirements for Rv Overfill Protection Instrumentation JPN-94-065, Application for Amend to License DPR-59,revising TSs Re PORC Membership & Review Responsibilities1994-12-0202 December 1994 Application for Amend to License DPR-59,revising TSs Re PORC Membership & Review Responsibilities ML20076F4631994-10-0707 October 1994 Application for Amend to License DPR-59,changing TS Re Safety/Relief Valve Testing Requirements 1999-09-29
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARJAFP-99-0279, Correction to 980226 Application for Amend to License DPR-59,revising Ref 19 to Assume 90% SBGT Sys Charcoal Efficiency,Instead of 99%.Ref 19 on TS Page 285 Needs to Be Changed from Rev 0 to Rev 1,based on Revised Calculation1999-10-14014 October 1999 Correction to 980226 Application for Amend to License DPR-59,revising Ref 19 to Assume 90% SBGT Sys Charcoal Efficiency,Instead of 99%.Ref 19 on TS Page 285 Needs to Be Changed from Rev 0 to Rev 1,based on Revised Calculation JAFP-99-0278, Application for Amend to License DPR-59,providing Rev C to Proposed TS Change Converting Current TSs to Improved Standard Tss.Withdrawal of JPTS-95-004,proposed TS Changes Re Inservice Leak & Hydrostatic Testing Operation,Reflected1999-10-14014 October 1999 Application for Amend to License DPR-59,providing Rev C to Proposed TS Change Converting Current TSs to Improved Standard Tss.Withdrawal of JPTS-95-004,proposed TS Changes Re Inservice Leak & Hydrostatic Testing Operation,Reflected ML20216J8321999-09-29029 September 1999 Application for Amend to License DPR-59,proposing Change to TS 3.5.B.3 & Associated Bases.Change Extends LCO for RHRSW Sys from 7 Days to 11 Days with Special Conditions to Allow for Installation of Mod to Division a RHRSW Strainer ML20196F5931999-06-22022 June 1999 Application for Amend to License DPR-59,changing to Pressure Temp limits.Pressure-temp Curves & Associated LCO & Bases Changes Included in Proposed Amend ML20195B8741999-06-0101 June 1999 Revised Application for Amend to License DPR-59,converting Plant CTS to Be Consistent with Improved Std TS in NUREG-1433,Rev 1,dtd Apr 1995 ML20206U1351999-05-19019 May 1999 Application for Amend to License DPR-59,requesting 14 Day AOT for EDG Sys ML20205K1041999-04-0505 April 1999 Application for Amend to License DPR-59,removing Position Title of General Manager from Sections & Will State That If Site Executive Officer Is Unavailable,Responsibilities Will Be Delegated to Another Staff Member,In Writing ML20205D8271999-03-26026 March 1999 Application for Amend to License DPR-59,converting CTS to Be Consistent with Improved Std TS in NUREG-1433,Rev 1 ML20199H3511999-01-15015 January 1999 Application for Amend to License DPR-59,removing Local Power Range Monitor (LPRM) Signal Calibr Method from TS Table 4.1-2 JAFP-98-0385, Revised Application for Amend to License DPR-59,revising Design Features.Rev 7 to non-proprietary & Proprietary Versions of HI-971661, Licensing Rept for Reracking of Ja FitzPatrick SFP, Encl.Proprietary Info Withheld1998-12-0303 December 1998 Revised Application for Amend to License DPR-59,revising Design Features.Rev 7 to non-proprietary & Proprietary Versions of HI-971661, Licensing Rept for Reracking of Ja FitzPatrick SFP, Encl.Proprietary Info Withheld ML20236X7811998-08-0303 August 1998 Application for Amend to License DPR-59,proposing Rev to Note Which Will Allow TS Section 1.1.A Re SLMCPR to Be Applicable During Cycle 14 ML20236X5831998-07-29029 July 1998 Amend 245 to License DPR-59,consisting of Changes to TS in Response to Application Transmitted by ,Requesting Rev of Reactor Protection Sys Normally Supply Electrical Protection Assembly Undervoltage Trip Setpoint ML20236M6151998-07-10010 July 1998 Application for Amend to License DPR-59 to Relocate Portions of TS 3/4.6.C, RCS - Coolant Chemistry, from TS to UFSAR & Applicable Plant Procedures Controlled by 10CFR50.59 Process ML20236L2741998-07-0606 July 1998 Application for Amend to License DPR-59,amending Tech Specs Section 3.5.b.1 Re Main Condenser Steam Jet Air Ejector & Table 3.10-1 Re Radiation Monitoring Sys That Initiates &/Or Isolates Sys ML20249B1551998-06-16016 June 1998 Application for Amend to License DPR-59,relocating Safety Review Committee Review,Audit & Related Record Keeping Requirements from Tech Specs to Chapter 17 of Fsar,Per Administrative Ltr 95-06 ML20217K0361998-03-30030 March 1998 Application for Amend to License DPR-59,changing Interval of Selected LSFT from Semiannually to Once Per 24 Months & Revising Definition of LSFT to Be Consistent w/NUREG-1433 ML20247F7791998-02-26026 February 1998 Application for Amend to License DPR-59,changing Allowable Containment Leakage Rate to 1.5 Percent Per Day & Assumed Value of Filter Efficiency for SBGT Used in Calculations to Determine Dose Effects to Onsite ML20202G8551998-02-0606 February 1998 Revised Application for Amend to License DPR-59,to Revise TS Tables 3.2-2 & 4.4-2,revising Allowed Outage Times for 4kV Emergency Bus Undervoltage Trip Functions & Replace Generic Actions for Inoperable Instrument Channels ML20202D3881998-02-0606 February 1998 Application for Amend to License DPR-59,revising RPS Normal Supply Electrical Protection Assembly Undervoltage Trip Setpoint as Result of Reanalysis Based on Most Limiting Min Voltage Requirements of Applied Loads ML20202D5391998-02-0606 February 1998 Application for Amend to License DPR-59,allowing RCS Pressure Tests to Be Performed in Cold Shutdown Mode ML20203J6671997-12-12012 December 1997 Application for Amend to License DPR-59,revising TS Section 6.2.2.6 Re Administrative Controls for Normal Working Hours of Plant Staff Who Perform Safety Related Functions ML20217H9801997-10-14014 October 1997 Application for Amend to License DPR-59,proposing Revision to TS Re Design Features Section,Including Revised Limits for Fuel Storage.Changes Correct Maximum Exposure Dependent, Infinite Lattice Multiplication Factor for Fuel Bundles ML20217G2991997-10-0808 October 1997 Application for Amend to License DPR-59,reflecting Change in LCO ML20140D8011997-04-14014 April 1997 Application for Amend to License DPR-59,deleting Plant Staff Performance Audit Requirement from Section 6.5.2.9.b & Incorporating Plant Staff Performance Review Requirement in Section 6.5.2.8 ML20135B1871996-11-26026 November 1996 Application for Amend to License DPR-59,requesting That Snubber Operability,Surveillance & Records Requirements in TS Be Relocated to Plant Controlled Documents ML20115G0581996-07-12012 July 1996 Application for Amend to License DPR-59,revising Min Critical Power Ratio Safety Limit ML20113B6261996-06-20020 June 1996 Application for Amend to License DPR-59,supporting Adoption of Primary Containment Leakage Rate Testing Requirements of Option B 10CFR50,App J at Plant ML20112D2671996-05-30030 May 1996 Application for Amend to License DPR-59,revising ATWS Recirculation Pump Trip Reactor Pressure ML20112D1501996-05-30030 May 1996 Application for Amend to License DPR-59,revising Minimum Critical Power Ratio Safety Limit & Associated Basis ML20112D5661996-05-30030 May 1996 Application for Amend to License DPR-59,eliminating Selected Response Time Testing Requirements ML20112B6411996-05-16016 May 1996 Application for Amend to License DPR-59,deleting Requirement for PORC to Review Fire Protection Program & Implementing Procedures.Addl Deletion of Insp & Audit Requirements of Specs 6.14.A & 6.14.B ML20107M4461996-04-24024 April 1996 Application for Amend to License DPR-59,relocating TS 3.11.B/4.11.B Crescent Area Ventilation & Associated Bases from TS to Controlled Procedure ML20108D1151996-04-24024 April 1996 Application for Amend to License DPR-59,supporting Adoption of Primary Containment Lrt Requirements of Option B to 10CFR50,App J & Clarifying Numerical Value of Allowable Containment Leakage Rate as 1.5% Per Day ML20101H6671996-03-27027 March 1996 Application for Amend to License DPR-59,adopting Primary Containment Lrt Requirements of Option B to 10CFR50,App J at Plant & Clarifies Numerical Value of Allowable Containment Lrt as 1.5% Per Day ML20101F8311996-03-22022 March 1996 Application for Amend to License DPR-59,revising TS to Implement BWROG Option I-D long-term Solution for Thermal Hydraulic Stability ML20101H3671996-03-22022 March 1996 Application for Amend to License DPR-59,changing TS Table 3.2-2, Core & Containment Cooling Sys Initiation & Control Instrumentation Operability Requirements ML20097A1921996-02-0101 February 1996 Application for Amend to License DPR-59,allowing RCS Pressure Tests to Be Performed While Remaining in Cold Shutdown Mode ML20100C2911996-01-25025 January 1996 Application for Amend to License DPR-59,revising Allowed out-of-service Times for Single Inoperable EDGs to Accommodate on-line Maint of EDGs ML20097J6661996-01-25025 January 1996 Application for Amend to License DPR-59,revising TS to Extend Instrumentation & Miscellaneous Surveillance Test Intervals to Support 24-month Operating Cycle ML20095F7051995-12-14014 December 1995 Application for Amend to License DPR-59,revising TSs to Incorporate IST Requirements of Section XI of ASME Boiler & Pressure Vessel Code JPN-95-051, Application for Amend to License DPR-59,proposing to Extend Surveillance Test Intervals for SLC Sys to Support 24 Month Operating Cycles1995-11-30030 November 1995 Application for Amend to License DPR-59,proposing to Extend Surveillance Test Intervals for SLC Sys to Support 24 Month Operating Cycles ML20094B6471995-10-25025 October 1995 Application for Amend to License DPR-59,revising TS Re Extensionof Containment Sys Surveillance Test Intervals to Accommodate 24 Month Operating Cycles ML20092H5341995-09-15015 September 1995 Application for Amend to License DPR-59,proposing TS by Extending Surveillance Test Intervals for Auxiliary Electrical Sys to Support 24 Month Operating Cycles ML20086P6421995-07-21021 July 1995 Application for Amend to License DPR-59.Amend Would Replace title-specific List of Members on PORC W/More General Statement of Membership Requirements ML20085G3561995-06-15015 June 1995 Application for Amend to License DPR-59,proposing Changes to Ts,By Extending Surveillance Test Intervals for Control Rod Sys to Support 24 Month Operating Cycles ML20083M8081995-05-12012 May 1995 Application for Amend to License DPR-59,extending Surveillance Test Intervals for Esws to Support 24 Month Operating Cycles,Per GL 91-04 JPN-95-022, Application for Amend to License DPR-59.Amend Would Extend Surveillance Test Intervals for Nuclear Steam Supply Sys to Support 24 Month Operating Cycles1995-04-12012 April 1995 Application for Amend to License DPR-59.Amend Would Extend Surveillance Test Intervals for Nuclear Steam Supply Sys to Support 24 Month Operating Cycles JPN-95-011, Application for Amend to License DPR-59,to Extend Surveillance Test Intervals for Snubber Systems to Support 24 Month Operating Cycles1995-03-0202 March 1995 Application for Amend to License DPR-59,to Extend Surveillance Test Intervals for Snubber Systems to Support 24 Month Operating Cycles JPN-95-007, Application for Amend to License DPR-59,to Impose Operability & Surveillance Requirements for Rv Overfill Protection Instrumentation1995-02-22022 February 1995 Application for Amend to License DPR-59,to Impose Operability & Surveillance Requirements for Rv Overfill Protection Instrumentation JPN-94-065, Application for Amend to License DPR-59,revising TSs Re PORC Membership & Review Responsibilities1994-12-0202 December 1994 Application for Amend to License DPR-59,revising TSs Re PORC Membership & Review Responsibilities 1999-09-29
[Table view] |
Text
-
Jime) A. Fit:P: trick Nucle r P:wir Pirnt j' ,4 268 Lake Road P.O. Box di Lycoming, New York 13093 315-342 3840 '-
E E Michael J. Colomb
& Authon,ty site executive orncer October 14,'1999.
JAFP-99-0278 ~
United States Nuclear Regulatory Commission Attn: . Document Control Desk.
Mail Station P1-137.
Y#,hington, D.C. 20555
Subject:
James A. FitzPatrick Nuclear Power Plant Docket No.' 50-333 License No. DPR-59 Revision C to Proposed Technical Specification Change (License Amendment)
. Conversion to Imoroved Standard Technical Soecifications
Reference:
- 1. NYPA Letter, J. Knubel to USNRC Document Control Desk, Proposed
-Technical Specification (License Amendment) Conversion to improved
< Technical Specifications (JPN-99-008), dated March 31,1999 (TAC No. MA5049) ^
m'
- 2. NRC Letter to J. Knubel (NYPA) Issuance of License Amendment 253, dated July 30,1999 (TAC No. M94611); Changes to Technical Spiecifications Regarding the Allowed Outage Time for an Emergency Diesel Generator System (JPTS-95-007)
- 3. NYPA Letter to J. Knubel (NYPA) to USNRC Document Control Desk, Withdrawal of Proposed Technical 6pecification Amendment (JPTS-95-004), inservice Leak and Hydrostatic Testing Operation) (TAC No, MA1135) (JPN-98-055, dated December 30,1998)
Dear Sir:
This' letter and the associated attachments provido Revision C tc, the previously submitted .
application for amendment to the James A. FitzPatrick Technical Specifications (Reference
- 1) for c.onverting the current Technical Specifications (CTS) to the improved Technical -
Specifications (ITS) consistent with improved Standard Technical Specifications (NUREG-1433, Revision :1).
Revision.C to the Reference 1 submittal addresses the following topics:
-~ _ Re .ect issuance of License Amendment 253 (Reference 2) and, Reflect withdrawal of JPTS-95-004, proposed Technical Specification changes regarding Inservice Leak and Hydrostatic Testing Operation (Reference 3).
.. ,i n 1.
9910210295 991014 1 4
"" i
^" ""2 . Acol 4
7 ,
' i? , g 4
- Attachment 1 contains a brief summary of the changes incicded in Revision C.
Attachment 2 contains the List of Commitments associated with this letter and Attachment 3 contains the revised pages and instructions for entering the revised pages.
Should you have any questions, please contact Mr. G. Tasick at (315) 349-6572.
Very truly yours,-
Michael J. Colomb Site Executive ~ Officer
' MJC:WVC:las -
Attachments as stated cc: Regional Administrator (w/ attachments) -
~ U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 -
Office of the Resident inspector (w/ Attachments 1 and 2 only)
U.S. Nuclear' Regulatory Commission l P.O. Box 136 -
Lycoming, New York 13093 L 1
Mr. G. Vissing, P; ject Manager (w/ attachments)
Project Directorate 1 -
Division of Licensing Project Management U. S. Nuclear Regulatory Commission Mail Stop 8C2 Washingtor.. DC 20555 Mr. F. William Valentino, President (w/ attachments)
New York State Energy, Research, and Development Authority Corporate Plaza West 286 Washington Avenue Extension Albany, NY 12203-6399 Mr. William D. Beckner, Chief (w/ attachments)
Technical Specifications Branch U. S. Nuclear Regulatory Commission Mail Stop 13H15 Washington, D.C. 20555 j
, . 4 Att: chm:nt 1 JAFP-99-0278 Summary of ITS Revision C Revision C to the FitzPatrick Plant improved Technical Specification (ITS) Submittal reflects changes to the current Technical Specifications (CTS) contained in License Amendment 253 and the withdrawal of proposed changes to CTS concerning inservice Leak and Hydrostatic Testing Operation. The correction of a number of minor errors have also been included in this revision.
Revision bars are in the right hand margin adjacent to the revised typewritten text of Discussion of Change (DOC), No Significant Hazards Consideration (NSHC), and Justification for Differe1ce (JDF) arvj clean-typed ITS Specification and Bases pages.
Revision bars and the letter "C" within a triangle ( ) are in the right hand margin adjacent to revised handwritten text of CTS markup, NUREG markup, and NUREG Bases markup pages. All revised pages (ir.cluding those pages revised solely due to "page roll" are also identified with either " Revision C" or "lTS Submittal Rev. C" at the bottom of the page.
The following portions of the ITS submittal required revision to reflect License Amendment 253:
ITS 3.7.2, Emergency Service Water (ESW) System; ITS 3.8.1, AC Gources - Operating:
ITS 3.8.2, AC Sources - Shutdown; ITS 3.8.3, Diesel Fuel Oil, Lube Oil, and Star ug Air; and ITS 5.5, Programs and Manuals.
The affected portions of the conversion packages are:
CTS markup and associated DOCS and No Significant Hazards Consideration-(NSHC);
NUREG and NUREG Bases Markup and the associated Justification for Differences (JFDs); and Clean-typed ITS Specifications and Bases.
1 i
The following portions of the ITS submittal required revision to reflect withdrawal of JPTS-95-004, Proposed Technical Specification Changes Regarding inservice Leak and Hydrostatic Testing Operation:
l l
ITS 3.0, LCO Applicability and SR Applicability; I -
IT S 3.4.3, Safety / Relief Valves (S/RVs); i ITS 3.4.9, RCS Pressure and Temperature (P/T) Limits; ;
ITS 3.5.1, ECCS-Operating;
- ITS 3.5.3, RCIC; and ITS 3.10.1, inservice Leak and Hydrostatic Testing Operation.
i
)
1 Attichmint 1 JAFP-99-0278 Suminary of ITS Revision C i
I l
The affected portions of the conversion packages are: 4 CTS markup and associated 00Cs and NSHCs; NUREG and NUREG Bases and the associated JFDs; and Clean-typed ITS Specifications and Bases.
In addition, a number of typographic and editorial errors were corrected in the packages for ITS 3.7.2, 3.8.1,~ 3.8.2, and 3.8.3.
l l
Y
1 Attachment 2 JAFP-99-0278 List of Commitments Commitment No. Description Due Date JAFP-99-0278 None N/A l
)
I
{
i
- i S
4 ,
l Attachment 3 JAFP-99-0278 3
ITS Revision C Paae Chance instructions l
I PAGE CHANGE INSTRUCTIONS i i
l i
NQTE: The page replacement instructions attached are provided as an t.id for those individuals using or reviewing the ITS conversion submittal that need to update the JAFNPP ITS submittal to Revision C.
NOTE: Replacement (or new) pages, except for JAFNPP clean-typed ITS Specification or Bases pages, are marked " Revision C" under the page number at the bottom center or lower right corner of the page.
NOTE: JAFNPP clean-typed Specification and Bases replacement pages are marked "ITS Submittal Rev. C" under the page number.
l l
l Page 1 of 12
i
- s i Att chm
- nt 3 f
JAFP-29-027F l i
l PAGE CHANGE INSTRUCTIONS l
= Volume 2 (ITS Specifications)
Tab Soecification Remove paae Insert oaae
. 3.7 3.7.2 3.7-3 3.7-3 3.8 3.8.1 3.8-1 3.8-1 thru thru 3.8-11 3.8-11 3.8- 3.8.2 3.8-12 3.8-12 3.8-14 3.8-14 3.8 3.8.3 3.8-16 3.8-16 3.8-17 3.8-17 l 1
5.0 5.5 5.0-18 5.0-18 Volume 4 (ITS 3.4 thru 3.10 Bases) l Tab Specification Remove oaae jnsert oaoe 3.7 3.7.2 B 3.7-10 B 3.7-10 B 3.7-11 B 3.7-11
' 3.8 3.8.1 B 3.8-5 B 3.8-5 B 3.8-6 B 3.8-6 B 3.8-8 B 3.8-8 l thru thru B 3.8-21 B 3.8-21 l B 3.8-23 B 3.8-23 thru thru j B 3.8-28 B 3.8-28 3.8 3.8.2 B 3.8-31 B 3.8-31 B 3.8-33 8 3.8-33 8 3.8-34 8 3.8-34 3.8 3.8.3 B 3.8-37 B 3.8-37 8 3.8-40 B 3.8-40 Page 2 of 12 J
v.
i i
AttCchmCnt 3 i JAFP-99-0278 !
PAGE CHANGE INSTRUCTIONS l
Volume 5 (CTS Markuo Paaes in CTS Order) l Remove Insert
' (CTS page/ Specification / Markup page) (CTS page/ Specification / Markup page)
OL 3a / 5.5 / 7 of 24 OL 3a / 5.5'/ 7 of 25 5 / 5.5 /16 of 24 5 / 5.5 /16 of 25 30a / 3.0 / 3 of 5 30a / 3.0 / 3 of 5 30a / 3.8.1/11 of 11 30a / 3.8.1/11 of 11 1
30a / 5.5 /14 of 24 30a / 5.5 /.14 of 25 )
30b / 5.5 /15 of 24 30b / 5.5 /15 of 25 118 / 3.5.1/ 6 of 20 118 / 3.5.1/ 6 of 20 l 118 / 3.5.1/ 7 of 20 None 120 / 3.5.1/ 8 of 20 120 / 3.5.1/ 8 of 20 120 / 3.5.1/ 9 of 20 None 121/ 3.5.3 /1 of 4 121/ 3.5.3 /1 of 4 ,
l 137 / 3.4.9 / 2 of 7 137 / 3.4.9 / 2 of 7 l 137 / 3.4.9 / 3 of 7 None 143 / 3.4.3 / 3 of 4 143 / 3.4.3 / 3 of 4
' 143 / 3.4.3 / 4 of 4 None 181/ 5.5 /17 of 24 181/ 5.5 /17 of 25 182 / 5.5 /18 of 24 182 / 5.5 /18 of 25 216 / 3.8.1 / 2 of 11 216 / 3.8.1/ 2 of 11 l 216 / 3.8.1/ 3 of 11 Nons
~ 216 / 3.8.3 / 5 of 6 216 / 3.8.3 / 5 of 6 216 / 3.8.3 / 6 of 6 None 217 / 3.8.1/ 4 of 11 217 / 3.8.1/ 4 of 11 217 / 3.8.1/ 5 of 11 None l
Page 3 of 12 s
Att: chm:nt 3 JAFP-99-0278 PAGE CHANGE INSTRUCTIONS Volume 5 (CTS Markuo Paaes in CTS Order)
- (cont'd.)
Remove - Insert 218 / 3.8.1/ 6 of 11 218 / 3.8.1/ 6 of 11 218 / 3.8.1/ 7 of 11 'None 218 / 3.8.3 /1 of 6 218 / 3.8.3 /1 of 6 218 / 3.8.3 / 2 of 6 None 220 / 3.8.1/ 9 of 11 220 / 3.8.1/ 9 of 11 220 / 3.8.1/10 of 11 None 220 / 3.8.2 /1 of 2 220 / 3.8.2 /1 of 2 220 / 3.8.2 / 2 of 2 None 220 / 3.8.3 / 3 of 6 220 / 3.8.3 / 3 of 6 220 / 3.8.3 / 4 of 6 None 237 / 5.5 /19 of 24 237 / 5.5 /19 of 25 238 / 5.5 / 20 of 24 238 / 5.5 / 20 of 25 255 / 5.5 /11 of 24 255 / 5.5 /11 of 25 ,
-258b / 5.5 / 3 of '24 258b / 5'.5 / 3 of 25 258c / 5.5 / 5 of 24 258c / 5.5 / 5 of 25 258e / 5.5 / 9 of 24 258e / 5.5 / 9 of 25 258e / 5.5 /10 of 24 258e / 5.5 /10 of 25 None- 258f / 5.5 / 25 of 25 261/ 5.5 /13 of 24 261/ 5.5 /13 of 25 RETS 1/ 5.5 /1 of 24 RETS 1/ 5.5 /1 of 25 RETS 1/ 5.5 / 2 of 24 RETS 1/ 5.5 / 2 of 25 RETS 14 / 5.5 / 22 of 24 RETS 14 / 5.5 / 22 of 25
- RETS 32 / 5.5 / 23 of 24 RETS 32 / 5.5 / 23 of 25 RETS 33 / 5.5 / 24 of 24 - RETS 33 / 5.5'/ 24 of 25 L
Page 4 of 12 l
I L
r 4
Attichm:nt 3 JAFP-99-0278 i ,
PAGE CHANGE INSTRUCTIONS Volume 6 (ITS 1.0,2.0 and 3.0 Conversion Packages)
Tab Section Remove oaae Insert oaoe 3.0 CTS Markup 3 of 5 3 of 5 l 1
3.0 DOCS 6 of 8 6 of 8 I 7 of 8 7 of 8 8 of 8- 8 of 8 Volume 11 (ITS 3.4 Conversion Packages)
Tab Section Remove oaae Insert naae 3.4.3 CTS Markup 3 of 4 3 of 4 4 of 4 4 of 4 3.4.3 DOCS 1 of 4 1 of 5 thru thru 4 of 4 5 of 5 3.4.9 CTS Markup . 2 of 7 2 of 7 3 of 7 3 of 7 3.4.9 DOCS 1 of 7 1 of 8 thru thru 7 of 7 8 of 8 Volume 12 (ITS 3.5 Conversion Packaaes) l l Tab Section Remove oaae Insert naae 3.5.1 CTS Markup 6 of 20 6 of 20 thru thru 9 of 20 9 of 20 l
3.5.1 DOCS 1 of 21 1 of 22 thru thru 21 of 21 22 of 22 I
3.5.3 CTS Markup 1 of 4 1 of 4 3.5.3 - DOCS 1 of 6 1 of 7 thru thru 6 of 6 7 of 7 Page 5 of 12 L_ ;
,, i Att:chmInt 3 JAFP-99-0278 PAGE CHANGE INSTRUCTIONS Volume 15 UTS 3.7 thru 3.8.2 Conversion Packaaes)
Tab Section Remove oaae Insert oaae 3.7.2 DOCS 1 of 9 - 1 of 9 I
3 of 9 3 of 9 8 of 9 8 of 9
-3.7.2 NUREG Markup 3.7-4 3.7-4 l
Insert page 3.7-4 Insert page 3.7-4 3.7.2 NUREG Bases B 3.710 B 3.7-10 Markup Insert page B 3.7-10 Insert page B 3.7-10 3.7.2 ' Specifications 3.7-3 3.7-3 l
3.7.2 Bases. B 3.7-10 B 3.7-10 B 3.7-11 B 3.7-11 3.8.1 CTS Markup 2 of 11 2 of 11 l
~thru thru 7 of 11 7 of 11 l
9 of 11 9 of 11 10 of 11 10 of 11 11 of 11 11 of 11 3.8.1 DOCS 1 of 13 1 of 13 2 of 13 2 of 13 i
I l 4 of 13 4 of 13 thru thru 12 of 13 12 of 13 3.8.1 , NSHCs 1 of 14 1 of 14 2 of 14 2 of 14 3 of 14 3 of 14 6 of 14 6 of 14 7 of 14 7 of 14 Page 6 of 12
5 Att:chmInt 3 JAFP-99-0278 PAGE CHANGE INSTRUCTIONS 1
1 Volume 15 (ITS 3.7 thru 3.8._2 Conversion Packaaes)
- (cont'd.)
Tab Section Remove oaae insert oaae ,
l 3.8.1 NSHCs 10 of 14 10 of 14 11 of 14 11 of 14 12 of 14 12 of 14 3.8.1 NUREG Markup 3.8-1 3.8-1 3.8-2 3.8-2 3.8-3 3.8-3 Insert page 3.8-3 None 3.8-4 3.8-4 thru' thru 3.8-11 3.8-11 3.8-13 3.8 13 3.8-15 3.8-15 3.8.1 NUREG Markup 5 of 8 5 of 8 JFDs 7 of 8 7 of 8 8 of 8 8 of 8 3.8.1 NUREG Bases Markup Insert page B 3.8-2 Insert page B 3.8-2 B 3.8-4 B 3.8-4 B 3.8-5 B 3.8-5 B 3.8-7 B 3.8-7 i B 3.8-8 B 3.8-8 Insert page B 3.8-8 None B 3.8-9 B 3.8-9 l B 3.8-10 B 3.8-10 l Insert page 3.8-10 Insert page B 3.8-10
[ Note: ITS 3.8.1, NUREG Bases markup
" Insert Page 3.8-10" (which is to be removed) is improperly labeled.
Replacement page " Insert Page B 3.810" is the properly labeled replacement.]
Page 7 of 12 l
F I -
, e Att: chm:nt 3 JAFP-99-0278 i
PAGE CHANGE INSTRUCTIONS Volume 15 (ITS 3.7 thru 3.8.2 Conversion Packages)
(cont'd.)
Tab Section Remove oaae Insert paae 3.8.1 NUREG Basis B 3.8-11 B 3.8-11 (cont'd.) . Markup B 3.8-12 B 3.8-12 Insert page B 3.8-12 Insert page B 3.8-12 i
B 3.8-13 B 3.813 thru thru B 3.8-16 B 3.8-16 Insert page B 3.8-16 Insert page B 3.8-16 ,
B 3.8-17 8 3.8-17 i B 3.8-18 B 3.8-18 l B 3.8-20 B 3.8-20 B 3.8-21 B 3.8-21 B 3;d-24 B 3.8-24 Insert page B 3.8-24 None B 3.8-25 B 3.8-25 Insert page B 3.8-25 None B 3.8-31 B 3.8-31 Insert page B 3.8-31 None 3.8.1 NUREG Bases 1 of 10 1 of 10 Markup JFDs 4 of 10 4 of 10 5 of 10 5 of 10 6 of 10 6 of 10 8 of 10 8 of 10 3.8.1 Specifications 3.8-1 3.8-1 thru thru 3.8-11 3.8-11 i \
I-Page 8 of 12
l c.
Att chm;nt 3 JAFP-99-0278 j j
PAGE CHANGE INSTRUCTIONS j l
Volume 15 (ITS 3.7 thru 3.8.2 Conversion Packaaes)
(cont'd.) I i
Tab Section Remove naae Insert oaae 3.8.1 Bases B 3.8-5 B 3.8-5 B 3.8 6 B 3.8-6 B 3.8-8 B 3.8-8 ,
thru thru B 3.8 21 B 3.8-21 B 3.8-23 8 3.8-23 thru thru
. B 3.8-27 8 3.8-27 I
3.8.2 CTS Markup 1 of 2 1 of 2 l 2 of 2 l 3.8.2 DOCS 1 of 4 1 of 4 thru thru 4cf4 4of4 3.8.2 NUREG Markup 3.8-18 3.8-18 3.8-20 3.8-20 3.8.2 NUREG Bases 3.8-36 3.8-36 Markup 3.8-37 3.8-37 3.8-39 3.8-39 '
3.8-40 3.8-40 3.8.2 Specifications 3.8-12 3.8-12 3.8-14 3.8-14 3.8.2 Bases B 3.8-31 B 3.8-31 B 3.8-33 B 3.8-33 B 3.8-34 B 3.8-34 Page 9 of 12
,. s Att: chm:nt 3 JAFP-99-0278 1 PAGE CHANGE INSTRUCTIONS
. Volume 16 (ITS 3.8.3 thru 3.8.8 Conversion Packages) ;
l Tab Section Remove oaae Insert oaae 3.8.3 CTS Markup 1 of 6 1 of 6 i thru thru 6 of 6 6 of 6 1
3.8,3 DOCS 1 of 5 1 of 5
'2 of 5 2 of 5 3 of 5 3 of 5 ]
5 of 5 5 of 5 3.8.3 - NSHCs 5 of 6 5 of 6 S of 6 S of 6 3.8.3 NUREG Markup 3.8-21 3.8-21 3.8-22 3.8-22 j l
3.8.3 NUREG Bases B 3.8-43 ' B 3.8-43 4 Markup B 3.8-45 B 3.8-45 3.8.3 Specifications 3.8-16 3.8-16 3.8-17 3.8-17 3.0.3 Bases B 3.8-37 B 3.8-37 ;
B 3.8-40 B 3.8-40 Volume 18 (ITS 3.10 and 4.0 Conversion Packaaes) l Tab' Section Bemove oaae Insert naae 3.10.1 . CTS Markup ' 1 of 2 1 of 1 2 of 2 None 3.10.1 DOCS 1 of 5 1 of 2 thru 2 of 2 5 of 5 3.10.1' NSHCs 1 of 6 1 of 3 l thru thru l 6 of 6 3 of 3 I i
i Page 10 of 12 :
i
Att:: chm:nt 3 -
JAFP-99-0278 PAGE CHANGE INSTRUCTIONS l
Volume 18 (ITS 3.10 and 4.0 Conversion Packaoes)
(cont'd.)
Tab Section ' Remove oaae Insert oaae l
{
l 3.10.1 NUREG Markup 3.10-1 3.10-1 3.10-2 3.10-2 3.10-3 3.10-3 3.10.1 NUREG Markup 1 of 1 1 of 1 JFDs l
3.10.1 NUREG Bases B 3.10 2 B 3.10-2 i Markup B 3.10-3 B 3.10-3 8 3.10-5 B 3.10-5 4 l
3.10.1 NUREG Bases 1 of 2 1 of 2 Markup JFDs 3.10.1 Bases B 3.10-2 B 3.10-2 B 3.10-5 8 3.10-5 Volume 19 (ITS 5.0 Conversion Packaae, CTS 6.0, CTS RETS and Generic !
NSHC) l Tab Section Rernove oaae Insert oaae 5.5 CTS Markup 1 of 24 1 of 25 thru thru 24 of 24 25 of 25 5.5 DOCS 2 of 11 2 of 11 l 6.5 NUREG Markup 5.0-17 5.0-17 i None Insert Page 5.0-17 l 5.5 NUREG Markup 1 of 4 1 of 4 JFDs
- 5. 5 . Specifications 5.0-18 5.0-18 Page 11 of 12
. .e Attichmtnt 3 JAFP-99-0278 PAGE CHANGE INSTRUCTIONS 4
VOLUME 1 (SUBMITTAL LETTER & SPLIT REPORT)
Enter the " Revision C" tab and submittal letter with Attachments 1,2, and 3 (except for the replacement pages that were entered in Volumes 2 through 19 in accordance with the 4 instructions above) in Volume 1 immediately in front of the " Split Report" tab.
Note: The " Revision B" tab and submittal letter, with attachments, should have also been entered in Volume 1 similar to the Revision C tab and transmittalletter. If the Revision B tab and letter is missing, contact Verne Chidis at (315) 349-6071 for assistance.
Page 12 of 12
O VOLUME 2 ITS SPECIFICATIONS
. This page provided as a place holder and to assist personnel updating f
the JAFNPP ITS submittal to Revision C.
] Discard this page along with pages removed in accordance with the page replacement instructions.
i e
b 9
e O
a