Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARJAFP-99-0278, Application for Amend to License DPR-59,providing Rev C to Proposed TS Change Converting Current TSs to Improved Standard Tss.Withdrawal of JPTS-95-004,proposed TS Changes Re Inservice Leak & Hydrostatic Testing Operation,Reflected1999-10-14014 October 1999 Application for Amend to License DPR-59,providing Rev C to Proposed TS Change Converting Current TSs to Improved Standard Tss.Withdrawal of JPTS-95-004,proposed TS Changes Re Inservice Leak & Hydrostatic Testing Operation,Reflected JAFP-99-0279, Correction to 980226 Application for Amend to License DPR-59,revising Ref 19 to Assume 90% SBGT Sys Charcoal Efficiency,Instead of 99%.Ref 19 on TS Page 285 Needs to Be Changed from Rev 0 to Rev 1,based on Revised Calculation1999-10-14014 October 1999 Correction to 980226 Application for Amend to License DPR-59,revising Ref 19 to Assume 90% SBGT Sys Charcoal Efficiency,Instead of 99%.Ref 19 on TS Page 285 Needs to Be Changed from Rev 0 to Rev 1,based on Revised Calculation ML20216J8321999-09-29029 September 1999 Application for Amend to License DPR-59,proposing Change to TS 3.5.B.3 & Associated Bases.Change Extends LCO for RHRSW Sys from 7 Days to 11 Days with Special Conditions to Allow for Installation of Mod to Division a RHRSW Strainer ML20196F5931999-06-22022 June 1999 Application for Amend to License DPR-59,changing to Pressure Temp limits.Pressure-temp Curves & Associated LCO & Bases Changes Included in Proposed Amend ML20195B8741999-06-0101 June 1999 Revised Application for Amend to License DPR-59,converting Plant CTS to Be Consistent with Improved Std TS in NUREG-1433,Rev 1,dtd Apr 1995 ML20206U1351999-05-19019 May 1999 Application for Amend to License DPR-59,requesting 14 Day AOT for EDG Sys ML20205K1041999-04-0505 April 1999 Application for Amend to License DPR-59,removing Position Title of General Manager from Sections & Will State That If Site Executive Officer Is Unavailable,Responsibilities Will Be Delegated to Another Staff Member,In Writing ML20205D8271999-03-26026 March 1999 Application for Amend to License DPR-59,converting CTS to Be Consistent with Improved Std TS in NUREG-1433,Rev 1 ML20199H3511999-01-15015 January 1999 Application for Amend to License DPR-59,removing Local Power Range Monitor (LPRM) Signal Calibr Method from TS Table 4.1-2 JAFP-98-0385, Revised Application for Amend to License DPR-59,revising Design Features.Rev 7 to non-proprietary & Proprietary Versions of HI-971661, Licensing Rept for Reracking of Ja FitzPatrick SFP, Encl.Proprietary Info Withheld1998-12-0303 December 1998 Revised Application for Amend to License DPR-59,revising Design Features.Rev 7 to non-proprietary & Proprietary Versions of HI-971661, Licensing Rept for Reracking of Ja FitzPatrick SFP, Encl.Proprietary Info Withheld ML20236X7811998-08-0303 August 1998 Application for Amend to License DPR-59,proposing Rev to Note Which Will Allow TS Section 1.1.A Re SLMCPR to Be Applicable During Cycle 14 ML20236M6151998-07-10010 July 1998 Application for Amend to License DPR-59 to Relocate Portions of TS 3/4.6.C, RCS - Coolant Chemistry, from TS to UFSAR & Applicable Plant Procedures Controlled by 10CFR50.59 Process ML20236L2741998-07-0606 July 1998 Application for Amend to License DPR-59,amending Tech Specs Section 3.5.b.1 Re Main Condenser Steam Jet Air Ejector & Table 3.10-1 Re Radiation Monitoring Sys That Initiates &/Or Isolates Sys ML20249B1551998-06-16016 June 1998 Application for Amend to License DPR-59,relocating Safety Review Committee Review,Audit & Related Record Keeping Requirements from Tech Specs to Chapter 17 of Fsar,Per Administrative Ltr 95-06 ML20217K0361998-03-30030 March 1998 Application for Amend to License DPR-59,changing Interval of Selected LSFT from Semiannually to Once Per 24 Months & Revising Definition of LSFT to Be Consistent w/NUREG-1433 ML20247F7791998-02-26026 February 1998 Application for Amend to License DPR-59,changing Allowable Containment Leakage Rate to 1.5 Percent Per Day & Assumed Value of Filter Efficiency for SBGT Used in Calculations to Determine Dose Effects to Onsite ML20202G8551998-02-0606 February 1998 Revised Application for Amend to License DPR-59,to Revise TS Tables 3.2-2 & 4.4-2,revising Allowed Outage Times for 4kV Emergency Bus Undervoltage Trip Functions & Replace Generic Actions for Inoperable Instrument Channels ML20202D5391998-02-0606 February 1998 Application for Amend to License DPR-59,allowing RCS Pressure Tests to Be Performed in Cold Shutdown Mode ML20202D3881998-02-0606 February 1998 Application for Amend to License DPR-59,revising RPS Normal Supply Electrical Protection Assembly Undervoltage Trip Setpoint as Result of Reanalysis Based on Most Limiting Min Voltage Requirements of Applied Loads ML20203J6671997-12-12012 December 1997 Application for Amend to License DPR-59,revising TS Section 6.2.2.6 Re Administrative Controls for Normal Working Hours of Plant Staff Who Perform Safety Related Functions ML20217H9801997-10-14014 October 1997 Application for Amend to License DPR-59,proposing Revision to TS Re Design Features Section,Including Revised Limits for Fuel Storage.Changes Correct Maximum Exposure Dependent, Infinite Lattice Multiplication Factor for Fuel Bundles ML20217G2991997-10-0808 October 1997 Application for Amend to License DPR-59,reflecting Change in LCO ML20140D8011997-04-14014 April 1997 Application for Amend to License DPR-59,deleting Plant Staff Performance Audit Requirement from Section 6.5.2.9.b & Incorporating Plant Staff Performance Review Requirement in Section 6.5.2.8 ML20135B1871996-11-26026 November 1996 Application for Amend to License DPR-59,requesting That Snubber Operability,Surveillance & Records Requirements in TS Be Relocated to Plant Controlled Documents ML20115G0581996-07-12012 July 1996 Application for Amend to License DPR-59,revising Min Critical Power Ratio Safety Limit ML20113B6261996-06-20020 June 1996 Application for Amend to License DPR-59,supporting Adoption of Primary Containment Leakage Rate Testing Requirements of Option B 10CFR50,App J at Plant ML20112D5661996-05-30030 May 1996 Application for Amend to License DPR-59,eliminating Selected Response Time Testing Requirements ML20112D1501996-05-30030 May 1996 Application for Amend to License DPR-59,revising Minimum Critical Power Ratio Safety Limit & Associated Basis ML20112D2671996-05-30030 May 1996 Application for Amend to License DPR-59,revising ATWS Recirculation Pump Trip Reactor Pressure ML20112B6411996-05-16016 May 1996 Application for Amend to License DPR-59,deleting Requirement for PORC to Review Fire Protection Program & Implementing Procedures.Addl Deletion of Insp & Audit Requirements of Specs 6.14.A & 6.14.B ML20108D1151996-04-24024 April 1996 Application for Amend to License DPR-59,supporting Adoption of Primary Containment Lrt Requirements of Option B to 10CFR50,App J & Clarifying Numerical Value of Allowable Containment Leakage Rate as 1.5% Per Day ML20107M4461996-04-24024 April 1996 Application for Amend to License DPR-59,relocating TS 3.11.B/4.11.B Crescent Area Ventilation & Associated Bases from TS to Controlled Procedure ML20101H6671996-03-27027 March 1996 Application for Amend to License DPR-59,adopting Primary Containment Lrt Requirements of Option B to 10CFR50,App J at Plant & Clarifies Numerical Value of Allowable Containment Lrt as 1.5% Per Day ML20101F8311996-03-22022 March 1996 Application for Amend to License DPR-59,revising TS to Implement BWROG Option I-D long-term Solution for Thermal Hydraulic Stability ML20101H3671996-03-22022 March 1996 Application for Amend to License DPR-59,changing TS Table 3.2-2, Core & Containment Cooling Sys Initiation & Control Instrumentation Operability Requirements ML20097A1921996-02-0101 February 1996 Application for Amend to License DPR-59,allowing RCS Pressure Tests to Be Performed While Remaining in Cold Shutdown Mode ML20100C2911996-01-25025 January 1996 Application for Amend to License DPR-59,revising Allowed out-of-service Times for Single Inoperable EDGs to Accommodate on-line Maint of EDGs ML20097J6661996-01-25025 January 1996 Application for Amend to License DPR-59,revising TS to Extend Instrumentation & Miscellaneous Surveillance Test Intervals to Support 24-month Operating Cycle ML20095F7051995-12-14014 December 1995 Application for Amend to License DPR-59,revising TSs to Incorporate IST Requirements of Section XI of ASME Boiler & Pressure Vessel Code JPN-95-051, Application for Amend to License DPR-59,proposing to Extend Surveillance Test Intervals for SLC Sys to Support 24 Month Operating Cycles1995-11-30030 November 1995 Application for Amend to License DPR-59,proposing to Extend Surveillance Test Intervals for SLC Sys to Support 24 Month Operating Cycles ML20094B6471995-10-25025 October 1995 Application for Amend to License DPR-59,revising TS Re Extensionof Containment Sys Surveillance Test Intervals to Accommodate 24 Month Operating Cycles ML20092H5341995-09-15015 September 1995 Application for Amend to License DPR-59,proposing TS by Extending Surveillance Test Intervals for Auxiliary Electrical Sys to Support 24 Month Operating Cycles ML20086P6421995-07-21021 July 1995 Application for Amend to License DPR-59.Amend Would Replace title-specific List of Members on PORC W/More General Statement of Membership Requirements ML20085G3561995-06-15015 June 1995 Application for Amend to License DPR-59,proposing Changes to Ts,By Extending Surveillance Test Intervals for Control Rod Sys to Support 24 Month Operating Cycles ML20083M8081995-05-12012 May 1995 Application for Amend to License DPR-59,extending Surveillance Test Intervals for Esws to Support 24 Month Operating Cycles,Per GL 91-04 JPN-95-022, Application for Amend to License DPR-59.Amend Would Extend Surveillance Test Intervals for Nuclear Steam Supply Sys to Support 24 Month Operating Cycles1995-04-12012 April 1995 Application for Amend to License DPR-59.Amend Would Extend Surveillance Test Intervals for Nuclear Steam Supply Sys to Support 24 Month Operating Cycles JPN-95-011, Application for Amend to License DPR-59,to Extend Surveillance Test Intervals for Snubber Systems to Support 24 Month Operating Cycles1995-03-0202 March 1995 Application for Amend to License DPR-59,to Extend Surveillance Test Intervals for Snubber Systems to Support 24 Month Operating Cycles JPN-95-007, Application for Amend to License DPR-59,to Impose Operability & Surveillance Requirements for Rv Overfill Protection Instrumentation1995-02-22022 February 1995 Application for Amend to License DPR-59,to Impose Operability & Surveillance Requirements for Rv Overfill Protection Instrumentation JPN-94-065, Application for Amend to License DPR-59,revising TSs Re PORC Membership & Review Responsibilities1994-12-0202 December 1994 Application for Amend to License DPR-59,revising TSs Re PORC Membership & Review Responsibilities ML20076F4631994-10-0707 October 1994 Application for Amend to License DPR-59,changing TS Re Safety/Relief Valve Testing Requirements 1999-09-29
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARJAFP-99-0279, Correction to 980226 Application for Amend to License DPR-59,revising Ref 19 to Assume 90% SBGT Sys Charcoal Efficiency,Instead of 99%.Ref 19 on TS Page 285 Needs to Be Changed from Rev 0 to Rev 1,based on Revised Calculation1999-10-14014 October 1999 Correction to 980226 Application for Amend to License DPR-59,revising Ref 19 to Assume 90% SBGT Sys Charcoal Efficiency,Instead of 99%.Ref 19 on TS Page 285 Needs to Be Changed from Rev 0 to Rev 1,based on Revised Calculation JAFP-99-0278, Application for Amend to License DPR-59,providing Rev C to Proposed TS Change Converting Current TSs to Improved Standard Tss.Withdrawal of JPTS-95-004,proposed TS Changes Re Inservice Leak & Hydrostatic Testing Operation,Reflected1999-10-14014 October 1999 Application for Amend to License DPR-59,providing Rev C to Proposed TS Change Converting Current TSs to Improved Standard Tss.Withdrawal of JPTS-95-004,proposed TS Changes Re Inservice Leak & Hydrostatic Testing Operation,Reflected ML20216J8321999-09-29029 September 1999 Application for Amend to License DPR-59,proposing Change to TS 3.5.B.3 & Associated Bases.Change Extends LCO for RHRSW Sys from 7 Days to 11 Days with Special Conditions to Allow for Installation of Mod to Division a RHRSW Strainer ML20196F5931999-06-22022 June 1999 Application for Amend to License DPR-59,changing to Pressure Temp limits.Pressure-temp Curves & Associated LCO & Bases Changes Included in Proposed Amend ML20195B8741999-06-0101 June 1999 Revised Application for Amend to License DPR-59,converting Plant CTS to Be Consistent with Improved Std TS in NUREG-1433,Rev 1,dtd Apr 1995 ML20206U1351999-05-19019 May 1999 Application for Amend to License DPR-59,requesting 14 Day AOT for EDG Sys ML20205K1041999-04-0505 April 1999 Application for Amend to License DPR-59,removing Position Title of General Manager from Sections & Will State That If Site Executive Officer Is Unavailable,Responsibilities Will Be Delegated to Another Staff Member,In Writing ML20205D8271999-03-26026 March 1999 Application for Amend to License DPR-59,converting CTS to Be Consistent with Improved Std TS in NUREG-1433,Rev 1 ML20199H3511999-01-15015 January 1999 Application for Amend to License DPR-59,removing Local Power Range Monitor (LPRM) Signal Calibr Method from TS Table 4.1-2 JAFP-98-0385, Revised Application for Amend to License DPR-59,revising Design Features.Rev 7 to non-proprietary & Proprietary Versions of HI-971661, Licensing Rept for Reracking of Ja FitzPatrick SFP, Encl.Proprietary Info Withheld1998-12-0303 December 1998 Revised Application for Amend to License DPR-59,revising Design Features.Rev 7 to non-proprietary & Proprietary Versions of HI-971661, Licensing Rept for Reracking of Ja FitzPatrick SFP, Encl.Proprietary Info Withheld ML20236X7811998-08-0303 August 1998 Application for Amend to License DPR-59,proposing Rev to Note Which Will Allow TS Section 1.1.A Re SLMCPR to Be Applicable During Cycle 14 ML20236X5831998-07-29029 July 1998 Amend 245 to License DPR-59,consisting of Changes to TS in Response to Application Transmitted by ,Requesting Rev of Reactor Protection Sys Normally Supply Electrical Protection Assembly Undervoltage Trip Setpoint ML20236M6151998-07-10010 July 1998 Application for Amend to License DPR-59 to Relocate Portions of TS 3/4.6.C, RCS - Coolant Chemistry, from TS to UFSAR & Applicable Plant Procedures Controlled by 10CFR50.59 Process ML20236L2741998-07-0606 July 1998 Application for Amend to License DPR-59,amending Tech Specs Section 3.5.b.1 Re Main Condenser Steam Jet Air Ejector & Table 3.10-1 Re Radiation Monitoring Sys That Initiates &/Or Isolates Sys ML20249B1551998-06-16016 June 1998 Application for Amend to License DPR-59,relocating Safety Review Committee Review,Audit & Related Record Keeping Requirements from Tech Specs to Chapter 17 of Fsar,Per Administrative Ltr 95-06 ML20217K0361998-03-30030 March 1998 Application for Amend to License DPR-59,changing Interval of Selected LSFT from Semiannually to Once Per 24 Months & Revising Definition of LSFT to Be Consistent w/NUREG-1433 ML20247F7791998-02-26026 February 1998 Application for Amend to License DPR-59,changing Allowable Containment Leakage Rate to 1.5 Percent Per Day & Assumed Value of Filter Efficiency for SBGT Used in Calculations to Determine Dose Effects to Onsite ML20202G8551998-02-0606 February 1998 Revised Application for Amend to License DPR-59,to Revise TS Tables 3.2-2 & 4.4-2,revising Allowed Outage Times for 4kV Emergency Bus Undervoltage Trip Functions & Replace Generic Actions for Inoperable Instrument Channels ML20202D3881998-02-0606 February 1998 Application for Amend to License DPR-59,revising RPS Normal Supply Electrical Protection Assembly Undervoltage Trip Setpoint as Result of Reanalysis Based on Most Limiting Min Voltage Requirements of Applied Loads ML20202D5391998-02-0606 February 1998 Application for Amend to License DPR-59,allowing RCS Pressure Tests to Be Performed in Cold Shutdown Mode ML20203J6671997-12-12012 December 1997 Application for Amend to License DPR-59,revising TS Section 6.2.2.6 Re Administrative Controls for Normal Working Hours of Plant Staff Who Perform Safety Related Functions ML20217H9801997-10-14014 October 1997 Application for Amend to License DPR-59,proposing Revision to TS Re Design Features Section,Including Revised Limits for Fuel Storage.Changes Correct Maximum Exposure Dependent, Infinite Lattice Multiplication Factor for Fuel Bundles ML20217G2991997-10-0808 October 1997 Application for Amend to License DPR-59,reflecting Change in LCO ML20140D8011997-04-14014 April 1997 Application for Amend to License DPR-59,deleting Plant Staff Performance Audit Requirement from Section 6.5.2.9.b & Incorporating Plant Staff Performance Review Requirement in Section 6.5.2.8 ML20135B1871996-11-26026 November 1996 Application for Amend to License DPR-59,requesting That Snubber Operability,Surveillance & Records Requirements in TS Be Relocated to Plant Controlled Documents ML20115G0581996-07-12012 July 1996 Application for Amend to License DPR-59,revising Min Critical Power Ratio Safety Limit ML20113B6261996-06-20020 June 1996 Application for Amend to License DPR-59,supporting Adoption of Primary Containment Leakage Rate Testing Requirements of Option B 10CFR50,App J at Plant ML20112D2671996-05-30030 May 1996 Application for Amend to License DPR-59,revising ATWS Recirculation Pump Trip Reactor Pressure ML20112D1501996-05-30030 May 1996 Application for Amend to License DPR-59,revising Minimum Critical Power Ratio Safety Limit & Associated Basis ML20112D5661996-05-30030 May 1996 Application for Amend to License DPR-59,eliminating Selected Response Time Testing Requirements ML20112B6411996-05-16016 May 1996 Application for Amend to License DPR-59,deleting Requirement for PORC to Review Fire Protection Program & Implementing Procedures.Addl Deletion of Insp & Audit Requirements of Specs 6.14.A & 6.14.B ML20107M4461996-04-24024 April 1996 Application for Amend to License DPR-59,relocating TS 3.11.B/4.11.B Crescent Area Ventilation & Associated Bases from TS to Controlled Procedure ML20108D1151996-04-24024 April 1996 Application for Amend to License DPR-59,supporting Adoption of Primary Containment Lrt Requirements of Option B to 10CFR50,App J & Clarifying Numerical Value of Allowable Containment Leakage Rate as 1.5% Per Day ML20101H6671996-03-27027 March 1996 Application for Amend to License DPR-59,adopting Primary Containment Lrt Requirements of Option B to 10CFR50,App J at Plant & Clarifies Numerical Value of Allowable Containment Lrt as 1.5% Per Day ML20101F8311996-03-22022 March 1996 Application for Amend to License DPR-59,revising TS to Implement BWROG Option I-D long-term Solution for Thermal Hydraulic Stability ML20101H3671996-03-22022 March 1996 Application for Amend to License DPR-59,changing TS Table 3.2-2, Core & Containment Cooling Sys Initiation & Control Instrumentation Operability Requirements ML20097A1921996-02-0101 February 1996 Application for Amend to License DPR-59,allowing RCS Pressure Tests to Be Performed While Remaining in Cold Shutdown Mode ML20100C2911996-01-25025 January 1996 Application for Amend to License DPR-59,revising Allowed out-of-service Times for Single Inoperable EDGs to Accommodate on-line Maint of EDGs ML20097J6661996-01-25025 January 1996 Application for Amend to License DPR-59,revising TS to Extend Instrumentation & Miscellaneous Surveillance Test Intervals to Support 24-month Operating Cycle ML20095F7051995-12-14014 December 1995 Application for Amend to License DPR-59,revising TSs to Incorporate IST Requirements of Section XI of ASME Boiler & Pressure Vessel Code JPN-95-051, Application for Amend to License DPR-59,proposing to Extend Surveillance Test Intervals for SLC Sys to Support 24 Month Operating Cycles1995-11-30030 November 1995 Application for Amend to License DPR-59,proposing to Extend Surveillance Test Intervals for SLC Sys to Support 24 Month Operating Cycles ML20094B6471995-10-25025 October 1995 Application for Amend to License DPR-59,revising TS Re Extensionof Containment Sys Surveillance Test Intervals to Accommodate 24 Month Operating Cycles ML20092H5341995-09-15015 September 1995 Application for Amend to License DPR-59,proposing TS by Extending Surveillance Test Intervals for Auxiliary Electrical Sys to Support 24 Month Operating Cycles ML20086P6421995-07-21021 July 1995 Application for Amend to License DPR-59.Amend Would Replace title-specific List of Members on PORC W/More General Statement of Membership Requirements ML20085G3561995-06-15015 June 1995 Application for Amend to License DPR-59,proposing Changes to Ts,By Extending Surveillance Test Intervals for Control Rod Sys to Support 24 Month Operating Cycles ML20083M8081995-05-12012 May 1995 Application for Amend to License DPR-59,extending Surveillance Test Intervals for Esws to Support 24 Month Operating Cycles,Per GL 91-04 JPN-95-022, Application for Amend to License DPR-59.Amend Would Extend Surveillance Test Intervals for Nuclear Steam Supply Sys to Support 24 Month Operating Cycles1995-04-12012 April 1995 Application for Amend to License DPR-59.Amend Would Extend Surveillance Test Intervals for Nuclear Steam Supply Sys to Support 24 Month Operating Cycles JPN-95-011, Application for Amend to License DPR-59,to Extend Surveillance Test Intervals for Snubber Systems to Support 24 Month Operating Cycles1995-03-0202 March 1995 Application for Amend to License DPR-59,to Extend Surveillance Test Intervals for Snubber Systems to Support 24 Month Operating Cycles JPN-95-007, Application for Amend to License DPR-59,to Impose Operability & Surveillance Requirements for Rv Overfill Protection Instrumentation1995-02-22022 February 1995 Application for Amend to License DPR-59,to Impose Operability & Surveillance Requirements for Rv Overfill Protection Instrumentation JPN-94-065, Application for Amend to License DPR-59,revising TSs Re PORC Membership & Review Responsibilities1994-12-0202 December 1994 Application for Amend to License DPR-59,revising TSs Re PORC Membership & Review Responsibilities 1999-09-29
[Table view] |
Text
_ _ _ _ _ _ _ _ _ . _ _ - _ _ _ _ _ _ - _
l )
BEFORE THE UNITED STATES l NUCLEAR REGULATORY COMMISSION l in the Matter of )
NEW YORK POWER AUTHORITY ) Docket No. 50-333 James A. FitzPatrick Nuclear Power Plant )
APPLICATION FOR AMENDMENT TO OPERATING LICENSE The New York Power Authority requests an amendment to the Technical Specifications l (TS) contained in Appendix A to Facility Operating License DPR-59 for the James A.
FitzPatrick Nuclear Power Plant. This application is filed in accordance with Section 10 CFR 50.00 of the Nuclear Regulatory Commission's regulations.
l l
This application for an amendment to the James A. FitzPatrick TS proposes a revision to a note which will allow TS Section 1.1.A, regarding the Safety Limit Minimum Critical Power Ratio (SLMCPR), to be applicable during Cycle 14. TS Section 1.1.A is currently only applicable for Cycle 13.
The signed original of the Application for Amendment to the Operating License is enclosed for filing. Attachment I contains the proposed new TS page ano Attachment 11is the Safety Evaluation for the proposed change. A markup of the affected TS page is included as Attachment lli.
A General Electric letter (Reference) specifies that the SLMCPR limits for FitzPatrick, Cycle 14 remain unchanged. This letter is included in this submittal as Attachment IV.
Information in Attachment IV is considered General Electric (GE) proprietary information and should be withheld from public disclosure in accordance with 10 CFR 9.17(a)(4) and 10 CFR 2.790(a)(4). An Affidavit, prepared in accordance with 10 CFR 2.790(b)(1),
supporting this request is provided with Attachment IV. Attachment V contains the non-proprietary version of Attachment IV.
New York Power Authority STATE OF NEW YORK COUNTY OF WESTCHESTER Subscri ed and s orn t before me this day of 998.
J. Idnubel . ,b - mM Senior Vice President and Notary Pu%c V Chief Nuclear Officer EE.EEN E. O'CONNOft Y No Oueilliedinwoeschester l
l
- E., e.ie-, ng .
i j
i ,
9808100253 980803 T PDR ADOCK 05000333 P PDR .
Attachmant I to JPN-98-036
, REVISED TECHNICAL SPECIFICATION PAGES I SAFETY LIMIT MINIMUM CRITICAL POWER RATIO (JPTS-98 002) i, l
I l
l 1
l i
i l
l l
l New York Power Authority JAMES A. FITZPATRICK NUCLEAR POWER PLANT l Docket No. 50-333 DPR-59
.-=
of dct e e e ef b sh gt ot t orS a s a ll n a it t
n is p y e h t
e ed sci t b s s v e gi r t ll g pr ed inage a n ipe r e t
t mt h s it t oc eo n t e
ot x Stugi s g s t
yeg de man ehd i
it n m a
lpi d n i t cd t e r e
pv e sia yhl s s cl sa aob Swc a spm r
ip n x c s g yt le r i lu l n er or te au f t t t
e f l u
Y itt af f s aee m S Mf T eh s e f RI Sci t Slb h t
t s o Ro I
gi a y i i mi t r G mh e5 inr a end s T E
T e wL it e y x h2 T1/
N s sy t
mse v vd ee t yet e: 0 I
Lsr Flu Si c fe i
f G va epc x
a w so n M2 1 R s h ot oe ec N yeS s l o
t o ge r I
I D ed y t r pd g n nb t u
D f
adt i f
en i t
t it d e A Snr ag oeta ie eh b s e i e mi N a L
y gst e v ti t n S i f o
e ic l
C e c oiimo i
t int ni n if t n i o
e t l i L i t a r h p .
E b i eg el sr T Ts P a im mn iv jeif c 1 U c t b v i P F i l L ud r i
c e
oe ot ns f i
c N o et d e l
i i e .
h et cim i
1 F c h sa b o A A 2 A Ticnl O TthaL S J
g nn la ) diAp o
m r
e w f o
Rd Pat .l o l i gh lo C c m e-int b e % MleLgi l d le 0
(
of yi u n d u s 1 t s af it .
it ahf g ee lce h i e md r t an let l w r Si r hr v o f ur eo u w nh e d l
f o t
ises l
F y e
l y
ei h n t o b e ar t p r
o o totd lp pi n o
C lalaep em v
s s ei iicola a l
1 4
r h og d vcl l ec n it r a e t n a si eh id s i a
cereht t s l
c y
pw r
s ad i s mtuf uia0 C Y o s itm lc o t e1 r T ims o r
I t le 5 ne1 f R d b a iL le 8 noh G ei yf u 7 imlc i ,f o le E h r t b T is av t ee > l t a N
l b f h e f aamihi m ic I
a s e at r o sl i l p
t Sf u yL p
G s o e o s e9t N eht s c 0. fey t a
I D s t o h y t it e
r n
e 1 ae sf . i s
_ D it imy f r og e :
P r
t s a n yS o an A.
A L
L lp et s n
o ixhiRt t r
i 1
t d C t y
y p ii vn o c e et gP r a 1 heseCe i t i at L
l i te a .r :
e ce t a ea st p S E b a f yo v jt eh c RR TlenMo i T
U at i c t b i f
Sriga i v c ohc F i t
o e ic :
e eeh i ei e .
t 1
n A ht e b h h o o Tibn Tw 1 A O S N
_ l
e Att: chm:nt ll to JPN-98-036 SAFETY EVALUATION SAFETY LIMIT MINIMUM CRITICAL POWER RATIO (JPTS-98-OO2)
New York Power Authority JAMES A. FITZPATRICK NUCLEAR POWER PLANT Docket No. 50-333 DPR-59
Attachment il to JPN-98-036 SAFETY EVALUATION
! Page 1 of 3
- 1. DESCRIPTION The following change revises a note which will allow TS Section 1.1.A, regarding the Safety Limit Minimum Critical Power Ratio (SLMCPR), to be applicable during Cycle 14. TS Section 1.1.A is currently only applicable for Cycle 13.
Paae 7 Change the note at the bottom of the page to read:
" NOTE: TS 1.1.A is applicable for Cycle 14 only."
ll. PURPOSE OF THE PROPOSED CHANGE A cycle specific evaluation has been performed by General Electric (GE). The results of this evaluation show that the current SLMCPR is conservative and remains applicable through Cycle 14.
lil. SAFETY IMPLICATIONS OF THE PROPOSED CHANGE in 1996, GE informed utilitiet. that under some conditions the generically calculated SLMCPR can be non-conservative. Based upon a discussion with the NRC on this issue, the Authority added a note to TS Section 1.1.A (JAFP-96-0449, Reference 1) to support the issuance of Amendment 238 (Reference 2). As a result of this note being added, a validation or re-calculation of the SLMCPR is required each cycle. Reference 3 is a 10 CFR 21 notification made by GE identifying the problem with the generic method of the SLMCPR calculation.
In Reference 4, GE reports a generic calculation of the SLMCPR for GE 12 fuel. This value was found to be applicable for Cycle 13 (Reference 5). The Cycle 13 SLMCPR was determined using the analysis basis documented in GESTAR (Reference 6) with the following exceptions: (1) the planned core loading pattern was analyzed; (2) the actual bundle parameters (e.g., local peaking) were used; (3) the full cycle exposure range was analyzed.
GE has performed an evaluation (Reference 7) of the SLMCPR for Cycle 14 and found that the cycle specific value, based on current reload plans, is bounded by the generic value calculated for GE 12 fuel. The methodology utilized in the Cycle 14 evaluation is identical to that used for Cycle 13. The proposed change maintains the same value for Cycle 14. As such, the SLMCPR values in TS Section 1.1.A remain unchanged.
Based on the above, this proposed change has no effect on nuclear safety.
IV. EVALUATION OF SIGNIFICANT HAZARDS CONSIDERATION Operation of the FitzPatrick plant in accordance with the proposed amendment would not involve a significant hazards consideration as defined in 10 CFR 50.92, since it would not:
- 1. involve a significant increase in the probability or consequences of an accident previously evaluated.
- A change to a note stating that the SLMCPR remains applicable through Cycle 14 does not 1 affect the initiation of any accident. Operation in accordance with the current SLMCPR ensures the consequences of previously analyzed accidents are not changed. Therefore, this proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
Att:chmsnt 11 to JPN-98-036 SAFETY EVALUATION Page 2 of 3
- 2. create the possibility of a new or different kind of accident from any accident previously evaluated.
The SLMCPR establishes a performance limit for the fuel. This limit remains unchanged.
Changing a note to reflect this is an administrative change and will not initiate any accident.
Therefore, this proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3. involve a significant reduction in a margin of safety.
GE has performed an evaluation of the SLMCPR for Cycle 14 and found that the cycle specific value, based on current reload plans, is bounded by the generic value calculated for GE 12 fuel.
The existing SLMCPR remains unchanged for Cycle 14 and the margin of safety for the prevention of onset of transition boiling is unchanged. Therefore, this proposed change does not involve a significant reduction in a margin of safety.
V. IMPLEMENTATION OF THE PROPOSED CHANGE This amendment request meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9) as follows: {
(i) the amendment involves no significant hazards consideration.
As described in Section IV of this evaluation, the proposed change involves no significant hazards consideration.
(ii) there is no significant change in the types or significant increase in the amounts of any effluents that may be released offsite.
The proposed change does not alter the margin of safety which is presently assumed for fuel cladding integrity with respect to onset of transition boiling. Therefore, there is no change in the amounts of effluents which may be released offsite.
(iii) there is no significant increase in individual or cumulative occupational radiation exposure.
The proposed change does not alter the margin of safety which is presently assumed for fuel cladding integrity with respect to onset of transition boiling. The current SLMCPR remains applicable through Cycle 14. Therefore, there will be no change in individual or cumulative radiation exposure.
Based on the above, the Authority concludes that the proposed changes meet the criteria specified in 10 CFR 51.22 for a categorical exclusion from the requirements of 10 CFR 51.21 relative to requiring a j specihc environmental assessment by the Commission.
l
[
l Attachmsnt il to JPN-98-036
~ SAFETY EVALUATION l' Page 3 of 3 VI. CONCLUSION Based on the discussions above, changing a note to allow the current SLMCPR to be applicable during Cycle 14 does not involve a significant hazards consideration, or an unreviewed safety question, and will not endanger the health and safety of the public. The Plant Operating Review Committee (PORC) and Safety Review Committee (SRC) have reviewed this proposed change to the TS and agree with this conclusion.
The proposed TS changes are not applicable for Cycle 13. The Authority requests the Amendment specify that the changes may be implemented any time after the upcoming Refueling Outage 13 begins (Currently scheduled to begin on October 16, 1998), but must be implemented prior to startup for Cycle 14.
Vll. REFERENCES
- 1. NYPA Letter, M. J. Colomb to the NRC, " Proposed Changes to the Technical Specifications Regarding Minimum Critical Power Ratio Safety Limit," (JAFP-96-0449), dated November 8, 1996
- 2. NRC Letter to W. J. Cahill, Jr., " Issuance of Amendment for James A. FitzPatrick Nuclear Power Plant (TAC NO. M95522)," dated November 14,1996
[
- 3. General Electric Letter, M. A. Smith to the NRC,10 CFR Part 21, Reportable condition, Safety Limit MCPR Evaluation, dated May 24,1996
- 4. GE12 Compliance with Amendment 22 of NEDE-24011-P-A (GESTAR ll), NEDE-32417P, December 1994 l
l 5. General Electric Report, Supplemental Reload Licensing Report for James A. FitzPatrick Reload 12 Cycle 13, J11-02914SRL, Rev. O, dated August,1996
! 6. General Electric Standard Application for Reactor Fuel, NEDE-24011-P-A-13, dated August,
- 1996 l 7. General Electric Letter, J. A. Baumgartner to P. Lemberg, " Cycle Specific SLMCPR for FitzPatrick Cycle 14," dated July 17,1998 l
l t