ML20085G356

From kanterella
Jump to navigation Jump to search
Application for Amend to License DPR-59,proposing Changes to Ts,By Extending Surveillance Test Intervals for Control Rod Sys to Support 24 Month Operating Cycles
ML20085G356
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 06/15/1995
From: William Cahill
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package
ML20085G345 List:
References
NUDOCS 9506200173
Download: ML20085G356 (2)


Text

.

Q 4

BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION in the matter of )

4 NEW YORK POWER AUTHORITY ) Docket No. 50-333 James A. FitzFetrick Nuclear Power Plant )

APPLICATION FOR AMENDMENT TO OPERATING LICENSE .

" The New York Power Authority requests an amendment to the Technical Specifications

contained in Appendix A to Facility Operating License No. DPR-59 for the James A.

FitzPatrick Nuclear Power Plant. This application is filed in accordance with Section 10.

i CFR 50.90 of the Nuclear Regulatory Commission's regulations.

This application for an amendment to the James A. FitzPatrick Nuclear Power Plant Technical Specifications proposes to extend the surveillance test intervals for the control rod system to support 24 month operating cycles. The proposed changes follow the guidance of Generic Letter 91-04. Approval of these changes will eliminate the need to schedule mid-cycle outages to conduct these surveillance tests.

Surveillance test interval extensions that are justified will be denoted as being performed "every 24 months" or "at Ioast once per 24 months" consistent with the guidance provided in NRC Generic Letter 91-04. Other surveillances currently l performed "once each operating cycle", "at least once during each' operating cycle",-

"each refueling", or similar notation, that are not being extended at this time will be denoted as being performed "at least once per 18 months."

The signed original of the Application for Amendment to the Technical Specifications is ,

enclosed for filing. Attachments I and lit to this application contain the proposed  ;

2. changes to the Technical Specifications, and a mark-up of the current Technical l Specification pages. Attachment 11 contains the associated Safety Evaluation for the l control rod system. l

. 1 New York Power A hority f y'. .

William J. C Jr. ,

Chief Nuclear Officer  !

STATE OF NEW YORK COUNTY OF WESTCHESTER Subscribed and sworn to before me.

this/S" day of f % - 1995. ,,

v ,

h9Yh }s a

/' Notary Public /

081ALDINE STRAfD Notary Ptblio. Stees of NewWet do.4001272 Que11 Redia Wesechester Commisoir4 Empires Jan. 27,1

-9506200173 950615 PDR ADOCK 05000333 P PDR ,

l

, l l

ATTACHMENT I to JPN-95-029 1 i

i Proposed Changes to Technical Specification Control Rod System Surveillance Test intervals to Accommodate 24-Month Operatino Cveles (JPTS-95-001El

. .?

i New York Power Authority l i

JAMES A. FITZPATRICK NUCLEAR POWER PLANT l Docket No. 50-333 -

DPR 59 e , - . -. e ,.+w-.- , , , . - - - <w- e v- =w - -w,--w- .w y-.#-